Trane S9V2C100D4VSAD Installation, Operation And Maintenance Manual
पीडीएफ
दस्तावेज़
विज्ञापन
विज्ञापन
Installation, Operation, and Maintenance Upflow/Horizontal and Dedicated Downflow Gas-Fired, Direct/Non-Direct Vent, 2-Stage Condensing Variable Speed Furnaces with Variable Speed Draft Inducer Upflow, Convertible to Horizontal Right or Horizontal Left S9V2B040U3VSAE S9V2B060U3VSAC/D S9V2B080U4VSAC/D S9V2C100U4VSAC/D S9V2D120U5VSAC/D Downflow Only S9V2B080D4VSAC/D S9V2C100D4VSAC/D N o t e : Graphics in this document are for representation only. Actual model may differ in appearance. ! CAUTION COIL REQUIREMENT! Failure to follow this Caution could result in property damage or personal injury. 4GXC* and 4MXC* coils installed on upflow furnaces in vertical, horizontal left, or horizontal right orientations without a factory installed metal drain pan shield must use a MAY*FERCOLKITAA kit. Coils installed on upflow furnaces must have drain pans that are suitable for 400° F (205°C) or have a metal drain pan shield. Downflow furnaces do not require a metal drain pan shield or the use of the MAY*FERCOLKITAA kit. S9V2-VS-SVX001-1B-EN SAFETY WARNING Only qualified personnel should install and service the equipment. The installation, starting up, and servicing of heating, ventilating, and air-conditioning equipment can be hazardous and requires specific knowledge and training. Improperly installed, adjusted or altered equipment by an unqualified person could result in death or serious injury. When working on the equipment, observe all precautions in the literature and on the tags, stickers, and labels that are attached to the equipment. December 2022 S9V2-VS-SVX001-1B-EN SAFETY SECTION — FURNACES I m p o r t a n t : — This document pack contains a wiring diagram and service information. This is customer property and is to remain with this unit. Please return to service information pack upon completion of work. WARNING FIRE OR EXPLOSION HAZARD! Failure to follow safety warnings exactly could result in a fire or explosion causing property damage, personal injury or loss of life. — Do not store or use gasoline or other flammable vapors and liquids in the vicinity of this or any other appliance. — WHAT TO DO IF YOU SMELL GAS • Do not try to light any appliance. • Do not touch any electrical switch;do not use any phone in your building. • Immediately call your gas supplier from a neighbor’s phone. Follow the gas supplier's instructions. • If you cannot reach your gas supplier, call the fire department. — Installation and service must be performed by a qualified installer, service agency, or the gas supplier. WARNING WARNING ELECTRICAL SHOCK, FIRE, OR EXPLOSION HAZARD! Failure to follow this Warning could result in dangerous operation, property damage, severe personal injury, or death. Improper servicing could result in dangerous operation, property damage, severe personal injury, or death. • Before servicing, disconnect all electrical power to furnace. • When servicing controls, label all wires prior to disconnection. Reconnect wires correctly. • Verify proper operation after servicing. WARNING CARBON MONOXIDE POISONING HAZARD! Failure to follow this Warning could result in property damage, severe personal injury, or death. To ensure furnace is vented properly, do not replace factory supplied venting components with field fabricated parts. Fabricating parts can result in damaged vents and components allowing carbon monoxide to escape the venting system. WARNING EXPLOSION HAZARD! CARBON MONOXIDE HAZARD! Failure to follow this Warning could result in property damage, personal injury or death. Install a gas detecting warning device in case of a gas leak. NOTE: The manufacturer of your furnace does not test any detectors and makes no representations regarding any brand or type of detector. Failure to follow this Warning could result in property damage, severe personal injury, or death. Do not attempt to change the venting system. Follow the installation and operation instructions for the venting system. WARNING FIRE OR EXPLOSION HAZARD! Failure to follow the safety warnings exactly could result in serious injury, death, or property damage. Never test for gas leaks with an open flame. Use a commercially available soap solution made specifically for the detection of leaks to check all connections. A fire or explosion may result causing property damage, personal injury, or loss of life. ©2022 WARNING FIRE HAZARD! Failure to follow this Warning could result in property damage, severe personal injury, or death. Do not install the furnace directly on carpeting, tile or other combustible material other than wood flooring. For vertical downflow applications, subbase (BAYBASE205) must be used between the furnace and combustible flooring.When the downflow furnace is installed vertically with a cased coil, a subbase is not required. S9V2-VS-SVX001-1B-EN SAFETY SECTION — FURNACES WARNING WARNING! This product can expose you to chemicals including lead, which are known to the State of California to cause cancer and birth defects or other reproductive harm. For more information go to www.P65Warnings.ca. gov. WARNING EXPLOSION HAZARD! Failure to follow this Warning could result in property damage, severe personal injury, or death. Propane gas is heavier than air and may collect in any low areas or confined spaces. In addition, odorant fade may make the gas undetectable except with a warning device. If the gas furnace is installed in a basement, an excavated areas or a confined space, it is strongly recommended to contact a gas supplier to install a gas detecting warning device in case of leak. The manufacturer of your furnace does not test any detectors and makes no representations regarding any brand or type of detector. WARNING WARNING CARBON MONOXIDE POISONING HAZARD! Failure to follow this Warning could result in property damage, severe personal injury, or death. Follow the service and/or periodic maintenance instructions for the Furnace and venting system. WARNING CARBON MONOXIDE POISONING HAZARD! Failure to follow this Warning could result in serious personal injury or death. Make sure that the blower door is in place and not ajar. Dangerous fumes could escape an improperly secured door. WARNING ELECTRICAL SHOCK HAZARD! Failure to follow this Warning could result in property damage, severe personal injury, or death. Disconnect power to the unit before removing the blower door. Allow a minimum of 10 seconds for IFC power supply to discharge to 0 volts. ELECTRICAL SHOCK HAZARD! Failure to follow this Warning could result in property damage, severe personal injury, or death. Do not bypass the door switch or panel loop by any permanent means. WARNING ELECTRICAL SHOCK HAZARD! Failure to follow this Warning could result in property damage, severe personal injury, or death. Do not touch any components other than the Menu and Option buttons on the IFC when setting up the system or during fault code recovery. WARNING FIRE OR EXPLOSION HAZARD! Failure to follow this Warning could result in property damage, severe personal injury, or death. Do NOT attempt to manually light the furnace. S9V2-VS-SVX001-1B-EN WARNING SAFETY HAZARD! Failure to follow this Warning could result in property damage, severe personal injury, or death. These furnaces are not approved or intended for installation in trailers or recreational vehicles. Installation in manufactured (mobile) housing is only approved with BAYMFGH Kit. WARNING EXPLOSION HAZARD! Failure to follow this Warning could result in property damage, severe personal injury, or death. In the event that electrical, fuel, or mechanical failures occur, shut gas supply off at the manual gas valve located on the supply gas piping coming into the furnace before turning off the electrical power to the furnace. Contact the service agency designated by your dealer. 3 SAFETY SECTION — FURNACES WARNING WARNING EXPLOSION HAZARD! CARBON MONOXIDE HAZARD! Failure to follow this Warning could result in property damage, serious personal injury, or death. Do not store combustible materials, gasoline, or other flammable vapors or liquids near the unit. Failure to follow this Warning could result in property damage, severe personal injury, or death. Furnace venting into an unlined masonry chimney or concrete chimney is prohibited. WARNING WARNING SAFETY HAZARD! CARBON MONOXIDE HAZARD! Failure to follow this Warning could result in property damage, severe personal injury, or death. Do not use semi-rigid metallic gas connectors (flexible gas lines) within the furnace cabinet. Failure to follow this Warning could result in property damage, severe personal injury, or death. The chimney liner must be thoroughly inspected to insure no cracks or other potential areas for flue gas leaks are present in the liner. Liner leaks will result in early deterioration of the chimney. WARNING INSTALLATION WARNING – HIGH VOLTAGE MOVING PARTS! Failure to follow this Warning could result in property damage, severe personal injury, or death. Bodily injury can result from high voltage electrical components, fast moving fans, and combustible gas. For protection from these inherent hazards during installation and servicing, the main gas valve must be turned off and the electrical supply must be disconnected. If operating checks must be performed with the unit operating, it is the technician’s responsibility to recognize these hazards and proceed safely. WARNING SAFETY HAZARD! Failure to follow this Warning could result in property damage, severe personal injury, or death. Do not install the filter in the return duct directly above the furnace in horizontal applications. Install the filter remotely. WARNING SAFETY HAZARD! Failure to follow this Warning could result in property damage, severe personal injury, or death. Turn the power to the furnace off before servicing filters to avoid contact with moving parts. 4 WARNING SHOCK HAZARD! Failure to follow this Warning could result in property damage, severe personal injury, or death. If a disconnect switch is present, it must always be locked in the open position before servicing the unit. WARNING ELECTRICAL SHOCK HAZARD! Failure to follow this Warning could result in an electrical shock, fire, injury or death. Ensure cabinet has an uninterrupted or unbroken ground in accordance with National Electrical Code, ANSI/ NFPA 70 – ‘latest edition’ and Canadian Electrical Code, CSA C22.1 or local codes to minimize personal injury if an electrical fault should occur. WARNING OVERHEATING AND EXPLOSION HAZARD! Failure to follow this Warning could result in property damage, personal injury or death. Should overheating occur, or the gas supply fail to shut off, shut off the gas valve to the unit before shutting off the electrical supply. S9V2-VS-SVX001-1B-EN SAFETY SECTION — FURNACES CAUTION CAUTION IMPROPER VOLTAGE CONNECTION! FREEZE CAUTION! Failure to follow this Caution could result in property damage. Do NOT connect the furnace line voltage to a GFCI protected circuit. Failure to follow this Caution could result in property damage or personal injury. When the vent pipe is exposed to temperatures below freezing, i.e., when it passes through unheated spaces, etc., the pipe must be insulated with 1/2 inch (12.7 mm) thick Armaflex-type insulation or equal. If the space is heated sufficiently to prevent freezing, then the insulation would not be required. If domestic water pipes are not protected from freezing then the space meets the condition of a heated space. CAUTION CORROSION WARNING! Failure to follow this Caution could result in property damage or personal injury. Do not install the furnace in a corrosive or contaminated atmosphere. CAUTION SAFETY HAZARD! Failure to follow this Caution could result in property damage or personal injury. The vent for this appliance shall not terminate; (1) Over public walkways; or (2) Near soffit vents or crawl space vents or other areas where condensate or vapor could create a nuisance or hazard or cause property damage; or (3) Where condensate vapor could cause damage or could be detrimental to the operation of regulators, relief valves, or other equipment. CAUTION SHARP EDGE HAZARD! Failure to follow this Caution could result in property damage or personal injury. Be careful of sharp edges on equipment or any cuts made on sheet metal while installing or servicing. CAUTION BACKUP WRENCH REQUIRED! Failure to follow this Caution could result in property damage or personal injury. Use a backup wrench on the gas valve when installing gas piping to prevent damage to the gas valve and manifold assembly. CAUTION FREEZE CAUTION! Failure to follow this Caution could result in property damage or personal injury. If complete furnace shutdown is done during the cold weather months, provisions must be taken to prevent freeze-up of all water pipes and water receptacles. S9V2-VS-SVX001-1B-EN CAUTION FREEZE CAUTION! Failure to follow this Caution could result in property damage or personal injury. Whenever your house is to be vacant, arrange to have someone inspect your house for proper temperature. This is very important during freezing weather. If for any reason your furnace should fail to operate damage could result, such as frozen water pipes. CAUTION FREEZE CAUTION! Failure to follow this Caution could result in property damage or personal injury. Caution should be taken to prevent drains from freezing or causing slippery conditions. Excessive draining of condensate may cause saturated ground conditions that may result in damage to plants. CAUTION IGNITION FUNCTION! Failure to follow this Caution may result in poor ignition characteristics. Maintain manifold pressure in high altitude installations. CAUTION WATER DAMAGE! Failure to follow this Caution could result in property damage or personal injury. It is recommended that an external overflow drain pan be installed in all applications over a finished ceiling to prevent property damage or personal injury from leaking condensate. 5 SAFETY SECTION — FURNACES CAUTION HOT SURFACE! Failure to follow this Caution could result in personal injury. Do NOT touch igniter. It is extremely hot. CAUTION FURNACE SERVICE CAUTION! Failure to follow this Caution could result in property damage or personal injury. Label all wires prior to disconnection when servicing controls. Verify proper operation after servicing. Wiring errors can cause improper and dangerous operation. WARNING CARBON MONOXIDE POISONING HAZARD! Failure to follow the steps outlined below for each appliance connected to the venting system being placed into operation could result in carbon monoxide poisoning or death. The following steps shall be followed for each appliance connected to the venting system being placed into operation, while all other appliances connected to the venting system are not in operation: • CAUTION DO NOT USE AS CONSTRUCTION HEATER! Failure to follow this Caution could result in property damage or personal injury. In order to prevent shortening its service life, the Furnace should NOT be used as a “Construction Heater” during the finishing phases of construction until the requirements listed in the Furnace Installation Guidelines section have been met. Condensate in the presence of chlorides and fluorides from paint, varnish, stains, adhesives, cleaning compounds, and cement create a corrosive condition which may cause rapid deterioration of the heat exchanger. CAUTION • • • WIRING INFORMATION! Failure to follow this Caution could result in property damage or personal injury. The integrated furnace control is polarity sensitive. The hot leg of the 120 VAC power must be connected to the BLACK field lead. • • • 6 Inspect the venting system for proper size and horizontal pitch as required in the National Fuel Gas Code, ANSI Z223.1/NFPA 54 or the CSA B149.1Natural Gas and Propane Installation Code and these instructions. Determine there is no blockage or restriction, leakage, corrosion or other deficiencies which could cause an unsafe condition. Close all doors and windows between the space in which the appliance(s) connected to the venting system are located. Also close fireplace dampers. Turn on clothes dryers and any appliance not connected to the venting system. Turn on any exhaust fans such as range hoods so they are operating at maximum speed. Do not operate a summer exhaust fan. Follow the lighting instructions. Place the appliance being inspected into operation. Adjust the thermostat so appliance is operating continuously. Test for spillage from draft hood equipped appliances at the draft hood relief opening after 5 minutes of main burner operation. Use the flame of a match or candle. If improper venting is observed during any of the above tests, the venting system must be corrected in accordance with the National Fuel Gas Code, ANSI Z221.1/NFPA 54 and/or CSA B149.1 Natural Gas and Propane Installation Code. After it has been determined that each appliance connected to the venting system properly vents when tested, return all doors, windows, exhaust fans, etc. to their previous condition of use. S9V2-VS-SVX001-1B-EN SAFETY SECTION — FURNACES CAUTION CAUTION VENTING REQUIREMENT! EQUIPMENT DAMAGE! Failure to follow this Caution could result in property damage or personal injury. For condensing furnaces, Do NOT run vent through chimney for wood burning or oil Furnaces or incinerators. If remaining free area between single wall flue pipe and masonry chimney is to be used for another gas appliance, venting area must be sufficient to vent that appliance and that appliance must be connected to chimney with separate entry openings. IMPORTANT – The single wall flue pipe joints must be sealed. The 90° elbow connection to vertical pipe must be sealed to prevent condensate leakage to base of masonry chimney. UV light exposure can cause the plastic blower material to deteriorate which could lead to Blower Housing Damage. For units containing a plastic Blower Housing, Do NOT install third party Ultra-Violet Air Cleaners where the Blower Housing can be exposed to UV light. CAUTION For more information, visit www.trane.com and www. americanstandardair.com or contact your installing dealer. 6200 Troup Highway Tyler, TX 75707 Coil Caution CAUTION VENTING REQUIREMENT! COIL REQUIREMENT!! Failure to follow this Caution could result in property damage or personal injury. Condensing furnaces may be vented through UNUSED chimneys. Do NOT run vent through chim ney for wood burning or oil Furnaces or incinerators or any other gas appliance. IMPORTANT – The single wall flue pipe joints must be sealed. The 90° elbow connection to vertical pipe must be sealed to prevent condensate leakage to base of masonry chimney. Failure to follow this Caution could result in property damage or personal injury. 4GXC* and 4MXC* coils installed on upflow furnaces in vertical, horizontal left, or horizontal right orientations without a factory installed metal drain pan shield must use a MAY*FERCOLKITAA kit. Coils installed on upflow furnaces must have drain pans that are suitable for 400° F (205° C) or have a metal drain pan shield. Downflow furnaces do not require a metal drain pan shield or the use of the MAY*FERCOLKITAA kit. S9V2-VS-SVX001-1B-EN 7 Table of Contents Accessories. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 General Start-up and Adjustment. . . . . . . . . . 66 Document Pack Contents S9V2-VS . . . . . . . . 10 Preliminary Inspections . . . . . . . . . . . . . . . . . . 66 Part List. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 Lighting Instructions . . . . . . . . . . . . . . . . . . . . . 66 Product Specification . . . . . . . . . . . . . . . . . . . . . . 11 Control and Safety Switch Adjustment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66 Furnace Installation Guidelines . . . . . . . . . . . . 13 Safety Practices and Precautions. . . . . . . . . . 13 General Guidelines . . . . . . . . . . . . . . . . . . . . . . 13 Furnace Combustion Air Exhaust Options. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67 Locations and Clearances . . . . . . . . . . . . . . . . 14 Upflow Furnace in Upflow Position - Top Vented Combustion Air . . . . . . . . . . . . . . . . . . 69 Outline Drawings . . . . . . . . . . . . . . . . . . . . . . . . . . 15 Upflow Furnace in Upflow Position - Left Side Vented Combustion Air. . . . . . . . . . . . . . 69 S9V2–VS Wiring Diagram . . . . . . . . . . . . . . . . . 17 Heating and Cooling Airflow Tables . . . . . . . 18 Furnace General Installation . . . . . . . . . . . . . . . 26 S-Series Furnace Panel Removal . . . . . . . . . . 26 Horizontal Installation in an Attic or Crawlspace . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26 Gas Piping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Combustion and Input Check. . . . . . . . . . Gas Valve Adjustment . . . . . . . . . . . . . . . . High Altitude Derate. . . . . . . . . . . . . . . . . . 27 29 30 31 General Venting . . . . . . . . . . . . . . . . . . . . . . . . . Special Case Venting . . . . . . . . . . . . . . . . . Vent Terminations . . . . . . . . . . . . . . . . . . . Attaching Vent Piping . . . . . . . . . . . . . . . . 32 33 34 35 Maximum Vent Length Table . . . . . . . . . . . . . 37 Horizontal Venting . . . . . . . . . . . . . . . . . . . . . . . 38 Horizontal Venting Through Wall with Concentric Vent Kit . . . . . . . . . . . . . . 40 Venting Through The Roof . . . . . . . . . . . . 44 Air for Combustion and Ventilation. . . . . . . . 46 Duct Connections. . . . . . . . . . . . . . . . . . . . . . . . 48 Return Air Filters . . . . . . . . . . . . . . . . . . . . . . . . 56 Electrical Connections . . . . . . . . . . . . . . . . . . . 58 Field Wiring . . . . . . . . . . . . . . . . . . . . . . . . . 58 Upflow Furnace in Horizontal Left Position - Top Vented Combustion Air. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 72 Upflow Furnace in Horizontal Left Position - Side Vented Combustion Air. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75 Upflow Furnace in Horizontal Right Position - Top Vented Combustion Air. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 78 Upflow Furnace in Horizontal Right Position - Left Side Vented Combustion Air. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 81 Downflow Furnace - Top Vented Combustion Air . . . . . . . . . . . . . . . . . . . . . . . . . 85 Downflow Furnace - Left Side Vented Combustion Air . . . . . . . . . . . . . . . . . . . . . . . . . 86 Integrated Furnace Control Menu. . . . . . . . . . 89 Belly Band Location. . . . . . . . . . . . . . . . . . . . . . 91 Integrated Furnace Control Display Codes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 92 Troubleshooting. . . . . . . . . . . . . . . . . . . . . . . . . . . 93 Sequence of Operation . . . . . . . . . . . . . . . . . . . 115 Periodic Servicing Requirements . . . . . . . . . 118 Condensate Drain Instructions. . . . . . . . . . . . . 61 Vertical Applications . . . . . . . . . . . . . . . . . 61 8 S9V2-VS-SVX001-1B-EN Accessories Table 1. Accessories Model Number Description Use with BAYHANG Horizontal Hanging Kit All Upflow Furnaces BAYVENT200B Sidewall Vent Termination Kit All Furnaces BAYVENTCN200B Sidewall Vent Termination Kit (Canada – CPVC) All Furnaces BAYAIR30AVENTA Concentric Vent Kit All Furnaces BAYAIR30CNVENT Concentric Vent Kit (Canada – CPVC) All Furnaces BAYREDUCE Reducing Coupling (CPVC) All Furnaces BAYLIFTB Dual Return Kit (B size extension) B Cabinet Upflow Furnaces BAYLIFTC Dual Return Kit (C size extension) C Cabinet Upflow Furnaces BAYLIFTD Dual Return Kit (D size extension) D Cabinet Upflow Furnaces BAYBASE205 Downflow Subbase All Downflow Furnaces Filter Access Door Kit (Downflow only) All Downflow Furnaces 1” SlimFit Box with MERV 4 Filter All Upflow Furnaces BAYLPSS400* Propane Conversion Kit with Stainless Steel Burners All Furnaces BAYMFGH200B Manufactured/Mobile Housing Kit All Furnaces BAYHALT250 High Altitude Pressure Switch Kit S9V2B040U3VSAE BAYHALT251 High Altitude Pressure Switch Kit S9V2B060U3VSAC/D BAYHALT252 High Altitude Pressure Switch Kit S9V2B080U4VSAC/D, S9V2B080D4VSAC/D, S9V2C100D4VSAC/D BAYHALT253 High Altitude Pressure Switch Kit S9V2C100U4VSAC/D BAYHALT254 High Altitude Pressure Switch Kit S9V2D120U5VSAC/D BAYCNDTRAP2 Inline Condensate Trap Kit used with Special Venting on 2” Vent Pipe All Furnaces BAYCNDTRAP3 Inline Condensate Trap Kit used with Special Venting on 3” Vent Pipe All Furnaces BAYFLTR206 BAYSF1165AA (a) (a) Airflow greater than 1600 CFM requires dual returns S9V2-VS-SVX001-1B-EN 9 Accessories Document Pack Contents S9V2-VS Item Qty. Description 1 1 Condensate Drain Tube Assembly 2 1 Inlet Vent (a) 3 1 Inlet Vent Gasket 4 1 Outlet Vent Assembly 5 1 Outlet Vent Gasket 6 6 Screws Installation, Operation, and Maintenance Upflow/Horizontal and Dedicated Downflow Gas-Fired, Direct/Non-Direct Vent, 2-Stage Condensing Variable Speed Furnaces with Variable Speed Draft Inducer U p ffllo w , C on v e r t i b l e t o Ho rizontal Right o r Ho rizontal Left S9V2B040U3VSAE S9V2B060U3VSAC/D S9V2B080U4VSAC/D S9V2C100U4VSAC/D S9V2D120U5VSAC/D D o w n ffllo w On ly S9V2B080D4VSAC/D S9V2C100D4VSAC/D Note: Graphics in this document are for representation only. Actual model may differ in appearance. ! CAUTION COIL REQUIREMENT! (a) (b) Failure to follow this Caution could result in property damage or personal injury. 4GXC* and 4MXC* coils installed on upflow furnaces in vertical, horizontal left, or horizontal right orientations without a factory installed metal drain pan shield must use a MAY*FERCOLKITAA kit. Coils installed on upflow furnaces must have drain pans that are suitable for 400° F (205°C) or have a metal drain pan shield. Downflow furnaces do not require a metal drain pan shield or the use of the MAY*FERCOLKITAA kit. 7 1 Condensate Trap Grommet 8 1 Plug – Condensate/Gas 9 1 Plug – Electrical 10 2 Grommet – Condensate/Gas 11 1 Installation, Operation, and Maintenance 12 1 Owner Guide 13 1 Limited Warranty 14 1 2” to 3” Coupling – CPL00938 (b) S9V2-VS-SVX001-1B-EN SAFETY WA R NIN G Only qualified personnel should install and service the equipment. The installation, starting up, and servicing of heating, ventilating, and air-conditioning equipment can be hazardous and requires specific knowledge and training. Improperly installed, adjusted or altered equipment by an unqualified person could result in death or serious injury. When working on the equipment, observe all precautions in the literature and on the tags, stickers, and labels that are attached to the equipment. December 2022 S 9V2 -V S- SVX001-1B-EN 3” inlet vent supplied with S9V2D120U5VS only. 2” inlet vent supplied with all other models. Supplied with S9V2D120U5VS only. Part List • Igniter • Inducer Assembly • Pressure Switch(es) • Flame Sensor • Blower Motor • Main Thermal Limit • In-shot Burner(s) • Blower Wheel • Roll-Out Switch(es) • Gas Valve • IFC (Integrated Furnace Control) • Reverse Air Switch(es) 10 S9V2-VS-SVX001-1B-EN Product Specification Model S9V2B060U3 VSAC/D (a), (b) S9V2B040U3 VSAE (a), (b) Type S9V2B080U4 VSAC/D (a), (b) S9V2C100U4 VSAC/D (a), (b) S9V2D120U5 VSAC/D (a), (b) 65,000 78,000 Upflow / Horizontal RATINGS (c) 1st Stage Input BTUH 26,000 39,000 52,000 1st Stage Capacity BTUH (ICS) 25,700 38,450 51,050 64,200 77,050 2nd Stage Input BTUH 40,000 60,000 80,000 100,000 120,000 2nd Stage Capacity BTUH (ICS) (d) 39,350 57,700 76,700 97,150 116,250 1st Stage Temp. Rise (Min. - Max.) °F 25 - 55 25 - 55 30 - 60 25 - 55 35 - 65 2nd Stage Temp. Rise (Min. - Max.) °F 30 - 60 35 - 65 35 - 65 35 - 65 40 - 70 AFUE (%) (d) 97.0 Return Air Temp. (Min. - Max.) °F 45°F - 80°F BLOWER DRIVE DIRECT Diameter - Width (in.) 11 X 8 11 X 10 No. Used 1 Speeds (No.) Variable CFM vs. in. w.g. See Fan Performance Table 1/2 Motor HP R.P.M. Volts / Ph / Hz FLA 3/4 1 8 / 9.6 10.5 / 10 Variable 120 / 1 / 60 6.4 5.7 / 6.4 COMBUSTION FAN - Type Variable Speed Drive - No. Speeds Direct - Variable Motor RPM 1/50 - 5000 Volts/Ph/Hz 33 - 110 / 3 / 60 - 180 FLA Inducer Orifice 0.77 0.61 0.79 0.96 FILTER - Furnished? 1.05 1.19 1 - 20 X 25 - 1 in. 1 - 24 X 25 - 1 in. No Type Recommended High Velocity Hi Vel. (No.-Size-Thk.) 1 - 16 X 25 - 1 in. VENT OUTLET DIA - MIN. (in.) (e) 2 Round 3 Round INLET AIR DIA - MIN. (in.) (e) 2 Round 3 Round HEAT EXCHANGER – Type Fired 409 Stainless Steel Unfired 29-4C Stainless Steel Gauge (Fired) 20 ORIFICES - Main Nat. Gas (Qty. - Drill Size) 2 - 45 3 - 45 4 - 45 5 - 45 6 - 45 Propane Gas (Qty. - Drill Size) 2 - 56 3 - 56 4 - 56 5 - 56 6 - 56 Inshot - 5 Inshot - 6 Redundant - Two Stage GAS VALVE 120 V SiNi Igniter PILOT SAFETY DEVICE – TYPE BURNERS - TYPE - QTY Inshot - 2 Inshot - 3 POWER CONN. - V/Ph/HZ (f) Ampacity (Amps) Inshot - 4 120 / 1 / 60 8.9 8.1 / 8.9 10.9 / 12.9 Max. Overcurrent Protection (Amps) 15 PIPE CONN. SIZE (IN.) 1/2 S9V2-VS-SVX001-1B-EN 14.1 / 13.4 11 Product Specification Model S9V2B080D4VSAC/D (a) , (b) Type S9V2C100D4VSAC/D (a), (b) Downflow RATINGS (c) 1st Stage Input BTUH 52,000 65,000 1st Stage Capacity BTUH (ICS) 51,150 64,300 2nd Stage Input BTUH 80,000 100,000 2nd Stage Capacity BTUH (ICS) (d) 76,900 97,071 1st Stage Temp. Rise (Min. - Max.) °F 30 - 60 2nd Stage Temp. Rise (Min. - Max.) °F 35 - 65 AFUE (%) (d) 97.0 Return Air Temp. (Min. - Max.) °F 45°F - 80°F BLOWER DRIVE Diameter - Width (in.) DIRECT 11 X 8 No. Used 11 X 10 1 Speeds (No.) Variable CFM vs. in. w.g. See Fan Performance Table 3/4 Motor HP R.P.M. Variable Volts / Ph / Hz 120 / 1 / 60 8 / 9.6 FLA COMBUSTION FAN - Type Variable Speed Drive - No. Speeds Direct - Variable Motor RPM 1/50 - 5000 Volts/Ph/Hz 33 - 110 / 3 / 60 - 180 FLA Inducer Orifice 0.77 0.96 FILTER - Furnished? No Type Recommended Hi Vel. (No.-Size-Thk.) 1.05 High Velocity 1 - 16 X 25 - 1 in. 1 - 20 X 25 - 1 in. VENT OUTLET DIA - MIN. (in.) (e) 2 Round INLET AIR DIA - MIN. (in.) (e) 2 Round HEAT EXCHANGER – Type Fired 409 Stainless Steel Unfired 29-4C Stainless Steel Gauge (Fired) 20 ORIFICES - Main Nat. Gas (Qty. - Drill Size) 4 - 45 Propane Gas (Qty. - Drill Size) 4 - 56 5 - 56 Redundant - Two Stage GAS VALVE 120 V SiNi Igniter PILOT SAFETY DEVICE – TYPE BURNERS - TYPE - QTY 5 - 45 Inshot - 4 Inshot - 5 POWER CONN. - V/Ph/HZ (f) 120 / 1 / 60 Ampacity (Amps) 10.9 / 12.9 Max. Overcurrent Protection (Amps) 15 PIPE CONN. SIZE (IN.) 1/2 (a) (b) (c) (d) (e) (f) 12 Meets Energy Star Central Furnace heating designs are certified to ANSI Z21.47 / CSA 2.3 - latest edition. For U.S. Applications, above input ratings (BTUH) are up to 2,000 feet, derate 4% per 1,000 feet for elevations above 2,000 feet above sea level. For Canadian applications, above input ratings (BTUH) are up to 4,500 feet, derate 4% per 1,000 feet for elevations above 4,500 feet above sea level. Based on U.S. government standard tests. Refer to Vent Length Table in this document. The above wiring specifications are in accordance with National Electrical Code; however, installations must comply with local codes. S9V2-VS-SVX001-1B-EN Furnace Installation Guidelines The following sections give general guidelines for the installation of the gas furnaces. Safety Practices and Precautions The following safety practices and precautions must be followed during the installation, servicing, and operation of this furnace. 1. Use only with the type gas approved for this furnace. Refer to the furnace rating plate. 2. Install the furnace only in a location and position as specified in “Locations and Clearances” of these instructions. 3. Provide adequate combustion and ventilation air to the furnace space as specified in “Air for Combustion and Ventilation” of these instructions. 4. Combustion products must be discharged outdoors. Connect this furnace to an approved vent system only, as specified in the “Venting” section of these instructions. 5. Never test for gas leaks with an open flame. Use a commercially available soap solution made specifically for the detection of leaks to check all connections, as specified in the “Gas Piping” section of these instructions. 6. Always install the furnace to operate within the furnace’s intended temperature-rise range with a duct system which has an external static pressure within the allowable range, as specified on the unit rating plate. Airflow within temperature rise for cfm versus static is shown in this document accompanying this furnace. 7. When a furnace is installed so that the supply ducts carry air circulated by the furnace to areas outside the space containing the furnace, the return air shall also be handled by a duct(s) sealed to the furnace casing and terminating outside the space containing the furnace. 8. A gas-fired furnace for installation in a residential garage must be installed as specified in "Location and Clearances" section of these instructions. 9. The furnace may be used for temporary heating of buildings or structures under construction only when the following conditions have been met: a. The furnace venting system must be complete and installed per manufacturer’s instructions. b. The furnace is controlled only by a room Comfort Control (no field jumpers). c. The furnace return air duct must be complete and sealed to the furnace. d. The furnace input rate and temperature rise must be verified to be within the nameplate marking. S9V2-VS-SVX001-1B-EN e. A minimum 4” MERV 11 air filter must be in place. f. 100% of the furnace combustion air requirement must come from outside the structure. g. The Furnace return air temperature range is between 45 and 80 Fahrenheit. 80% models = 55°F 90%+ models = 45°F h. Clean the furnace, duct work, and components upon substantial completion of the construction process, and verify furnace operating conditions including ignition, input rate, temperature rise, and venting, according to the manufacturer’s instructions. 10. I n t h e C o m m o n w e a l t h o f M a s s a c h u s e t t s , t h i s product must be gas piped by a Licensed Plumber or Gas Fitter. This furnace is certified to leak 2% or less of nominal air conditioning CFM delivered when pressurized to .5” water column with all inlets, outlets, and drains sealed. General Guidelines The manufacturer assumes no responsibility for equipment installed in violation of any code or regulation. It is recommended that Manual J of the Air Conditioning Contractors Association (ACCA) or A.R.I. 230 be followed in estimating heating requirements. When estimating heating requirements for installation at Altitudes above 2000 ft., remember the gas input must be reduced. See Combustion and Input Check. Material in this shipment has been inspected at the factory and released to the transportation agency without known damage. Inspect exterior of carton for evidence of rough handling in shipment. Unpack carefully after moving equipment to approximate location. If damage to contents is found, report the damage immediately to the delivering agency. Codes and local utility requirements governing the installation of gas fired equipment, wiring, plumbing, and flue connections must be adhered to. In the absence of local codes, the installation must conform with latest edition of the National Fuel Gas Code ANSI Z223.1 / NFPA 54 • National Installation Code, CAN/CGA B149.1. The latest code may be obtained from the American Gas Association Laboratories, 400 N. Capitol St. NW, Washington D.C. 20001. 1-800-699-9277 or www.aga.org. These furnaces have been classified as CATEGORY IV furnaces in accordance with latest edition of ANSI Z21.47 standards • CSA 2.3. Category IV furnaces operate with positive vent static pressure and with a 13 Furnace Installation Guidelines flue loss less than 17 percent. These conditions require special venting systems, which must be gas tight and water tight. These Category IV Direct Vent furnaces are approved for installation in Manufactured/ Mobile housing when used with BAYMFGH200B. 3. Is there sufficient space for servicing the furnace and other equipment? A minimum of 24 inches front accessibility to the furnace must be provided. Any access door or panel must permit removal of the largest component. A manufactured (mobile) home installation must conform with the Manufactured Home Construction and Safety Standard, Title 24 CFR, Part 3280, or when this Standard is not applicable, the Standard for Manufactured Home Installations (Manufactured Home Sites, Communities and Set-Ups), ANSI/NCS A225.1. and/or MH Series Mobile Homes, CAN/CSA-Z240. 4. Are there at least 3 inches of clearance between the furnace combustion air openings in the front panel and any closed panel or door provided? Locations and Clearances 6. Allow sufficient height in supply plenum above the furnace to provide for cooling coil installation, if the cooling coil is not installed at the time of this furnace installation. The location of the furnace is normally selected by the architect, the builder, or the installer. However, before the furnace is moved into place, be sure to consider the following requirements: 1. Is the location selected as near the chimney or vent and as centralized for heat distribution as practical? 2. Do all clearances between the furnace and enclosure equal or exceed the minimums stated in Clearance Table below? Minimum clearance to combustible materials Closet 5. Are the ventilation and combustion air openings large enough and will they remain unobstructed? If outside air is used, are the openings set 12" above the highest snow accumulation level? 7. The furnace shall be installed so electrical components are protected from water. 8. A vertical downflow furnace without a coil, must use BAYBASE205 when installed on combustible flooring. 9. If the furnace is installed in a garage, it must be installed so that the burners, and the ignition source are located not less than 18 inches above the floor and the furnace must be located or protected to avoid physical damage from vehicles. Sides 0 in. Back 1 in. Top 1 in. Front 0 in. a. Permanent wave solutions Bottom 0 in. b. Chlorinated waxes and cleaners Flue 0 in. c. Chlorine based swimming pool chemicals 10. The gas furnace must not be located where excessive exposure to contaminated combustion air will result in safety and performance related problems. Avoid the following contaminants: 24 in. minimum front clearance recommended for service d. Water softening chemicals Horizontal Closet and Alcove e. De-icing salts or chemicals Right Side 0 in. f. Left Side 0 in. g. Halogen type refrigerants Back 1 in. Top 1 in. h. Cleaning solvents (such as perchloroethylene) Bottom 0 in. i. Printing inks, paint removers, varnishes, etc. 0 in. j. Hydrochloric acid, Cements and glues Flue Horizontal Flue (discharge on left) Right Side 0 in. Left Side 0 in. Rear 1 in. Top 1 in. Bottom 0 in. Flue 0 in. 14 k. Antistatic fabric softeners for clothes dryers l. Closet Carbon tetrachloride Masonry acid washing materials IMPORTANT: The furnace must be installed level. The only allowable variation would be slightly to the left and/ or forward in upflow installations or slightly toward the front in horizontal installations. This is necessary for proper condensate drainage. S9V2-VS-SVX001-1B-EN Outline Drawings Table 2. 17.5”, 21” and 24.5” Upflow Cabinets S9V2-VS-SVX001-1B-EN 15 Outline Drawings Table 3. 17.5” and 21” Downflow Cabinets 16 S9V2-VS-SVX001-1B-EN S9V2–VS Wiring Diagram NOTES: 1. IF ANY OF THE ORIGINAL WIRING AS SUPPLIED WITH THIS FURNACE MUST BE REPLACED, IT MUST BE WITH WIRE HAVING A TEMPERATURE RATING OF AT LEAST 105°C. WIRES 12, 48, 49, 50, AND 51 REQUIRE A TEMPERATURE RATING OF AT LEAST 250°C. 2. FOR PROPER AIRFLOW IN COOLING/HEAT PUMP MODES, Y1AND/OR Y2 MUST CONNECT FROM THE THERMOSTAT TO THE IFC LOW VOLTAGE TERMINAL STRIP. 3. FOR COOLING ONLY SYSTEMS, LEAVE Y1-O JUMPER IN PLACE ON THE IFC FOR CORRECT LED READOUT. 4. FOR HEATPUMP SYSTEMS, REMOVE THE Y1-O JUMPER, CONNECT "O" FROM THE THERMOSTAT TO "O" ON THE IFC LOW VOLTAGE TERMINAL STRIP FOR CORRECT LED READOUT. 5. VSPD OD SYSTEMS REQUIRE DIFFERENT CONNECTIONS, SEE RELAY PANEL INSTRUCTIONS. 6. IF USING A SINGLE STAGE HEATING THERMOSTAT, JUMPER W1 AND W2 TERMINALS AT THE LOW VOLTAGE TERMINAL STRIP. HT2 WILL BE SHOWN ON THE SEVEN SEGMENT DISPLAY AT ALL TIMES. SECOND STAGE OPERATION WILL BEGIN AFTER THE INTERSTAGE DELAY HAS COMPLETED. 7. AIRFLOW TABLES ARE LOCATED IN THE SERVICE FACTS. TO CHANGE AIRFLOW, REFER TO THE INTEGRATED FURNACE CONTROL MENU AND OPTIONS TO SET AIRFLOW AND BLOWER DELAYS. 8. THE "BK" JUMPER MUST BE CUT WHEN APPLYING AN AIRFLOW COMMAND TO THE "BK" TERMINAL SUCH AS PULSE WIDTH MODULATION. 9. CORRECT PERSONALITY MODULE IS REQUIRED FOR PROPER FURNACE OPERATION AND IS SPECIFIC TO EACH MODEL AND SERIAL NUMBER. IT IS TO REMAIN WITH THE ORIGINAL UNIT. 10. LINE CHOKE AND WIRE BK/28 ONLY USED ON MODELS WITH 1 HP MOTORS. FRS FLAME_ROLLOUT1 11. SOME MODELS WITH 3/4 HP MOTORS MAY USE JUMPER BETWEEN WIRES BK/27 AND BK/28. YL/48 YL/50 1 12. WIRE YL/45 AND RAF-2 ARE NOT PRESENT ON DOWNFLOW MODELS. 1 YL/47 YL/48 PS1 1JPR 12V 2 2JPR Tx 3 GND 4 AC 5 AC BLOWER MOTOR 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 BK/30 X X X GR/56 Rx 3 GND 4 Tx WH/16 WH/15 GR/8 BURNER BOX GND BK BLACK WH WHITE YL YELLOW 7 PS2 6 TH 5 MVC 4 HLO OR/11 3 PS1 BL/2 PR/1 2 TR 1 ILI IFC SEE NOTES 8 FP FLAME PROBE IGN HOT SURFACE IGNITER IGN-H 2 BK JUMPER FUSE WH/21 BK/22 1 2 LINE LINE SCALE <VIEW SCALE> BK W2W1 R G B/C Y2 Y1 O SEE NOTES 2, 3, 4, 5, 6 CONDENSATE SWITCH LC LINE CHOKE RAF REVERSE AIR FLOW THERMAL LIMIT INDUCER LIMIT GROUND BK JUMPER Variable Speed (3-Phase) Inducer w/ ECM Blower Motor OdU Status Codes Outdoor Unit Blower Constant Fan Airflow Multiplier % COF 1 dL Idle CPC Cooling (CFM/Ton) Ht1 1st Stage Gas Heating CPH Heat Pump Heating (CFM/Ton) Lr1 1st Stage Gas Heating HOd Learning Routine Heat Off Delay (sec) Inter-Stage Delay (sec) HT2 2nd Stage Heating 9HC Gas Heating CFM 2nd Stage (1st Stage Lr2 2nd Stage Gas Heat Learning Routine is not adjustable) (Airflow x10) Run Test Mode rUn ArF Airflow (followed by Airflow times 10) Error Codes Loss of the IRQ/other internal failures E01 COF Continuous Fan E2.1 Retry exceeded (Failed to est flame) CL1 1st Stage Cooling CL2 2nd Stage Cooling E2.2 Recycles exceeded (loss of established flame) or 10X PS1 open HP1 1st Stage Heat Pump E2.3 1st Stage Gas Valve not energized when HP2 2nd Stage Heat Pump it should be exceeded after 10 times dFt Defrost Mode E2.4 Redundant Relay (HLO output) Not Menu Options Energized when it should be Err Active Alarm Menu exceeded after 10 times L6 F Last 6 Faults (To Clear, Hold Option Button 5 sec) E3.1 Shorted Pressure Switch, 1st Stage E3.2 Open Pressure Switch, 1st Stage Cr Code Release Number E3.3 Shorted Pressure Switch, 2nd Stage COd Cooling Off Delay (sec) E3.4 Open Pressure Switch, 2nd Stage 0dt Outdoor Tonnage S9V2-VS-SVX001-1B-EN E04 E05 E06 E6.3 E7.1 E7.2 E08 E09 E10 E11 E12 E13 E14 E15 E17 E18 JUMPER LINE CHOKE WH WH BK BK GND AC IND-W 1 BK 1 IND-V 2 3 RD WH 2 IND-U IGN-N 1 IGN-H 2 12V AC BK GR 3 GR 4 VENT MOTOR (INDUCER) ** BLOWER MOTOR 1 BL BL Rx 2 WH WH GND 3 BK WH Tx 4 WH BK 1 H LINE N NEUTRAL GND GROUND HLO HIGH LIMIT OUTPUT HLI HIGH LIMIT INPUT PS1 1ST STAGE PRESSURE INPUT PS2 2ND STAGE PRESSURE INPUT IND INDUCER IFC INTEGRATED FURNACE CONTROL RAF REVERSE AIR FLOW Tx TRANSMIT SIGNAL Rx RECEIVE SIGNAL TH 24VAC (HOT) TR 24VAC (COMMON) MVC VALVE COMMON MVL VALVE LOW STAGE MVH VALVE HIGH STAGE TNS TRANSFORMER ILI INDUCER LIMIT INPUT IGN IGNITER FP FLAME PROBE PSO PRESSURE SWITCH OUTPUT 24 V PR TR 2 BL PS1 3 OR 12V Tx Rx GND HLO 4 PR MVC 5 TNS BK 24v FACTORY WIRING FIELD WIRING INTEGRATED FURNACE CONTROL ELECTRICAL RATING INPUT: 24 VAC, 60 HZ. XFMR SEC. CURRENT: 450 MA. + MV LOAD MV OUTPUT: 1.5A @ 24 VAC IND OUTPUT: 2.2 FLA,3.5 LRA @ 120 VAC MAX. IGN OUTPUT: 2.0 A @ 120 VAC CIRC. BLOWER OUTPUT: 14.5 FLA,25 LRA @ 120 VAC HUMIDIFIER & AIR CLEANER (DRY CONTACTS) MAX. LOAD: 1.0 A @ 120 VAC 24 VAC OR 120 VAC MAY BE USED FUSE: 5A TIMINGS PREPURGE: 5 SEC. INTERPURGE: 60 SEC. POST PURGE: 5 SEC. IGN WARMUP: 20 SEC. IAP: 2; TFI: 5 SEC. RETRIES: 2 RECYCLES: 10 HEAT ON DELAY: UP TO 30 SEC. COOL ON DELAY: 0 SEC. AUTO RESTART: 60 MIN. Open Thermal Limit, Rollout Switch, or Reverse Airflow Switch Flame detected, should not be present Voltage reversed polarity or Bad Grounding (1) Igniter relay fails, (2) Igniter open 1st stage gas valve (MVL) is energized when it should be off Redundant Relay (HLO output) Energized when it should NOT be Flame current is low, but still strong enough to allow operation. Open Inducer Limit Switch or Condensate Switch Inducer Motor no communication response, could be communication failure between two micro-controllers. (1) 2nd stage gas valve energized when it should NOT be (2) 2nd stage gas valve not energized when it should be (3) 1st stage gas valve not energized when it should be (4) Redundant relay (HLO output) not energized when it should be Open fuse Blower HP/OEM ID No PM and local copy bad Both of Unit Data File in PM and local Unit Data File are Corrupt Blower motor no communication response Blower communication failure on the control D346055P01 REV B WH 6 RD 7 BR GND 8 GR MVL 9 RD RD MVH 10 BR BL HLI 11 BR BR PSO 12 BURNER BOX GND 1 2 3 WH FP 1 G B/C Y2 Y1 O THERMOSTAT BK W2 W1 R FRS FLAME_ROLLOUT2 BR YL PS2 BR THERMAL_LIMIT YL RAF-2 YL 120v BL TH PS2 JUMPER SEE NOTE 11 24 V THERMOSTAT PS PRESSURE SWITCH FRS FLAME ROLLOUT SWITCH 1 TO PERSONALITY MODULE OR ORANGE BR BROWN PR PURPLE RD RED GR GREEN BL BLUE ** INTERNAL THERMAL PROTECTION IGN-N EAC BR/7 RD/6 BL/5 PR/4 1 ILI VENT MOTOR (INDUCER) ** 3 LINE CHOKE IGN HUM GND 8 BK/29 BK/28 1 2 3 MENU OPTION 1 2 3 4 MVL 2JPR GR GAS VALVE MVH 9 WH LINE-N SEE NOTE 10 LINE-H HLI 10 1 BK/27 CIRC-H 11 TNS-H BR/53 BR/10 RD/9 PSO 1 1 LINE 12 2 4 BK/14 BK/27 BK/13 1 12V 2 2 2 FP 1 4 3 YL WH/17 2 3 CIRC-N YL RAF-1 YL CONDENSATE YL IND-W 1 WH PANEL LOOP BK/18 RD/19 WH/20 TNS-N NEUTRAL 4 3 2 1 CIRC-N 2 BL/26 WH/24 BK/23 WH/25 (blocked) WH/12 IND-V 4 4 3 BK/18 RD/19 WH/20 LINE-N IND-U BK BK GND X WH/12 1 BK TNS-N X BK/13 2 GR/YL GR/YL N FLAME_PROBE 3 BK 1 X BK/14 4 BK 2 TNS-H WH H GR/32 RD/6 3 CIRC-H 1JPR GR/YL/31 WH/16 120v IGN 4 JUNCTION BOX BK/23 5 GR/56 24v GR/41 BK/39 BL/35 WH/37 WH/36 4 GR/32 BK/28 BL/26 WH/25 WH/24 YL/52 YL/46 OR/11 PR/4 YL/3 YL/44 YL/43 WH/40 3 LINE-H 3 GND 120v 60 Hz. 1 PH POWER SUPPLY PER LOCAL CODE 2 WH/15 2 BL/35 WH/37 WH/36 BK/38 1 TNS BL/2 1 Rx 3 2 1 2 RD/9 BL/5 BR/10 PR/1 1 3 1 GAS VALVE BK BK WH/17 PS2 YL/42 GR/41 WH/40 BK/39 2 WH GR/YL/31 YL/47 1 2 IFC YL/51 YL/45 YL/52 1 YL/51 THERMAL_LIMIT YL/49 BK/29 PR/54 BR/7 YL/50 YL/45 *SEE NOTE 12 RAF-2 PANEL LOOP BK FRS FLAME_ROLLOUT2 TO BURNER BOX HARN RAF-1 CONDENSATE INDUCER_LIMIT YL/3 BR/53 YL/49 2 N FLAME-PROBE_c0 S9V2-VS 2 GND H WH YL/46 S9V2-VS 120v 60 Hz. 1 PH POWER SUPPLY PER LOCAL CODE JUNCTION BOX YL INDUCER_LIMIT PR PR PR PS1 FRS FLAME_ROLLOUT1 YL OR YL 17 Heating and Cooling Airflow Tables Table 4. S9V2B040U3VSAE Heating Airflow S9V2B040U3VSAE Furnace Heating Airflow (CFM), Temp. Rise (°F), and Power (Watts) vs. External Static Pressure with Filter (iwc) 1st Stage Capacity = 25,700 2nd Stage Capacity = 39,350 Airflow External Static Pressure Target Heating Setting 0.1 0.3 0.5 0.7 0.9 Airflow Low 468 Medium Low 598 Medium (a) 634 High 864 Low 650 Medium Low 830 Medium (a) 880 High 1200 Heating 1st Stage Heating 2nd Stage CFM Temp. Rise Watts CFM Temp. Rise Watts CFM Temp. Rise Watts CFM Temp. Rise Watts CFM Temp. Rise Watts CFM Temp. Rise Watts CFM Temp. Rise Watts CFM Temp. Rise Watts 468 49 27 552 43 41 583 39 48 753 30 87 633 57 48 760 48 82 792 44 94 1023 34 192 452 51 58 600 39 76 635 36 83 786 29 129 636 57 92 786 46 132 817 44 142 1044 34 251 437 54 90 647 36 112 687 33 118 818 28 171 639 57 135 813 45 182 842 43 189 1066 33 310 421 56 121 694 32 147 739 30 153 850 27 214 643 56 179 840 43 232 867 43 237 1088 33 369 406 58 152 741 28 183 791 27 189 883 26 256 646 56 223 866 41 282 892 42 284 1109 32 428 Table 5. S9V2B040U3VSAE Cooling Airflow S9V2B040U3VSAE Furnace Cooling Airflow (CFM) and Power (Watts) vs. External Static Pressure with Filter (iwc) EXTERNAL STATIC PRESSURE (IN. W. C.) Outdoor Airflow Tonnage Setting 0.1 0.3 0.5 0.7 0.9 "Odt" (tons) (CFM/ton) 1.5 2.0 2.5 18 450 420 400 370 350 330 310 290 450 420 400 370 350 330 310 290 450 420 400 370 350 330 310 290 CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS 675 / 47 630 / 40 600 / 36 555 / 30 525 / 27 495 / 24 465 / 21 435 / 19 900 / 94 840 / 79 800 / 70 740 / 58 700 / 51 660 / 44 620 / 38 580 / 33 1125 / 167 1050 / 139 1000 / 123 925 / 100 875 / 87 825 / 121 775 / 101 725 / 88 675 / 81 630 / 72 600 / 67 555 / 60 525 / 56 495 / 51 465 / 48 435 / 44 900 / 137 840 / 120 800 / 109 740 / 95 700 / 86 660 / 78 620 / 71 580 / 64 1125 / 219 1050 / 188 1000 / 170 925 / 145 875 / 129 825 / 160 775 / 139 725 / 123 675 / 121 630 / 111 600 / 105 555 / 96 525 / 90 495 / 85 465 / 80 435 / 76 900 / 186 840 / 166 800 / 154 740 / 138 700 / 127 660 / 118 620 / 109 580 / 101 1125 / 278 1050 / 244 1000 / 223 925 / 195 875 / 178 825 / 205 775 / 182 725 / 164 675 / 166 630 / 154 600 / 147 555 / 136 525 / 130 495 / 124 465 / 118 435 / 113 900 / 240 840 / 218 800 / 204 740 / 185 700 / 173 660 / 162 620 / 152 580 / 142 1125 / 341 1050 / 304 1000 / 281 925 / 250 875 / 230 825 / 254 775 / 229 725 / 210 675 / 215 630 / 202 600 / 193 555 / 181 525 / 174 495 / 167 465 / 161 435 / 155 900 / 298 840 / 273 800 / 258 740 / 236 700 / 223 660 / 211 620 / 199 580 / 188 1125 / 408 1050 / 368 1000 / 343 925 / 308 875 / 287 825 / 308 775 / 281 725 / 260 S9V2-VS-SVX001-1B-EN Heating and Cooling Airflow Tables Table 5. S9V2B040U3VSAE Cooling Airflow (continued) S9V2B040U3VSAE Furnace Cooling Airflow (CFM) and Power (Watts) vs. External Static Pressure with Filter (iwc) EXTERNAL STATIC PRESSURE (IN. W. C.) Outdoor Airflow Tonnage Setting 0.1 0.3 0.5 0.7 0.9 "Odt" (tons) (CFM/ton) 3.0 (a) 450 420 400 370 350 (a) 330 310 290 CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS 1350 / 272 1260 / 226 1200 / 198 1110 / 161 1050 / 139 990 / 119 930 / 102 870 / 86 1350 / 334 1260 / 284 1200 / 254 1110 / 213 1050 / 188 990 / 166 930 / 146 870 / 128 1350 / 402 1260 / 348 1200 / 315 1110 / 271 1050 / 244 990 / 219 930 / 197 870 / 176 1298 / 440 1260 / 417 1200 / 381 1110 / 333 1050 / 304 990 / 277 930 / 252 870 / 229 1198 / 450 1198 / 450 1198 / 450 1110 / 399 1050 / 368 990 / 338 930 / 311 870 / 285 Table 6. S9V2B060U3VSAC/D Heating Airflow S9V2B060U3VSAC/D Furnace Heating Airflow (CFM), Temp. Rise (°F), and Power (Watts) vs. External Static Pressure with Filter (iwc) 1st Stage Capacity = 38,450 2nd Stage Capacity = 57,700 Airflow External Static Pressure Target Heating Setting 0.1 0.3 0.5 0.7 0.9 Airflow Low 632 Medium Low (a) 814 Medium 893 High 1027 Low 800 Medium Low (a) 1030 Medium 1130 High 1300 Heating 1st Stage Heating 2nd Stage CFM Temp. Rise Watts CFM Temp. Rise Watts CFM Temp. Rise Watts CFM Temp. Rise Watts CFM Temp. Rise Watts CFM Temp. Rise Watts CFM Temp. Rise Watts CFM Temp. Rise Watts 660 53 48 860 41 91 900 39 110 1068 33 165 851 64 81 1092 49 157 1132 47 201 1280 42 319 658 53 85 856 41 128 899 39 147 1061 33 202 843 64 127 1075 50 209 1128 47 255 1281 42 365 656 53 121 852 42 164 898 39 183 1054 33 239 835 64 172 1057 50 262 1124 48 308 1282 42 410 654 53 157 848 42 200 897 39 219 1047 33 276 826 64 218 1039 51 314 1119 48 362 1283 42 456 652 54 193 844 43 236 896 39 255 1041 33 313 818 64 264 1022 52 366 1115 48 416 1283 42 502 Table 7. S9V2B060U3VSAC/D Cooling Airflow S9V2B060U3VSAC/D Furnace Cooling Airflow (CFM) and Power (Watts) vs. External Static Pressure with Filter (iwc) Outdoor Airflow EXTERNAL STATIC PRESSURE (IN. W. C.) Tonnage Setting 0.1 0.3 0.5 0.7 0.9 "Odt" (tons) (CFM/ton) 1.5 2.0 450 420 400 370 350 330 310 290 450 420 400 370 350 330 310 290 S9V2-VS-SVX001-1B-EN CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS 663 / 47 621 / 41 582 / 36 549 / 32 521 / 29 492 / 26 463 / 23 435 / 21 878 / 90 821 / 76 770 / 66 725 / 57 687 / 51 649 / 45 611 / 39 573 / 34 673 / 83 630 / 75 580 / 67 556 / 63 527 / 59 497 / 55 468 / 51 438 / 48 893 / 135 834 / 119 778 / 105 737 / 96 698 / 88 659 / 80 620 / 73 581 / 67 666 / 119 621 / 109 566 / 99 546 / 95 516 / 90 486 / 85 455 / 81 424 / 77 890 / 179 830 / 161 770 / 144 731 / 134 691 / 124 651 / 115 611 / 107 571 / 99 641 / 155 595 / 144 528 / 130 517 / 128 486 / 122 455 / 117 423 / 112 391 / 107 869 / 223 808 / 202 742 / 182 707 / 172 666 / 161 625 / 151 584 / 142 543 / 133 596 / 192 549 / 180 507 / 170 469 / 162 437 / 156 405 / 150 372 / 145 339 / 141 829 / 266 767 / 244 725 / 230 664 / 211 622 / 199 580 / 188 538 / 177 496 / 168 19 Heating and Cooling Airflow Tables Table 7. S9V2B060U3VSAC/D Cooling Airflow (continued) S9V2B060U3VSAC/D Furnace Cooling Airflow (CFM) and Power (Watts) vs. External Static Pressure with Filter (iwc) EXTERNAL STATIC PRESSURE (IN. W. C.) Outdoor Airflow Tonnage Setting 0.1 0.3 0.5 0.7 0.9 "Odt" (tons) (CFM/ton) 2.5 3.0 (a) 450 420 400 370 350 330 310 290 450 420 400 370 350 (a) 330 310 290 CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS 1097 / 159 1023 / 133 976 / 117 902 / 97 854 / 84 806 / 73 759 / 63 711 / 55 1319 / 260 1229 / 215 1170 / 189 1082 / 154 1023 / 133 965 / 114 907 / 98 850 / 83 1114 / 212 1040 / 184 989 / 166 917 / 142 868 / 128 819 / 115 771 / 103 722 / 93 1340 / 321 1249 / 274 1189 / 245 1100 / 206 1040 / 184 981 / 163 922 / 144 863 / 127 1114 / 265 1039 / 233 990 / 214 915 / 187 865 / 171 815 / 157 766 / 143 716 / 130 1343 / 382 1251 / 331 1190 / 300 1099 / 258 1039 / 233 979 / 210 919 / 189 860 / 170 1097 / 317 1020 / 282 970 / 261 894 / 232 843 / 214 793 / 198 742 / 182 692 / 168 1328 / 441 1235 / 387 1173 / 354 1081 / 309 1020 / 282 960 / 257 899 / 234 838 / 212 1061 / 368 984 / 331 932 / 308 855 / 276 803 / 257 752 / 239 700 / 222 648 / 206 1295 / 501 1201 / 443 1139 / 408 1046 / 360 984 / 331 922 / 304 860 / 278 798 / 255 Table 8. S9V2B080U4VSAC/D Heating Airflow S9V2B080U4VSAC/D Furnace Heating Airflow (CFM), Temp. Rise (°F), and Power (Watts) vs. External Static Pressure with Filter (iwc) 1st Stage Capacity = 51,050 2nd Stage Capacity = 76,700 Airflow External Static Pressure Target Heating Setting 0.1 0.3 0.5 0.7 0.9 Airflow Low 864 Medium Low (a) 907 Medium 958 High 1051 Low 1200 Medium Low (a) 1260 Medium 1330 High 1460 Heating 1st Stage Heating 2nd Stage 20 CFM Temp. Rise Watts CFM Temp. Rise Watts CFM Temp. Rise Watts CFM Temp. Rise Watts CFM Temp. Rise Watts CFM Temp. Rise Watts CFM Temp. Rise Watts CFM Temp. Rise Watts 860 54 87 907 51 97 957 49 112 1042 45 140 1211 60 196 1258 58 215 1307 55 260 1431 50 334 849 55 125 893 52 135 930 50 153 1015 46 182 1206 60 248 1261 57 271 1303 55 312 1412 51 390 838 56 163 879 53 174 903 51 194 989 47 225 1201 60 300 1263 57 326 1299 55 364 1393 52 445 827 57 200 865 54 212 876 52 234 962 47 267 1197 60 352 1265 57 381 1296 55 416 1374 52 501 816 58 238 852 54 251 849 53 275 936 48 310 1192 60 404 1268 57 436 1292 55 468 1355 53 557 S9V2-VS-SVX001-1B-EN Heating and Cooling Airflow Tables Table 9. S9V2B080D4VSAC/D Heating Airflow S9V2B080D4VSAC/D Furnace Heating Airflow (CFM), Temp. Rise (°F), and Power (Watts) vs. External Static Pressure with Filter (iwc) 1st Stage Capacity = 51,150 2nd Stage Capacity = 76,900 Airflow External Static Pressure Target Heating Setting 0.1 0.3 0.5 0.7 0.9 Airflow Low 864 Medium Low 907 Medium (a) 958 High 1066 Low 1200 Medium Low 1260 Medium (a) 1330 High 1480 Heating 1st Stage Heating 2nd Stage Table 10. CFM Temp. Rise Watts CFM Temp. Rise Watts CFM Temp. Rise Watts CFM Temp. Rise Watts CFM Temp. Rise Watts CFM Temp. Rise Watts CFM Temp. Rise Watts CFM Temp. Rise Watts 780 60 94 807 57 101 862 54 117 977 48 128 1111 66 204 1193 59 232 1217 58 273 1342 53 329 776 60 135 811 57 151 862 54 168 963 49 179 1104 66 260 1201 59 296 1217 58 335 1328 54 389 772 61 176 814 58 201 862 54 219 949 50 230 1096 66 317 1209 59 360 1216 58 396 1313 55 448 768 61 216 818 58 252 861 54 271 934 51 281 1088 66 373 1217 59 424 1215 58 457 1299 56 508 764 61 257 822 58 302 861 54 322 920 52 332 1081 66 429 1225 59 488 1215 59 518 1284 56 567 S9V2B080U4VSAC/D / S9V2B080D4VSAC/D Cooling Airflow S9V2B080U4VSAC/D / S9V2B080D4VSAC/D Furnace Cooling Airflow (CFM) and Power (Watts) vs. External Static Pressure with Filter (iwc) Outdoor Airflow EXTERNAL STATIC PRESSURE (IN. W. C.) Tonnage Setting 0.1 0.3 0.5 0.7 0.9 "Odt" (tons) (CFM/ton) 2.0 2.5 3.0 450 420 400 370 350 330 310 290 450 420 400 370 350 330 310 290 450 420 400 370 350 330 310 290 S9V2-VS-SVX001-1B-EN CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS 892 / 91 834 / 77 785 / 67 738 / 58 700 / 52 662 / 46 624 / 40 585 / 35 1108 / 159 1035 / 133 988 / 118 916 / 97 868 / 85 820 / 74 772 / 64 724 / 56 1326 / 257 1239 / 214 1181 / 188 1094 / 153 1036 / 133 978 / 115 920 / 99 863 / 84 899 / 136 841 / 120 785 / 106 744 / 97 705 / 89 666 / 81 627 / 74 588 / 67 1120 / 213 1046 / 184 997 / 167 924 / 143 875 / 129 826 / 116 778 / 104 729 / 94 1341 / 320 1252 / 273 1193 / 245 1105 / 207 1046 / 184 987 / 164 929 / 145 870 / 128 893 / 180 834 / 161 781 / 146 736 / 134 697 / 125 658 / 116 619 / 107 580 / 100 1116 / 265 1041 / 233 992 / 214 918 / 188 868 / 172 819 / 157 770 / 143 721 / 131 1341 / 380 1250 / 330 1191 / 299 1101 / 258 1041 / 233 982 / 210 923 / 189 863 / 170 872 / 222 813 / 202 754 / 183 714 / 172 675 / 161 635 / 151 596 / 142 557 / 133 1098 / 315 1022 / 281 972 / 260 897 / 231 848 / 213 798 / 197 749 / 182 699 / 168 1325 / 439 1234 / 385 1173 / 353 1083 / 308 1022 / 281 962 / 256 902 / 233 843 / 212 838 / 265 777 / 243 737 / 229 677 / 210 638 / 198 598 / 187 558 / 177 518 / 168 1065 / 365 989 / 328 938 / 306 863 / 275 813 / 255 762 / 237 712 / 221 663 / 205 1296 / 497 1203 / 440 1142 / 405 1050 / 358 989 / 329 928 / 302 868 / 277 807 / 253 21 Heating and Cooling Airflow Tables Table 10. S9V2B080U4VSAC/D / S9V2B080D4VSAC/D Cooling Airflow (continued) S9V2B080U4VSAC/D / S9V2B080D4VSAC/D Furnace Cooling Airflow (CFM) and Power (Watts) vs. External Static Pressure with Filter (iwc) EXTERNAL STATIC PRESSURE (IN. W. C.) Outdoor Airflow Tonnage Setting 0.1 0.3 0.5 0.7 0.9 "Odt" (tons) (CFM/ton) 4.0 (a) Table 11. 450 420 400 370 350 (a) 330 310 290 CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS 1769 / 570 1650 / 469 1571 / 410 1453 / 330 1375 / 284 1297 / 242 1219 / 205 1142 / 172 1791 / 648 1670 / 544 1590 / 481 1470 / 397 1391 / 348 1312 / 303 1233 / 263 1154 / 227 1797 / 725 1675 / 616 1593 / 550 1472 / 462 1391 / 410 1311 / 363 1230 / 319 1151 / 280 1789 / 799 1664 / 686 1582 / 618 1458 / 526 1376 / 471 1295 / 420 1214 / 374 1133 / 332 1766 / 873 1639 / 756 1555 / 685 1430 / 588 1347 / 530 1265 / 477 1183 / 428 1101 / 384 S9V2C100U4VSAC/D Heating Airflow S9V2C100U4VSAC/D Furnace Heating Airflow (CFM), Temp. Rise (°F), and Power (Watts) vs. External Static Pressure with Filter (iwc) 1st Stage Capacity = 64,200 2nd Stage Capacity = 97,150 Airflow External Static Pressure Target Heating Setting 0.1 0.3 0.5 0.7 0.9 Airflow Low 1146 Medium Low 1280 Medium 1359 High (a) 1446 Low 1450 Medium Low 1620 Medium 1720 High (a) 1830 Heating 1st Stage Heating 2nd Stage 22 CFM Temp. Rise Watts CFM Temp. Rise Watts CFM Temp. Rise Watts CFM Temp. Rise Watts CFM Temp. Rise Watts CFM Temp. Rise Watts CFM Temp. Rise Watts CFM Temp. Rise Watts 1132 52 139 1265 46 187 1291 45 211 1401 41 255 1421 63 272 1620 55 354 1646 53 408 1805 49 525 1120 52 192 1251 47 239 1269 46 272 1404 41 311 1416 63 336 1611 55 424 1643 54 484 1787 50 579 1108 52 246 1237 47 291 1248 46 332 1408 41 367 1412 63 401 1602 55 493 1640 54 559 1768 50 633 1097 52 299 1223 48 343 1226 47 393 1412 41 423 1408 63 466 1593 56 562 1638 54 635 1749 51 687 1085 53 352 1209 48 395 1205 47 454 1415 41 479 1404 63 531 1584 56 631 1635 54 711 1731 51 741 S9V2-VS-SVX001-1B-EN Heating and Cooling Airflow Tables Table 12. S9V2C100D4VSAC/D Heating Airflow S9V2C100D4VSAC/D Furnace Heating Airflow (CFM), Temp. Rise (°F), and Power (Watts) vs. External Static Pressure with Filter (iwc) 1st Stage Capacity = 64,300 2nd Stage Capacity = 97,071 Airflow External Static Pressure Target Heating Setting 0.1 0.3 0.5 0.7 0.9 Airflow Low 1080 Medium Low 1166 Medium (a) 1318 High 1361 Low 1500 Medium Low 1620 Medium (a) 1830 High 1890 Heating 1st Stage Heating 2nd Stage Table 13. CFM Temp. Rise Watts CFM Temp. Rise Watts CFM Temp. Rise Watts CFM Temp. Rise Watts CFM Temp. Rise Watts CFM Temp. Rise Watts CFM Temp. Rise Watts CFM Temp. Rise Watts 1068 55 101 1158 51 115 1326 46 153 1312 46 166 1514 58 223 1620 55 276 1768 50 372 1810 49 405 1048 57 151 1113 53 172 1272 48 206 1270 47 221 1478 60 297 1588 56 345 1746 51 446 1783 50 476 1029 60 201 1068 55 229 1218 50 259 1229 47 276 1441 61 370 1556 57 415 1724 52 520 1756 51 548 1009 63 251 1023 57 285 1164 51 312 1188 48 331 1404 63 443 1523 58 484 1702 53 594 1729 52 677 989 66 301 978 59 342 1111 53 365 1147 49 387 1367 64 516 1491 59 553 1620 53 668 1702 52 695 S9V2C100U4VSAC/D / S9V2C100D4VSAC/D Cooling Airflow S9V2C100U4VSAC/D / S9V2C100D4VSAC/D Furnace Cooling Airflow (CFM) and Power (Watts) vs. External Static Pressure with Filter (iwc) Outdoor Airflow EXTERNAL STATIC PRESSURE (IN. W. C.) Tonnage Setting 0.1 0.3 0.5 0.7 0.9 "Odt" (tons) (CFM/ton) 2.5 3.0 3.5 450 420 400 370 350 330 310 290 450 420 400 370 350 330 310 290 450 420 400 370 350 330 310 290 S9V2-VS-SVX001-1B-EN CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS 1153 / 111 1077 / 94 1061 / 90 950 / 69 899 / 60 848 / 53 796 / 46 745 / 39 1378 / 178 1289 / 149 1228 / 131 1138 / 108 1077 / 94 1016 / 81 955 / 70 894 / 59 1601 / 269 1498 / 224 1428 / 196 1324 / 160 1253 / 138 1183 / 119 1112 / 102 1041 / 86 1149 / 159 1073 / 138 1057 / 134 945 / 109 893 / 98 841 / 89 789 / 80 737 / 72 1376 / 234 1286 / 201 1225 / 181 1134 / 154 1073 / 138 1011 / 123 950 / 110 888 / 97 1599 / 334 1496 / 284 1426 / 254 1321 / 214 1251 / 190 1180 / 167 1109 / 147 1037 / 129 1147 / 208 1071 / 185 1054 / 180 942 / 151 890 / 140 838 / 129 786 / 119 733 / 110 1374 / 292 1284 / 256 1223 / 234 1132 / 203 1071 / 185 1009 / 168 947 / 153 885 / 138 1597 / 401 1494 / 347 1424 / 314 1319 / 270 1249 / 243 1178 / 218 1107 / 196 1035 / 175 1145 / 260 1068 / 235 1044 / 227 939 / 197 887 / 184 835 / 172 782 / 161 729 / 151 1372 / 352 1282 / 312 1221 / 288 1130 / 255 1068 / 235 1006 / 216 944 / 199 882 / 183 1594 / 469 1491 / 411 1422 / 376 1317 / 327 1246 / 298 1175 / 271 1104 / 246 1032 / 223 1141 / 314 1064 / 287 1021 / 273 935 / 246 882 / 232 830 / 219 777 / 208 724 / 198 1368 / 413 1277 / 371 1217 / 345 1125 / 309 1064 / 287 1002 / 266 940 / 248 877 / 231 1590 / 539 1487 / 477 1417 / 439 1313 / 387 1242 / 355 1171 / 326 1100 / 299 1028 / 275 23 Heating and Cooling Airflow Tables Table 13. S9V2C100U4VSAC/D / S9V2C100D4VSAC/D Cooling Airflow (continued) S9V2C100U4VSAC/D / S9V2C100D4VSAC/D Furnace Cooling Airflow (CFM) and Power (Watts) vs. External Static Pressure with Filter (iwc) EXTERNAL STATIC PRESSURE (IN. W. C.) Outdoor Airflow Tonnage Setting 0.1 0.3 0.5 0.7 0.9 "Odt" (tons) (CFM/ton) 4.0 (a) Table 14. 450 420 400 370 350 (a) 330 310 290 CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS 1820 / 388 1704 / 321 1626 / 281 1507 / 228 1428 / 196 1348 / 168 1268 / 143 1188 / 120 1819 / 462 1702 / 390 1624 / 347 1505 / 289 1426 / 254 1346 / 223 1266 / 195 1185 / 169 1816 / 538 1700 / 461 1622 / 415 1504 / 352 1424 / 314 1344 / 280 1264 / 248 1183 / 220 1812 / 615 1697 / 533 1619 / 484 1501 / 417 1422 / 376 1342 / 338 1261 / 304 1180 / 273 1807 / 693 1692 / 607 1614 / 554 1497 / 482 1417 / 439 1338 / 399 1257 / 362 1176 / 328 S9V2D120U5VSAC/D Heating Airflow S9V2D120U5VSAC/D Furnace Heating Airflow (CFM), Temp. Rise (°F), and Power (Watts) vs. External Static Pressure with Filter (iwc) 1st Stage Capacity = 77,050 2nd Stage Capacity = 116,250 Airflow External Static Pressure Target Heating Setting 0.1 0.3 0.5 0.7 0.9 Airflow Low 1123 Medium Low 1332 Medium (a) 1404 High 1620 Low 1560 Medium Low 1850 Medium (a) 1950 High 2250 Heating 1st Stage Heating 2nd Stage Table 15. CFM Temp. Rise Watts CFM Temp. Rise Watts CFM Temp. Rise Watts CFM Temp. Rise Watts CFM Temp. Rise Watts CFM Temp. Rise Watts CFM Temp. Rise Watts CFM Temp. Rise Watts 1138 61 115 1371 51 182 1440 48 208 1669 42 315 1654 65 291 1980 55 456 2075 52 527 2280 48 795 1158 60 176 1383 50 251 1450 48 283 1674 42 388 1637 66 360 1951 56 539 2037 53 611 2197 50 819 1178 59 236 1394 50 320 1461 48 357 1680 41 460 1621 67 430 1922 57 621 1999 54 696 2114 52 842 1198 58 297 1406 49 389 1471 47 431 1685 41 533 1604 67 499 1893 58 704 1961 55 781 2032 54 865 1218 57 358 1417 49 457 1482 47 505 1691 41 605 1587 68 568 1864 58 787 1923 56 865 1949 56 888 S9V2D120U5VSAC/D Cooling Airflow S9V2D120U5VSAC/D Furnace Cooling Airflow (CFM) and Power (Watts) vs. External Static Pressure with Filter (iwc) EXTERNAL STATIC PRESSURE (IN. W. C.) Outdoor Airflow Tonnage Setting 0.1 0.3 0.5 0.7 0.9 "Odt" (tons) (CFM/ton) 3.0 3.5 24 450 420 400 370 350 330 310 290 450 420 400 370 350 330 310 290 CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS 1336 / 163 1248 / 137 1189 / 121 1102 / 100 1043 / 87 985 / 76 927 / 65 869 / 56 1559 / 244 1455 / 204 1386 / 179 1282 / 147 1214 / 127 1145 / 110 1077 / 94 1009 / 80 1346 / 221 1258 / 191 1199 / 173 1110 / 148 1051 / 133 991 / 119 932 / 107 872 / 95 1567 / 312 1464 / 267 1395 / 240 1292 / 203 1223 / 181 1154 / 160 1085 / 142 1016 / 125 1354 / 281 1265 / 247 1206 / 227 1116 / 198 1057 / 181 996 / 165 936 / 150 874 / 136 1574 / 381 1472 / 331 1403 / 301 1300 / 260 1231 / 235 1161 / 212 1092 / 191 1021 / 171 1360 / 341 1271 / 304 1211 / 281 1121 / 249 1060 / 230 999 / 211 937 / 195 875 / 179 1579 / 450 1477 / 396 1409 / 363 1305 / 318 1236 / 290 1166 / 265 1096 / 241 1025 / 219 1363 / 402 1274 / 361 1214 / 336 1123 / 301 1062 / 279 1000 / 259 938 / 241 875 / 223 1583 / 519 1481 / 462 1413 / 426 1309 / 376 1239 / 346 1169 / 318 1098 / 292 1026 / 267 S9V2-VS-SVX001-1B-EN Heating and Cooling Airflow Tables Table 15. S9V2D120U5VSAC/D Cooling Airflow (continued) S9V2D120U5VSAC/D Furnace Cooling Airflow (CFM) and Power (Watts) vs. External Static Pressure with Filter (iwc) EXTERNAL STATIC PRESSURE (IN. W. C.) Outdoor Airflow Tonnage Setting 0.1 0.3 0.5 0.7 0.9 "Odt" (tons) (CFM/ton) 4.0 5.0 (a) (a) 450 420 400 370 350 330 310 290 450 420 400 370 350 (a) 330 310 290 CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS CFM / WATTS 1783 / 350 1663 / 290 1584 / 255 1465 / 207 1386 / 179 1307 / 154 1228 / 131 1150 / 111 2238 / 646 2086 / 533 1985 / 466 1834 / 377 1733 / 324 1633 / 277 1534 / 234 1435 / 196 1789 / 427 1671 / 362 1592 / 324 1474 / 271 1395 / 240 1317 / 211 1238 / 185 1159 / 162 2235 / 742 2086 / 623 1987 / 552 1838 / 456 1740 / 399 1641 / 347 1543 / 301 1444 / 259 1793 / 505 1677 / 436 1599 / 393 1481 / 336 1403 / 301 1324 / 269 1246 / 240 1166 / 214 2230 / 840 2085 / 714 1988 / 639 1842 / 536 1745 / 475 1647 / 419 1550 / 369 1452 / 322 1796 / 584 1681 / 509 1603 / 464 1487 / 401 1409 / 363 1330 / 328 1251 / 296 1171 / 266 2226 / 938 2083 / 806 1988 / 726 1844 / 617 1748 / 552 1652 / 492 1555 / 437 1458 / 387 1798 / 663 1683 / 583 1607 / 534 1491 / 467 1413 / 426 1334 / 388 1254 / 352 1174 / 320 2220 / 1036 2080 / 897 1986 / 813 1845 / 698 1750 / 628 1655 / 564 1558 / 505 1461 / 451 Factory Setting. S9V2-VS-SVX001-1B-EN 25 Furnace General Installation The following sections give general instructions for the installation of the gas furnaces. S-Series Furnace Panel Removal Note: Use a 5/16” Allen wrench to turn the four latches on the front panel a quarter turn. Horizontal Installation in an Attic or Crawlspace The S-Series upflow condensing furnace may be installed in an attic or crawl space in the horizontal let or right position for needed airflow direction. The horizontal furnace installation in an attic should be on a service platform large enough to allow for proper clearances on all sides and service access to the front of the furnace. See “the Locations and Clearance section,” p. 14. Line contact is only permissible between lines formed by intersections of the top and two sides of the furnace casing and building joists, studs, or framing. Horizontal Installation Hanging Using Straps The furnace may be installed hanging in a hanging position using straps. The furnace should be supported at both ends and have an additional support in the center of the furnace in front. The furnace may be placed horizontally in a crawl space on a pad or other noncombustible material which will raise the unit for sufficient protection from moisture. The Furnace must be supported at both ends and the middle when installed horizontally. The Furnace must also be elevated approximately 6 inches to allow clearance for the condensate drain to exit the cabinet in the h o r i z o n t a l p o s i t i o n . FURNACE MUST BE SUPPORTED AT ALL FOUR CORNERS. BAYHANG - OPTIONAL HORIZONTAL HANGING BRACKET KIT TO APPROVED OPEN / VENTED DRAIN Note: The overflow stand pipe termination must be even with or slightly below the bottom of the condensate trap. Note: Water from the overflow pipe must drain into the emergency drain pan. 26 S9V2-VS-SVX001-1B-EN Furnace General Installation Gas Piping Important: When converting the gas piping from the factory default, the plug must be removed from the new gas piping location and swapped with the grommet from the default location. The upflow furnace default is left side gas piping. The downflow furnace default is right side gas piping. Upflow furnace with gas piping on left side Upflow furnace with gas piping on right side 1/8” NPT Test Fitting 1/8” NPT Test Fitting Automatic Gas Valve with Manual Shut-off Main Manual Shut-off Valve Automatic Gas Valve with Manual Shut-off Gas Line Grommet Gas Line Grommet Ground Union Joint Main Manual Shut-off Valve Ground Union Joint Drip Leg Drip Leg Downflow furnace with gas piping on left side Downflow furnace with gas piping on right side 1/8” NPT Test Fitting 1/8” NPT Test Fitting Main Manual Shut-off Valve Gas Line Grommet Ground Union Joint Gas Line Grommet Main Manual Shut-off Valve Ground Union Joint Drip Leg Drip Leg Automatic Gas Valve with Manual Shut-off Horizontal left furnace with gas piping out left side Automatic Gas Valve with Manual Shut-off Horizontal left furnace with gas piping out right side 1/8” NPT Test Fitting Main Manual Shut-off Valve Automatic Gas Valve with Manual Shut-off 1/8” NPT Test Fitting Main Manual Shut-off Valve Ground Union Joint Ground Union Joint Gas Line Grommet Drip Leg Gas Line Grommet Drip Leg S9V2-VS-SVX001-1B-EN Automatic Gas Valve with Manual Shut-off 27 Furnace General Installation Horizontal right furnace with gas piping out left side Horizontal right furnace with gas piping out right side Main Manual Shut-off Valve Automatic Gas Valve with Manual Shut-off Gas Line Grommet Ground Union Joint 1/8” NPT Test Fitting Ground Union Joint Drip Leg Automatic Gas Valve with Manual Shut-off Gas Line Grommet Drip Leg The upflow/horizontal furnace is shipped standard for left side installation of gas piping. An opening with plug is provided on the right side for an alternate gas piping arrangement. The installation of piping shall be in accordance with piping codes and the regulations of the local gas company. Pipe joint compound must be resistant to the chemical reaction with liquefied petroleum gases. I m p o r t a n t : If local codes allow the use of flexible gas appliance connector, always use a new listed connector. Do not use a connector which has previously serviced another gas appliance. Refer to the piping table for delivery sizes. Connect gas supply to the unit, using a ground joint union and a manual shut-off valve. National codes require a condensation drip leg to be installed ahead of the gas valve. The furnace and its individual shut-off valve must be disconnected from the gas supply piping system during any pressure testing of that system at test pressures in excess of 1/2 psig (3.5 kPa). The furnace must be isolated from the gas supply piping by closing its individual manual shut-off valve during any pressure testing of the gas supply piping system at test pressures equal to or less than 1/2 psig (3.5 kPa). N o t e : Maximum pressure to the gas valve for natural gas is 13.8" W.C. Minimum pressure is 5.0" W.C. Maximum pressure to the gas valve for propane is 13.8" W.C. Minimum pressure is 11.0" W.C. 28 Main Manual Shut-off Valve 1/8” NPT Test Fitting NATURAL GAS ONLY TABLE OF CUBIC FEET PER HOUR OF GAS FOR VARIOUS PIPE SIZES AND LENGTHS LENGTH OF PIPE PIPE SIZE 10 20 30 40 50 60 70 1/2 131 90 72 62 55 50 46 3/4 273 188 151 129 114 104 95 1 514 353 284 243 215 195 179 1–1/4 1060 726 583 499 442 400 368 This table is based on Pressure Drop of 0.3 inch W.C. and 0.6 SP. GR. Gas All gas fittings must be checked for leaks using a soapy solution before lighting the furnace. D O N O T C H E C K WITH AN OPEN FLAME! For propane conversions on all S-Series Furnaces, use BAYLPSS400* conversion kit with stainless steel burners. When installing our furnaces in a manufactured house, use Manufactured Housing Accessory Kit, BAYMFGH200B. ORIFICE SIZES INPUT RATING BTUH NUMBER OF BURNERS 40,000 60,000 MAIN BURNER ORIFICE DRILL SIZE NAT. GAS PROPANE GAS 2 45 56 3 45 56 80,000 4 45 56 100,000 5 45 56 120,000 6 45 56 S9V2-VS-SVX001-1B-EN Furnace General Installation Combustion and Input Check 1. Make sure all gas appliances are off except the furnace. 2. Clock the gas meter with the furnace operating (determine the dial rating of the meter) for one revolution. 3. Match the "Sec" column in the gas flow table with the time clocked. 4. 5. 6. Gas Flow in Cubic Feet Per Hour 2 Cubic Foot Dial Sec. Flow Sec. Flow Sec. Flow Sec. Flow Read the "Flow" column opposite the number of seconds clocked. 10 732 31 236 52 141 86 85 Use the following factors if necessary: 11 666 32 229 53 138 88 83 12 610 33 222 54 136 90 81 13 563 34 215 55 133 94 78 14 523 35 209 56 131 98 75 15 488 36 203 57 128 100 73 16 458 37 198 58 126 104 70 17 431 38 193 59 124 108 68 18 407 39 188 60 122 112 65 19 385 40 183 62 118 116 63 20 366 41 179 64 114 120 61 21 349 42 174 66 111 130 56 22 333 43 170 68 108 140 52 23 318 44 166 70 105 150 49 24 305 45 163 72 102 160 46 25 293 46 159 74 99 170 43 26 282 47 156 76 96 180 41 27 271 48 153 78 94 190 39 28 262 49 149 80 92 200 37 29 253 50 146 82 89 30 244 51 144 84 87 a. For 1 Cu. Ft. Dial Gas Flow CFH = Chart Flow Reading ÷ 2 b. For 1/2 Cu Ft. Dial Gas Flow CFH = Chart Flow Reading ÷ 4 c. For 5 Cu. Ft. Dial Gas Flow CFH = 10X Chart Flow Reading ÷ 4 Multiply the final figure by the heating value of the gas obtained from the utility company and compare to the nameplate rating. This must not exceed the nameplate rating. S9V2-VS-SVX001-1B-EN 29 Furnace General Installation Gas Valve Adjustment Changes can be made by adjusting the manifold pressure, or changing orifices (orifice change may not always be required). To adjust the manifold pressure: 1. Turn off all electrical power to the system. 2. Loosen (Do Not remove) the pressure tap test set screw one turn with 3/32" hex wrench. a. White-Rodgers 36J Gas Valve On/Off Toggle Switch Inlet Pressure Boss The pressure tap adjustment kit (KIT07611) contains a 3/32" hex wrench, a 5/16" hose and a connector and can be ordered through Global Parts. 3. Attach a manifold pressure gauge with flexible tubing to the outlet pressure boss marked "OUT P" on White- Rodgers gas valve model 36J. 4. Turn on system power and energize valve. Important: Adjust 2nd stage on the gas valve before attempting to adjust 1st stage. 5. Adjust 2nd stage gas heat by removing the high (HI) adjustment regulator cover screw. a. To increase outlet pressure, turn the regulator adjust screw clockwise. b. To decrease outlet pressure, turn the regulator adjust screw counterclockwise. c. Adjust regulator until pressure shown on manometer matches the pressure specified in the table. 2nd Stage (HI) Manifold Pressure Adjustment 1st Stage (LO) Manifold Pressure Adjustment The input of no more than nameplate rating and no less than 93% of the nameplate rating, unless the unit is derated for high altitude. Fuel Manifold Pressure Settings (inches w.c.) Fuel 2nd Stage Max. 1st Stage Max. Replace and tighten the regulator cover screw securely. Natural Gas 3.5” W.C. 1.7” W.C. Adjust 1st stage gas heat by removing the low (LO) adjustment regulator cover screw. Propane Gas 10.0” W.C. 6.0” W.C. d. 6. Outlet Pressure Boss a. To increase outlet pressure, turn the regulator adjust screw clockwise. b. To decrease outlet pressure, turn the regulator adjust screw counterclockwise. c. Adjust regulator until pressure shown on manometer matches the pressure specified in the table. The input of no more than nameplate rating and no less than 93% of the nameplate rating, unless the unit is derated for high altitude. d. 7. Replace and tighten the regulator cover screw securely. Cycle the valve several times to verify regulator setting. a. Repeat steps 5-7 if needed. 8. Turn off all electrical power to the system. 9. Remove the manometer and flexible tubing and tighten the pressure tap screw. 10. Using a leak detection solution or soap suds, check for leaks at the pressure outlet boss and pressure tap test screw. 11. Turn on system power and check operation of the unit. 30 S9V2-VS-SVX001-1B-EN Furnace General Installation High Altitude Derate Input ratings (BTUH) of these Furnaces are based on sea level operation and should not be changed at elevations up to 2,000 ft. (610 m). PART NUMBERS FOR REPLACEMENT ORIFICES DRILL SIZE PART NUMBER DRILL SIZE PART NUMBER 44 ORF00501 54 ORF00555 45 ORF00644 55 ORF00693 46 ORF00909 56 ORF00907 47 ORF00910 57 ORF00908 48 ORF01099 58 ORF01338 49 ORF00503 59 ORF01339 50 ORF00493 If the installation is 2,000 ft. (610 m) or above, the Furnace input rate (BTUH) shall be reduced 4% for each 1,000 ft. above sea level. Installations of this furnace at altitudes above 2,000 ft. (610 m) shall be made utilizing the Vent Length table and/or Part Numbers for Replacement Orifices table in these installation instructions. The Furnace input rate shall be checked by clocking the gas flow rate (CFH) and multiplying by the heating value obtained from the local utility supplier for the gas being delivered at the installed altitude. Input rate changes can be made by adjusting the Manifold Pressure (min 3.0 - max 3.7 in. W.C. - Natural Gas) or changing orifices (orifice change may not always be required). If the desired input rate can not be achieved with a change in Manifold Pressure, then the orifices must be changed. Propane installations will require an orifice change. Important: Reinstall the replacement orifices to the same depth as the orifices supplied with the equipment. See the table for help in selecting orifices if orifice change is required. Furnace input rate and temperature rise should be checked again after changing orifices to confirm the proper rate for the altitude. The vent length table shows the required vent lengths for installations at various altitudes. Optional high altitude kits are available for installations over 5000 feet. Installations above 12,000 feet are not allowed. Turn the main Gas Valve toggle switch within the unit to the "OFF" position. Turn the external gas valve to "ON". Purge the air from the gas lines. After purging, check all gas connections for leaks with a soapy solution – DO NOT CHECK WITH AN OPEN FLAME. Allow 5 minutes for any gas that might have escaped to dissipate. Propane Gas being heavier than air may require forced ventilation. Turn the toggle switch on the Gas Valve in the unit to the "ON" position. The table lists the main burner orifices used with the furnace. If a change of orifices is required to correct the furnace input rating refer to the part number for replacement orifices table. Installation of this furnace at altitudes above 2000 ft (610m) shall be in accordance with local codes, or in the absence of local codes, the National Fuel Gas Code, ANSI Z223.1/NFPA 54 or National Standard of Canada, Natural Gas and Propane Installation Code, CSA B149.1. Installation of this furnace at altitudes above 2,000 ft (610 m) shall be made in accordance with the listed high altitude conversion kit available with the furnace. Orifice Twist Drill Size If Installed at Sea Level Altitude Above Sea Level and Orifice Required at Other Elevations 2000 3000 4000 5000 6000 7000 8000 9000 10000 42 42 43 43 43 44 44 45 46 47 43 44 44 44 45 45 46 47 47 48 44 45 45 45 46 47 47 48 48 50 45 46 47 47 47 48 48 49 49 50 46 47 47 47 48 48 49 49 50 51 47 48 48 49 49 49 50 50 51 52 54 54 55 55 55 55 55 56 56 56 55 55 55 55 56 56 56 56 56 57 56 56 56 57 57 57 58 59 59 60 57 58 59 59 60 60 61 62 63 63 58 59 60 60 61 62 62 63 63 64 From National Fuel Gas Code — Table E.1.1(d) S9V2-VS-SVX001-1B-EN 31 Furnace General Installation General Venting FURNACE EXHAUST MUST BE VENTED TO THE OUTDOORS. THESE FURNACES ARE INDUCED DRAFT VENTED AND MUST NOT BE CONNECTED TO ANY VENT SERVING ANOTHER APPLIANCE. PLEASE NOTE THAT THESE FURNACES USE POSITIVE-PRESSURE VENT SYSTEMS. Proper venting is essential to obtain maximum efficiency from a condensing Furnace. Proper installation of the vent system is necessary to assure drainage of the condensate and prevent deterioration of the vent system. ETL has certified the design of condensing Furnaces for a minimum of 0" clearance from combustible materials to single wall plastic vent pipe. The recommended system is assembled from 2" or 3" plastic pipe and fittings found in the Approved Vent Pipe Materials Table. Where the system is routed to the outdoors through an existing masonry chimney containing flue products from another gas appliance, or where required by local codes, then 3" venting of Type 29- 4C stainless steel must be used in place of PVC material. These Furnaces have been classified as CATEGORY IV Furnaces in accordance with ANSI Z21.47 “latest edition” standards. Category IV Furnaces operate with positive vent pressure and with a vent gas temperature less than 140°F above the dewpoint. These conditions require special venting systems, which must be gas tight and water tight. Note: When an existing Furnace is removed from a venting system serving other gas appliances, the venting system is likely to be too large to properly vent the remaining attached appliances. Important: These Furnaces may be installed as Direct Vent (sealed combustion) or as Nondirect Vent (single pipe). The Furnaces are shipped DIRECT VENT with sealed combustion. Important: Products installed in Canada must use vent systems that are certified to the Standard for Type BH Gas Venting Systems (ULC S636) for Class II-A venting systems (up to 65°C). Components of the vent system must not be interchanged with other vent systems or unlisted pipe or fittings. Plastic components, specified primers, and glues must be from a single system manufacturer and not intermixed with other system manufacturer's vent system parts. In addition, the first three feet of the vent pipe must be visible for inspection. When the vent pipe is exposed to temperatures below freezing, e.g., when it passes through unheated spaces, etc., the pipe must be insulated with 1/2 inch (12.7 mm) thick Armaflex-type insulation or equal. If the space is heated sufficiently to prevent freezing, then the insulation will not be required. If domestic water pipes are not protected from freezing then the space meets the condition of a heated space. 3” Venting requirements Important: To determine if your application requires 3” venting, see the Maximum Vent Length Table. Important: Horizontal venting application must use the 2” x 3” offset reducing coupling. Vertical venting applications do not require the reducing coupling to be offset. LABEL SAYS “TOP” Note: If your furnace comes with a factory supplied 2" X 3" offset reducing coupling it is used for 3" vent pipe installation. Make sure the marking "TOP" is located on the top side of the pipe in horizontal venting applications. The straight side of the coupling must be on bottom for proper drainage of condensate Note: For Canadian applications, BAYREDUCE 2” x 3” offset reducing coupling meets ULC-S636 requirements. Make sure the marking "TOP" is located on the top side of the pipe. The straight side of the coupling must be on bottom for proper drainage of condensate in horizontal venting. CPL00938 2" TO 3" COUPLING BAYREDUCE may be used in Canadian applications to meet ULC-S636 CPL00938 2" TO 3" COUPLING FIELD SUPPLIED 2” COUPLING CPL00938 IS FACTORY SUPPLIED ONLY WITH THE 120,000 BTUH UPFLOW FURNACE MODELS BAYREDUCE may be used in Canadian applications to meet ULC-S636 FIELD SUPPLIED 2” COUPLING CPL00938 IS FACTORY SUPPLIED ONLY WITH THE 120,000 BTUH UPFLOW FURNACE MODELS 32 S9V2-VS-SVX001-1B-EN Furnace General Installation Special Case Venting Special instructions for direct vent furnace air intake. In certain applications, particularly when the furnace is located in a basement, there are certain conditions that can be met where warm humid air from the outside is drawn into combustion air piping. If the area where the piping is located is conditioned below 70° F, condensation could occur inside the piping and ultimately drain into the furnace compartment, which could lead to premature component failure. We recommend following one of the options to prevent this condition from occurring and possibly damaging components within the furnace: Option 1 If possible, slope the inlet combustion air piping away from the furnace. Condensation that may occur will now drain outside of the home. The combustion air outlet piping must remain sloped back to the furnace. Option 1 Combustion air exhaust Combustion air intake Slope equals 1/4” per foot Note: Inlet air piping is not considered to be part of the venting system. The inlet air piping may be made from PVC. Optional In-line Condenser Trap Kit The BAYCNDTRAP2 and BAYCNDTRAP3 may be used for Option 1 venting. The in-line condenser trap kit must be installed on the vertical section of the combustion air intake pipe. Note: The in-line condenser trap may only be installed one way. See the imprint on the trap to ensure the arrow is pointing towards the furnace. The BAYCNDTRAP2 is used when the system uses 2” vent pipe. The BAYCNDTRAP3 is used when the system uses 3” vent pipe. Combustion air exhaust Combustion air intake BAYCNDTRAP2 BAYCNDTRAP3 Field fabricated trap Primary drain vent stack must terminate below the bottom of the condensate trap To an approved vented drain Option 2 – Top combustion air intake If sloping the combustion air intake pipe is not possible, install a DWV Tee as close to the furnace as possible with drain and trap to prevent condensation from occurring in the furnace cabinet. Do not tee AC condensate and combustion air condensate trap together. Primary drain vent stack must terminate below the bottom of the condensate trap To an approved vented drain Option 3 – Side combustion air intake If sloping the combustion air intake pipe is not possible, install an approved DWV Tee as close to the furnace as possible with drain and trap. Option 3 Option 2 Combustion air intake Combustion air exhaust Combustion air exhaust Combustion air intake Approved DWV Tee Field fabricated trap Approved DWV Tee Field fabricated trap Primary drain vent stack must terminate below the bottom of the condensate trap To an approved vented drain S9V2-VS-SVX001-1B-EN Primary drain vent stack must terminate below the bottom of the condensate trap To an approved vented drain 33 Furnace General Installation Vent Terminations For DIRECT VENT APPLICATION: The Furnaces must be vented to the exterior of the house and combustion air MUST come through the inlet air pipe from OUTSIDE AIR. Note: BAYVENT* accessories can be used for inlet and outlet terminals when the pipes do not exit the structure together. For Canadian applications, venting systems must meet ULC-S636 requirements. For NONDIRECT VENT APPLICATION: The Furnace shall be vented to the exterior of the house, but combustion air may enter from the surrounding area as long as combustion air requirements are met. (See AIR FOR COMBUSTION AND VENTILATION) Vent terminations • BAYVENT200B • BAYAIR30AVENTA Vent terminations – Canadian applications. Meets ULC-S636 requirements. • BAYVENTCN200B • BAYAIR30CNVENT FURNACE VENT / INLET PIPE INSTALLATION IN TWO PRESSURE ZONE CONFIGURATIONS There are many different variations of the vent / inlet air pipe combination. The vent / inlet air combination used for installation of these Furnaces depends on the needs of the location. However, these guidelines must be followed: 1. The Furnace must vent outside the structure. 2. Furnace combustion air requirements must be met for non-direct, single pipe applications. 3. For direct vent application of these Furnaces, the vent pipe and air inlet pipe do not have to exit in the same air space or even on the same surface of the structure. However, the longest individual pipe will decide the value for the longest allowable equivalent vent/ inlet air length as shown in the vent length table. Note: For single pressure zone applications, see the Horizontal Venting section. The following are EXAMPLES ONLY. EX. 1 – Example 1 shows the vent pipe exhausting through the roof and the inlet air coming from the interior of the house. The inlet air coming from the interior of the house must meet combustion requirements for area, etc., as shown in the section AIR FOR COMBUSTION AND VENTILATION. Vent Air Inlet Note: If only the flue gas pipe is to the outside of the structure, a straight section of pipe (long enough to exit the Furnace cabinet) must be attached to the inlet air side with an elbow (which is 5 to 10 equiv. ft.) installed on the end to prevent dust and debris from falling directly into the Furnace. EX. 2 – Furnace Attic Vent The inlet air does not have to come from outside the structure. Example 2 shows the inlet air, may come from the attic if the requirements for combustion air are met as shown in the section AIR FOR COMBUSTION AND VENTILATION. Vent Air Inlet Note: If only the flue gas pipe is to the outside of the structure, a straight section of pipe (long enough to exit the Furnace cabinet) must be attached to the inlet air side with an elbow (which is 5 to 10 equiv. ft.) installed on the end to prevent dust and debris from falling directly into the Furnace. (See Note) Furnace EX. 3 – Vent Example 3 shows that the exhaust vent may go vertical while the inlet air may be on any side of the structure. The vent pipe would decide the maximum equivalent length for the pip depending on the furnace and pipe size. Air Inlet Furnace 34 S9V2-VS-SVX001-1B-EN Furnace General Installation EX. 4 – Example 4 shows the vent exiting one side of the house while the inlet air is on the opposite side of the structure. Here the vent pipe length must be within the allowable length for the size of Furnace and size of the vent pipe. This example demonstrates that the pipes do not have to exit on the same side of the structure. Vent Air Inlet Furnace Attaching Vent Piping VENT FITTING MATERIAL – PLASTIC Gas and liquid tight single wall vent fittings, designed for resistance to corrosive flue condensate, MUST be used throughout. Listed in the Approved Vent Pipe Materials table are designations for different types of 2" and 3" size pipe and fittings that meet these requirements. The materials listed are various grades of PVC, CPVC, ABS, PolyPro® by DuraVent , Z-Dens by Novaflex Group, Innoflue® by Centrotherm, ECCO™ polypropylene venting system, and PolyFlue™ polypropylene venting systems. ATTACHING VENT PIPING Important: Products installed in Canada must use vent systems that are certified to the Standard for Type BH Gas Venting Systems (ULC S636) for Class II-A venting systems (up to 65°C). Components of the vent system must not be interchanged with other vent systems or unlisted pipe or fittings. Plastic components, specified primers, and glues must be from a single system manufacturer and not intermixed with other system manufacturer's vent system parts. In addition, the first three feet of the vent pipe must be visible for inspection. PIPE JOINTS: All joints must be fastened and sealed per manufacturer instructions and local and national codes to prevent escape of combustion products into the building. MANUFACTURED MODULAR VENTING SYSTEMS WARNING WARNING CARBON MONOXIDE POISONING HAZARD! CARBON MONOXIDE POISONING HAZARD! Failure to follow this Warning may result in property damage, severe personal injury, or death. See the Approved Vent Pipe Materials table for manufactured modular venting systems that are approved for use with this product. Follow the manufacturer’s installation instructions when installing the venting system. Failure to follow this Warning may result in property damage, severe personal injury, or death. Do not use cement on polypropylene venting systems. Follow the manufacturer’s installation instructions when installing the venting system. For manufactured modular venting systems that are approved with this product see PVC vent fitting material table. Do not drill into polypropelene venting pipes S9V2-VS-SVX001-1B-EN 35 Furnace General Installation BONDING OF PVC Note: Follow venting instructions carefully when using PVC cement. Note: It is recommended that the first joints from the Furnace be connected and sealed with high temperature RTV. This will enable the pipes to be removed later without cutting. Be sure to properly support these joints. Commercially available solvent cement for PVC must be used to join PVC pipe fittings. Follow instructions on container carefully. Pipe and Fitting – ASTM D1785, D2466, D2661, & D2665 PVC Primer and Solvent Cement – ASTM D2564 Procedure for Cementing Joints – Ref ASTM D2855 1. Important: All joints must be water tight. Flue condensate is somewhat acidic, and leaks can cause equipment damage. Cut pipe square, remove ragged edges and burrs. Chamfer end of pipe, then clean fitting socket and pipe joint area of all dirt, grease, moisture or chips. 2. After checking pipe and socket for proper fit, wipe socket and pipe with cleaner-primer. Apply a liberal coat of primer to inside surface of socket and outside of pipe. DO NOT ALLOW PRIMER TO DRY BEFORE APPLYING CEMENT. 3. Apply a thin coat of cement evenly in the socket. Quickly apply a heavy coat of cement to the pipe end and insert pipe into fitting with a slight twisting movement until it bottoms out. 4. Hold the pipe in the fitting for 30 seconds to prevent tapered socket from pushing the pipe out of the fitting. Seal INLET AIR PIPE with RTV sealant 5. Wipe all excess cement from the joint with a rag. Allow 15 minutes before handling. Cure time varies according to fit, temperature and humidity. Connection of the pipe and collar of the combustion air inlet should just be a friction fit. It is recommended that the inlet air joint be sealed with RTV type sealant to allow the joint to be separated for possible future service. The inlet and vent pipes must be properly supported throughout the entire length. APPROVED VENT PIPE MATERIALS PVC VENT FITTING MATERIAL These fittings are available from your Gas Furnace Distributors. ANSI/UL 1738 APPROVED VENT PIPE MATERIAL ASTM STANDARD PIPE TYPE N/A N/A ALLOWABLE TEMPERATURE °F MARKING 158 UL 1738 PVC ASTM STANDARD PIPE TYPE ALLOWABLE TEMPERATURE °F MARKING F891 CELLULAR CORE 158 ASTM F891 D2665 DWV PIPE 158 ASTM D2665 D1785 SCH 40, 80, 120 158 ASTM 1785 D2241 SDR SERIES 158 ASTM D2241 ASTM STANDARD PIPE TYPE ALLOWABLE TEMPERATURE °F MARKING CPVC D2846 CPVC 41 212 ASTM D2846 F441 SCH 40, 80 212 ASTM F441 F442 SDR SERIES 212 ASTM F442 ASTM STANDARD PIPE TYPE ALLOWABLE TEMPERATURE °F MARKING D2661 SCH 40 DWV 180 ASTM D2661 F628 SCH 40 DWV CELLULAR CORE 180 ASTM F628 ABS PolyPro® by DuraVent, Z-Dens by Novaflex Group, Innoflue® by Centrotherm, System 1738 by IPEX, ECCO™ polypropylene venting system, and PolyFlue™ polypropylene venting systems. 36 ASTM STANDARD PIPE TYPE ALLOWABLE TEMPERATURE °F MARKING N/A N/A 230 ULC-S636 S9V2-VS-SVX001-1B-EN Furnace General Installation Maximum Vent Length Table Maximum Total Equivalent Length in Feet for Vent and Inlet Air (See Notes) Model 2 inch or 2.5 inch Pipe 3 inch or 4 inch Pipe Altitude 0–2,000 Feet S9V2B040U3VS, S9V2B060U3VS 200 S9V2B080U4VS, S9V2B080D4VS 100 200 S9V2C100U4VS, S9V2C100D4VS 50 200 S9V2D120U5VS Note 1 200 200 Altitude 2,001–5,400 Feet S9V2B040U3VS, S9V2B060U3VS 200 200 S9V2B080U4VS, S9V2B080D4VS 80 120 S9V2C100U4VS, S9V2C100D4VS 50 150 Note 1 200 S9V2D120U5VS Altitude 5,401–7,800 Feet S9V2B040U3VS, S9V2B060U3VS 100 150 S9V2B080U4VS, S9V2B080D4VS 50 70 S9V2C100U4VS, S9V2C100D4VS Note 1 100 S9V2D120U5VS Note 1 100 Altitude 7,801–10,100 Feet S9V2B040U3VS, S9V2B060U3VS 50 90 S9V2B080U4VS, S9V2B080D4VS Note 1 50 S9V2C100U4VS, S9V2C100D4VS Note 1 50 S9V2D120U5VS Note 1 50 Notes: 1. Not allowed 2. For PolyPro® by Duravent, Z-DENS by Novaflex Group, InnoFlue®by Centrotherm, ECCO™ polypropylene venting system, and Polyflue™ manufactured modular venting systems that are in the approved vent pipe material table, fitting equivalent vent lengths may be different from what is shown in Note 6. Refer to the venting system manufacturer’s installation instruction for appropriate venting diameters and equivalent lengths. 3. Minimum vent length for all models: 15' equivalent. 4. DO NOT MIX PIPE DIAMETERS IN THE SAME LENGTH OF PIPE OUTSIDE THE FURNACE CABINET (Except adapters at the top of the furnace). If different inlet and vent pipe sizes are used, the vent pipe must adhere to the maximum length limit shown in the table above (See note 7 below for exception). The inlet pipe can be of a larger diameter, but never smaller than the vent pipe. 5. MAXIMUM PIPE LENGTHS MUST NOT BE EXCEEDED! THE LENGTH SHOWN IS NOT A COMBINED TOTAL, IT IS THE MAXIMUM LENGTH OF EACH (Vent or Inlet air pipes). 6. One SHORT radius 90° elbow is equivalent to 10' of 4" pipe, 10' of 3" pipe, or 8’ of 2" pipe. One LONG radius elbow is equivalent to 6' of 4" pipe, 7’ of 3" pipe, or 5' of 2" pipe. Two 45° elbows equal one 90° LONG elbow. One MITERED elbow is equivalent to 12’ of 3” pipe or 12’ of 2” pipe. 7. The termination tee or bend must be included in the total number of elbows. If the BAYAIR30AVENTA or BAYAIR30CNVENT termination kit is used, the equivalent length of pipe is 5 feet. For BAYVENT200B and BAYVENTCN200B the equivalent length is 0 feet. 8. For Canadian applications, venting systems must meet ULC-S636 requirements. 9. The INLET AIR of one pipe systems require the installation of a minimum of one 90° elbow (to prevent dust and debris from falling straight into the furnace). S9V2-VS-SVX001-1B-EN 37 Furnace General Installation Horizontal Venting Note: Insure that vent piping is sloped 1/4" per foot and that piping is supported properly to prevent sags and condensate pooling. 3” Venting requirements Important: To determine if your application requires 3” venting, see the Maximum Vent Length Table. Important: Horizontal venting application must use the 2” x 3” offset reducing coupling. Vertical venting applications do not require the reducing coupling to be offset. When the vent pipe is exposed to temperatures below freezing, e.g., when it passes through unheated spaces, etc., the pipe must be insulated with 1/2 inch (12.7 mm) thick Armaflex-type insulation or equal. If the space is heated sufficiently to prevent freezing, then the insulation will not be required. If domestic water pipes are not protected from freezing then the space meets the condition of a heated space. Note: If your furnace comes with a factory supplied 2" X 3" offset reducing coupling it is used for 3" vent pipe installation. Make sure the marking "TOP" is located on the top side of the pipe in horizontal venting applications. The straight side of the coupling must be on bottom for proper drainage of condensate. Note: For Canadian applications, BAYREDUCE 2” x 3” offset reducing coupling meets ULC-S636 requirements. Make sure the marking "TOP" is located on the top side of the pipe. The straight side of the coupling must be on bottom for proper drainage of condensate in horizontal venting. CPL00938 2" TO 3" COUPLING LABEL SAYS “TOP” BAYREDUCE may be used in Canadian applications to meet ULC-S636 FIELD SUPPLIED 2” COUPLING CPL00938 IS FACTORY SUPPLIED ONLY WITH THE 120,000 BTUH UPFLOW FURNACE MODELS CPL00938 2" TO 3" COUPLING FIELD SUPPLIED 2” COUPLING CPL00938 IS FACTORY SUPPLIED ONLY WITH THE 120,000 BTUH UPFLOW FURNACE MODELS BAYREDUCE may be used in Canadian applications to meet ULC-S636 COMBUSTIBLE MATERIAL WALL A minimum clearance of 1" to combustible materials must be maintained when using single wall stainless steel venting. Shield material to be a minimum of 24 gauge stainless or aluminized sheet metal. Minimum dimensions are 12"x12". Shield must be fastened to both inside and outside of wall. Use screws or anchor type fasteners suited to the outside or inside wall surfaces. COUPLING (PLASTIC VENTING) 6 IN. MIN. (TO JOINT) 1” CLEARANCE (AIR SPACE) STUD PVC WALL MOUNT FLANGE (OPTIONAL) APPROVED TERMINATION 12” MINIMUM ABOVE NORMALLY EXPECTED SNOW ACCUMULATION LEVEL NONCOMBUSTIBLE MATERIAL WALL The hole through the wall must be large enough to maintain pitch of vent and properly seal. Use cement mortar seal on inside and outside of wall. COUPLING (PLASTIC VENTING) 6 IN. MIN. (TO JOINT) CEMENT MORTAR SEAL INSIDE & OUTSIDE PVC WALL MOUNT FLANGE (OPTIONAL) APPROVED TERMINATION 12” MINIMUM ABOVE NORMALLY EXPECTED SNOW ACCUMULATION LEVEL VENTING THROUGH COMBUSTIBLE WALLS Pitch - 1/4 Inch Per Foot CLEARANCE (0” ACCEPTABLE FOR PVC VENT PIPE) (1” ACCEPTABLE FOR TYPE 29-4C STAINLESS STEEL VENT PIPE) 38 VENTING THROUGH NON-COMBUSTIBLE WALLS Pitch - 1/4 Inch Per Foot S9V2-VS-SVX001-1B-EN Furnace General Installation Table 16. Horizontal Venting Through Wall The vent for this appliance shall not terminate 1. Over public walkways; or 2. Near soffit vents or crawl space vents or other areas where condensate or vapor could create a nuisance or hazard or cause property damage; or 3. Where condensate vapor could cause damage or could be detrimental to the operation of regulators, relief valves. or other equipment. Possible configurations for two pipe venting system. Both terminations must be located in the same pressure zone. Important: Maintain 12” minimum clearance above highest anticipated snow level or grade, whichever is greater. Note: All distances are centerline to centerline. 12” Min. 15” Max. 12” Min. 15” Max. 6” Min. 24” Max. 6” Min. 24” Max. 9” Minimum minimum from end of exhaust pipe to end of inlet pipe 9” Minimum minimum from end of exhaust pipe to end of inlet pipe 12” Min. 15” Max. 6” Min. 24” Max. 4” Min. 24” Max. 9” Minimum minimum from end of exhaust pipe to end of inlet pipe Elbow and Tee Must be as close together as possible 6” Max. to wall 12” Min. between inlet and vent terminations 4” Min. 24” Max. VENT INLET 4” Min. 24” Max. S9V2-VS-SVX001-1B-EN 39 Furnace General Installation Horizontal Venting Through Wall with Concentric Vent Kit These Furnaces may be installed as direct vent (as shipped) or as nondirect vent. Installation must conform to national, state, and local codes. The BAYVENT200B, BAYVENTCN200B, BAYAIR30AVENTA, and BAYAIR30CNVENT vent & inlet terminals kits must be located at least 12" minimum above normally expected snow accumulation level. Avoid areas where staining or condensate drippage may be a problem. Location of the vent/wind terminal should be chosen to meet the requirements for either direct or non-direct vent applications. PITCH — Venting through the wall must maintain 1/4" per foot pitched upward to insure that condensate drains back to the Furnace. FLUE GAS DEGRADATION — The moisture content of the flue gas may have a detrimental effect on some building materials. This can be avoided by using the roof or chimney venting option. When wall venting is used on any surface that can be affected by moisture, it is recommended that a corrosion resistant shield (24 inches square) be used behind the vent terminal. This shield can be wood, plastic, sheet metal, etc. Also, silicone caulk all cracks, seams and joints within 3 feet of the vent terminal. BAYVENT200B / BAYVENTCN200B Note: For Canadian applications, horizontal vent termination kits must meet ULC-S636. ANCHORS (4 req.) " 7.2 3.2" Over public walkways; or 2. Near soffit vents or crawl space vents or other areas where condensate or vapor could create a nuisance or hazard or cause property damage; or Where condensate vapor could cause damage or could be detrimental to the operation of regulators, relief valves. or other equipment. For Canadian installations, if you used a ULC-S636 approved manufactured modular venting system, a copy of the manufacturer's instructions should remain with the system. The installation instruction can be obtained from the vent termination manufacturer. BAYVENTCN200B and BAYAIR30CNVENT meet ULC-S636 requirements. 12" MINIMUM TO OVERHANG COMBUSTION AIR SCREWS (4 req.) VENT VENT CAP MAINTAIN 12" MINIMUM CLEARANCE ABOVE HIGHEST ANTICIPATED SNOW LEVEL OR GRADE WHICHEVER IS GREATER The vent for this appliance shall not terminate 1. VENT PLATE VENT BAYAIR30AVENTA / BAYAIR30CNVENT(Sidewall) 3. COMBUSTION AIR STRAP (FIELD SUPPLIED) RAIN CAP VENT VENT 1" + 1/2" COMBUSTION AIR ELBOW (FIELD SUPPLIED) 12" MIN TO OVERHANG 1" + 1 2" COMBUSTION AIR VENT MAINTAIN 12 IN. MINIMUM CLEARANCE ABOVE HIGHEST ANTICIPATED SHOW LEVEL OR GRADE WHICH EVER IS GREATER 40 S9V2-VS-SVX001-1B-EN Furnace General Installation Important: The Commonwealth of Massachusetts requires compliance with regulation 248 CMR 4.00 and 5.00 for installation of through – the – wall vented gas appliances as follows: For all side wall horizontally vented gas fueled equipment installed in every dwelling, building or structure used in whole or in part for residential purposes, including those owned or operated by the Commonwealth and where the side wall exhaust vent termination is less than seven (7) feet above finished grade in the area of the venting, including but not limited to decks and porches, the following requirements shall be satisfied: 1. INSTALLATION OF CARBON MONOXIDE DETECTORS. At the time of installation of the side wall horizontal vented gas fueled equipment, the installing plumber or gasfitter shall observe that a hard wired carbon monoxide detector with an alarm and battery back-up is installed on the floor level where the gas equipment is to be installed. In addition, the installing plumber or gasfitter shall observe that a battery operated or hard wired carbon monoxide detector with an alarm is installed on each additional level of the dwelling, building or structure served by the side wall horizontal vented gas fueled equipment. It shall be the responsibility of the property owner to secure the services of qualified licensed professionals for the installation of hard wired carbon monoxide detectors. a. In the event that the side wall horizontally vented gas fueled equipment is installed in a crawl space or an attic, the hard wired carbon monoxide detector with alarm and battery back-up may be installed on the next adjacent floor level. b. In the event that the requirements of this subdivision can not be met at the time of completion of installation, the owner shall have a period of thirty (30) days to comply with the above requirements; provided, however, that during said thirty (30) day period, a battery operated carbon monoxide detector with an alarm shall be installed. 2. APPROVED CARBON MONOXIDE DETECTORS. Each carbon monoxide detector as required in accordance with the above provisions shall comply with NFPA 720 and be ANSI/UL 2034 listed and IAS certified. 3. SIGNAGE. A metal or plastic identification plate shall be permanently mounted to the exterior of the building at a minimum height of eight (8) feet above grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment. The sign shall read, in print size no less than one-half (1/2) inch in size, "GAS VENT DIRECTLY BELOW. KEEP CLEAR OF ALL OBSTRUCTIONS". 4. INSPECTION. The state or local gas inspector of the side wall horizontally vented gas fueled equipment shall not approve the installation unless, upon inspection, the inspector observes carbon monoxide detectors and signage installed in accordance with the provisions of 248 CMR 5.08(2) (a)1 through 4. This appliance requires a special venting system. If BAYAIR30AVENTA or BAYVENT200B are used, a copy of the installation instructions for the kit shall remain with the appliance or equipment at the completion of installation. The venting system installation instructions can be obtained from the manufacturer by writing to the following address: Trane and American Standard 6200 Troup Highway Tyler, TX 75707 Attention: Manager of Field Operations Excellence Horizontal Vent Clearances INSIDE CORNER DETAIL G V A H D E V B C V B FIXED CLOSED V L I B V OPERABLE F V VENT TERMINAL S9V2-VS-SVX001-1B-EN X AIR SUPPLY INLET X V X V J B V V M B B FIXED CLOSED OPERABLE A K AREA WHERE TERMINAL IS NOT PERMITTED 41 Furnace General Installation Non-Direct Vent Termination Clearances Canadian Installations US Installations A= Clearance above grade, veranda, porch, deck, or balcony 12 inches (30 cm) 12 inches (30 cm) B= Clearance to window or door that may be opened 12 inches (30 cm) for appliances > 10,000 BTUH (3 kw) and ≤ 100,000 BTUH (30 kw), 36 inches (91 cm) for appliances > 100,000 BTUH (30 kw) 4 feet (1.2m) below or to the side of opening; 1 foot (0.3m) above opening C= Clearance to permanently closed window * * D= Vertical clearance to ventilated soffit located above the terminal within a horizontal distance of 2 feet (61 cm) from the center line of the terminal * * E= Clearance to unventilated soffit * * F= Clearance to outside corner * * G= Clearance to inside corner * * H= Clearance to each side of center line extended above meter/regulator assembly 3 feet (91 cm) with a height 15 feet (4.5 m) above the meter/regulator assembly * I= Clearance to service regulator vent outlet 3 feet (91 cm) * J= Clearance to nonmechanical air supply inlet to building or the combustion air inlet to any other appliance 12 inches (30 cm) for appliances > 10,000 BTUH (3 kw) and ≤ 100,000 BTUH (30 kw), 36 inches (91 cm) for appliances > 100,000 BTUH (30 kw) 4 feet (1.2 m) below or to side of opening; 1 foot (300 m) above opening K= Clearance to a mechanical air supply inlet 6 feet (1.83m) 3 feet (91 cm) above if within 10 feet (3m) horizontally L= Clearance above a paved sidewalk or paved driveway located on public property 7 feet (2.13 m) and not located above public walkways or other areas where condensate or vapor can cause a nuisance or hazard 7 feet (2.13 m) and not located above public walkways or other areas where condensate or vapor can cause a nuisance or hazard M= Clearance under veranda, porch, deck, or balcony 12 inches (30 cm) if veranda, porch, deck, or balcony is fully open on a minimum of two sides beneath the floor 12 inches (30 cm) where the area beneath the veranda, porch, deck, or balcony is open on not less than two sides. The vent terminal is prohibited in this location where only one side is open Notes: 1. The Canadian venting installations must be in accordance with local codes or in the absence of local codes with the current CSA B149.1 Natural Gas and Propane Installation Code. 2. The US venting installations must be in accordance with local codes or in the absence of local codes with the current ANSI Z223.1/NFPA 54 National Fuel Gas Code. * Clearance in accordance with local installation codes and the requirements of the gas supplier. 42 S9V2-VS-SVX001-1B-EN Furnace General Installation Direct Vent Termination Clearances Canadian Installations US Installations A= Clearance above grade, veranda, porch, deck, or balcony 12 inches (30 cm) 12 inches (30 cm) B= Clearance to window or door that may be opened 12 inches (30 cm) for appliances > 10,000 BTUH (3 kw) and ≤ 100,000 BTUH (30 kw), 36 inches (91 cm) for appliances > 100,000 BTUH (30 kw) 9 inches (23 cm) for appliances > 10,000 BTUH (3 kw) and =/< 50,000 BTUH (15 kw), 12 inches (30 cm) for appliances > 50,000 BTUH (15 kw) C= Clearance to permanently closed window * * D= Vertical clearance to ventilated soffit located above the terminal within a horizontal distance of 2 feet (61 cm) from the center line of the terminal * * E= Clearance to unventilated soffit * * F= Clearance to outside corner * * G= Clearance to inside corner * * H= Clearance to each side of center line extended above meter/regulator assembly 3 feet (91 cm) with a height 15 feet (4.5 m) above the meter/regulator assembly * I= Clearance to service regulator vent outlet 3 feet (91 cm) * J= Clearance to nonmechanical air supply inlet to building or the combustion air inlet to any other appliance 12 inches (30 cm) for appliances > 10,000 BTUH (3 kw) and =/< 100,000 BTUH (30 kw), 36 inches (91 cm) for appliances > 100,000 BTUH (30 kw) 9 inches (23 cm) for appliances > 10,000 BTUH (3 kw) and ≤ 50,000 BTUH (15 kw); 12 inches (30 cm) for appliances > 50,000 BTUH (15 kw) K= Clearance to a mechanical air supply inlet 6 feet (1.83m) 3 feet (91 cm) above if within 10 feet (3m) horizontally L= Clearance above a paved sidewalk or paved driveway located on public property 7 feet (2.13 m) and not located above public walkways or other areas where condensate or vapor can cause a nuisance or hazard 7 feet (2.13 m) and not located above public walkways or other areas where condensate or vapor can cause a nuisance or hazard M= Clearance under veranda, porch, deck, or balcony 12 inches (30 cm) if veranda, porch, deck, or balcony is fully open on a minimum of two sides beneath the floor 12 inches (30 cm) where the area beneath the veranda, porch, deck, or balcony is open on not less than two sides. The vent terminal is prohibited in this location where only one side is open Notes: 1. The Canadian venting installations must be in accordance with local codes or in the absence of local codes with the current CSA B149.1 Natural Gas and Propane Installation Code. 2. The US venting installations must be in accordance with local codes or in the absence of local codes with the current ANSI Z223.1/NFPA 54 National Fuel Gas Code. * Clearance in accordance with local installation codes and the requirements of the gas supplier. S9V2-VS-SVX001-1B-EN 43 Furnace General Installation Venting Through The Roof Support Horizontal pipe every 3’0” with the first support as close to the furnace as possible. Induced draft blower, housing, and furnace must not support the weight of the flue pipe. Supports 34” BAYAIR30AVENTA / BAYAIR30CNVENT VENT 12 INCHES MIN. CLEARANCE MUST BE MAINTAINED ABOVE HIGHEST ANTICIPATED SNOW LEVEL. MAXIMUM NOT TO EXCEED 24 INCHES ABOVE ROOF. MAINTAIN 12 IN. (18 IN. FOR CANADA) MINIMUM CLEARANCE ABOVE HIGHEST ANTICIPATED SNOW LEVEL. MAXIMUM OF 24 IN. ABOVE ROOF. COMBUSTION AIR Note: All measurements are from centerline to centerline. BAYAIR30AVENTA / BAYAIR30CNVENT MAINTAIN 12 IN. VENT (18 IN. FOR CANADA) MINIMUM CLEARANCE REMOVE RIBS ABOVE HIGHEST FROM CAP ANTICIPATED SNOW LEVEL. MAXIMUM OF COMBUSTION 24 IN. ABOVE ROOF AIR SEAL BETWEEN FLANGE, PIPE, COUPLING AND METAL PANEL WITH HI TEMP RTV SILICONE SEALANT FLUE PIPE COUPLING ROOF FLASHING BOOT (FIELD SUPPLIED) SUPPORT FLANGE SUPPORT (FIELD SUPPLIED) ELBOW (FIELD SUPPLIED) VENT COMBUSTION AIR CEILING GALVANIZED FIRESTOP SHOULD BE FABRICATED WITH 3-7/8" DIA. HOLE FOR SUPPORT FLANGE (12" x 12" PANEL OR 12" DIA MIN.) CLEARANCE - 0" ACCEPTABLE FOR PVC VENT PIPE 1" ACCEPTABLE FOR TYPE 29-4C STAINLESS STEEL VENT PIPE VENTING THROUGH CEILING 44 S9V2-VS-SVX001-1B-EN Furnace General Installation When penetrating roof with PVC vent pipe, a flexible flashing may be used for a weather tight seal. Lubricate flexible seal on flashing before PVC pipe is pushed through the seal. (Field Supplied) Note: No vent cap is the preferred method for vertical vent termination in extremely cold climates. Note: In extreme climate conditions, insulate the exposed pipe above the roof line with Armaflex type insulation. PVC PLASTIC VENTING THROUGH UNUSED CHIMNEY Venting Through an UNUSED Chimney Venting Routed Through a Masonry Chimney STAINLESS STEEL VENT CAP (OPTIONAL) Important: Refer to Section 12.6.8 of NFPA 54 / ANSI 223.1 2012 when routing vent piping through a chimney. Important: The single wall flue pipe joints must be sealed. The 90° elbow connection to vertical pipe must be sealed to prevent condensate leakage to base of masonry chimney. SEE CAUTION 6 IN. MIN. FLUE PIPE SUPPORT THE SINGLE WALL FLUE PIPE AND CENTER IT IN THE CHIMNEY OPENING WITH ANGLES AS SHOWN OR ANOTHER EQUIVALENT MANNER. COUPLING TO SUPPORT PIPE FROM ANGLES OR OTHER SUITABLE SUPPORT METHOD COUPLING AS REQUIRED FLUE PIPE NOTE: HORIZONTAL VENTING TO VERTICAL VENTING Venting Through an UNUSED Chimney Important: Refer to Section 12.6.8 of NFPA 54 / ANSI 223.1 2012 when routing vent piping through a chimney. Important: The single wall flue pipe joints must be sealed. The 90° elbow connection to vertical pipe must be sealed to prevent condensate leakage to base of masonry chimney. VENT FITTING MATERIAL – STAINLESS STEEL Gas and liquid tight single wall metal vent fitting, designed for resistance to corrosive flue condensate such as Type 29-4C MUST be used throughout. These fittings and fitting accessories are to be field supplied. DIRECTION OF STAINLESS STEEL FITTING All stainless steel fitting must be installed with male end towards the Furnace. All horizontal stainless steel sections must be positioned with the seam on top. All long horizontal sections must be supported to prevent sagging. All pipe joints must be fastened and sealed to prevent escape of combustion products into the building. TYPE 29-4C STAINLESS STEEL VENTING THROUGH UNUSED CHIMNEY STAINLESS STEEL VENT CAP (OPTIONAL) SEE CAUTION 6 IN. MIN. SUPPORT THE SINGLE WALL STAINLESS STEEL GAS VENTING AND CENTER IT IN THE CHIMNEY OPENING WITH ANGLES AS SHOWN OR ANOTHER EQUIVALENT MANNER. NOTE: HORIZONTAL VENTING TO VERTICAL VENTING S9V2-VS-SVX001-1B-EN 45 Furnace General Installation Downward Venting Furnace may be in vertical or horizontal configuration. Notes: 1. Condensate trap for vent pipe must be a minimum of 6 inches in height. 2. Condensate trap for vent and inlet pipe must be connected into a condensate drain pump; an open or vented drain; or it can be connected to the outlet hose of the Furnace condensate trap. Outdoor draining of the Furnace and coil condensate is permissible if allowed by local codes. 3. The condensate trap should be primed at initial start up prior to heating season operation. All horizontal pipes must be supported at maximum of 3 foot intervals Downward vent length is limited to a maximum of 15 equivalent feet. Upflow or Downflow Furnace Slope 1/4" per ft. Slope 1/4" per ft. 6" Min. Caution should be taken to prevent drains from freezing or causing slippery conditions that could lead to personal injury. Excessive draining of condensate may cause saturated ground conditions that may result in damage to plants. Air for Combustion and Ventilation Minimum Area in Square Feet for Unconfined Space Installations Furnace Maximum BTUH Input Rating With 8 Ft. Ceiling, Minimum Area in Square Feet of Unconfined Space 40,000 60,000 80,000 100,000 120,000 250 375 500 625 750 Adequate flow of combustion and ventilating air must not be obstructed from reaching the Furnace. Air openings provided in the Furnace casing must be kept free of obstructions which restrict the flow of air. Airflow restrictions affect the efficiency and safe operation of the Furnace. Keep this in mind should you choose to remodel or change the area which contains your Furnace. Furnaces must have a free flow of air for proper performance. Provisions for combustion and ventilation air shall be made in accordance with "latest edition" of Section 9.3, Air for Combustion and Ventilation, of the National Fuel Gas Code, ANSI Z223.1 / NFPA 54, or Sections 8.2, 8.3 or 8.4 of CSA B149.1 Installation Codes, and applicable provisions of the local building codes. Special conditions created by mechanical exhausting of air and fireplaces must be considered to avoid unsatisfactory Furnace operation. Furnace location may be in an u n c o n f i n e d space or a c o n f i n e d space. U n c o n f i n e d space are installations with 50 cu. ft. or more per 1000 BTU/hr input from all equipment installed. Unconfined spaces are defined in the table and illustration for various furnace sizes. These spaces may have adequate air by infiltration to provide air for combustion, ventilation, and dilution of flue gases. Buildings with tight construction (for example, weather stripping, heavily insulated, caulked, vapor barrier, etc.), may need additional air provided as described for confined space. UNCONFINED NO DOORS 50 CU. FT. OR MORE PER 1000 BTU/HR INPUT ALL EQUIP. INSTALLED WATER FURNACE HEATER CLOTHES DRYER C o n f i n e d spaces are installations with less than 50 cu. ft. of space per 1000 BTU/ hr input from all equipment installed. Confined spaces are defined in the table and illustration for various furnace sizes. Air for combustion and ventilation requirements can be supplied from inside the building. 1. The following types of installations will r e q u i r e use of OUTDOOR AIR for combustion, due to chemical exposures: • Commercial buildings • Buildings with indoor pools • Furnaces installed in commercial laundry rooms • Furnaces installed in hobby or craft rooms • Furnaces installed near chemical storage areas Exposure to the following substances in the combustion air supply will also require OUTDOOR AIR for combustion: • 46 Permanent wave solutions S9V2-VS-SVX001-1B-EN Furnace General Installation • Chlorinated waxes and cleaners • Chlorine based swimming pool chemicals • Water softening chemicals • Deicing salts or chemicals • Carbon Tetrachloride • Halogen type refrigerants • Cleaning solvents (such as perchloroethylene) • Printing inks, paint removers, varnish, etc. • Hydrochloric acid • Cements and glues • Antistatic fabric softeners for clothes dryers • Masonry acid washing material CONFINED SPACE PERMANENT OPENINGS N o t e : Extended warranties are not available in some instances. Extended warranty does not cover repairs to equipment installed in establishments with corrosive atmospheres, including but not limited to, dry cleaners, beauty shops, and printing facilities. Minimum Free Area in Square Inches Each Opening (Furnace Only) in a Confined Space Furnace Max BTUH.Input Rtg. Air From Inside 40,000 60,000 80,000 100,000 120,000 140,000 100 100 100 100 120 140 CONFINED SPACE AIR FROM INSIDE BUILDING All air from outdoors The confined space shall be provided with two permanent openings, one commencing within 12 inches of the top and one commencing within 12 inches of the bottom of the enclosure. The openings shall communicate directly, or by ducts, with the outdoors or spaces (crawl or attic) that freely communicate with the outdoors. Refer to the Minimum Free Area in square inches for confined spaces table, for minimum open areas required. CONFINED SPACE AIR FROM OUTDOORS Air From Outside Vertical Duct (a) Horizontal Duct (b) 10 15 20 25 30 35 20 30 40 50 60 70 CONFINED SPACE OUTLET OUTDOOR AIR DUCTS INLET (a) 1 Square inch per 4000 BTU/hr Vertical Duct. (b) 1 Square inch per 2000 BTU/hr Horizontal Duct. CONFINED SPACE AIR FROM VENTILATED ATTIC/CRAWL SPACE CONFINED ATTIC LOUVERS TO OUTDOORS FURNACE LESS THAN 50 CU. FT. PER 1000 BTU/HR INPUT ALL EQUIP. INSTALLED CONFINED SPACE ALTERNATE INLET AIR All air from inside the building The confined space shall be provided with two permanent openings communicating directly with an additional room(s) of sufficient volume so that the combined volume of all spaces meets the criteria for an unconfined space. The total input of all gas utilization equipment installed in the combined space shall be considered in making this determination. Refer to the Minimum Free Area in square inches for confined spaces table, for minimum open areas required. OUTLET AIR INLET AIR DUCT CONFINED SPACE AIR FROM VENTILATED ATTIC ATTIC LOUVERS TO OUTDOORS CONFINED SPACE OUTLET AIR INLET AIR DUCT S9V2-VS-SVX001-1B-EN 47 Furnace General Installation Duct Connections Air duct systems should be installed in accordance with standards for air conditioning systems, National Fire Protection Association Pamphlet No. 90. They should be sized in accordance with ACCA Manual D or whichever is applicable. Check on controls to make certain they are correct for the electrical supply. Central furnaces, when used in connection with cooling units, shall be installed in parallel or on the upstream side of the cooling units to avoid condensation in the heating element, unless the furnace has been specifically approved for downstream installation. With a parallel flow arrangement, the dampers or other means used to control flow of air shall be adequate to prevent chilled air from entering the furnace, and if manually operated, must be equipped with means to prevent operation of either unit unless the damper is in full heat or cool position. Flexible connections of nonflammable material may be used for return air and discharge connections to reduce the transmission of vibration. Though these units have been specifically designed for quiet, vibration free operation, air ducts can act as sounding boards and could, if poorly installed, amplify the slightest vibration to the annoyance level. When the furnace is located in a utility room adjacent to the living area, the system should be carefully designed with returns which minimize noise transmission through the return air grille. Although these winter air conditioners are designed with large blowers operating at moderate speeds, any blower moving a high volume of air will produce audible noise which could be objectionable when the unit is located very close to a living area. It is often advisable to route the return air ducts under the floor or through the attic. Such design permits the installation of air return remote from the living area (i.e. central hall). When the furnace is installed so that the supply ducts carry air circulated by the furnace to areas outside the space containing the furnace, the return air shall also be handled by a duct(s) sealed to the furnace and terminating outside the space containing the furnace. For furnaces not equipped with a cooling coil, it is recommended that the outlet duct be provided with a removable access panel. The opening shall be accessible when the furnace is installed and shall be of such a size that the heat exchanger can be viewed for possible openings using light assistance or a probe can be inserted for sampling the air stream. The removable cover must be sealed to prevent air leaks. Where there is no complete return duct system, the return connection must be run full size from the Furnace to a location outside the utility room, basement, attic, or crawl space. Do Not install return air through the back of the Furnace cabinet. Do Not install return air through the side of the furnace cabinet on horizontal applications without following the guidelines in Figure 1, p. 57. Carbon monoxide, fire or smoke can cause serious bodily injury, death, and/or property damage. A variety of potential sources of carbon monoxide can be found in a building or dwelling such as gas-fired clothes dryers, gas cooking stoves, water heaters, furnaces and fireplaces. The U.S. Consumer Product Safety Commission recommends that users of gas-burning appliances install carbon monoxide detectors as well as fire and smoke detectors per the manufactures installation instructions to help alert dwelling occupants of the presence of fire, smoke or unsafe levels of carbon monoxide. These devices should be listed by Underwriters Laboratories, Inc. Standards for Single and Multiple Station Carbon Monoxide Alarms, UL 2034 or CSA International Standard, Residential Carbon Monoxide Alarming Devices, CSA 6.19. Note: The manufacturer of your Furnace DOES NOT test any detectors and makes no representations regarding any brand or type of detector. Note: Seal per local codes 48 S9V2-VS-SVX001-1B-EN Furnace General Installation Table 17. Supply Duct Connections CAUTION COIL REQUIREMENT!! Note: The "Coil Requirement" caution is applicable to: Upflow furnace with coil, Furnace in horizontal left with coil and Furnace in horizontal right with "A" coil Failure to follow this Caution could result in property damage or personal injury. 4GXC* and 4MXC* coils installed on upflow furnaces in vertical, horizontal left, or horizontal right orientations without a factory installed metal drain pan shield must use a MAY*FERCOLKITAA kit. Coils installed on upflow furnaces must have drain pans that are suitable for 400° F (205° C) or have a metal drain pan shield. Downflow furnaces do not require a metal drain pan shield or the use of the MAY*FERCOLKITAA kit. Upflow Furnace with Coil Upflow Furnace with Coil Note: There are no longer guide holes located on the furnace flange. Refer to Step 1. Refer to Step 2., Step 3., Step 4. Furnace in Horizontal Left with Coil Furnace in Horizontal Left with Coil Note: There are no longer guide holes located on the furnace flange. Refer to Step 1. S9V2-VS-SVX001-1B-EN Refer to Step 6., Step 3., Step 4. 49 Furnace General Installation Table 17. Supply Duct Connections (continued) Furnace in Horizontal Right with “A” Coil Furnace in Horizontal Right with “A” Coil Note: Flat or dedicated horizontal coils may require flanges to be bent upward. Refer to Step 7., Step 8., Step 9., Step 6. Refer to Step 10., Step 4. Downflow Furnace with Coil Downflow Furnace with Coil Note: 4GXC* or 4MXC* coils installed on a downflow furnace do not require a metal drain pan shield or the use of the MAY*FERCOLKITAA kit. Refer to Step 7., Step 8., Step 9., Step 6. Refer to Step 11., Step 4. 50 S9V2-VS-SVX001-1B-EN Furnace General Installation Table 17. Supply Duct Connections (continued) Horizontal Right and Downflow Furnace — no Coil Important: A BAYBASE is required when installing the furnace on a combustible floor. Refer to Step 1., Step 12., Step 4. Installation Instructions 1. Bend furnace flanges up. 2. Set the coil on top of the furnace. 3. Screw through the coil cabinet into the furnace flange. Guide holes are located on the coil. 4. Seal per local codes and requirements. 5. Insulate the first 6–12 inches of the supply duct. 6. Support the furnace and coil independently. 8. Starting at the back of the furnace, cut the side flanges along perforations until past the end of the heat shield to avoid interference when bending. 9. Bend furnace side flanges down. 10. Match the coil up flush to the back of the furnace. 11. Set the furnace on top of the coil so that it is flush with the back of the furnace. 12. Attach ducting. 7. Cut the back flange along perforation. S9V2-VS-SVX001-1B-EN 51 Furnace General Installation Table 18. Return Duct Connections Return Ducting General Guidelines • Back returns are not allowed on any S-Series furnaces • Side returns are not allowed on downflow S-Series furnaces • Mounting flanges must be located on ducting • Shoot screws through the mount flanges into the furnace cabinet • Always seal per local codes and requirements • Furnace, coil, and ducting must be supported separately • An external overflow drain pan must be installed in all applications over a finished ceiling to prevent property damage Upflow Furnace with Bottom Return in Closet with Remote Filter Upflow Furnace with Bottom Return in Closet with Filter Box Filter Refer to Step 1., Step 2., Step 3., Step 4. Upflow Furnace with Bottom Return Mounted on a Ducted Pedestal Refer to Step 1., Step 5., Step 6., Step 4. Upflow Furnace with Bottom Return Mounted on a Ducted Pedestal with Filter Box Filter Refer to Step 1., Step 7., Step 8., Step 4. Refer to Step 1., Step 9., Step 4. 52 S9V2-VS-SVX001-1B-EN Furnace General Installation Table 18. Return Duct Connections (continued) Upflow Furnace with Bottom and Side Returns Mounted on a Ducted Pedestal with Side Return and Filter Box Important: Make sure the condensate and thermostat wiring holes are sealed on the cabinet side with the side return. The plugs and grommets may need to be changed with those on the opposite side of the cabinet. 17.5” Filter Cabinet with BAYLIFT Kit Important: Make sure not to cut the cabinet in the “No Cut” area. Note: Use Optional BAYLIFT kit to lift furnace. Follow kit instructions. Filter Note: The furnace bottom pedestal must be a minimum of 6” in height. No Cut Area Cutouts Flush with back of furnace cabinet Refer to Step 1., Step 10., Step 11., Step 12., Step 13., Step 14., Step 15., Step 4. Upflow Furnace with Side Return 21” Filter Cabinet with BAYLIFT Kit Important: Make sure the condensate and thermostat wiring holes are sealed on the cabinet side with the side return. The plugs and grommets may need to be changes with those on the opposite side of the cabinet. Important: Make sure not to cut the cabinet in the “No Cut” area. Note: Return air on right side with the condensate on the left or return air on left with the condensate on the right do not require a transition. Note: If using a filter box, use a transition, if possible, to attach the filter box to the furnace cabinet. Use four corner guides to create cutout No Cut Area Cutouts Flush with back of furnace cabinet No Cut Area Refer to Step 16., Step 17., Step 18., Step 19. S9V2-VS-SVX001-1B-EN 53 Furnace General Installation Table 18. Return Duct Connections (continued) Upflow Furnace with Two Side Returns Downflow Furnace with Top Return Important: One of the sides must have a transition to allow the condensate and thermostat wiring to exit the cabinet. Important: If a transition is not a viable option, a hole may be drilled in the bottom of the cabinet to allow the condensate to exit. Also, a hole will need to be drilled in the side of the cabinet for the thermostat wiring to exit. Important: Make sure not to cut the cabinet in the “No Cut” area. Note: If using one transition, the condensate and thermostat wiring will exit on the transition side. Note: If using a filter boxes, use transitions, if possible, to attach the filter boxes to the furnace cabinet. If transitions are not used, condensate may exit through the bottom of the furnace. Use four corner guides to create cutout No Cut Area Refer to Step 20., Step 21., Step 3., Step 4. Refer to Step 16., Step 17., Step 18., Step 19. Downflow Furnace with Top Return and Plenum Downflow Furnace with Top Return and Plenum with Filter Box Filter Refer to Step 20., Step 22., Step 3., Step 4. 54 Refer to Step 20., Step 23., Step 24., Step 4. S9V2-VS-SVX001-1B-EN Furnace General Installation Installation Instructions 14. Attach ducting to the filter box. 1. Remove the bottom plate. 2. Set the furnace on the base inside closet. 15. The ducted pedestal will use ducted air from a remote location. 3. Install remote filter. 16. Using guides, remove the cutout for the side return. 4. Seal per local codes and requirements. 17. Create ducting and set the furnace in place. Use screws to attach ducting to the furnace cabinet. 5. Set the furnace on the filter box inside closet. 6. Must have grill present for air. 18. Seal bottom panel per local codes and requirements. 7. Set the furnace on the ducted pedestal. The ducted pedestal will use ducted air from a remote location. 19. Seal all other panels per local codes and requirements. 8. Install filter at a remote location. 20. Remove the top plate. 9. Set the furnace on the filter box. The ducted pedestal will use ducted air from a remote location. 21. Attach the ducting to the top of the furnace. 10. Create ducting and set the furnace in place. 11. Match the filter cabinet flush to the back and bottom sides of the furnace cabinet and secure in place with screws. 22. Attach the plenum ducting to the top of the furnace. 23. Attach the filter box to the top of the furnace. 24. Attach ducting. 12. Mark the two areas to be cut out for the return air. 13. Cut out the two sections of the cabinet and BAYLIFT kit to be removed. S9V2-VS-SVX001-1B-EN 55 Furnace General Installation Return Air Filters Return Air Filters TYPICAL UPFLOW RETURN AIR FILTER INSTALLATIONS Filters are not factory supplied for upflow furnaces. Filter size needed will be dependent on type of filter and CFM requirement. Filters must be installed externally to the unit. Important: It is recommended to transition return ducting to the same size as the opening. It is acceptable for return duct or filter frame to extend forward of the opening but plastic plugs MUST be installed in any opening that the duct or filter frame may cover. Upflow Return Air Filters Furnace Width Filter Qty and Size 17–1/2” 1 — 16” x 25” x 1” 21” 1 — 20” x 25” x 1” 24–1/2” 1 — 24” x 25” x 1” Note: For upflow furnace models in any configuration, where the airflow requirement exceeds 1600 CFM - Furnaces will require return air openings and filters on: (1) both sides, or (2) one side and the bottom, or (3) just on the bottom. Preparation for Upflow Bottom and Side Return Air Filter Installations All return air duct systems should provide for installation of return air filters. 1. Determine the appropriate position to set the furnace in order to connect to existing supply and return ductwork. 2. For upflow side return installations, remove the insulation around the opening in the blower compartment 3. The side panels of the upflow furnace include locating notches that are used as guides for cutting an opening for return air, refer to the figure and the upflow furnace outline drawing for duct connection dimensions for various furnaces. 4. If a 3/4" flange is to be used for attaching the air inlet duct, add to cut where indicated by dotted lines. Cut corners diagonally and bend outward to form flange. 5. If flanges are not required, and a filter frame is installed, cut between locating notches as in illustration. 6. The bottom panel of the upflow furnace must be removed for bottom return air. UPFLOW FURNACES ONLY * LOCATING NOTCHES PROVIDED FOR SIDE RETURN CUTOUT * * * FRONT OF FURNACE * SEE OUTLINE DRAWING 56 S9V2-VS-SVX001-1B-EN Furnace General Installation 1. Upflow Furnaces: Figure 1. Horizontal upflow furnace with side return When the upflow furnace is installed in the horizontal right or left application and a return duct is attached to the top side, do not install a filter in the return duct directly above the furnace. Install the filter in a remote location. When the upflow furnace is installed in the horizontal right or left application and a close coupled (less than 36") return duct is attached to the bottom side of the furnace as shown above, securely attach a 1/2" mesh metal hardware cloth protective screen to the inside bottom of the filter grill to prevent personal injury from contacting moving parts when reaching into the return opening to replace the filter. FILTER Close coupled (less than 36") return (filter directly beneath bottom side return) is not recommended due to noise considerations. 2. Connect the duct work to the furnace. See Outline Drawing for supply and return duct size and location. Flexible duct connectors are recommended to connect both supply and return air ducts to the furnace. If only the front of the furnace is accessible, it is recommended that both supply and return air plenums are removable. 3. When replacing a furnace, old duct work should be cleaned out. Thin cloths should be placed over the registers and the furnace fan should be run for 10 minutes. Don’t forget to remove the cloths before you start the furnace. 4. The horizontal installation of the upflow furnace requires an external filter section. Filter kits are available for horizontal applications. LESS THAN 36” CLOSE COUPLED (LESS THAN 36”) RETURN (FILTER DIRECTLY BENEATH BOTTOM SIDE RETURN) NOT RECOMMENDED DUE TO NOISE CONSIDERATIONS. IF USED, SECURELY ATTACH 1/2” MESH METAL HARDWARE CLOTH PROTECTIVE SCREEN TO THE INSIDE BOTTOM OF THE FILTER GRILL. RETURN AIR FILTERS FOR UPFLOW FURNACE IN HORIZONTAL CONFIGURATION When the Upflow Furnace is installed in the horizontal configuration, the return air filters must be installed exterior to the furnace cabinet. Remote filter grilles may be used for homeowner convenience or the filters may be installed in the duct work upstream of the furnace. TYPICAL DOWNFLOW FURNACE RETURN AIR FILTER INSTALLATIONS Filters are not factory supplied for downflow furnaces. Filter size needed will be dependent on type of filter and CFM requirement. Filters must be installed externally to the unit. S9V2-VS-SVX001-1B-EN Downflow Return Air Filters Furnace Width Filter Qty and Size 17–1/2” 2 — 14” x 20” x 1” 21” 2 — 16” x 20” x 1” 24–1/2” 2 — 16” x 20” x 1” 57 Furnace General Installation Electrical Connections Make wiring connections to the unit as indicated on enclosed wiring diagram. As with all gas appliances using electrical power, this furnace shall be connected into a permanently live electric circuit. It is recommended that furnace be provided with a separate "circuit protection device" electric circuit. The furnace must be electrically grounded in accordance with local codes or in the absence of local codes with the National Electrical Code, ANSI/NFPA 70 or CSA C22.1 Electrical Code, if an external electrical source is utilized. The integrated furnace control is polarity sensitive. The hot leg of the 120V power supply must be connected to the black power lead as indicated on the wiring diagram. Refer to the Wiring Diagram section in this document and unit wiring diagram attached to furnace. Field Wiring Two Stage Thermostat Furnace BK BK W2 W2 W1 W1 R R G G B/C B/C FIELD WIRING DIAGRAM FOR TWO STAGE HEATING THERMOSTAT, TWO STAGE COOLING Outdoor Unit (No Transformer) B/C Y2 NOTES: 1) For PWM (BK) enabled thermostats, cut the BK jumper on the IFC and connect wiring. 2) The factory Y1-O jumper must remain in place for proper LED read out in cooling mode. 3) Y1 and Y2 wiring from the thermostat must connect to the IFC for proper airflow and LED readout. 4) Single compressor and two compressor airflow is automatically set with the IFC Menu optionsin ODU section. 2-1=2 stage / 1 compressor (1st stage airflow = 80%) 2-2=2 stage / 2 compressors (1st stage airflow = 50%) Furnace IFC Y2 Y2 Y1 Y1 O O Two Stage Thermostat Furnace BK BK Y1 INTER-COMPONENT WIRING SEE NOTE 2 24 V FIELD WIRING 24 V FACTORY WIRING FIELD WIRING DIAGRAM FOR TWO STAGE HEATING THERMOSTAT, TWO STAGE HEAT PUMP Outdoor Unit (No Transformer) W2 W2 W1 W1 X2 R R R G G B/C B/C Y2 Y2 Y1 Y1 B/C Y2 O NOTES: 1) For PWM (BK) enabled thermostats, cut the BK jumper on the IFC and connect wiring. 2) Remove the factory Y1-O jumper for HP systems for proper LED read out. 3) Y1 and Y2 wiring from the thermostat must connect to Y1 and Y2 of the IFC for proper airflow and LED readout. 4) Single compressor and two compressor airflow is automatically set with the IFC Menu options in ODU section. 2-1=2 stage / 1 compressor (1st stage airflow = 80%) 2-2=2 stage / 2 compressors (1st stage airflow = 50%) Furnace IFC Y1 SEE NOTE 2 O O INTER-COMPONENT WIRING 24 V FIELD WIRING 24 V FACTORY WIRING 58 BK JUMPER SEE NOTE 1 R-BK JUMPER SEE NOTE 1 S9V2-VS-SVX001-1B-EN Furnace General Installation Single Stage Thermostat Furnace BK BK FIELD WIRING DIAGRAM FOR SINGLE STAGE HEATING THERMOSTAT, SINGLE STAGE COOLING W2 SEE NOTE 4 W1 W1 R R Outdoor Unit (No Transformer) G G B/C B/C B/C Y2 Y1 Y1 Y1 O O NOTES: 1) For PWM (BK) enabled thermostats, cut the BK jumper on the IFC and connect wiring. 2) The factory Y1-O jumper must remain in place for proper LED read out in cooling mode. 3) Y1 wiring from the thermostat must connect to Y1 of the IFC for proper airflow and LED readout. 4) Place field supplied jumper between W1 and W2 on the IFC. Interstage delay is factory set for 10 minutes but is field adjustable with the Menu option in the ISD section. 5) Single stage airflow is set with the IFC Menu options in ODU section. Select 1-1. Furnace IFC INTER-COMPONENT WIRING SEE NOTE 2 24 V FIELD WIRING 24 V FACTORY WIRING BK JUMPER SEE NOTE 1 Single Stage Thermostat Furnace BK BK W2 FIELD WIRING DIAGRAM FOR SINGLE STAGE HEATING THERMOSTAT, SINGLE STAGE HEAT PUMP Outdoor Unit SEE NOTE 4 (No Transformer) W1 W1 X2 R R R G G B/C B/C B/C NOTES: 1) For PWM (BK) enabled thermostats, cut the BK jumper on the IFC and connect wiring. 2) Remove the factory Y1-O jumper for HP systems for proper LED read out. 3) Y1 wiring from the thermostat must connect to Y1 of the IFC for proper airflow and LED readout. 4) Place field supplied jumper between W1 and W2 on the IFC. Interstage delay is factory set for 10 minutes but is field adjustable with the Menu option in the ISD section. 5) Single stage airflow is set with the IFC Menu options in ODU section. Select 1-1. Furnace IFC Y2 Y1 Y1 Y1 SEE NOTE 2 O O O INTER-COMPONENT WIRING 24 V FIELD WIRING 24 V FACTORY WIRING S9V2-VS-SVX001-1B-EN BK JUMPER SEE NOTE 1 59 Furnace General Installation COMMUNICATING CONTROLS WITH NON-COMMUNICATING S9V2 FURNACE AND COMMUNICATING VS COOLING/HP Communicating Control Relay Panel D R B D Outdoor Unit Indoor Unit R D B R R B B/C O O SOV Y1 STG1 Y2 STG2 Y2 W1 STG1 W1 W2 STG2 W2 W3 STG3 G G FAN BK BK PWM HUM HUM HUM AUX1 AUX2 60 24V ONLY AUX2 24V ONLY AUX1 24V ONLY Y1 HUM NOTES: 1. Cut the BK jumper at the indoor unit - After cutting the jumper, power must be off or cycled on-off-on for the IFC to work properly. 2. Requires an 850 control with software version 3.0+ or 1050. Not a valid combination with 950 control. CPC = CFM/Ton cooling. Must be set to 400. CPH = CFM/Ton heating. Must be set to 400. ODT = Must be set to match the OD tonnage. Furnace LED’s will read “CoF“ continous fan during cooling and heat pump operation. 24 V Field Wiring AUX1 AUX1 AUX2 AUX2 S9V2-VS-SVX001-1B-EN Condensate Drain Instructions The following sections give general instructions for the installation of the gas furnace condensate drains. Repositioning of the condensate trap is covered in the exhaust air options section. Cutouts with plugs and grommets are provided on the left and right hand side of the furnace cabinets for drain connections IN VERTICAL APPLICATIONS. The standard arrangement is for the drain connection on the left side. The tubing may have to be trimmed in this application to avoid kinking. The u p f l o w ( v e r t i c a l a p p l i c a t i o n ) also has provisions for right side drain connections. Exchange the grommet and plugs from the left and right side. Trim all excess tubing to avoid kinking. It is always recommended that an auxiliary drain pan be installed under a horizontally installed evaporator or 90% Gas Furnace. Connect the auxiliary drain line to a separate drain line (no trap is needed in this line). Horizontal applications require repositioning the condensate canister trap. Additionally the drain tubing connected to the inducer housing may need to be repositioned for removing the plug and reconnecting the tubing to the lower connection on the inducer housing. Connections must be made to an O P E N / V E N T E D DRAIN. N o t e : All condensate drain piping supplies included with the furnace are intended for internal piping only and should not be applied external to the furnace. All external piping must use 1/2" minimum size PVC pipe and fittings throughout for drain connections (fittings, pipe and PVC solvent cement not provided with furnace, must be field supplied). A 3/4" coupling is supplied to connect to systems that are using 3/4" piping with an air conditioner coil. N o t e : A corrosion resistant condensate pump must be used if a pump is required for a specific drain system. CAUTION Water Damage/Property Damage! It is recommended that a drain pan be installed under the furnace to prevent property damage or personal injury from leaking condensate. I m p o r t a n t : The condensate drain should be installed with provisions to prevent winter freeze-up of the condensate drain line. Frozen condensate will block drains, resulting in furnace shutdown. If the drain line cannot be installed in a conditioned space and/ or its surrounding ambient temperature is expected to fall below freezing, then heat tape should be applied as required to prevent freezing (per manufacturer’s instructions). The heat tape should be rated at 5 or 6 watts per foot at 120 volts. Selfregulating (preferred) or thermostatically controlled heat tape is required. Typical sources of UL listed heat tapes are W.W. Granger, Inc. (Wintergard PlusTM Series), McMaster Carr Supply Co. (3554 Series), or your equipment supplier. The condensate drain may be cleaned or inspected by removal of the drain tube at the header. Evaporator and Furnace condensate drain piping may be manifolded together. A primary drain vent stack must be installed and terminated below the outlet of the secondary heat exchanger drain connection to prevent water from damaging Furnace controls if the primary drain outlet plugs up. Where the Furnace is installed above a finished ceiling, the primary drain vent stack must be installed such that overflow from the vent stack opening will flow into an auxiliary drain pan in order to prevent water damage to the finished ceiling below. Vertical Applications Upflow furnace 1. Remove the plug from the side panel where the condensate will exit. 2. Install the condensate grommet into the side panel. 3. Install the connection tubing from the trap to the side of the unit and trim all excess tubing to avoid kinks. S9V2-VS-SVX001-1B-EN Note: For easiest installation, remove the spring clip from the end of the condensate line and feed through the grommet. Important: Condensate grommet must be installed for proper operation. 61 Condensate Drain Instructions COIL PRIMARY DRAIN COIL PRIMARY DRAIN CONDENSATE GROMMET CONDENSATE GROMMET RIGHT SIDE DRAIN LEFT SIDE DRAIN COIL PRIMARY DRAIN LEFT SIDE DRAIN COIL PRIMARY DRAIN IF THE FURNACE IS INSTALLED OVER A FINISHED CEILING, OVERFLOW FROM THE PRIMARY DRAIN VENT STACK MUST FLOW INTO AN AUXILIARY DRAIN PAN TO PREVENT DAMAGE TO THE FINISHED CEILING BELOW CONDENSATE GROMMET PRIMARY DRAIN VENT STACK MUST TERMINATE BELOW THE BOTTOM OF THE CONDENSATE TRAP RIGHT SIDE DRAIN IF THE FURNACE IS INSTALLED OVER A FINISHED CEILING, OVERFLOW FROM THE PRIMARY DRAIN VENT STACK MUST FLOW INTO AN AUXILIARY DRAIN PAN TO PREVENT DAMAGE TO THE FINISHED CEILING BELOW CONDENSATE GROMMET PRIMARY DRAIN VENT STACK MUST TERMINATE BELOW THE BOTTOM OF THE CONDENSATE TRAP OR CONDENSATE PIPED TO OPEN VENTED DRAIN CONDENSATE PIPES MUST NOT BE BELOW WATER SURFACE CONDENSATE PIPED TO OPEN VENTED DRAIN OR CONDENSATE PUMP CONDENSATE PUMP 62 S9V2-VS-SVX001-1B-EN Condensate Drain Instructions Downflow furnace - Cut the 90 degree section of the condensate tubing off and connect the tubing to the condensate trap. Install the condensate grommet into the bottom panel. Cut to length as needed. LEFT SIDE DRAIN WITH EVAPORATOR AND CONDENSATE DRAIN PIPING MANIFOLDED TOGETHER. COIL PRIMARY DRAIN CONDENSATE GROMMET IF THE FURNACE IS INSTALLED OVER A FINISHED CEILING, OVERFLOW FROM THE PRIMARY DRAIN VENT STACK MUST FLOW INTO AN AUXILIARY DRAIN PAN TO PREVENT DAMAGE TO THE FINISHED CEILING BELOW PRIMARY DRAIN VENT STACK MUST TERMINATE BELOW THE BOTTOM OF THE CONDENSATE TRAP DOWNFLOW FURNACES WITH BOTTOM DRAIN IF THE FURNACE IS INSTALLED OVER A FINISHED CEILING, OVERFLOW FROM THE PRIMARY DRAIN VENT STACK MUST FLOW INTO AN AUXILIARY DRAIN PAN TO PREVENT DAMAGE TO THE FINISHED CEILING BELOW CONDENSATE GROMMET PRIMARY DRAIN VENT STACK MUST TERMINATE BELOW THE BOTTOM OF THE CONDENSATE TRAP OR CONDENSATE PIPED TO OPEN VENTED DRAIN CONDENSATE PIPE MUST NOT BE BELOW WATER SURFACE COIL PRIMARY DRAIN CONDENSATE PUMP CONDENSATE PIPED TO OPEN VENTED DRAIN Downflow furnace with Left Side Condensate 1. Remove left hand condensate plug. 2. Install into bottom cross member. Left Side Gas Entry Left Side Condensate Plug the bottom hole with plug provided in document pack. S9V2-VS-SVX001-1B-EN 63 Condensate Drain Instructions Attaching the condensate drain line. 1. Locate the condensate grommet and the condensate drain line assembly in the doc pack. 2. Insert the condensate grommet in the 1–5/8” hole in the side of the cabinet. 3. Remove the fitting at the end of the drain line assembly and insert it through the cabinet from the inside out. Attach the 90 degree section of the hose to the condensate drain trap. 4. Cut off the excess tube and reinstall the end fitting to the drain hose. DOWNFLOW FURNACES LEFT SIDE DRAIN BOTTOM HOLE MUST BE PLUGGED. IF THE FURNACE IS INSTALLED OVER A FINISHED CEILING, OVERFLOW FROM THE PRIMARY DRAIN VENT STACK MUST FLOW INTO AN AUXILIARY DRAIN PAN TO PREVENT DAMAGE TO THE FINISHED CEILING BELOW CONDENSATE GROMMET Downflow furnace with Right Side Condensate - Drill an 11/16 inch diameter hole in the right side of the case at the dimensions shown. 11/16” Φ 1.00 4.60 Plug the bottom hole with plug provided in document pack. Attaching the condensate drain line. 1. Locate the condensate drain line assembly in the doc pack. Important: It is best to cut the condensate drain hose assembly longer than 4 inches and then fit in place. It can then be trimmed to needed length. The 4 inch measurement is an approximation. 2. Cut the condensate drain line assembly as shown. 3. Use a field supplied hose clamp to secure the condensate drain line to the condensate trap. 4. Insert a field supplied piece of 1/2” CPVC pipe though the 11/16” hole drilled through the cabinet and insert into drain line hose. Secure with the spring clip. Note: Seal around the condensate drain tubing where it exits the cabinet. Cut hose Approx. 4” DOWNFLOW FURNACES RIGHT SIDE DRAIN 11/16” DIAMETER HOLE MUST BE CUT IN RIGHT SIDE OF CASE. BOTTOM HOLE MUST BE PLUGGED. CUT FACTORY SUPPLIED CONDENSATE ASSEMBLY HOSE AND ATTACH TO FIELD SUPPLIED CPVC TUBE. SECURE WITH SPRING CLIP AND FIELD SUPPLIED HOSE CLAMP. IF THE FURNACE IS INSTALLED OVER A FINISHED CEILING, OVERFLOW FROM THE PRIMARY DRAIN VENT STACK MUST FLOW INTO AN AUXILIARY DRAIN PAN TO PREVENT DAMAGE TO THE FINISHED CEILING BELOW 64 S9V2-VS-SVX001-1B-EN Condensate Drain Instructions Horizontal Applications HORIZONTAL APPLICATIONS Upflow models in horizontal - It is always recommended that the auxiliary drain pan be installed under a horizontally installed evaporator and/or 90% gas furnace. Connect the auxiliary drain pan to a separate drain line (no trap is needed in this line). Connections must be made to an OPEN/VENTED DRAIN. Outdoor draining of the furnace and coil condensate is permissible if allowed by local codes. Caution should be taken to prevent drains from freezing or causing slippery conditions that could lead to personal injury. Excessive draining of condensate may cause saturated ground conditions that may result in damage to plants. Note: Use 1/2" or larger PVC or CPVC pipe and fittings as required for drain connections (fittings, pipe and solvent cement not provided). Note: A corrosion resistant condensate pump must be used if a pump is required for a specific drain system. Important: The condensate drain should be installed with provisions to prevent winter freeze-up of the condensate drain line. Frozen condensate will block drains, resulting in furnace shutdown. If the drain line cannot be installed in a conditioned space, then UL listed heat tape should be applied as required to prevent freezing (per manufacturer’s instructions). The heat tape should be rated at 5 or 6 watts per foot at 120 volts. Self-regulating (preferred) or thermostatically controlled heat tape is required. FURNACE MUST BE SUPPORTED AT ALL FOUR CORNERS. BAYHANG - OPTIONAL HORIZONTAL HANGING BRACKET KIT TO APPROVED OPEN / VENTED DRAIN Note: The overflow stand pipe termination must be even with or slightly below the bottom of the condensate trap. Note: Water from the overflow pipe must drain into the emergency drain pan. To prevent AC condensate from backing up into the furnaces, follow these instructions for condensate drainage. Note: 1. The overflow stand pipe termination must be even with or slightly below than the bottom of the condensate trap. Note: 2. Water from the overflow pipe must drain into the emergency drain pan. Note: 3. It is recommended to use the secondary drain. The secondary drain pipe must terminate over the emergency drain pan. 12 3 Note: 4. Emergency drain pan. 4 Horizontal Right 3 12 4 Horizontal Left S9V2-VS-SVX001-1B-EN 65 General Start-up and Adjustment The following sections give instructions for the general start-up and adjustment of the gas furnaces. Preliminary Inspections With gas and electrical power "OFF", ensure: 1. Duct connections are properly sealed. 2. Filters are in place. 3. Venting is properly assembled. 4. Blower vestibule panel is in place and all screws in place. Turn knob on main gas valve within the unit to the "OFF" position. Turn the external gas valve to "ON". Purge the air from the gas lines. After purging, check all gas connections for leaks with a soapy solution. — DO NOT CHECK WITH AN OPEN FLAME. Allow 5 minutes for any gas that might have escaped to dissipate. Turn the gas valve in the unit to the "ON" position. Propane Gas being heavier than air may require forced ventilation. Turn the toggle switch on the Gas Valve in the unit to the “ON” position. Lighting Instructions Lighting instructions appear on each unit. Each installation must be checked out at the time of initial start up to ensure proper operation of all components. Check out should include putting the unit through one complete cycle as outlined below. Turn on the main electrical supply and set the comfort control above the indicated temperature. The igniter will automatically heat, then the gas valve is energized to permit the flow of gas to the burners. After ignition and flame is established, the flame control module monitors the flame and supplies power to the gas valve until the comfort control is satisfied. WARNING FIRE OR EXPLOSION HAZARD! Failure to follow this Warning could result in property damage, severe personal injury, or death. Do NOT attempt to manually light the furnace. To shut off For complete shutdown: Turn the toggle or control switch located on the main gas valve inside the unit to the "OFF" position and the external main gas shutoff valve to the "OFF" position. Disconnect the electrical supply to the unit. Whenever your house is to be vacant, arrange to have someone inspect your house for proper temperature. This is very important during freezing weather. If for any reason your furnace should fail to operate damage could result, such as frozen water pipes. CAUTION FREEZE CAUTION! Failure to follow this Caution could result in property damage or personal injury. If complete furnace shutdown is done during the cold weather months, provisions m ust be taken to prevent freeze-up of all water pipes and water receptacles. Control and Safety Switch Adjustment LIMIT SWITCH CHECK OUT The limit switch is a safety device designed to close the gas valve should the furnace become overheated. Since proper operation of this switch is important to the safety of the unit, it must be checked out on initial start up by the installer. 66 To check for proper operation of the limit switches, set the thermostat to a temperature higher than the indicated temperature to bring on the gas valve. Restrict the airflow by blocking the return air to the blower. When the furnace reaches the maximum outlet temperature as shown on the rating plate, the burners must shut off. If they do not shut off after a reasonable time and overheating is evident, a faulty limit switch is probable and the limit switch must be replaced. After checking the operation of the limit control, be sure to remove the paper or cardboard from the return air inlet, or reconnect the blower. S9V2-VS-SVX001-1B-EN Furnace Combustion Air Exhaust Options Important: All plugs must be in place for sealed combustion. Note: Default is left side for electric and natural gas connections. Default for the combustion air inlet and exhaust is top of the furnace. Important: If the locations are changed from the defaults, the default holes not being used must be plugged. Note: If the electrical and natural gas connections are moved to the right side, remove the plugs and move them to the left side. The grommets will move from the left side to the right side. Note: The grommets are different for the natural gas and condensate connections. The following sections give instructions for the different furnace orientations and the options for venting the inlet and exhaust combustion air. Table 19. I m p o r t a n t : When looking at the different orientations, the direction of the combustion air exhaust in the illustration’s description is after the furnace has been rotated, if needed. Combustion Air Venting Options Refer to the illustrations below to find the approved venting options for upflow and horizontal left furnace models. Important: The combustion air exhaust must be vented to the outdoors. Note: The combustion air inlet does not have to be on the same side as the combustion air exhaust. Note: Right side combustion air entry is allowed in upflow applications. Upflow Orientation or Installation Combustion air exhaust vented out top. Combustion air exhaust vented through left side. Horizontal Left Orientation or Installation Combustion air exhaust vented out top. Combustion air exhaust vented through left side. S9V2-VS-SVX001-1B-EN 67 Furnace Combustion Air Exhaust Options Table 20. Combustion Air Venting Options Continued Refer to the illustrations below to find the approved venting options for horizontal right furnace models. Important: The combustion air exhaust must be vented to the outdoors. Note: The combustion air inlet does not have to be on the same side as the combustion air exhaust. Horizontal Right Orientation or Installation Combustion air exhaust vented through left side. Combustion air exhaust vented out top. Note: Requires a hole to be drilled in the case. Refer to the illustrations below to find the approved venting options for downflow furnace models. Important: The combustion air exhaust must be vented to the outdoors. Note: The combustion air inlet does not have to be on the same side as the combustion air exhaust. Note: Right side combustion air entry is allowed. Downflow Orientation or Installation Combustion air exhaust vented out top. Combustion air exhaust vented through left side. 68 S9V2-VS-SVX001-1B-EN Furnace Combustion Air Exhaust Options Upflow Furnace in Upflow Position - Top Vented Combustion Air No changes need to be made to the inducer when installing the upflow furnace with the combustion air vented through the top. I m p o r t a n t : Trim the condensate pressure switch tubing to length to ensure there is no sag or trap created. N o t e : The vent outlet adapter is used for strain relief against the weight of the venting. The clamp should be tightened after the internal connection is made. 8. Install the combustion air inlet PVC pipe. N o t e : If required, transition to larger venting within 2' of the cabinet. CPL00938 – 2" x 3" offset coupling may be used and is factory supplied with 120 KBTUH furnaces. Canadian applications may use BAYREDUCE to meet ULC-S636 requirements. 1. Attach the vent outlet gasket to the vent outlet. 2. Install vent outlet to top of cabinet using 2 screws supplied in the doc pack. 3. Install vent inlet gasket and vent inlet using 4 screws supplied in the doc pack. Upflow Furnace in Upflow Position - Left Side Vented Combustion Air Changes need to be made to the inducer orientation when installing the upflow furnace with the combustion air vented through the side. Additional changes are needed for hose routing and PS2 rotation. The figure to the top left in next page shows the furnace as it is sent from the factory. Use the following steps to modify the furnace for upflow with side venting of combustion air. I m p o r t a n t : Right side vent outlet is not allowed because condensate will not drain. 4. Slide PVC pipe through vent outlet adaptor and insert into inducer outlet. 5. Twist to insure PVC is fully inserted. 6. Tighten the clamp on the end of the 45 degree elbow. 7. Tighten the clamp on the outlet vent adapter. S9V2-VS-SVX001-1B-EN 69 Furnace Combustion Air Exhaust Options 6. Remove two 3” plugs on left side of cabinet. To be used for combustion air and vent exhaust. 7. Install the two 3” plugs into the two 3” default openings on the top of the cabinet. 8. Loosen the clamp holding the 45° elbow. Remove the elbow and discard. Before proceeding, lay unit on its back to make conversion easier. 1. Disconnect all drain tubes from condensate trap. N o t e : When removing condensate hoses from the condensate trap, hold the trap with your hand to prevent the trap from breaking. Removing the trap before the hoses is also an option. 2. Remove drain tubing from bottom of inducer housing. 3. Remove rain gutter tubing from inducer outlet. 4. Remove tubing from condensate pressure switch. 5. Remove tubing from PS2 to cold header. 9. Remove the three inducer mounting screws. 10. Rotate inducer counter-clockwise so that the inducer outlet aligns with the exhaust vent outlet. 11. Insert and re-tighten screws to 30 in.-lbs. Do not overtighten. 5 4 2 70 3 S9V2-VS-SVX001-1B-EN Furnace Combustion Air Exhaust Options 12. Remove the pressure switch bracket assembly. 13. Remove the screw that holds PS2, rotate 90 degrees clockwise, and reattach. 14. Reattach the pressure switch bracket assembly. 19. Slide PVC through vent outlet adaptor and insert into inducer outlet. N o t e : Illustration below shows the PS2 pressure switch in the final rotated position. 20. Twist to insure PVC is fully inserted. 21. Tighten the two clamps. 22. Install the combustion air inlet pipe. N o t e : The vent outlet adapter is used for strain relief against the weight of the venting. The clamp should be tightened after the internal connection is made. N o t e : If required, transition to larger venting within 2' of the cabinet. An 2" x 3" offset coupling is required if the transition is made in a horizontal plane. Use coupling CPL00938 (Canadian applications may use BAYREDUCE to meet ULCS636 requirements.) See Horizontal Venting section for proper orientation of 2” x 3” offset coupling. 15. Attach the vent outlet gasket to the vent outlet. 16. Install vent outlet to top of cabinet using 2 screws supplied in the dock pack. 17. Install vent inlet gasket and vent inlet using 4 screws supplied in the dock pack. 18. Install the grommet for the condensate drain tube. The drain may be located on either side of the cabinet. S9V2-VS-SVX001-1B-EN 71 Furnace Combustion Air Exhaust Options 23. Connect PS2 tubing to switch and sensing location. I m p o r t a n t : Trim the condensate pressure switch tubing to length to ensure there is no sag or trap created. 24. Remove port cap at bottom of inducer and connect inducer condensate tubing. Connect other end of inducer condensate tubing to top port on the condensate trap. Cut tubing to length, if necessary. 25. Install previously removed port cap onto bottom port of the inducer. (As viewed in upflow) 26. Connect condensate pressure switch tubing to pressure port on the condensate trap. I m p o r t a n t : Trim the condensate pressure switch tubing to length to ensure there is no sag or trap created. 27. Remove port plug from rain gutter and install in new position on opposite side of the rain gutter. 28. Connect rain gutter condensate hose to the rain gutter and the lower port of the condensate trap. Cut to length, if necessary. Before proceeding, lay unit on its back to make the conversion easier. 1. Remove all drain hoses from condensate trap. N o t e : When removing condensate hoses from the condensate trap, hold the trap with your hand to prevent the trap from breaking. Removing the trap before the hoses is also an option. 2. Remove tubing from PS2 to cold header. 3. Remove drain tubing from bottom of inducer housing. 4. Remove rain gutter tubing from inducer outlet. 27 23 5. Remove tubing from condensate pressure switch. 28 6. Remove the screws that hold the condensate trap bracket. The condensate trap should not be removed from the condensate trap bracket. Remove assembly and retain for later installation. 25 26 24 Upflow Furnace in Horizontal Left Position - Top Vented Combustion Air Changes need to be made to the inducer orientation when installing the upflow furnace in the horizontal left position with the combustion air vented through the side. Additional changes are needed for hose routing, condensate trap orientation, and inducer hoses. N o t e : There is a plastic adapter with O-rings located inside the cold header that is held in place by the condensate trap bracket. Do not lose this adapter. This adapter needs to be in place when the condensate trap bracket is reattached. 4 2 3 5 The figure to the top right shows the furnace as it is sent from the factory. Use the following steps to modify the furnace for horizontal left with side venting of combustion air. 72 S9V2-VS-SVX001-1B-EN Furnace Combustion Air Exhaust Options 7. Loosen the clamp holding the 45° elbow. Remove the elbow and discard. 11. Remove 3” plug on left side of unit. To be used for condensate trap. 8. Remove three inducer screws. 12. Install condensate trap grommet. 9. Rotate the inducer so that the outlet is pointing vertically. 13. Remove two 3” plugs on right side of cabinet. To be used for combustion air exhaust and inlet. 10. Use the three screws to reattach the inducer to the cold header to 30 in.-lbs. Do not overtighten. 14. Reuse the two 3” plugs to seal the two 3” default openings on the top of the furnace. 15. Attach the vent outlet gasket to the vent outlet. 16. Install vent outlet to top of cabinet using 2 screws supplied in the dock pack. 17. Install vent inlet gasket and vent inlet using 4 screws supplied in the dock pack. S9V2-VS-SVX001-1B-EN 73 Furnace Combustion Air Exhaust Options Condensate Trap Installation 22. Reinstall the condensate adapter if it was earlier removed or ensure adapter is still in place. I m p o r t a n t : The condensate adapter must be present for proper condensate drain operation. 23. Install condensate trap into new location by fitting into grommet and aligning the hole on the condensate trap with the hole labeled “HL”. I m p o r t a n t : When installing a 21.0” wide S-Series furnace, the condenser trap grommet must be rotated so that the notch in the grommet faces the outer edge of the furnace cabinet as shown in the illustrations below and to the top left in next page. This allows the rain gutter tubing to fully seat onto the lower condensate port trap. 24. Hand tighten screws. 18. Slide PVC through vent outlet adaptor and insert into inducer outlet. 19. Twist to insure PVC is fully inserted. 20. Tighten the two clamps. 21. Install the combustion air inlet PVC pipe. N o t e : The vent outlet adapter is used for strain relief against the weight of the venting. The clamp should be tightened after the internal connection is made. N o t e : If required, transition to larger venting within 2' of the cabinet. CPL00938 – 2" x 3" offset coupling may be used and is factory supplied with 120 MBTUH furnaces. Canadian applications may use BAYREDUCE to meet ULC-S636 requirements. 74 S9V2-VS-SVX001-1B-EN Furnace Combustion Air Exhaust Options Upflow Furnace in Horizontal Left Position - Side Vented Combustion Air Changes do not need to be made to the inducer orientation when installing the upflow furnace in the horizontal left position with the combustion air vented through the top. Changes are needed for hose routing, condensate trap orientation, and inducer port caps. The figure below shows the furnace as it is sent from the factory. Use the following steps to modify the furnace for horizontal left with top venting of combustion air. 25. Connect PS2 tubing to switch and new sensing location. I m p o r t a n t : Trim the condensate pressure switch tubing to length to ensure there is no sag or trap created. 26. Remove port cap on left of inducer and connect inducer condensate tubing. Connect other end of inducer condensate tubing to top port on the condensate trap. Cut tubing to length, if necessary. 27. Install previously removed port cap onto bottom port of the inducer. 28. Connect condensate pressure switch tubing to pressure port on the condensate trap. I m p o r t a n t : Trim the condensate pressure switch tubing to length to ensure there is no sag or trap created 29. Connect rain gutter condensate hose to the rain gutter and the lower port of the condensate trap. Before proceeding, lay unit on its back to make the conversion easier. 1. Remove all drain hoses from condensate trap. N o t e : When removing condensate hoses from the condensate trap, hold the trap with your hand to prevent the trap from breaking. Removing the trap before the hoses is also an option. 2. Remove tubing from PS2 to cold header. 3. Remove drain tubing from bottom of inducer housing. 4. Remove rain gutter tubing from inducer outlet. 25 5. Remove tubing from condensate pressure switch. 29 28 26 S9V2-VS-SVX001-1B-EN 27 6. Remove the screws that hold the condensate trap bracket. The condensate trap should not be removed from the condensate trap bracket. Remove assembly and retain for later installation. N o t e : There is a plastic adapter with O-rings located inside the cold header that is held in place by the condensate trap bracket. Do not lose this adapter. This adapter needs to be in place when the condensate trap bracket is reattached. 75 Furnace Combustion Air Exhaust Options 4 2 3 5 7. Remove plug from 3” hole. 8. Install condensate trap grommet. 12. Attach the vent outlet gasket to the vent outlet. 13. Install vent outlet to top of cabinet using 2 screws supplied in the doc pack. 14. Install vent inlet gasket and vent inlet using 4 screws supplied in the doc pack. 9. Remove the pressure switch bracket assembly. 10. Remove the screw that holds PS2, rotate 90 degrees clockwise, and reattach. 11. Reattach the pressure switch bracket assembly. 76 S9V2-VS-SVX001-1B-EN Furnace Combustion Air Exhaust Options Condensate Trap Installation 19. Reinstall the condensate adapter if it was earlier removed or ensure adapter is still in place. I m p o r t a n t : The condensate adapter must be present for proper condensate drain operation. 20. Install condensate trap into new location by fitting into grommet and aligning the hole on the condensate trap with the hole labeled “HL”. When installing a 21.0” wide S-Series furnace, the condenser trap grommet must be rotated so that the notch in the grommet faces the outer edge of the furnace cabinet as shown in the illustrations below and to the top left in next page. This allows the rain gutter tubing to fully seat onto the lower condensate port trap. 21. Hand tighten screws. 15. Slide PVC through vent outlet adaptor and insert into inducer outlet. 16. Twist to insure PVC is fully inserted. 17. Tighten the two clamps. 18. Install the combustion air inlet PVC pipe. N o t e : The vent outlet adapter is used for strain relief against the weight of the venting. The clamp should be tightened after the internal connection is made. N o t e : If required, transition to larger venting within 2' of the cabinet. An 2" x 3" offset coupling is required if the transition is made in a horizontal plane. Use coupling CPL00938 (Canadian applications may use BAYREDUCE to meet ULCS636 requirements.) See Horizontal Venting section for proper orientation of 2” x 3” offset coupling. S9V2-VS-SVX001-1B-EN 77 Furnace Combustion Air Exhaust Options Upflow Furnace in Horizontal Right Position - Top Vented Combustion Air Changes need to be made to the inducer orientation when installing the upflow furnace in the horizontal right position with the combustion air vented through the left side. Additional changes are needed for hose routing, condensate trap location, and inducer port caps, and the condensate plug. The figure below shows the furnace as it is sent from the factory. Use the following steps to modify the furnace for horizontal right with left side venting of combustion air. 22. Connect PS2 tubing to switch and new sensing location. I m p o r t a n t : Cut to length but insure there is a rise in the tubing to avoid condensed flue gases from entering pressure switch. 23. Remove port cap on left side of inducer and connect inducer condensate tubing. Connect other end of inducer condensate tubing to top port on the condensate trap. Cut tubing to length, if necessary. 24. Install previously removed port cap onto bottom port of the inducer. (As viewed in upflow) 25. Connect condensate pressure switch tubing to pressure port on the condensate trap. I m p o r t a n t : Trim the condensate pressure switch tubing to length to ensure there is no sag or trap created. 26. Remove port plug from rain gutter and install in new position on opposite side of the rain gutter. 27. Connect rain gutter condensate hose to the rain gutter and the lower port of the condensate trap. Route rain gutter condensate hose to the right of the inducer motor. Before proceeding, lay unit on its back to make the conversion easier. 1. Remove all drain hoses from condensate trap. N o t e : When removing condensate hoses from the condensate trap, hold the trap with your hand to prevent the trap from breaking. Removing the trap before the hoses is also an option. 2. Remove tubing from PS2 to cold header. 3. Remove drain tubing from bottom of inducer housing. 4. Remove rain gutter tubing from inducer outlet. 5. Remove tubing from condensate pressure switch. 26 22 27 24 25 23 78 6. Remove the screws that hold the condensate trap bracket. The condensate trap should not be removed from the condensate trap bracket. Remove assembly and retain for later installation. 7. Remove the adapter located inside the condensate trap connection on the cold header and retain for later installation. N o t e : The plastic adapter with O-rings located inside the cold header that is held in place by the condensate trap bracket. Do not lose this adapter. This adapter needs to be in place when the condensate trap bracket is reattached. S9V2-VS-SVX001-1B-EN Furnace Combustion Air Exhaust Options 4 5 3 2 15. Remove three inducer screws. 8. Remove 3” plug on right side of unit. To be used for condensate trap. 9. Install condensate trap grommet. 10. Remove two 3” plugs on left side of cabinet. 16. Rotate the inducer so that the outlet is pointing vertically. 17. Use the three inducer screws to reattach the inducer to the cold header. Torque to 30 in.-lbs. Do not overtighten. 11. Reuse the two 3” plugs to seal the two 3” default openings on the top of the cabinet. 12. Attach the vent outlet gasket to the vent outlet. 13. Install vent outlet to top of cabinet using 2 screws supplied in the doc pack. 14. Install vent inlet gasket and vent inlet using 4 screws supplied in the doc pack. 18. Remove condensate drain plug from top right location on cold header. 19. Place condensate drain plug onto the cold header outlet located on the bottom left of the cold header. S9V2-VS-SVX001-1B-EN 79 Furnace Combustion Air Exhaust Options Condensate Trap Installation 19 24. Reinstall the condensate adapter if it was earlier removed or ensure adapter is still in place. I m p o r t a n t : The condensate adapter must be present for proper condensate drain operation. 25. Install condensate trap into new location by fitting into grommet and aligning the hole on the condensate trap with the hole labeled “HR”. 18 20. Slide PVC through vent outlet adaptor and insert into inducer outlet. 21. Twist to insure PVC is fully inserted. 22. Tighten the two clamps. I m p o r t a n t : When installing a 21.0” wide S-Series furnace, the condenser trap grommet must be rotated so that the notch in the grommet faces the outer edge of the furnace cabinet as shown in the illustrations below and to the top left in next page. This allows the rain gutter tubing to fully seat onto the lower condensate port trap. 26. Hand tighten screw. 23. Install the combustion air inlet PVC pipe. N o t e : The vent outlet adapter is used for strain relief against the weight of the venting. The clamp should be tightened after the internal connection is made. N o t e : If required, transition to larger venting within 2' of the cabinet. CPL00938 – 2" x 3" offset coupling may be used and is factory supplied with 120 MBTUH furnaces. Canadian applications may use BAYREDUCE to meet ULC-S636 requirements. 80 S9V2-VS-SVX001-1B-EN Furnace Combustion Air Exhaust Options Upflow Furnace in Horizontal Right Position - Left Side Vented Combustion Air Changes need to be made to the inducer orientation when installing the upflow furnace in the horizontal right position with the combustion air vented through the bottom. Additional changes are needed for hose routing, condensate trap location, and inducer port caps, and the condensate plug. The figure below shows the furnace as it is sent from the factory. Use the following steps to modify the furnace for horizontal right with bottom venting of combustion air. 27. Connect PS2 tubing to switch and new sensing location. I m p o r t a n t : Trim the condensate pressure switch tubing to length to ensure there is no sag or trap created. 28. Remove port cap on the right side of the inducer and connect inducer condensate tubing. Connect other end of inducer condensate tubing to top port on the condensate trap. Cut tubing to length, if necessary. 29. Install previously removed port cap onto bottom port of the inducer. 30. Connect condensate pressure switch tubing to pressure port on the condensate trap. I m p o r t a n t : Cut to length to ensure there is no sag or trap created. 31. Connect rain gutter condensate hose to the rain gutter and the lower port of the condensate trap. Before proceeding, lay unit on its back to make the conversion easier. 1. Remove all drain hoses from condensate trap. N o t e : When removing condensate hoses from the condensate trap, hold the trap with your hand to prevent the trap from breaking. Removing the trap before the hoses is also an option. 2. Remove tubing from PS2 pressure switch. 3. Remove drain tubing from bottom of inducer housing. 27 4. Remove rain gutter tubing from inducer outlet. 5. Remove tubing from condensate pressure switch. 29 31 7. Remove the condensate adapter located inside the condensate trap connection on the cold header and retain for later installation. 28 30 S9V2-VS-SVX001-1B-EN 6. Remove the screws that hold the condensate trap bracket. The condensate trap should not be removed from the condensate trap bracket. Remove assembly and retain for later installation. N o t e : The plastic condensate adapter with O-rings located inside the cold header that is held in place by the condensate trap bracket. Do not lose this adapter. The condensate adapter needs to be in place when the condensate trap bracket is reattached. 81 Furnace Combustion Air Exhaust Options 16. Use the three inducer screws to reattach the inducer to the cold header. Torque to 30 in.-lbs. Do not overtighten. 4 5 3 2 8. Remove 3” plug on right side of unit. To be used for condensate trap. 9. Install condensate trap grommet. 14 10. Remove 3” plugs on the left side of the cabinet. To be used for combustion air inlet. 11. Reuse the two 3” plugs to seal the two 3” default openings on the top of the furnace. 13 12. Remove three inducer screws. 13. While the inducer is loose, remove condensate drain plug from top right location on cold header. 14. Place condensate drain plug onto the cold header outlet located on the bottom left of the cold header. 15. Rotate the inducer 180 degrees so that the elbow is pointing towards the left. 82 S9V2-VS-SVX001-1B-EN Furnace Combustion Air Exhaust Options 17. Remove the pressure switch bracket assembly. 18. Remove the screw that holds PS2, rotate 90 degrees clockwise, and reattach. 19. Reattach the pressure switch bracket assembly. N o t e : The inducer is shown rotated into its final position in the illustration below. N o t e : If required, transition to larger venting within 2' of the cabinet. An 2" x 3" offset coupling is required if the transition is made in a horizontal plane. Use coupling CPL00938 (Canadian applications may use BAYREDUCE to meet ULCS636 requirements.) See Horizontal Venting section for proper orientation of 2” x 3” offset coupling. 20. Cut 3” hole in bottom panel using large dimple as guide. 24. Slide PVC through vent outlet adaptor and insert into inducer outlet. 25. Twist to insure PVC is fully inserted. 26. Tighten the two clamps. 27. Install the combustion air inlet PVC pipe. 21. Attach the vent outlet gasket to the vent outlet. 22. Install vent outlet to top of cabinet using 2 screws supplied in the doc pack. 23. Install vent inlet gasket and vent inlet using 4 screws supplied in the doc pack. N o t e : The vent outlet adapter is used for strain relief against the weight of the venting. The clamp should be tightened after the internal connection is made. S9V2-VS-SVX001-1B-EN Condensate Trap Installation 28. Reinstall the condensate adapter if it was earlier removed or ensure adapter is still in place. I m p o r t a n t : The condensate adapter must be present for proper condensate drain operation. 83 Furnace Combustion Air Exhaust Options 29. Install condensate trap into new location by fitting into grommet and aligning the hole on the condensate trap with the hole labeled “HR”. I m p o r t a n t : When installing a 21.0” wide S-Series furnace, the condenser trap grommet must be rotated so that the notch in the grommet faces the outer edge of the furnace cabinet as shown in the illustrations below and to the top right. This allows the rain gutter tubing to fully seat onto the lower condensate port trap. 30. Hand tighten screw. 31. Connect PS2 tubing to switch and new sensing location. Use additional tubing in ship with bag, if necessary. I m p o r t a n t : Trim the condensate pressure switch tubing to length to ensure there is no sag or trap created. 32. Remove port cap on the right side of inducer and connect inducer condensate tubing. Connect other end of inducer condensate tubing to top port on the condensate trap. Cut tubing to length, if necessary. 33. Install previously removed port cap onto bottom port of the inducer. (As viewed in upflow) 34. Connect condensate pressure switch tubing to pressure port on the condensate trap. I m p o r t a n t : Cut to length to ensure there is no sag or trap created. 35. Remove port plug from rain gutter and install in new position on opposite side of the rain gutter. 36. Connect rain gutter condensate hose to the rain gutter and the lower port of the condensate trap. Route rain gutter condensate hose to the right of the inducer motor. 35 31 36 33 34 32 84 S9V2-VS-SVX001-1B-EN Furnace Combustion Air Exhaust Options Downflow Furnace - Top Vented Combustion Air No changes need to be made to the inducer when installing the downflow furnace with the combustion air vented through the top. I m p o r t a n t : Trim the condensate pressure switch tubing to length to ensure there is no sag or trap created. 4. Slide PVC pipe through vent outlet adaptor and insert into inducer outlet. 5. Twist to insure PVC is fully inserted. 6. Tighten the two clamps. 7. Install the combustion air inlet PVC pipe. N o t e : The vent outlet adapter is used for strain relief against the weight of the venting. The clamp should be tightened after the internal connection is made. N o t e : If required, transition to larger venting within 2' of the cabinet. CPL00938 – 2" x 3" offset coupling may be used and is factory supplied with 120 MBTUH furnaces. Canadian applications may use BAYREDUCE to meet ULC-S636 requirements. 1. Attach the vent outlet gasket to the vent outlet. 2. Install vent outlet to top of cabinet using 2 screws supplied in the doc pack. 3. Install vent inlet gasket and vent inlet using 4 screws supplied in the doc pack. S9V2-VS-SVX001-1B-EN 85 Furnace Combustion Air Exhaust Options Downflow Furnace - Left Side Vented Combustion Air 5 Changes need to be made to the inducer orientation when installing the downflow furnace with the combustion air vented through the side. Additional changes are needed for hose routing and PS2 rotation. 4 The figure below shows the furnace as it is sent from the factory. Use the following steps to modify the furnace for downflow with side venting of combustion air. 3 2 I m p o r t a n t : Right side vent outlet is not allowed because condensate will not drain. 6. Remove two 3” plugs on left side of cabinet. To be used for combustion air exhaust and inlet. 7. Reuse the two 3” plugs to seal the two 3” default openings on the top of the cabinet. Before proceeding, lay unit on its back to make conversion easier. 8. Loosen the clamp holding the 45° elbow. Remove the elbow and discard. 1. Disconnect all drain tubes from condensate trap. N o t e : When removing condensate hoses from the condensate trap, hold the trap with your hand to prevent the trap from breaking. 2. Remove drain tubing from bottom of inducer housing. 3. Remove rain gutter tubing from inducer outlet. 4. Remove tubing from condensate pressure switch. 5. Remove tubing from PS2 to cold header. 86 S9V2-VS-SVX001-1B-EN Furnace Combustion Air Exhaust Options 9. Remove the three inducer mounting screws. 12. Remove the pressure switch bracket assembly. 10. Rotate inducer counterclockwise so that the inducer outlet aligns with the exhaust vent outlet. 13. Remove the screw that holds PS2, rotate 90 degrees counterclockwise, and reattach. 11. Reinsert and tighten screws to 30 in.-lbs. Do not overtighten. 14. Reattach the pressure switch bracket assembly. N o t e : The illustration below shows PS2 in its final position after being rotated. 15. Attach the vent outlet gasket to the vent outlet. 16. Install vent outlet to cabinet using 2 screws supplied in the doc pack. 17. Install vent inlet gasket and vent inlet using 4 screws supplied in the doc pack. 18. Install the grommet for the condensate drain tube. The drain may be located on either side of the cabinet. 19. Slide PVC through vent outlet adaptor and insert into inducer outlet. 20. Twist to insure PVC is fully inserted. 21. Tighten the two clamps. 22. Install the combustion air inlet PVC pipe. S9V2-VS-SVX001-1B-EN 87 Furnace Combustion Air Exhaust Options N o t e : The vent outlet adapter is used for strain relief against the weight of the venting. The clamp should be tightened after the internal connection is made. 24. Remove port cap at bottom of inducer and connect inducer condensate tubing. Connect other end of inducer condensate tubing to top port on the condensate trap. Cut tubing to length, if necessary. N o t e : If required, transition to larger venting within 2' of the cabinet. An 2" x 3" offset coupling is required if the transition is made in a horizontal plane. Use coupling CPL00938 (Canadian applications may use BAYREDUCE to meet ULCS636 requirements.) See Horizontal Venting section for proper orientation of 2” x 3” offset coupling. 25. Install previously removed port cap onto bottom port of the inducer. 26. Connect condensate pressure switch tubing to pressure port on the condensate trap. I m p o r t a n t : Cut to length to ensure there is no sag or trap created. 27. Remove port plug from rain gutter and install in new position on opposite side of the rain gutter. 28. Connect rain gutter condensate hose to the rain gutter and the lower port of the condensate trap. Cut to length, as required. 27 25 23 26 28 24 23. Connect PS2 tubing to switch and sensing location. I m p o r t a n t : Trim the condensate pressure switch tubing to length to ensure there is no sag or trap created. 88 S9V2-VS-SVX001-1B-EN S9V2-VS-SVX001-1B-EN Run Test Mode Gas Hea!ng CFM Inter-Stage Delay Heat Off Delay Hea!ng CFM per Ton Cooling CFM per Ton Con!nuous Fan OD Unit Type OD Tonnage Cooling Off Delay Control Release# Last 6 Faults Ac!ve Errors Status Menu 130 900 140 370 370 75 Example 2 stage 1 compressor 1_5 Example 1st Stage Pressure Switch Error 2_0 Example Open Limit Switch Error 099 000 180 400 400 100 Example 2 stage 2 compressor Example 800 CFM Example 1st Stage Pressure Switch Error See Run Test Menu 116 Example 2nd stage Hea!ng CFM Example Seconds Example Seconds Example CFM per Ton Example CFM per Ton 50 Example 50% Cooling Airflow Example 1 stage 1 compressor Example Outdoor Nominal Tonnage Example seconds 021 Example So"ware Version # Example 2nd Stage Pressure Switch Error Example 2nd Stage Pressure Switch Error Example 1st stage Gas Heat S9V2-VS Control System Menu 109 300 60 25 2_5 Example Enhanced Mode Important: When applied with zoning or a VSPD outdoor unit, the CFM/Ton must be set to 400. CFM per Ton selec!ons range from 290 – 450 Note: Do not adjust COF above 50%. Downflow S9V2B080D4VS 4T[4T], 2T, 2.5T, 3T S9V2C100D4VS 4T[4T], 2.5T, 3T, 3.5T Model ODT Op ons [ ]= Default Upflow S9V2B040U3VS 3T[3T], 1.5T, 2T, 2.5T S9V2B060U3VS 3T[3T], 1.5T, 2T, 2.5T S9V2B080U4VS 4T[4T], 2T, 2.5T, 3T S9V2C100U4VS 4T[4T], 2.5T, 3T, 3.5T S9V2D120U5VS 5T[5T], 3T, 3.5T, 4T Scroll to the selected Menu item by momentarily depressing the “MENU” key and then depress the “OPTION” key to the desired se*ng. Then momentarily depress the “MENU” key again to save the change. SETTING UP YOUR SYSTEM: To change any factory default value, first remove any “call” from the furnace and allow any fan off delays to finish. ( should be seen on the display.) Downflow S9V2B080D4VS S9V2C100D4VS 133 [133], 148, 120, 126 183 [183], 189, 150, 162 Model Gas Hea ng CFM [ ]=Default Upflow S9V2B040U3VS 088 [088], 120, 065, 083 S9V2B060U3VS 103 [103], 113, 130, 080 S9V2B080U4VS 133 [133], 146, 120, 126 S9V2C100U4VS 183 [183], 145, 162, 172 S9V2D120U5VS 195 [195], 225, 156, 185 Gas Hea!ng CFM shown is 2nd stage airflow. 1st stage airflow is ~80% of the selected 2nd stage airflow and cannot be adjusted. Gas hea!ng CFM can be adjusted while the unit is opera!ng in gas heat mode to enable the technician to quickly adjust to the manufacturer's suggested heat rise across the heat exchanger. Mul ply the value shown by 10 for actual airflow. CLEARING THE LAST6 FAULTS: To clear the stored faults, scroll to the last 6 faults menu (L6F), enter the menu by scrolling to the right and hold the “OPTION” key for at least 5 seconds. Release and a set of 3 dashes will be seen 3 !mes. This confirms the faults have been cleared. Integrated Furnace Control Menu 89 Example Calculated Airflow 90 Example 800 CFM NOTES: (1) The menu status displayed is solely dependent on the input of 24VAC that is applied to the low voltage terminal strip. (2) The status will alternate between the system mode and the airflow request every 2 seconds. (3) If an error occurs, an E*.* will alternately flash with the system mode and airflow request. See first example (4) Mul!ply the value shown by 10 for actual airflow = Idle, no demand for cooling, hea!ng, or fan = Demand for 1st stage gas heat = Demand for 2nd stage gas heat = Demand for 1st stage cooling = Demand for 2nd stage cooling = Demand for 1st stage heat pump = Demand for 2nd stage heat pump = Demand for con!nuous fan = Demand for outdoor unit defrost, furnace running in gas heat mode / Calculated airflow is 800 CFM. Airflow display is rounded down to the nearest 10 cfm LR1 = 1st stage gas heat learning rou!ne LR2 = 2nd stage gas heat learning rou!ne Example 1st Stage Pressure Switch Error S9V2-VS Examples of System Status Integrated Furnace Control Menu S9V2-VS-SVX001-1B-EN Integrated Furnace Control Menu Note: During run test mode, depressing the option key will allow the user to hold (HLD) that test sequence if measurements want to be taken. The exception is RU3 (ignitor). Run Test Mode – Run Test Mode: To enter Run Test Mode, scroll to using the Menu key, then push the op!on key. The LED will flash three !mes, then begin the test. To exit the test mode, momentarily push the Menu key, cycle power to the furnace, or make a valid thermostat call for capacity or fan. Sequence of Run Test Mode -Turns the inducer on in 1st stage for 30 seconds – Turns on the inducer on 2nd stage for 30 seconds – Turns the ignitor on for 10 seconds – Turns the circula!ng blower on 1st stage compressor speed for 10 seconds – Turns the circula!ng blower on 2nd stage compressor speed for 10 seconds – Turns the circula!ng blower on 1st stage gas heat speed for 10 seconds – Turns on the circula!ng blower on 2nd stage gas heat speed for 10 seconds The above sequence will repeat two more !mes unless the Run Test Mode is exited, see above Important: The Run Test Mode does not test fire the furnace or bring the outdoor unit on. It is designed to allow the technician to observe each mode to ensure the IFC, inducer, and circula!ng blower are performing as intended. Belly Band Location Distance from belly band to the front face of motor for minimum vibration For C Models only Furnace Cabinet Size Dimension “A” (inches) B 2.705 C 1.790 D 1.790 A For D and E Models only Blower housings and wheel removed from view for clarity. S9V2-VS-SVX001-1B-EN Furnace Cabinet Size Dimension “A” (inches) B 2.75 C 3.54 D 3.79 91 Integrated Furnace Control Display Codes 2 Stage Inducer with ECM Blower Motor IdL Idle XtI First Stage Gas Heating Lr1 First Stage Gas Heat Learning Routine Xt2 Second Stage Heating Lr2 Second Stage Gas Heat Learning Routine aRF Calculated Airflow (Followed by Airflow times 10) C0F Continuous Fan CLI First Stage Cooling CL2 Second Stage Cooling Xp! First Stage Heat Pump Xp2 Second Stage Heat Pump dFt Defrost Mode err Active Alarm Menu L6F Last 6 Faults (To clear — Hold Option button down for 5 seconds) Cr Code Release Number C0d Cooling Off Delay (Seconds) 0dt Outdoor Tonnage 0du Outdoor Unit COF Blower Constant Fan Airflow Multiplier (Percentage) CpC Cooling (CFM/Ton) CpH Heat Pump Heating (CFM/Ton) Xod Heat Off Delay (Seconds) !sd Inter-Stage Delay (Seconds) gXC Gas Heating CFM 2nd Stage (1st Stage is not adjustable) (Airflow times 10) run Run Test Mode Menu Options Table 21. Fault Code Recovery Fault Code Recovery 1. To view the last 6 faults, press the “Menu” key until the “Last 6 Faults” (L6F) menu appears. 2. Enter the menu by pressing the “Option” key. 3. The last 6 faults can be viewed. Clearing the Last 6 Faults 1. To clear the last 6 faults, press the “Menu” key until the “Last 6 Faults” (L6F) menu appears. 2. Enter the menu by pressing the “Option” key. 3. Hold the “Option” key for at least 5 seconds. 4. Release and a set of 3 dashes with be seen 3 times. This confirms the faults have been cleared. 7 Segment LED MENU Button Resetting Factory Defaults 1. Display must be in Idle Mode. 2. Push the “Menu” and “Option” buttons at the same time for 15 seconds then release. 3. The 7 segment will flash “FD” 3 times. This confirms the unit has been reset to the factory defaults. 92 OPTION Button S9V2-VS-SVX001-1B-EN Troubleshooting The following pages include troubleshoong flowcharts in reference for the 2 Stage S9V2* family of furnaces only. The informaon contained is for reference only and does not cover all scenarios or problems that may be encountered. ONLY qualified technicians should aempt to install, troubleshoot, or repair this appliance. Failure to follow all cauons and /or warnings could result in personal or property damage, including death. Error Codes Alarm Error Code Alarm Explanation e0! Loss of the IRQ or other internal failures (Internal IFC error) e2.! Retry Exceeded (Failed to Establish Flame) e2.2 Recycles exceeded (Loss of Established Flame) or 10X PS1 Open e2.3 1st Stage Gas Valve Not Energized When It Should Be exceeded after 10 times e2.4 Redundant Relay (HLO output) Not Energized when it should be exceeded after 10 times e3.! Shorted Pressure Switch, 1st Stage e3.2 Open Pressure Switch, 1st Stage e3.3 Shorted Pressure Switch, 2nd Stage e3.4 Open Pressure Switch, 2nd Stage e04 Open Limit (Main Thermal, Rollout Switch, or Reverse Airflow Switch) e0s Flame detected, should not be present e06 Voltage reversed polarity or Bad Grounding (1) Igniter relay fails e6.3 (2) Igniter open e7.! 1st stage gas valve (MVL) is energized when it should be off e7.2 Redundant Relay (HLO output) Energized when it should Not be e08 Flame current is low, but still strong enough to allow operation e0g Open Inducer Limit Switch or Condensate Pressure Switch e10 Communication error between variable speed inducer and blower motor microprocessor (1) 2nd stage gas valve energized when it should NOT be (2) 2nd stage gas valve not energized when it should be e!! (3) 1st stage gas valve not energized when it should be (4) Redundant relay (HLO output) not energized when it should be e!2 Open fuse e!3 Blower HP/OEM ID e!4 No PM and local copy bad e!s Both of unit Data File in PM and local Unit Data File are corrupt e!7 Blower motor no communication response e!8 Blower communication failure on the control S9V2-VS-SVX001-1B-EN 93 Troubleshooting IFC Component Layout FP - Flame Sensor Connector LINE Connections VSPD Inducer Connector Neutral Connections Motor Communications 7 Segment LED Igniter Connector MENU and OPTION Select Buttons EAC Dry Contact HUM Dry Contact 12 Pin Connector Personality Module 5 Amp Fuse BK Jumper 94 Low Voltage Terminal Strip S9V2-VS-SVX001-1B-EN Troubleshooting GETTING STARTED Is the IFC Seven Segment LED on? NO Is 120 VAC measured at transformer? Is 120 VAC measured between Line and Neutral at the IFC? NO NO Is 120 VAC measured between Line and Neutral at J-box? NO Repair hi voltage YES YES Is 24 VAC measured at transformer? NO YES Replace Xfmr Verify Panel Loop is connected YES YES Is 24 VAC measured at TH and TR at IFC? NO Repair wiring YES Replace IFC What is the fault code? See FAULT LED Codes page Go to L6F (Last 6 Faults) DEFINITION: 01 Fault Code Internal failure of the control board Replace IFC S9V2-VS-SVX001-1B-EN 95 Troubleshooting DEFINITION 2.1 Fault Code RETRY Lock Out = 3 unsuccessful tries for igni!on within a single call for heat. Lockout period is for one hour Flame has never been sensed All gas appliances in the home should be turned on to verify gas pressure Disconnect electrical power to furnace. Connect manometer to inlet gas pressure connector Is inlet gas pressure above 13.8" WC or less than nameplate minimum ? YES Correct inlet gas pressure. Maximum pressure is 13.8"WC Check opera!on NO Is any gas pressure present? Cycle power to furnace. Connect manometer to manifold pressure connector and call for 1st stage heat Possible causes Switch OFF? No voltage to GV Debris in gas valve YES NO Does gas ignite? NO Is manifold pressure ~1.7"WC (NG) ~6.0"WC (LP) NO Adjust manifold gas pressure to ~1.7"WC (NG) ~6.0"WC (LP) Check opera!on YES YES Possible causes: Burner alignment Dirty burners Low manifold pressure NO Do all burners ignite within 4 seconds? Check igniter posi!on and correct if needed. Check opera!on YES Measure flame current. Is flame current less than 0.5 micro-amp? YES Possible Causes Dirty Sensor Dirty burners Poor grounding Sensor loca!on Wire connec!ons NO Flame sensor is good To measure flame current, use a VOM set to DC microamps. Connect voltmeter leads in series with flame sensor circuit, see illustra!on 96 S9V2-VS-SVX001-1B-EN Troubleshooting DEFINITION 2.2 Fault Code RECYCLE Lock Out = 10 recycles within a single call for heat. Lockout period is for one hour. Flame is sensed & then lost All gas appliances in the home should be turned on to verify gas pressure Disconnect electrical power to furnace. Connect manometer to manifold pressure connector NO Cycle power to furnace and call for 1st stage heat Measure flame current. Is flame current greater than 0.75 micro-amp? (0.75-3 µA = Normal) YES NO Possible Causes: Dirty Sensor Dirty burners Poor grounding Sensor loca!on Wire connec!ons Is manifold pressure ~1.7"WC (NG) ~6.0"WC (LP) NO Adjust manifold gas pressure to ~1.7"WC (NG) ~6.0"WC (LP) Check opera!on YES Posible Causes Plugs Blower door Wind gust Condensate Power interrupt YES Is minimum outlet gas manifold pressure maintained? NO Disconnect electrical power to furnace. Connect manometer to inlet gas pressure connector Cycle power to furnace and call for 1st stage heat Repeat steps with 2nd stage hea!ng YES Is minimum outlet gas manifold pressure maintained? NO Correct incoming gas supply pressure To measure flame current, use a VOM set to DC micro-amps. Connect voltmeter leads in series with flame sensor circuit, see illustra!on S9V2-VS-SVX001-1B-EN 97 Troubleshooting DEFINITION 1st Stage Gas Valve not energized when it should be 10 !mes within the same call for heat . 2.3 Fault Code 24VAC not sensed on MVL 10 !mes Replace IFC DEFINITION High limit output relay is not closed when it should be 2.4 Fault Code 24VAC not sensed on HLO 10 !mes Replace IFC DEFINITION An error has occurred with the PS1, indica!ng that the pressure switch is closed when it should be open. Note #1 24 volts = Open Switch 0 volts = Closed Switch In most cases, the pressure switch is not the problem. NOTE: Verify pressure switch wiring and tube rou!ng are correct. 3.1 Fault Code Is PS1 oriented correctly for the applica!on? NO Correct orienta!on See in this document YES Cycle power to the furnace and call for 1st stage heat. Replace pressure switch 98 NO Is 24 volts present, measured across PS1 (orange to yellow)? See Note #1 YES Verify wiring. If correct, replace IFC S9V2-VS-SVX001-1B-EN Troubleshooting Note #1 24 volts = Open Switch 0 volts = Closed Switch DEFINITION An error has occurred with the PS1 indica!ng that the pressure switch is open when it should be closed. Note #2 Measured pressure is nega!ve, greater than refers to magnitude only. In most cases, the pressure switch is not the problem. NOTE: Verify pressure switch wiring and tube rou!ng are correct. 3.2 Fault Code PS1 Open errors can occasionally occur when wind gusts occur. The IFC will a"empt to close both PS1 by increasing the voltage to the inducer motor Is PS1 oriented correctly for the applica!on? NO Correct orienta!on See in this document Cycle power to the furnace and call for 1st stage heat. NO Is the inducer motor running? NO Is voltage measured from RD- WH BK-RD BK-WH at the inducer motor YES Replace inducer assembly YES PS1 is closed Does the igniter glow within 60 seconds? Yes NO Verify no voltage at IFC Replace IFC NO Pressure switch is okay. NO Is 24 volts present, measured across PS1 (orange to yellow)? See Note #1 YES Is pressure greater than pressure switch label? See Note #2 YES Replace pressure switch. Check opera!on. NO Possible Causes: PS hose, flue piping for obstruc!on and/or confirm vent size is correct S9V2-VS-SVX001-1B-EN 99 Troubleshooting 3.3 Fault Code DEFINITION An error has occurred with the PS2, indica!ng that the pressure switch is closed when it should be open. Note #1 24 volts = Open Switch 0 volts = Closed Switch Cycle power OFF, then ON to the furnace In most cases, the pressure switch is not the problem. NOTE: Verify pressure switch wiring and tube rou!ng are correct. Is PS2 oriented correctly for the applica!on? NO Correct orienta!on See in this document YES Replace pressure switch NO DEFINITION An error has occurred with the PS2 indica!ng that the pressure switch is open when it should be closed. Is 24 volts present, measured across PS2? (brown to yellow)? See Note #1 YES Verify wiring Note #1 24 volts = Open Switch 0 volts = Closed Switch 3.4 Fault Code In most cases, the pressure switch is not the problem. NOTE: Verify pressure switch wiring and tube rou!ng are correct. Is PS2 oriented correctly for the applica!on? Correct orienta!on See in this document NO Note #2 Measured pressure is nega!ve, greater than refers to magnitude only. YES Cycle power to the furnace and call for 2nd stage heat. Is the inducer motor running? NO Is voltage measured from RD- WH BK-RD BK-WH at the inducer motor? NO Replace inducer assembly YES YES Pressure switch is okay. NO Is 24 volts present, measured across PS2 (orange to yellow)? See Note #1 Call Technical Support YES Is pressure greater than pressure switch label? See Note #2 YES Replace pressure switch. Check opera!on. NO Check PS hose, flue piping for obstruc!on and confirm vent size is correct 100 S9V2-VS-SVX001-1B-EN Troubleshooting DEFINITION Limit switches are safety devices that will open when an abnormal high temperature has been sensed. REMOVE ALL JUMPER WIRING TO SWITCHES! Under no circumstances, shall these switches be le' jumpered when not troubleshoo!ng. Verify filters and blower wheels are clean See next page for addi!onal 04 faults 04 Fault Code Is blower motor running? NO See troubleshoo!ng for motor YES Are either of the flame roll-out switches tripped? Is 24 VAC measured across main thermal limit? YL49-YL51 YES NO NO Reverse flow switch checkout Does motor con!nue to run during the en!re hea!ng cycle? YES Note: Furnace will need to be checked in both 1st & 2nd stage opera!on YES Is external sta!c pressure greater than nameplate? Correct applica!on or duct issues. Check opera!on Is heat rise within specifica!on? See Nameplate NO Is return air temperature above 85 F? Is outlet manifold gas pressure within specifica!ons? NO Replace reverse flow switch YES YES NO Check for loose insula!on or other objects within furnace air stream Increase blower off delay YES YES NO Is temperature at reverse flow switch above specifica!ons? Return air temperature is above max limit NO YES YES Is temperature at high limit above the switch se#ng? Correct gas pressure Check opera!on NO Make sure any temperature measuring devices (thermocouples, dial thermometers) used to es!mate limit temperature are within ¼ inch of limit disc Replace high limit switch S9V2-VS-SVX001-1B-EN 101 Troubleshooting 04 Fault Code Flame Rollout DEFINITION Limit switches are safety devices that will open when an abnormal high temperature has been sensed. REMOVE ALL JUMPER WIRING TO SWITCHES! Under no circumstances, shall these switches be le$ jumpered when not troubleshoo!ng. Is LP gas being used? YES Is the burner orifice size 56? Or matched to this document for LP? NO Install correct size orifices Check opera!on NO Disconnect electrical power to furnace Correct as needed Check opera!on YES YES Is flue piping restricted? NO Check flue pipe for correct sizing and long horizontal runs or slope less than ¼” per linear foot. Correct as needed Remove, clean, and reassemble burners. Push RED reset on both rollout switches Cycle power to furnace and call for heat Check burner alignment Correct as needed Check opera!on NO Are all burner flames directed into heat exchanger with a !ght pa%ern? (inadequately aired burners tend to roll back) Igni!on occurs Do all burners ignite within 4 seconds? NO YES YES Are flames from burners impinging on sides of heat exchanger? YES Check combus!on air blower, ven!ng, heat exchanger for blockage (i.e. soo!ng) NO When fan comes on, do flames stay consistent? NO Replace heat exchanger Check opera!on YES Replace Roll out switch Check opera!on 102 S9V2-VS-SVX001-1B-EN Troubleshooting DEFINITION: 05 Fault Code Flame is sensed when it should not be. Is flame seen with no call for heat? NO YES Is flame current present? See illustra!on NO Replace IFC YES Disconnect power to unit Turn off gas supply! Remove gas valve Possible Causes: Flame sense wire shorted to ground Flame sensor is grounded Are there signs of moisture or debris in the inlet gas screen? YES Inspect gas supply for leaks and have gas supplier check gas quality NO Install drip leg per Na!onal Fuel Gas Code and Installa!on Instruc!ons NO Is there a drip leg installed on inlet gas piping per installa!on instruc!ons? YES Using a back-up wrench, install new gas valve Check opera!on To measure flame current, use a VOM set to DC micro-amps. Connect voltmeter leads in series with flame sensor circuit, see illustra!on S9V2-VS-SVX001-1B-EN 103 Troubleshooting DEFINITION: Polarity Fault – Incoming high voltage wiring is reversed 06 Fault Code Reversed Polarity Ensure that high voltage wiring to unit is connected properly Connect volt meter to white incoming neutral wire and green earth ground YES Is ~120 VAC read? NO Wiring Error Reverse 120 vac power leads to furnace wiring Disconnect incoming electrical power to furnace Does meter read more than 50 vac? YES Correct neutral and ground problem. Furnace must be on a dedicated circuit. NO Reconnect power Check opera!on Replace IFC 104 S9V2-VS-SVX001-1B-EN Troubleshooting DEFINITION: Ground Fault - Incoming or chassis ground connec!on is not sensed 06 Fault Code Faulty Ground Connect volt meter to black incoming and chassis ground at burner box Correct earth ground. Check opera!on Furnace must be on a dedicated circuit. Disconnect incoming electrical power to furnace NO Does meter read ~120 vac? YES Disconnect incoming electrical power to furnace Check / correct all ground connec!ons within furnace for con!nuity. Furnace must be on a dedicated circuit. Check opera!on S9V2-VS-SVX001-1B-EN 105 Troubleshooting DEFINITION: Igniter Relay Fault – The control board has sensed that the igniter relay has stuck closed 6.3 Fault Code Ignitor Fault – The control board has sensed that the ignitor circuit is open or shorted. Make a call for 1st stage hea!ng Igniter is good Replace IFC YES Does igniter glow? NO Is 120 VAC measured between IGN-H and IGN-N? NO Replace IFC YES YES Verify igniter harness is not damaged and connectors are !ght Disconnect electrical power to the furnace Disconnect igniter and check resistance Replace ignitor. Check opera!on NO Is resistance reading between 37 – 70 ohms? (at ~75F) YES Igniter is good 106 S9V2-VS-SVX001-1B-EN Troubleshooting DEFINITION: External Gas Valve Circuit Error (24 volts is present when it should not be present) 7.1 Fault Code Remove any hea!ng call Is 24 VAC nominal voltage present between Red lead at gas valve connec!on to chassis ground? YES Correct wiring Check opera!on NO Replace IFC DEFINITION: Internal control board error Redundant HLO relay closed when it should not be 7.2 Fault Code Replace IFC S9V2-VS-SVX001-1B-EN 107 Troubleshooting DEFINITION: The flame sense current is less than 0.5 micro-amp DC 08 Fault Code Make a call for 1st stage hea!ng Once flame has been established, set meter to DC volts and measure flame current Ensure all burner flames directed into heat exchanger with a !ght pa#ern? (inadequately aired burners tend to roll back) Important: LP applica!ons must have SEN02662 flame sensor installed. This sensor is iden!fied by having a brown stripe / brown ceramic body Correct flame sensor loca!on NO Is flame sensor located correctly? See figure YES Is flame current measured less than 0.5 micro-amp DC? NO YES Check opera!on Replace flame sensor Flame sensor is good. Check wiring and / or connec!ons. Flame Sensor To measure flame current, use a VOM set to DC micro-amps. Connect voltmeter leads in series with flame sensor circuit, see illustra!on 108 S9V2-VS-SVX001-1B-EN Troubleshooting 09 Fault Code Defini!on: Condensate Pressure Switch Open: The condensate system is not free flowing and opened the safety switch OR Inducer Limit: This error is normally caused by improper installa!on or applica!on of the furnace ven!ng system. Make a call for 1st stage hea!ng Correct condensate drain system YES Is 24 VAC measured across condensate pressure switch? NO Inducer limit switch is open. Allow !me for inducer limit to cool. Verify ven!ng and vent termina!ons are within allowable lengths and clear of any obstruc!ons. YES Is 24 VAC measured across inducer limit switch? Correct ven!ng system NO NO Are ven!ng and vent termina!ons are within allowable limits and clear any obstruc!ons. YES Replace IFC Is Inducer Limit cool and contacts closed? Replace Inducer Limit switch. Check opera!on YES Possible Causes: Incorrect Limit switch installed Inducer malfunc!on Heat exchanger malfunc!on DEFINITION: Internal control board error. Communica!on error between the inducer and blower motor microprocessors 10 Fault Code Replace IFC S9V2-VS-SVX001-1B-EN 109 Troubleshooting Defini"on The IFC has detected that internal gas valve relays have failed OR 24 VAC is being sensed at 2nd stage gas valve 11 Fault Code Remove any hea"ng call Is 24 VAC nominal voltage present between Brown lead at gas valve connec"on to chassis ground? Correct wiring Check opera"on YES NO Replace IFC Defini"on: The onboard 5 amp fuse is open or missing. 12 Fault Code Apply power to the unit Replace fuse YES Is 24 VAC measured across the fuse terminals? NO Is fuse fully seated into connector? NO Properly seat the fuse YES Start unit and measure amp draw on transformer 24VAC red wire (accessories turned OFF) Is amp draw less than 5 amps? Replace IFC NO Turn on each accessory (if installed) and measure amp draw. If amp draw exceeds fuse ra"ng, correct wiring associated with that accessory YES Correct low voltage wiring Possible Causes Field wiring shorted Unit wiring shorted 110 S9V2-VS-SVX001-1B-EN Troubleshooting DEFINITION: This fault is generated when the HP or OEM ID of the blower motor does not match the value that is programmed on the Personality Module 13 Fault Code Disconnect electrical power to furnace. Replace PM with the correct model/serial Does the model & serial number of the PM match the nameplate? NO YES Remove blower ves!bule panel to gain access to blower motor Replace motor with correct HP Does the blower motor HP match the nameplate? NO DEFINITION: This fault is generated when the PM is missing and the onboard informaon cannot be read Replace motor YES 14 Fault Code Disconnect power Install and/or fully seat S9V2-VS-SVX001-1B-EN NO Is PM installed and fully seated? YES Possible causes: PM not programmed Faulty IFC 111 Troubleshooting DEFINITION: This fault is generated when the PM and the IFC informa!on is corrupted 15 Fault Code Disconnect power Possible causes PM corrupted Faulty IFC DEFINITION: This fault is generated when IFC does not see a return signal from the blower motor 17 Fault Code Disconnect power Install and/or fully seat NO Is 4 pin motor communica!on connector installed and fully seated on the IFC? YES Install and/or fully seat NO Is 9 pin connector at the blower ves!bule panel installed and fully seated? YES Install and/or fully seat NO Is 4 pin connector at the blower installed and fully seated? YES Verify con!nuity of all motor wiring and replace motor if required 112 S9V2-VS-SVX001-1B-EN Troubleshooting DEFINITION: This fault is generated when the IFC does not see a send message itelf. 18 Fault Code With power on, remove the 4 pin motor connector from the IFC Does the error code change to E17? YES Verify harness and wiring connec!ons. See addi!onal motor troubleshoo!ng NO Replace IFC Serial Motor Troublesho!ng S9V2-VS-SVX001-1B-EN 113 Troubleshooting Serial Motor Troubleshoo!ng NO Replace IFC Check opera!on Is ~12VDC measured from terminals 1 (12V) and 3 (GND) at the IFC? Is 120 VAC measured at the line voltage connector at the motor? (5 pin connector terminals 4 and 5) Correct, replace wiring. Check opera!on NO See diagram #1 below YES Remove the serial motor wiring harness at the IFC. Apply 24 VAC to wires 3 & 4. Does motor run? See diagram #2 below NO Replace motor. Check opera!on YES Replace IFC. Check opera!on DIAGRAM #1 DIAGRAM #2 #4 = WHITE wire, connects to TX #3 = BLACK wire, connects to GND 114 S9V2-VS-SVX001-1B-EN Sequence of Operation N o t e : The seven segment LED readout is based on thermostat input. During a simultaneous call for W1 and W2, the seven segment LED will read “Xt2”, although the IFC will process the call for 1st stage heat first. 1st Stage Gas Heating 1. R – W1 contacts close on the thermostat sending 24VAC to the W1 low voltage terminal of the IFC. Technician should read 24VAC from W1 to B/C. The seven segment LED will read “Xt1”. 2. T h e I F C p e r f o r m s a s e l f - c h e c k r o u t i n e a n d t h e n confirms: a. Condensate pressure switch and Inducer limit switch are closed by sending 24VAC out the HLO terminal and monitoring the ILI input. b. Flame roll-out switches (FRS) 1 & 2, main thermal limit (TCO), and any reverse air flow (RAF) switches are closed by sending 24VAC out the HLO terminal and monitoring the HLI input. N o t e : Downflow units will have one reverse air flow switch (RAF). Upflow units will have two reverse air flow switches (RAF). c. Pressure switch 1 (PS1) and pressure switch 2 (PS2) are opened by sending 24VAC out the HLO terminal, through the limit switches, and monitoring the PS1 and PS2 inputs. 3. 4. 5. 6. 7. N o t e : If a thermal limit is open, 24VAC will not be present at either pressure switch. After steps 2a, b, and c are confirmed, the variable speed inducer is energized and will run at the predetermined factory default 1st stage inducer speed. As the inducer ramps up, PS1 will close. When PS1 closes, the ignitor relay on the IFC will close. The ignitor is energized and warm up is approximately 20 seconds. After the ignitor warm up, the 1st stage gas valve relay is closed, energizing the 1st stage gas valve solenoid to allow ignition. The first burner will ignite and flame will crossover to the remaining burners, establishing current to the flame sensor. Flame sensing must take place within 4 seconds. Once flame sense has been achieved, a timer on the IFC starts and after the “Blower On” delay has completed, the indoor blower will energize and run at the 1st stage gas heating speed. • During this time, the variable speed inducer will start its 1st stage learning routine, seen as L R 1 on the seven segment LED display. X t 1 and L R 1 will alternately be displayed until the learning routine has been successfully completed. See Learning Routine section below for specifics. S9V2-VS-SVX001-1B-EN 8. Once the 1st stage learning routine has successfully been achieved, the seven segment LED will alternately read: XtI = Gas heating, Stage 1 ARF = Airflow 060 = 600 calculated cfm (value shown x 10) 9. When the temperature raises enough to satisfy the thermostat setting, contacts R-W1 will open. 10. The gas valve relay will open, closing the gas valve. The inducer will continue to run the post-purge for approximately 5 seconds to remove any combustion byproducts from inside the furnace. 11. The indoor blower continues to run the heat off delay to remove heat from the heat exchangers. The blower off time is field adjustable through the IFC menu setup option. The seven segment LED will read “IDL” = Idle, no thermostat demand. 2nd Stage Gas Heating N o t e : 2nd stage heating cannot operate without 1st stage operation. 1. R – W1 contacts close on the thermostat sending 24VAC to the W1 low voltage terminal of the IFC. Technician should read 24VAC from W1 to B/C. The seven segment LED will read “Xt1”. 2. T h e I F C p e r f o r m s a s e l f - c h e c k r o u t i n e a n d t h e n confirms: a. Condensate pressure switch and Inducer limit switch are closed by sending 24VAC out the HLO terminal and monitoring the ILI input. b. Flame roll-out switches (FRS) 1 & 2, main thermal limit (TCO), and any reverse air flow (RAF) switches are closed by sending 24VAC out the HLO terminal and monitoring the HLI input. N o t e : Downflow units will have one reverse air flow switch (RAF). Upflow units will have two reverse air flow switches (RAF). c. Pressure switch 1 (PS1) and pressure switch 2 (PS2) are opened by sending 24VAC out the HLO terminal, through the limit switches, and monitoring the PS1 and PS2 inputs. N o t e : If a thermal limit is open, 24VAC will not be present at either pressure switch. 3. After steps 2a, b, and c are confirmed, the variable speed inducer is energized and will run at the predetermined factory default 1st stage inducer speed. As the inducer ramps up, PS1 will close. 4. When PS1 closes, the ignitor relay on the IFC will close. The ignitor is energized and warm up is approximately 20 seconds. 115 Sequence of Operation 5. After the ignitor warm up, the 1st stage gas valve relay is closed, energizing the 1st stage gas valve solenoid to allow ignition. 6. The first burner will ignite and flame will crossover to the remaining burners, establishing current to the flame sensor. Flame sensing must take place within 4 seconds. 7. Once flame sense has been achieved, a timer on the IFC starts and after the “Blower On” delay has completed, the indoor blower will energize and run at the 1st stage gas heating speed. • During this time, the variable speed inducer will start its 1st stage learning routine, seen as L R 1 on the seven segment LED display. X t 1 and L R 1 will alternately be displayed until the learning routine has been successfully completed. See Learning Routine section below for specifics. 8. Once the 1st stage learning routine has successfully been achieved, the seven segment LED will alternately read: XtI = Gas heating, Stage 1 ARF = Airflow 060 = 600 calculated cfm (value shown x 10) 9. R-W2 contacts close on the thermostat sending 24VAC to the W2 low voltage terminal of the IFC. Technician should read 24VAC from W2 to B/C. The seven segment LED will read “HT2”. 10. The IFC checks to insure that PS2 is open and the inducer is ramped up to the predetermined factory default 2nd stage speed, closing PS2 pressure switch. The second stage gas valve relay on the IFC closes, energizing second stage gas valve. The indoor blower motor will ramp up to the 2nd stage gas heating speed. • During this time, the variable speed inducer will start its 2nd stage learning routine, seen as L R 2 on the seven segment LED display. H T 2 and L R 2 will alternately be displayed until the learning routine has been successfully completed. See Learning Routine section below for specifics 11. Once the the 2nd stage learning routine has successfully been completed, the seven segment LED will alternately read: HT2 = Gas heating, Stage 2 ARF = Airflow 123 = 1230 calculated cfm (value shown x 10) 12. When the temperature raises enough to satisfy the thermostat setting, contacts R-W2 will open, 2nd stage gas valve will close, the indoor blower motor will ramp down to 1st stage, and the unit will continue to run until R-W1 contacts open. 13. When the temperature raises enough to satisfy the thermostat setting, contacts R-W1 will open. 14. The gas valve relay will open, closing the gas valve. The inducer will continue to run for approximately 5 seconds to remove any combustion byproducts from inside the furnace. 116 15. The indoor blower continues to run to remove heat from the heat exchangers. This blower off time is field adjustable through the IFC menu setup option. The seven segment LED will read “IDL” = Idle, no thermostat demand. Single Stage Cooling 1. R-Y1-G contacts on the thermostat close sending 24VAC to the Y1 and G low voltage terminals on the IFC. Technician should read 24VAC between Y1-B/C and between G-B/C. N o t e : Factory supplied Y1-O jumper must remain in place for proper seven segment LED readout. If removed, seven segment LED will read “HP1”. 2. 24VAC is sent to the OD unit via thermostat wiring. 3. The indoor blower ramps to the cooling airflow. The seven segment LED for example will alternately read: CL1 = Cooling, Stage 1 ARF = Airflow 080 = 800 calculated cfm (value shown x 10) 4. When the temperature is lowered enough to satisfy the thermostat setting, contacts R-Y1-G will open. 5. The OD unit shuts off and the indoor blower shuts off, unless a blower off delay has been enabled in the IFC setup menu options. The seven segment LED will read “IDL” = Idle, no thermostat demand. Two Stage Cooling 1. R-Y1-G contacts on the thermostat close sending 24VAC to the Y1 and G low voltage terminals on the IFC. Technician should read 24VAC between Y1-B/C and between G-B/C. N o t e : Factory supplied Y1-O jumper must remain in place for proper seven segment LED readout. If removed, seven segment LED will read “HP1”. 2. 24VAC is sent to the OD unit via thermostat wiring. 3. The indoor blower ramps to the cooling airflow. The seven segment LED for example will alternately read: CL1 = Cooling, Stage 1 ARF = Airflow 080 = 800 calculated cfm (value shown x 10) 4. R-Y2 contact on the thermostat closes sending 24VAC to Y2 low voltage terminal on the IFC. Technician should read 24VAC between Y2 and B/C. 5. 24VAC is sent to the OD unit via thermostat wiring. 6. The indoor airflow ramps to 2nd stage cooling airflow. The seven segment LED for example will read: CL2 = Cooling, Stage 2 ARF = Airflow 160 = 1600 calculated cfm (value shown x 10) S9V2-VS-SVX001-1B-EN Sequence of Operation 7. When the temperature is lowered enough to satisfy the thermostat setting, contacts R-Y1-Y2-G will open. 8. The OD unit shuts off and the indoor blower shuts off, unless a blower off delay has been enabled in the IFC setup menu options. The seven segment LED will read “IDL” = Idle, no thermostat demand. Variable Speed Inducer Learning Routine The purpose of the learning routine is to determine the most efficient inducer operating speed for the furnace in a given heat stage. On a call for gas heat, or transition to a given gas heat stage, the inducer is commanded to a speed in order to close the pressure switch for that stage. N o t e : NOTE: Gas manifold measurements or adjustments must not be made until the learning routine for each stage has been successfully completed. There are two learning routines, one for 1st stage gas heat and another for 2nd stage gas heat. Each learning routine is separate and will occur: 1. Upon initial commissioning of the furnace 2. When power to the furnace has been interrupted 3. After the below number of heating cycles has been reached a. 150 1st stage cycles b. 100 2nd stage cycles 1st Stage Heat 1. When 1st stage gas heat is requested, the variable speed inducer is energized and will run at the predetermined factory default 1st stage inducer speed. Once the ignition process and the blower on delay have successfully completed the IFC will begin the Inducer Learning Routine as outlined below PS1 closes at default speed a. The inducer speed is reduced every 2 seconds until PS1 opens c. The inducer RPM is then raised every 3 seconds to re-close PS1. Upon PS1 closing, the IFC has now learned the most efficient inducer speed for 1st stage gas heat operation. PS1 does not close at default speed The IFC will increase the speed of the inducer until: a. The maximum RPM for 1st stage gas heat is reached b. Or PS1 closes Once PS1 closes, the learning routine will begin as stated above. 2nd Stage Heat 1. When 2nd stage gas heat is requested, the variable speed inducer will run at the predetermined factory default 2nd stage inducer speed. PS2 closes at default speed a. The inducer speed is reduced every 2 seconds until PS2 opens b. At the time PS2 opens, the IFC stores the inducer RPM c. The inducer RPM is then raised every 3 seconds to re-close PS2. Upon PS2 closing, the IFC has now learned the most efficient inducer speed for 2nd stage gas heat operation. PS2 does not close at default speed The IFC will increase the speed of the inducer until: a. The maximum RPM for 2nd stage gas heat is reached b. Or PS2 closes Once PS2 closes, the learning routine will begin as stated above. If PS2 does not close after reaching the maximum RPM, a PS2 open error will be reported and the furnace will continue to run in 1st stage for 10 minutes and retry 2nd stage. This process will repeat until the request for 2nd stage heat is removed. b. At the time PS1 opens, the IFC stores the inducer RPM S9V2-VS-SVX001-1B-EN 117 Periodic Servicing Requirements 1. GENERAL INSPECTION – E x a m i n e t h e f u r n a c e installation annually for the following items: a. All flue product carrying areas external to the Furnace (i.e. chimney, vent connector) are clear and free of obstruction. A vent screen in the end of the Vent (flue) Pipe must be inspected for blockage annually, if applicable. b. The vent connector is in place, slopes upward and is physically sound without holes or excessive corrosion. c. The return air duct connection(s) is physically sound, is sealed to the Furnace and terminates outside the space containing the Furnace. 2. 3. 4. 5. d. The physical support of the Furnace should be sound without sagging, cracks, gaps, etc., around the base so as to provide a seal between the support and the base. FILTERS – Filters should be cleaned or replaced (with high velocity filters only), monthly and more frequently during high use times of the year such as midsummer or midwinter. BLOWERS – The Blower size and speed determine the air volume delivered by the Furnace. The Blower motor bearings are factory lubricated and under normal operating conditions do not require servicing. Annual cleaning of the Blower wheel and housing is recommended for maximum air output, and this must be performed only by a qualified servicer or service agency. IGNITER – This unit has a special hot surface direct ignition device that automatically lights the burners. Please note that it is very fragile and should be handled with care. ! CAUTION Do NOT touch igniter. It is extremely hot. BURNER – Gas burners do not normally require scheduled servicing, however, accumulation of foreign material may cause a yellowing flame or delayed ignition. Either condition indicates that a service call is required. For best operation, burners must be cleaned annually using brushes and vacuum cleaner. Turn off gas and electric power supply. To clean burners, remove burner bottom plate (2 screws) and bottom burner bracket (2 screws). Twist burner towards slot, lift, and push forward away from orifice. Remove burners. Alternate method — Remove manifold assembly, bottom burner plate, and bottom burner bracket. Remove burners. 118 N o t e : Be careful NOT to break igniter when removing burners. Clean burners with brush and/ or vacuum cleaner. Reassemble parts by reversal of the above procedure. N o t e : Natural gas units should not have any yellow tipped flames. This condition indicates that a service call is required. For best operation, burners must be cleaned annually using brushes and vacuum cleaner N o t e : On Propane units, due to variations in BTU content and altitude, servicing may be required at shorter intervals. 6. HEAT EXCHANGER/ FLUE PIPE – These items must be inspected for signs of corrosion, and/ or deterioration at the beginning of each heating season by a qualified service technician and cleaned annually for best operation. To clean flue gas passages, follow recommendations below: a. Turn off gas and electric power supply. b. Inspect flue pipe exterior for cracks, leaks, holes or leaky joints. Some discoloration of PVC pipe is normal. c. Remove door from Furnace. d. Inspect around insulation covering flue collector box. Inspect induced draft Blower connections from recuperative cell and to the flue pipe connection. e. Remove burners. (See 5. Burner) f. Use a mirror and flashlight to inspect interior of Heat Exchanger, be careful not to damage the Igniter, Flame Sensor or other components. g. If any corrosion is present, the Heat Exchanger should be cleaned by a qualified service technician. h. After inspection is complete replace burners and Furnace door. i. Restore gas supply. Check for leaks using a soap solution. Restore electrical supply. Check unit for normal operation. 7. COOLING COIL CONDENSATE DRAIN - If a cooling coil is installed with the Furnace, condensate drains should be checked and cleaned periodically to assure that condensate can drain freely from coil to drain. If condensate cannot drain freely water damage could occur. S9V2-VS-SVX001-1B-EN Notes S9V2-VS-SVX001-1B-EN 119 About Trane and American Standard Heating and Air Conditioning Trane and American Standard create comfortable, energy efficient indoor environments for residential applications. For more information, please visit www.trane.com or www.americanstandardair.com. The manufacturer has a policy of continuous data improvement and it reserves the right to change design and specifications without notice. We are committed to using environmentally conscious print practices. S9V2-VS-SVX001-1B-EN 02 Dec 2022 Supersedes S9V2-VS-SVX001-1A-EN (July 2022) ©2022 ">
/
डाउनलोड
बस एक दोस्ताना अनुस्मारक. आप दस्तावेज़ को यहीं देख सकते हैं. लेकिन सबसे महत्वपूर्ण बात यह है कि हमारे AI ने इसे पहले ही पढ़ लिया है. यह जटिल चीजों को सरल शब्दों में समझा सकता है, किसी भी भाषा में आपके सवालों के जवाब दे सकता है, और सबसे लंबे या सबसे जटिल दस्तावेजों को भी जल्दी से नेविगेट करने में आपकी मदद कर सकता है.
विज्ञापन