Cree Lighting VG Series Parking Structure Pendant Installation Guide

Add to My manuals
2 Pages

advertisement

Cree Lighting VG Series Parking Structure Pendant Installation Guide | Manualzz

VG Series

LED Parking Luminaire

Pendant Mount (PD)

INSTALLATION INSTRUCTIONS

INSTRUCTIONS D’INSTALLATION

IMPORTANT SAFEGUARDS

When using electrical equipment, basic safety precautions should always be followed including the following:

READ AND FOLLOW ALL SAFETY INSTRUCTIONS

1. To reduce the risk of electrical shock, turn off power supply before installation or servicing.

DANGER – Risque de choc – Couper l’alimentation avant l’installation.

2. This luminaire must be installed in accordance with the NEC or your local electrical code.

If you are not familiar with these codes and requirements, consult a qualified electrician.

Ce produit doit être installé conformément à NEC ou votre code électrique local. Si vous n’êtes pas familier avec ces codes et ces exigences, veuillez contacter un électricien qualifié.

3. DO NOT lift luminaire by the power leads.

4. Pendant kit is NOT supplied with luminaire.

SAVE THESE INSTRUCTIONS FOR FUTURE

REFERENCE

TO INSTALL:

1

2

1 of 2

Water Shield

Luminaire

Water Shield

3

Slots

Latch

Pendant Kit

(Supplied by

Customer)

Pendant Mount

Bracket

Slots

Luminaire

Clips

LUMINAIRE INSTALLATION

STEP 1:

Feed luminaire leads through the

Water Shield and attach the Water

Shield to the luminaire using (4) supplied #8 screws. See

Figure 1 and 2.

STEP 2:

Attach Pendant Mount Bracket to customer supplied pendant kit. See

Figure 1.

STEP 3:

Feed luminaire leads thru Pendant

Mount Bracket and customer supplied pendant kit. See

Figure 1.

STEP 4:

Position the arrow on the Pendant

Mount Bracket to point towards the recessed area nearest to the latch on the luminaire. See Figure 3.

STEP 5:

Attach Pendant Mount Bracket and customer supplied pendant kit to luminaire by engaging the clips on the luminaire with the slots on the

Pendant Mount Bracket and rotate until latch locks securely. See

Figure 3.

NOTE: May require extra pressure on

Pendant Mount Bracket to engage luminaire clips into slots.

NOTE: If the Pendant Mount Bracket slots become deformed during installation, slightly reopen the slots back up using a screwdriver to ensure proper install of luminaire.

LPN00100X0002A0_C

4

Pendant Mount

Bracket

STEP 6:

Cut off any excess length of leads from the top of the customer supplied pendant kit.

STEP 7:

Make wiring connections to customer supplied junction box per “Electrical Connections” section.

STEP 8:

Using customer supplied hardware attach pendant kit and luminaire to customer suppled junction box with the arrow on the Pendant Mount Bracket directed parallel to vehicle traffic. See Figure 5.

5

Arrow On Mounting Plate

Pointing Parrallel To

Traffic

ELECTRICAL CONNECTIONS

STEP 1:

Make the following Electrical Connections : a. For 120/277/347V connect the black fixture lead to the voltage supply position of the junction box (Hot 1 for

208/240/480V wiring).

b. For 120/277/347V Connect the white fixture lead to the neutral supply position of the junction box (Hot 2 for

208/240/480V wiring).

c. Connect the green or green/yellow ground lead to the green wire position of the junction box.

d. If Dimming is an option; connect the violet dimming positive lead to the supply dimming positive lead.

e. If Dimming is an option; connect the grey or pink` dimming negative lead to the supply dimming negative lead.

LINE

OR HOT 1

GREEN

JUNCTION

BOX

LINE-BLACK

GROUND-GREEN

LUMINAIRE

NEUTRAL

OR HOT 2

VIOLET

NEUTRAL-WHITE

DIM (+) VIOLET

GREY

OR PINK

DIM (-) GREY

OR PINK

© 2021 Cree Lighting, A company of IDEAL INDUSTRIES. All rights reserved. For informational purposes only. Content is subject to change. See www.creelighting.com/warranty for warranty and specifications. Cree ® and the Cree Lighting logo are registered trademarks of Cree, Inc.

2 of 2 www.creelighting.com

LPN00100X0002A0_C

advertisement

Related manuals

Download PDF

advertisement