MONNIT 3P--01 150 Amp Three Phase Current Meter User Guide
Anuncio
Anuncio
Remote Monitoring for Business
Quick Start Guide for the 20 / 100 / 150 Amp Three-Phase Current Meter
1 2 Open iMonnit and verify the sensor is checking in and reporting data.
Verify the sensor has a full battery level.
If you don't see the sensor checking in, press the button on the gateway and power cycle the sensor.
NOTE
Remove your sensor from the package and install the antenna.
Create or log in to your iMonnit account and register your sensor. Find the device ID on the label and click "Add
Device".
Next, power the sensor on and verify it checks into iMonnit.
We recommend powering the sensor on near the gateway then moving to the installation location, checking signal strength along the way.
For more information on this Monnit product, click this link: https://www.monnit.com/support/
The CTs are designed to clip around a single current carrying wire. Ensure that the CT is NOT wrapped around a cable with a common and live wire otherwise the sensor will read approximately 0.00 amps. See the diagram below for appropriate CT installation.
Monnit Corporation
3400 South West Temple Salt Lake City, UT 84115 801-561-5555 www.monnit.com
Monnit, iMonnit and all other trademarks are property of Monnit, Corp. © 2020 Monnit Corp. All Rights Reserved.
3P-QSG-01 (07/20)
Descargar
Anuncio