विज्ञापन
विज्ञापन
Infor LN User Guide for Project Pegging Copyright © 2015 Infor Important Notices The material contained in this publication (including any supplementary information) constitutes and contains confidential and proprietary information of Infor. By gaining access to the attached, you acknowledge and agree that the material (including any modification, translation or adaptation of the material) and all copyright, trade secrets and all other right, title and interest therein, are the sole property of Infor and that you shall not gain right, title or interest in the material (including any modification, translation or adaptation of the material) by virtue of your review thereof other than the non-exclusive right to use the material solely in connection with and the furtherance of your license and use of software made available to your company from Infor pursuant to a separate agreement, the terms of which separate agreement shall govern your use of this material and all supplemental related materials ("Purpose"). In addition, by accessing the enclosed material, you acknowledge and agree that you are required to maintain such material in strict confidence and that your use of such material is limited to the Purpose described above. Although Infor has taken due care to ensure that the material included in this publication is accurate and complete, Infor cannot warrant that the information contained in this publication is complete, does not contain typographical or other errors, or will meet your specific requirements. As such, Infor does not assume and hereby disclaims all liability, consequential or otherwise, for any loss or damage to any person or entity which is caused by or relates to errors or omissions in this publication (including any supplementary information), whether such errors or omissions result from negligence, accident or any other cause. Although Infor has taken due care to ensure that the material included in this publication is accurate and complete, Infor cannot warrant that the information contained in this publication is complete, does not contain typographical or other errors, or will meet your specific requirements. As such, Infor does not assume and hereby disclaims all liability, consequential or otherwise, for any loss or damage to any person or entity which is caused by or relates to errors or omissions in this publication (including any supplementary information), whether such errors or omissions result from negligence, accident or any other cause. Without limitation, U.S. export control laws and other applicable export and import laws govern your use of this material and you will neither export or re-export, directly or indirectly, this material nor any related materials or supplemental information in violation of such laws, or use such materials for any purpose prohibited by such laws. Trademark Acknowledgements The word and design marks set forth herein are trademarks and/or registered trademarks of Infor and/or related affiliates and subsidiaries. All rights reserved. All other company, product, trade or service names referenced may be registered trademarks or trademarks of their respective owners. Publication Information Document code crossppegug (U9777) Release 10.4.x Cloud Edition (10.4.1) Publication date October 27, 2015 Table of Contents About this document Chapter 1 Introduction.........................................................................................................................9 Project pegging overview..............................................................................................................9 Setting up project pegging..................................................................................................9 Project (cost) pegging.......................................................................................................10 Chapter 2 Master Data........................................................................................................................13 Cost peg transfer rules...............................................................................................................13 Error message..................................................................................................................13 Borrow/loan and payback transfers..................................................................................14 Cost peg transfer type.......................................................................................................14 Cost peg change reasons...........................................................................................................16 Cost peg transfer settings for specific scenarios........................................................................16 Excess inventory only.......................................................................................................17 Excess and ATT within lead time fences..........................................................................17 Use ATT inventory regardless of lead time fences...........................................................17 ATT inventory with minimum cost effects – borrow/loan and payback.............................17 Important...........................................................................................................................17 Use ATT inventory regardless of lead time fences.....................................................................17 Chapter 3 Sales...................................................................................................................................19 Project pegging in Sales.............................................................................................................19 Chapter 4 Planning.............................................................................................................................21 Using cost peg supplying relationships.......................................................................................21 Master data.......................................................................................................................21 Planned distribution orders and warehouse transfers.......................................................22 Updating cost peg supplying relationships........................................................................23 Cost peg transfers in Enterprise Planning..................................................................................24 Cost peg transfers in order planning.................................................................................24 Creating planned cost peg transfers.................................................................................24 Updating and deleting planned cost peg transfers............................................................25 Cost peg transfer exception messages.............................................................................25 Temporary cost peg transfers...........................................................................................25 Chapter 5 Manufacturing...................................................................................................................27 Project Pegging in Manufacturing...............................................................................................27 Production orders..............................................................................................................27 Bill of material....................................................................................................................27 Estimated materials..........................................................................................................27 Material issue....................................................................................................................28 Safety stock calculation....................................................................................................28 Report operations completed............................................................................................28 Chapter 6 Procurement......................................................................................................................29 Project pegging in Procurement.................................................................................................29 Generating a peg distribution............................................................................................29 Commingling pegs............................................................................................................30 Handling peg data.............................................................................................................31 Warehouse receipts..........................................................................................................31 Purchase receipts.............................................................................................................32 Notes and related processes............................................................................................32 Supplier stage payments............................................................................................................33 Pegging stage payment lines............................................................................................33 Material supply lines...................................................................................................................33 Pegging material supply lines for operation and item subcontracting...............................33 Return orders..............................................................................................................................35 Return Inventory orders....................................................................................................35 Return Rejects orders.......................................................................................................36 Chapter 7 Warehousing.....................................................................................................................37 Peg distributions.........................................................................................................................37 Peg distribution in the inbound and inspection processes................................................37 Peg distribution in the outbound process..........................................................................41 Peg distribution for cycle counting and adjustment orders...............................................74 Peg distribution - gains and losses...................................................................................74 Cost peg transfers......................................................................................................................76 Cost peg transfers in Warehousing...................................................................................76 Chapter 8 Service...............................................................................................................................83 Project pegging in depot repair...................................................................................................83 Overview...........................................................................................................................83 Propagation of the peg in the depot repair process..........................................................83 Propagation of the peg to the maintenance sales quotations...........................................84 Propagation of the peg to the maintenance sales order...................................................84 Propagation of the peg to the work order for MSO part line.............................................84 Propagation of the peg to the work order linked /originating from a maintenance sales order........................................................................................................................85 Propagation of the peg to the follow-up work order..........................................................85 Propagation of a material request to LN Warehousing from depot repair.........................85 Propagation of the peg to book hours...............................................................................86 Book other costs or bench stock material costs................................................................86 Propagation of the peg to a maintenance sales order coverage line................................86 Chapter 9 People................................................................................................................................87 Costs distribution of production order hours – examples...........................................................87 Chapter 10 Borrow/Loan and Payback.............................................................................................91 Cost peg transfers - borrow/loan and payback...........................................................................91 The borrow/loan and payback process.............................................................................91 Manual finalization and aging...........................................................................................91 Cost aspects.....................................................................................................................91 Tracking borrow/loan and payback information................................................................92 To set up borrow/loan and payback transfers...................................................................92 To set up borrow/loan and payback transfers.............................................................................92 Important...........................................................................................................................93 The borrow/loan and payback process.......................................................................................93 Borrow/loan.......................................................................................................................94 Payback............................................................................................................................94 Partial paybacks................................................................................................................94 Manual finalization and aging.....................................................................................................95 Impact...............................................................................................................................95 Manual finalization............................................................................................................95 Aging.................................................................................................................................95 Cost aspects of borrow/loan and payback transfers...................................................................96 Cost aspects of borrow transfers................................................................................................96 Example............................................................................................................................96 Cost aspects of paybacks...........................................................................................................96 Example............................................................................................................................97 Cost aspects of aging or manual finalization..............................................................................97 Tracking borrow/loan and payback transfers..............................................................................97 Examples of integration transactions for borrow/loan and payback transfers............................98 Borrow/loan transfer..........................................................................................................99 Payback transfer...............................................................................................................99 Finalization by aging or manual intervention...................................................................100 Chapter 11 Costing Breaks..............................................................................................................103 Costing Breaks.........................................................................................................................103 Pre-requisites to create costing breaks...........................................................................104 Setting up costing breaks................................................................................................105 Search criteria for costing breaks...................................................................................105 Copying costing breaks...................................................................................................106 Removing empty costing breaks.....................................................................................107 Costing breaks in Enterprise Planning and Manufacturing.......................................................107 Project Pegging Costing Breaks in Depot Repair.....................................................................109 Appendix A Glossary.......................................................................................................................115 Index About this document This document explains the process to set up and use pegs in project manufacturing environments. The usage of pegs across LN, the setup and usage of borrow/loan inventory transfers between cost pegs, and the handling of costing breaks, are also described. Document summary This table shows the chapters of this guide: Chapter number Chapter title Content Chapter 1 Introduction and Setup Introduction to and setup of project pegging Chapter 2 Master Data Setup of project pegging master data. The master data for setting up borrow/loan and payback, and costing breaks is explained in the appropriate chapters. Chapter 3 Sales Project pegging in Sales Chapter 4 Planning Project pegging in Enterprise Planning Chapter 5 Manufacturing Project pegging in Manufacturing Chapter 6 Procurement Project pegging in Procurement Chapter 7 Warehousing Project pegging in Warehousing Chapter 8 Service Project pegging in Service Chapter 9 People Project pegging in People Chapter 10 Borrow/Loan and Payback Setup and use of borrow/loan inventory transfers between cost pegs Chapter 11 Costing Breaks Setup and use of costing breaks Project pegging related to project contracts is not described in this guide. For more information, refer to the User Guide for Contract Management U9797 US. Infor LN | User Guide for Project Pegging | 7 About this document How to read this document This document was assembled from online Help topics. Consequently, references to other sections in the manual are presented as shown in the following example: For details, refer to Introduction. To locate the referred section, please refer to the Table of Contents or use the Index at the end of the document. Underlined terms indicate a link to a glossary definition. If you view this document online, clicking the underlined term takes you to the glossary definition at the end of the document. Comments? We continually review and improve our documentation. Any remarks/requests for information concerning this document or topic are appreciated. Please e-mail your comments to [email protected] . In your e-mail, refer to the document number and title. More specific information will enable us to process feedback efficiently. Contacting Infor If you have questions about Infor products, go to the Infor Xtreme Support portal. If we update this document after the product release, we will post the new version on this website. We recommend that you check this website periodically for updated documentation. If you have comments about Infor documentation, contact [email protected] . 8 | Infor LN | User Guide for Project Pegging Chapter 1 Introduction 1 Project pegging overview In project manufacturing environments, to facilitate cost accountability for finished goods within projects, you can implement project pegging and indicate that items are project pegged. If a project-pegged item is specified on a demand order, pegging information is used to allocate, track, trace, register, and supply inventory. Throughout the entire flow of goods, pegging information is added to items, inventory, and transactions when goods are ordered, received, issued, and consumed. Consequently, you can track the costs at the project, activity, and element level. Peg distribution information is available for purchase, warehouse and job shop orders to track for which project cost account the goods are ordered. The peg distribution lines include the item, required quantity, unit, configuration, and the project cost account (peg) elements. In addition, the distribution lines contain information on the top demand order, such as customer, contract, prime contractor, and top demand order date. The main purpose of distribution lines is cost distribution and not the physical movement of items. In case of exceptional situations, such as partial receipts, over issues, rejections, and returns, the quantities are allocated according to the fair, equitable and unbiased accounting principle in which the demand need date is the main driver. Multilevel order pegging inquiries are available to manage dependencies in the supply chain, and requirements of multiple projects can be commingled in one purchase order to leverage volume discounts. Actual costing and earned value can be reported any time against the project. Setting up project pegging To set up project pegging, complete these steps: Step 1: Select the Project Pegging check box in the Implemented Software Components (tccom0100s000) session. Infor LN | User Guide for Project Pegging | 9 Introduction If you want to use project pegging in combination with costing breaks, also select the Costing Breaks check box. Step 2: Specify the project pegging parameters in the Project Pegging Parameters (tcpeg0100m000) session. Step 3: For each item, specify the peg parameters in the Items (tcibd0501m000) session. Select the Inherit Project Peg and/or Mandatory Project Peg check boxes. Project (cost) pegging Project cost pegging affects multiple LN packages. For more information, refer to the main topics as shown in this table: Package Topic Common Cost peg transfers - borrow/loan and payback (p. 91) To set up borrow/loan and payback transfers (p. 92) Cost peg transfer rules (p. 13) Cost peg change reasons (p. 16) Cost peg transfer settings for specific scenarios (p. 16) Use ATT inventory regardless of lead time fences (p. 17) Sales Project pegging in Sales (p. 19) Enterprise Planning Using cost peg supplying relationships (p. 21) Cost peg transfers in Enterprise Planning (p. 24) Manufacturing Project Pegging in Manufacturing (p. 27) Procurement Project pegging in Procurement (p. 29) Warehousing Peg distribution in the inbound and inspection processes (p. 37) 10 | Infor LN | User Guide for Project Pegging Introduction Peg distribution in the outbound process (p. 41) Peg distribution for cycle counting and adjustment orders (p. 74) Peg distribution - gains and losses (p. 74) Cost peg transfers in Warehousing (p. 76) Service Project pegging in depot repair (p. 83) People Costs distribution of production order hours – examples (p. 87) Infor LN | User Guide for Project Pegging | 11 Introduction 12 | Infor LN | User Guide for Project Pegging Chapter 2 Master Data 2 Cost peg transfer rules Cost peg transfer rules determine the sources and the destinations that are allowed for cost peg transfers. If no transfer rules are specified in the Cost Peg Transfer Rules (tcpeg1100m000) session, cost peg transfers from and to project cost pegs of all planning groups within the company are allowed. You can set transfer rules for the following levels: 1. Planning group 2. Project 3. Element 4. Activity The planning group is the highest level. The rules set for a particular level also apply to the lower levels. You can select the Inherit Transfer In and Inherit Transfer Out check boxes to inherit the transfer rules from the preceding, higher level. For the highest level, planning group, the inherit options are not available, because this is the highest level. Note If you re-assign projects to other planning groups, LN automatically updates the transfer rules. Therefore, manual adjustment of the transfer rules is not required. Error message When setting transfer rules, the following error message is displayed if the element and activity setup is not defined as recommended: “Change the value of the Activity field. Reason: Work Authorization status of Project </Element/Activity/xyz> should be Released.” You can maintain elements and activities in the Activities (tppss2100m000) and Elements (tpptc1100m000) sessions. Infor LN | User Guide for Project Pegging | 13 Master Data Borrow/loan and payback transfers If you use borrow/loan and payback transfers, ensure that cost peg transfers in and out are allowed for the projects involved in these transfers. For example, to allow project A to borrow and pay back inventory to project B, you must allow transfers in and transfers out for both projects. Alternatively, if the transfer rules that you specified do not allow transfers out for potential borrowing projects and thus rule out payback transfers, you can select the Ignore Cost Peg Transfer Rules for Paybacks check box in the Project Pegging Parameters (tcpeg0100m000) session. For the relevant projects, this allows payback transfers and rules out permanent transfers. Cost peg transfer type The Borrow / Loan value does not fully exclude permanent cost peg transfers for the specified planning group, project, element, or activity. If Borrow / Loan is specified in the Cost Peg Transfer Type field: ▪ ▪ The generate outbound advice process will generate borrow/loan transfers if an inventory shortage is identified and ATT inventory if found at other projects. If excess inventory is present, however, the outbound advice process generates permanent transfers. Enterprise Planning only considers excess inventory and ignores ATT inventory when generating permanent cost peg transfers. If Permanent is specified, and the Use Available to Transfer check box is: ▪ Selected Enterprise Planning and the outbound advice process generate permanent transfers from excess inventory, if present. If not, the permanent transfers are based on ATT inventory, if present. ▪ Cleared Permanent transfers are generated from excess inventory, if present. If none of the projects for which the setup allows cost peg transfers has sufficient ATT or excess inventory, LN generates no cost peg transfers and creates an inventory shortage report. The Permanent value excludes borrow/loan transfers. Note If the Use Available to Transfer check box is cleared, only the Permanent value is available in the Cost Peg Transfer Type field. If this check box is selected,, you can choose Permanent or Borrow / Loan in the Cost Peg Transfer Type field. Setup example for cost peg transfer rules Cost peg transfer rules determine the sources and the destinations that are allowed for cost peg transfers. If no transfer rules are specified in the Cost Peg Transfer Rules (tcpeg1100m000) session, cost peg transfers from and to project cost pegs of all planning groups within the company are allowed. 14 | Infor LN | User Guide for Project Pegging Master Data Planning group Project Element Activity Inherit Transfer In Inherit Transfer Out A Within Group Across Groups Transfers to project pegs related to planning group A are allowed if the transfers originate from projects within the same planning group. Transfers out from these project pegs to project pegs related to projects across all planning groups of the company are allowed. Planning group Project Element Activity Inherit Transfer In A A A1 X Inherit Transfer Out Within Group Across Groups Within Group Within Project For project A1, which belongs to planning group A, the rules for transfers to the project are inherited from the planning group. Transfers out of project A1 are now restricted to cost pegs within the project. To all other projects belonging to planning group A, the general rules set for planning group A still apply. Planning group Project Element Activity Inherit Transfer In Inherit Transfer Out A Within Group Across Groups Within Group Within Project A A1 A A1 B X E1 ACT1 Not Allowed Not Allowed E2 ACT2 Not Allowed X Within Project Within Project Within Project For cost account A/A1/E1/ACT1, no cost peg transfers in or out are allowed. Transfers to cost account A/A1/E2/ACT2 are not allowed, but transfers out are allowed to cost pegs within project A. The transfer-out rules are inherited from the transfer-out rules set for project A. Infor LN | User Guide for Project Pegging | 15 Master Data Cost peg change reasons Peg change reasons specify why a user manually adds, changes or removes cost peg transfer lines or cost peg distribution lines. If the Manual Project Peg Modification check box is selected in the Project Pegging Parameters (tcpeg0100m000) session, you can manually add, change, or delete a cost peg transfer line or a cost peg distribution line. However, you must specify the reason before you can make any modifications. For this purpose, the Peg Change Reason field is available in the peg sessions. A status bar message informs you if a peg change reason is required. Note ▪ ▪ Because you must specify a reason code after each saved change, do not save the peg distribution before you made all necessary changes. LN modifies the cost peg transfers, orders, or order lines that affect the related cost peg transfer or cost peg distribution lines. Therefore, users are not required to specify peg change reasons. You cannot change cost peg transfer lines or cost peg distribution lines that are processed, or cost peg transfer lines that are generated from the outbound advice. If this check box is selected, you must specify a reason code for a manual change to a project peg transfer line or project peg distribution line. This reason code, which you can define in the Reasons (tcmcs0105m000) session, must be of the type Project Peg Audit History. It is applicable to all pegs in the peg distribution. Note Manual changes and reasons for cost peg transfer lines and cost peg distribution lines are saved in the Cost Peg Audit History (tpctm2500m000) session. For cost peg transfer lines, LN creates separate audit history records for the transfer-from and the transfer-to information. Cost peg transfer settings for specific scenarios The preferred availability of inventory for transfers determine how you set up cost peg transfers. This topic describes the setup required for a few typical scenarios. Before setting up these scenarios, the general cost peg transfer and/or borrow/loan and payback setup is required. 16 | Infor LN | User Guide for Project Pegging Master Data Excess inventory only If only excess inventory must be available for cost peg transfers: 1. Clear the Use Available to Transfer check box in the Planning Parameters (cprpd0100m000) session. 2. In the Cost Peg Transfer Rules (tcpeg1100m000) session, clear the Use Available to Transfer check box and select Permanent in the Cost Peg Transfer Type field. As a result, LN creates only permanent transfers. Excess and ATT within lead time fences If you want excess and ATT inventory with safe replenishment lead times to be available for cost peg transfers, you must select the Use Available to Transfer check box in the Cost Peg Transfer Rules (tcpeg1100m000) session. Based on this setting, the Enterprise Planning planning engine only creates permanent transfers. The outbound process can also create borrow/loan transfers if you also select transfer type Borrow / Loan in the Cost Peg Transfer Rules (tcpeg1100m000) session. Use ATT inventory regardless of lead time fences You can also Use ATT inventory regardless of lead time fences (p. 17) while allowing ATT inventory to be available for cost peg transfers. ATT inventory with minimum cost effects – borrow/loan and payback To handle shortages of project pegged inventory identified during the outbound process, you can use the borrow/loan and payback procedure to temporarily transfer available to transfer (ATT) inventory from other projects with minimum cost impact on either project. Important Before setting up these scenarios, the general cost peg transfer and/or borrow/loan and payback setup is required. Use ATT inventory regardless of lead time fences Sometimes, a demand of a project attains high priority and requires immediate fulfillment, while the project has insufficient inventory and lead time fences prevent ATT cost peg transfers from other projects. When creating ATT cost peg transfers, the Enterprise Planning planning engine and the outbound process offset the replenishment lead times of a potential originating project against the issue date of Infor LN | User Guide for Project Pegging | 17 Master Data the receiving project. If the replenishment date is after the issue date, no transfer is created and other projects are checked. To enable the creation of ATT cost peg transfers regardless of replenishment lead times: 1. In the Project Pegging Parameters (tcpeg0100m000) session, select the Ignore ATT Time Fence during Outbound check box. 2. In the Cost Peg Transfer Rules (tcpeg1100m000) session, select the Use Available to Transfer check box. Consequently, the outbound process creates permanent transfers for all excess or ATT inventory that belongs to other projects, and selects cost pegs to transfer from in the following sequence: ▪ ▪ ▪ Excess inventory inventory ATT considering lead times ATT regardless of lead times The Enterprise Planning planning engine ignores the Ignore ATT Time Fence during Outbound check box. Note If the lead times are ignored, the originating projects cannot be replenished in time through normal planned replenishment orders, because these will arrive too late according to the replenishment lead times. This may cause other cost peg transfers to be created to alleviate the shortages. If you also select the Borrow/Loan and Payback check box in the Project Pegging Parameters (tcpeg0100m000) session and specify Borrow / Loan in the Cost Peg Transfer Type field of the Cost Peg Transfer Rules (tcpeg1100m000) session for the relevant project ranges, the outbound process can generate borrow/loan transfers for ATT inventory. 18 | Infor LN | User Guide for Project Pegging Chapter 3 Sales 3 Project pegging in Sales To identify costs, demand, and supply for a project, you can implement project pegging and specify the items for which project pegging is required. For more information, refer to Project pegging overview (p. 9) . Note To use project pegging in combination with costing breaks, also select the Costing Breaks check box in the Implemented Software Components (tccom0100s000) session. For more information, refer to Costing Breaks (p. 103) . Project pegging in Sales includes the pegging of project costs for sales order and quotation lines. If project pegging is mandatory for the item on the sales order line or quotation line, a peg must be specified in the Sales Order Lines (tdsls4101m000) and Sales Quotation Lines (tdsls1501m000) sessions. A peg is a combination of project/ budget, project element and/or project activity. For example, if demand is pegged for a sales order line, the goods are sold for and the costs are booked to the project, element, and activity on the sales order line. The peg is mandatory when planned inventory transactions are generated for the sales order line or quotation line. For sales quotation lines this means the peg is not mandatory if the Probability Percentage is lower than the value specified in the Minimum Probability % for Time Phased Inventory field of the Sales Quotation Parameters (tdsls0100s100) session. However, when you confirm a sales quotation line, the peg is always mandatory. Note If an item linked to an opportunity requires a peg, you can specify the peg in the Items by Opportunity (tdsmi1113m000) session. However, using pegs for opportunities is always optional. When generating a sales quotation line from an opportunity item line, the opportunity's peg is copied to the Budget, Element for Budget, and Activity for Budget fields on the quotation line. Infor LN | User Guide for Project Pegging | 19 Sales When a sales quotation is processed to a sales order, the peg is copied as follows: ▪ ▪ ▪ If the Budget, Element for Budget, Activity for Budget, Project, Element for Project, and Activity for Project fields are specified on a quotation line, the budget related peg fields are ignored and the project peg fields are copied to the sales order line peg fields. If only the Budget, Element for Budget, and Activity for Budget fields are specified on a quotation line, these fields are copied to the sales order line peg fields. If the Budget field is specified on the quotation header, this budget is copied to the project on the sales order header. However, if one of the quotation lines has a project specified that differs from the quotation line budget, the sales order header project is left empty. The sales peg is copied to all relevant objects further in the process, such as Warehousing, Invoicing, Procurement, or Shop Floor Control. If the target object uses peg distributions, the sales peg is copied to a distribution line. Note If project pegging is implemented but a project peg is not mandatory for an item, you can optionally specify a peg. If a project pegged sales order requires supply from a business unit in a different logistical company, a cost peg supplying relationship must be available to keep track of and link the cost peg data of the demand and the supply business units during planning and transfer. For more information, refer to Using cost peg supplying relationships (p. 21) . 20 | Infor LN | User Guide for Project Pegging Chapter 4 Planning 4 Using cost peg supplying relationships For large enterprises consisting of multiple business units, subassemblies manufactured in one business unit often must be delivered to another business unit in another logistic company. If project cost pegging is required, all costs must be tracked in both business units against their specific projects. In both companies, projects are set up, and a cost peg supplying relationship must be defined to establish a link between them. The cost peg supplying relationship links the demand cost peg from the demand company to the supply cost peg from the supply company. Master data Before you can use cost peg supplying relationships, these conditions must be met: ▪ ▪ ▪ ▪ The Project Pegging check box must be selected in the Implemented Software Components (tccom0100s000) session for both companies. The Inherit Project Peg or Mandatory Project Peg check boxes must be selected for the component in the Items (tcibd0501m000) session. A supplying relationship must be available for the component in the Supplying Relationships (cprpd7130m000) session of the receiving company. Identical item codes must be assigned to the component in both business units. Note If the Use Identical Cost Pegs for Multi-Company Warehouse Transfers check box is selected in the Project Pegging Parameters (tcpeg0100m000) session, no user involvement is required to create the cost peg supplying relationship. The receiving cost peg will use the same code as the supplying cost peg, and vice versa. However, to use automatic cost peg generation, ensure that the same project, activity, and element codes are used in the receiving and supplying company. If the Use Identical Cost Pegs for Multi-Company Warehouse Transfers check box is cleared in the Project Pegging Parameters (tcpeg0100m000) session, and if delivery of a subassembly from another business unit is required, you must manually specify the cost peg supplying relationship in the Cost Peg Supplying Relationships (tppss3130m000) session of the receiving company. An entry appears in the Cost Peg Supplying Relationships (tppss3130m000) session of the supplying business unit to which Infor LN | User Guide for Project Pegging | 21 Planning the supplying cost peg data must be added. Additionally, through SocialSpace, a message can be sent to the supplying business unit to notify that the supplying cost peg must be added to this cost peg supplying relationship. After the supplying cost peg is added by the supplying business unit, the status of the cost peg supplying relationship can be set to Completed. A cost peg supplying relationship with the Completed status can be used on a planned distribution order or (manual) warehouse transfer. Planned distribution orders and warehouse transfers If a demand order needs supply from a business unit in a different logistical company, a multisite planned distribution order is generated for the project pegged demand using the Generate Order Planning (cprrp1210m000) session. One planned distribution order can have multiple demand orders with different project pegs, and a peg distribution. For each of these pegs, Enterprise Planning uses the applicable cost peg supplying relationship to retrieve the project pegs for the planned inventory movements in the supplying company. In the Transfer Order Planning (cppat1210m000) session of the receiving company, you can transfer a multicompany, cost pegged planned distribution order only to a warehouse transfer and not to a purchase order. The warehouse transfer uses the receiving and supplying cost pegs of the planned distribution order. Note If the item is not cost pegged in the supplying company (the Inherit Project Peg and Mandatory Project Peg check boxes are cleared), the supplying cost peg can remain empty. Planned distribution order Supplying company Mandatory Project Inherit Project Peg selected Peg selected Receiving compa- Cost pegged ny Not cost pegged Receiving and sup- Receiving and sup- Receiving cost peg plying cost peg plying cost peg only Not cost pegged Not supported No cost peg in both No cost peg in both business units business units In case of a planned distribution order, the demand in the receiving company triggers the supply via a warehouse transfer. This table shows the various pegging options supported for this scenario. You can also manually create a warehouse transfer. In this case, you must manually select a supplying cost peg based on which the receiving cost peg is retrieved. If multiple receiving cost pegs are linked to one supplying cost peg, all linked receiving cost pegs are shown from which you can make your selection. Alternatively, you can select an existing cost peg supplying relationship. 22 | Infor LN | User Guide for Project Pegging Planning If no cost peg supplying relationship is found for the to be transferred supply, an error message is displayed. Manual warehouse transfer Supplying company Cost pegged Receiving company Not cost pegged Mandatory Project Peg Receiving and supplying cost selected peg Not supported Inherit Project Peg se- Receiving and supplying cost lected peg No cost peg in both business units Not cost pegged Cost peg in supplying business No cost peg in both busiunit only ness units In case of a manual warehouse transfer, the warehouse transfer is created in the supplying company before the receiving side is triggered. This table shows the various pegging options supported for this scenario. Updating cost peg supplying relationships Planned distribution order ▪ ▪ ▪ If the receiving business unit changes the cost peg on the demand order, you must manually update the existing cost peg supplying relationship. To perform the update, the status of the cost peg supplying relationship must be Draft. After the cost peg supplying relationship is changed and the status set to Submitted, the supplying business unit can update the supplying cost peg. The supplying business unit can change the supplying cost peg on the cost peg supplying relationship if its status is Draft or Submitted. If the cost peg supplying relationship is changed after the warehouse transfer is created, you must manually delete the warehouse transfer or change the cost peg(s) on the warehouse transfer. Manual warehouse transfer ▪ ▪ ▪ If the supplying business unit changes the supplying cost peg on the warehouse transfer, the existing cost peg supplying relationship is not changed. If required, the receiving business unit must manually change the receiving cost peg on the warehouse transfer. The supplying business unit can change the supplying cost peg on the cost peg supplying relationship if its status is Draft. The receiving business unit can change the ship-from or ship-to company on the cost peg supplying relationship if its status is Draft. After the cost peg supplying relationship is changed Infor LN | User Guide for Project Pegging | 23 Planning ▪ and the status set to Submitted, the supplying business unit can update the supplying cost peg. The receiving business unit can change the receiving cost peg on the cost peg supplying relationship if its status is Draft or Submitted. Note You can delete cost peg supplying relationships with the Draft or Closed status. Cost peg transfers in Enterprise Planning These types of cost peg transfers are available in Enterprise Planning: ▪ Manual cost peg transfer Orders for this type of transfer are retrieved from Warehousing and are considered firm planned demand. You cannot create, updated, or delete these orders in order planning. You can view these orders in the Item Order Plan (cprrp0520m000) session. ▪ Planned cost peg transfer Orders for this type of transfer are created based on the available excess on hand and excess on order. You can view these orders in the Item Order Plan (cprrp0520m000) session. A transfer from a project peg is shown as a demand transaction and a transfer to a project peg is shown as a supply transaction. You can also view planned cost peg transfers in the Planned Cost Peg Transfers (cprrp0130m000) session, which shows detailed information about the transfer. Cost peg transfers in order planning Order planning takes both manual cost peg transfers and planning cost peg transfers into account. The manual cost peg transfers are treated as demand orders and the excess on hand and excess on order are used to supply these transfers. If there is insufficient excess on hand or on order, a cancel exception message is logged. Planned cost peg transfers are created, updated, or deleted during the demand and supply matching of the order planning run. The planned cost peg transfers are maintained by the order planning process and cannot be changed. Creating planned cost peg transfers When excess on hand or excess on order is available that can be assigned to a cost peg, a planned cost peg transfer is created to show the transfer of the cost peg. Transfer rules that apply to the excess are verified in the Cost Peg Transfer Rules (tcpeg1100m000) session. 24 | Infor LN | User Guide for Project Pegging Planning Updating and deleting planned cost peg transfers Planned cost peg transfers that have the Planned status cannot be changed. Before the planning of a plan item starts, planned cost peg transfers that have the Planned status, are deleted. Planned cost peg transfers with a status of Firm Planned or Confirmed cannot be changed by order planning. The procedure for planned cost peg transfers is the same as for manual cost peg transfers. The default status of a cost peg transfer is Planned. You can change the status of a cost peg to Firm Planned or Confirmed. Cost peg transfer exception messages Cancellation exception messages can be logged for cost peg transfers. You can delete or regenerate these exception messages in the Update Exception Messages (cprao1210m000) session. Temporary cost peg transfers You can transfer inventory between two projects. If the Borrow/Loan and Payback check box is selected in the Project Pegging Parameters (tcpeg0100m000) session, there is no cost or billing impact. The borrow/loan functionality allows the physical transfer of materials between projects for a limited amount of time. The borrowing projects remain responsible for any additional costs incurred during the time the loan is active. If the Aging check box is selected in the Project Pegging Parameters (tcpeg0100m000) session, you can specify time limits for the return of the borrowed inventory. If the loaned inventory cannot be replenished on time by the borrowing project, the loan is converted into a permanent transfer. Infor LN | User Guide for Project Pegging | 25 Planning 26 | Infor LN | User Guide for Project Pegging Chapter 5 Manufacturing 5 Project Pegging in Manufacturing Production orders Production orders with peg information are created as follows: ▪ Transferred from Enterprise Planning Peg information from planning is transferred during creation. ▪ Created manually You can specify peg information based on the item settings such as Inherit Project Peg and Mandatory Project Peg. The peg distributions that you specify are checked against commingling rules to verify that the pegs can be on the same production order. You can also specify a peg on a production order for an anonymous end item. Note When you print production order documents in the Print Production Order Documents (tisfc0408m000) session, peg information is also printed. Bill of material Because you can modify the Inherit Project Peg setting for an item, inconsistencies in the BOM can occur. To prevent inconsistencies, you must set up a multilevel bill of material that is validated when you change the setting of an item. Estimated materials Estimated materials can be updated with peg information from a production order. Each material line requires its own peg distribution that is sent to planned inventory transactions. You cannot change the peg information in the peg distribution for an estimated material line. For each line, the quantity is prorated based on the planned quantity that is required per peg. Infor LN | User Guide for Project Pegging | 27 Manufacturing Material issue When parts that are project pegged are issued to a production order, the associated costs are updated in that production order. Because the material costs are already included in the production order, the project costs are not updated. If there is a shortage of pegged inventory on a peg, and excess inventory is available from another peg, transfer rules determine whether inventory can be transferred between pegs. When anonymous items are issued to a peg production order, costs are updated in the project ledger and in the production order. When a customer furnished material item is issued to a production order, costs are not updated in the project ledger or production order. Safety stock calculation You can, for non-mandatory project pegged items, receive orders for an inventory item to fulfill project pegged demand, and at the same time adjust the safety stock. The supply order is a combined distribution of project pegged demand and safety stock demand (no project peg). An item that is not project pegged can be used to fulfill project pegged demand and also adjust the safety stock at the same time. In this case, the supply order includes a combined distribution of project pegged demand and safety stock demand (no project peg). Note If the supply for a specific project cost account is excluded from commingling, this supply cannot be combined with the supply for safety stock. Report operations completed The distribution line to choose when reporting a certain end item quantity complete is based on priority of the different lines. The priority is determined by requirement or need date and by the distribution line sequence of the project pegs. To always work with correct values the Generate Order Planning (Item) (cprrp1220m000) and Generate Pegging Relations Forecast - Confirmed Supply (cpvmi1212m000) sessions must be run regularly. For a specific production order and project peg, Enterprise Planning can specify zero, one or more requirement dates with a specific quantity for each. If more than one date exists for a distribution line, they may not be reported completed for the full quantity, but partially per the different requirement dates. 28 | Infor LN | User Guide for Project Pegging Chapter 6 Procurement 6 Project pegging in Procurement To identify costs, demand, and supply for a project, you can implement project pegging. You can also specify the items for which project pegging is required. For more information, refer to Project pegging overview (p. 9) . Note To use project pegging in combination with costing breaks, you must select the Costing Breaks check box in the Implemented Software Components (tccom0100s000) session. For more information, refer to Costing Breaks (p. 103) . Project pegging in Procurement includes pegging of project costs for purchase documents, such as requisitions, requests for quotation, purchase orders, and purchase (push) schedules. If the item specified for the purchase document requires a peg, a peg distribution must be linked to the document. As a result, the required quantity of the parent document is distributed across distribution lines for combinations of project/budget, project element and/or project activity. For example, if a distribution is used to peg the ordered quantity of a purchase order line, the purchased goods and the related costs are booked to these projects, elements, and activities. Generating a peg distribution When you save a purchase document line, a peg distribution can be generated in the Purchase Peg Distribution (tdpur5100m000) session. A peg distribution can be manually specified or automatically defaulted from other documents. This table shows the documents stored on the distribution line and the related fields: Infor LN | User Guide for Project Pegging | 29 Procurement Document Type for Peg Distri- Business Object bution Document Reference RFQ Line RFQ number position/alternative RFQ Response RFQ number position/alternative/bidder Requisition Line requisition number position Purchase Order Line order number position/sequence Purchase Order Receipt order number position/sequence/receipt sequence Purchase Order Material Sup- order number ply Line position/sequence/material sequence Stage Payment Line order number position/stage payment line Purchase Schedule Line schedule number position Purchase Schedule Receipt schedule number position/receipt sequence Commingling pegs If purchase order/schedule lines are project pegged, commingling of pegs is subject to project combination checks. Commingling rules specified in Project Pegging in Common, determine if lines with different pegs can be commingled into one purchase order line or purchase schedule. In general, commingling is executed by planning group, which includes the commingling rules for the linked projects. However, commingling for export license required items is restricted by project. This means if projects are different, separate purchase order lines or purchase schedules are created. To further restrict commingling, you can specify commingling exceptions, which are the pegs that must be excluded from commingling. Example Project 1 with activity 10 and project 1 with activity 20, have a requirement for an export licensed item. ▪ ▪ Without an exception: One purchase order line with two distribution lines are created. With an exception for one or both of the activities: One purchase order line per project peg, one purchase order with two purchase order lines are created. 30 | Infor LN | User Guide for Project Pegging Procurement Note If commingling of pegs is not allowed, a new purchase schedule header must be created when generating schedule lines from Enterprise Planning. Therefore, multiple active schedules with the same item, buy-from business partner, ship-from business partner, purchase office, and warehouse can be available. Handling peg data If the purchased goods and related costs are booked to only one project, the peg is displayed on the purchase document line. When you save the line, LN creates one distribution line for the peg distribution. Peg fields, quantities, or the ordered amount can be updated on both the parent document line and the distribution line, before the lines are synchronized. If additional pegs (distribution lines) are specified in the peg distribution, the peg fields are cleared on the parent document line and the quantities or ordered amount are unavailable. The sum of the quantities or ordered amounts on the peg distribution can be updated to the quantities or ordered amount on the parent document line. If the peg distribution's total quantity differs from the quantity on the parent document line, a message with regards to updating the parent document line is displayed: Peg distribution quantity does not match line total. Click OK to update 'Total'. If the Manual Project Peg Modification check box is selected in the Project Pegging Parameters (tcpeg0100m000) session, for all manual actions that affect a peg distribution, you must specify a change reason in the pegged purchase document. The project peg changes and reason codes are logged in the Cost Peg Audit History (tpctm2500m000) session for analysis. Note ▪ ▪ The reason code applies to the entire peg distribution. So, when you change a single line in a peg distribution, the reason code is applied to all pegs in the peg distribution. A message is displayed if a change reason is required. Based on the session, you must specify the change reason either in a field or window. If you do not specify a change reason, you cannot save the pegged purchase document. Warehouse receipts For partial warehouse receipts, pegs with the highest priority receive the quantities. The priority of the peg is based on the required date and quantity, as specified in Enterprise Planning, for the required purchase line. The peg with the earliest required date has the highest priority. If the required date and quantity cannot be retrieved from Enterprise Planning, the following is applicable: ▪ ▪ Purchase order lines The priority is based on the dates specified for the inbound order line peg distribution. Purchase schedule lines The priority is based on the dates specified for the purchase schedule line peg distribution. Schedule lines are not linked to individual inbound order lines because, for push schedules, goods are received against a blanket warehouse order, which is linked to the schedule header. During the receipt process for a required quantity, the pegs that match the total quantity to be received for the schedule lines are transferred to Warehousing for use in the receipt process. Infor LN | User Guide for Project Pegging | 31 Procurement These schedule lines are transferred, based on line position and the (oldest) planned receipt date. The generated warehouse receipt line peg distribution is a subset of the (aggregated) peg distribution of the schedule lines. When a receipt is confirmed, the peg distribution (order line) or peg distribution data (schedule line) is copied from the warehouse receipt line to the purchase order/schedule receipt. You cannot update the peg distribution for the purchase order/schedule receipt. If a receipt correction or an inspection is performed for a receipt line in Warehousing, based on the priority specified for the peg distribution, the peg distribution lines are also updated with the modified quantity. Based on the Warehouse Receipt Distribution Line field in Warehousing, the related distribution lines are updated in the Purchase Peg Distribution (tdpur5100m000) session. Purchase receipts For partial purchase receipts and invoice handling, priority rules are not used. Partial purchase receipts are proportionally distributed across the peg distribution lines. You cannot update pegging information on the purchase receipt. However, if a parent document line and the linked distribution line(s) include an ordered amount and no ordered quantity, you can change the ordered amount after receipt in the Change Price and Discounts after Receipt (tdpur4122m000) session. If the received amount is changed for the order line, the amount change is proportionally distributed across the peg distribution lines. Notes and related processes ▪ ▪ ▪ ▪ ▪ Transactions Planned inventory transactions, material transactions, and (financial) integration transactions are not generated for the parent document line, but for the peg distribution. Therefore, transactions are booked by peg. Optional peg distribution If project pegging is implemented but a project peg is not mandatory for an item, you can optionally specify a peg (distribution). Requisition generated from catalog If a purchase requisition line is generated from a catalog and the selected item requires a mandatory peg, the requisition line can be inserted without a peg distribution. LN does not check the availability of a purchase distribution before the requisition is submitted for approval. Peg distribution and RFQ response line After a bidder is linked to an RFQ, a record is inserted in the RFQ Responses (tdpur1506m000) session, but no peg distribution is linked. The RFQ line's peg distribution is copied to the response line when the status is set to Accepted. A peg distribution that is linked to a response line with the Accepted status cannot be updated. Landed costs If landed costs are linked to an order/schedule line with a peg distribution, the landed costs are proportionally calculated by peg and transferred to the Integration Transactions (tfgld4582m000) session, based on the peg distribution that is linked to the order/schedule line. 32 | Infor LN | User Guide for Project Pegging Procurement ▪ ▪ ▪ ▪ Supplier stage payments If an item that requires a peg must be invoiced by supplier stage payments, a peg distribution is linked to a Stage Payment Line. For a combination of purchase order line/stage payment line, the Amount of the stage payment line is distributed across the distribution lines. The peg distribution is created when the stage payment line is approved and is deleted if the stage payment line is unapproved. For more information, refer to Pegging stage payment lines. Subcontracting with material flow For project pegged orders, operations or items can be subcontracted. In case of a project pegged subcontracting order with material flow, a peg distribution is linked to the Purchase Order Material Supply Line. For more information, refer to Pegging material supply lines for operation and item subcontracting (p. 33) . Backorders Backorder lines are handled as independent order lines. During backorder creation, the original distribution line number is specified in the Parent Distribution Line field of the Purchase Peg Distribution (tdpur5100m000) session. You can change, add, and delete peg distribution lines for a backorder line. The backorder line pegs need not be equal to the parent object line pegs. However, if the backorder line is linked to a purchase line for item subcontracting, you cannot add new pegs or modify the project, element, or activity of a distribution line that is linked to the backorder line. Return orders When returning pegged goods, specific conditions are applicable. For more information, refer to Pegging (return inventory) and Pegging (return rejects). Supplier stage payments Pegging stage payment lines If an item that must be invoiced by stage payments requires a peg, a peg distribution is linked to the Stage Payment Line in the Purchase Peg Distribution (tdpur5100m000) session when the stage payment line is approved. For a specific purchase order line and stage payment line, the stage payment line's Amount is distributed across distribution lines for combinations of project/budget, project element and/or project activity. The peg information in the Purchase Peg Distribution (tdpur5100m000) session includes the line number for the peg in the distribution, the peg (project, element, activity), and the stage payment amount by peg. Material supply lines Pegging material supply lines for operation and item subcontracting For project pegged production orders, operations can be subcontracted. The material delivered to the subcontractor can be project pegged or anonymous. The subassemblies that are sent and retrieved are Infor LN | User Guide for Project Pegging | 33 Procurement always project pegged. Costing breaks can apply to direct the costs of the subcontracted operation to a specific project cost account. If (production material) costing breaks are used, a purchase order line's peg can differ from the peg on the material supply line. For item subcontracting, the subcontracted purchase orders can include materials that inherit the project pegs, or can include anonymous materials. The pegged materials are stored in inventory and are shipped to the subcontractor with project pegged orders. Note The Project Pegged Inventory check box in the Purchase Order Material Supply Lines (tdpur4116m000) session determines if project pegged or anonymous inventory is utilized when issuing components to the subcontractor. This also determines if pegged or unpegged consumptions are performed. In case of a project pegged order, a peg distribution is linked to the Purchase Order Material Supply Line in the Purchase Peg Distribution (tdpur5100m000) session. For a specific purchase order line (detail) and material sequence, the material supply line's Order and Consumption quantities are distributed across the peg distribution lines for combinations of project/budget, project element, and/or project activity. The peg information in the Purchase Peg Distribution (tdpur5100m000) session includes the line number for the peg in the distribution, the peg (project, element, activity), and the material supply line quantity by peg. The peg distribution cannot be manually created and must always be generated using the parent. For operation subcontracting, the purchase order line, the material supply line, and the linked peg distributions are generated by Shop Floor Control (SFC) and can only be updated by SFC. For item subcontracting, the purchase order line, the material supply line, and the peg distributions are generated by Procurement. A material supply line's peg distribution can be updated only from the parent, that is the purchase order line, the purchase order line peg distribution, or the material supply line. If a purchase order line's distribution line is changed, and no quantities are received or consumed yet, the pegged fields on the linked material supply lines are synchronized to the updated distribution line in the Purchase Order Material Supply Lines (tdpur4116m000) session. However, if a different quantity distribution is applicable, the quantities of the material supply lines' distribution lines are redetermined in the Purchase Peg Distribution (tdpur5100m000) session. Consuming pegged components If the Project Pegged Inventory check box is selected in the Purchase Order Material Supply Lines (tdpur4116m000) session, pegged consumptions are performed. For operation subcontracting, consumptions are handled by Shop Floor Control. For item subcontracting, consumptions are handled by Purchase Control. The consumptions are updated using backflushing, consumption messages, or through manual consumption. ▪ Backflushing The distribution line number constitutes the link between the pegs of the received end item and the components that must be backflushed. Therefore, the received purchase order line-pegs are used to backflush the quantities of the material supply line-pegs. 34 | Infor LN | User Guide for Project Pegging Procurement ▪ Consumption messages If consumption messages are used to inform the manufacturer about the consumption of components, the subcontractor does not know whether the order is pegged. The total consumption quantity of the consumption message is assigned to the following levels, in descending sequence of priority: a. Priorities from Enterprise Planning, based on the planning details of the purchase order line receipt. The peg with the oldest need date is consumed first. b. Priorities from Enterprise Planning, based on planning data from Enterprise Planning. The peg with the oldest need date is consumed first. ▪ c. Distribution line number. The peg with the lowest distribution line number is consumed first. Manual consumption If backflushing is used, you can manually adjust the consumed quantity of the material supply lines. The inventory is increased or decreased using the pegs. Positive adjustment More components are used than calculated by the backflushing mechanism. The total adjustment consumption quantity is divided pro rata across the pegs. Negative adjustment Backflushed inventory is returned to inventory. The adjustment quantity is distributed across the pegs, based on: ▪ ▪ a. Priorities from Enterprise Planning, considering the planning details for the purchase order line receipt: the peg with the lowest priority is returned to the inventory first. b. Receipt date: the peg with the latest receipt date is returned to the inventory first. Return orders Return Inventory orders Pegging Specific conditions are applicable for returning pegged inventory. If a return order line is linked to an original document, the linked peg distribution is defaulted. If a return order line is not linked to an original document, you can manually specify a peg distribution for the return order line. You can manually update the defaulted peg distribution. The return order line's pegs can differ from the pegs on the original document. If two purchase return order lines are linked to a specific original schedule line/schedule receipt line, for both order lines, the same return order quantity and peg distribution are defaulted. As a result, you must manually decrease the return order quantity and update the peg distribution. Infor LN | User Guide for Project Pegging | 35 Procurement Return Rejects orders Pegging LN takes the peg information for the purchase return order from the order from which the purchase return order was generated. For items rejected during receipt, this is the information from the receipt line pegs of the warehousing order related to the originating purchase order. For items rejected during issue, this is the information of the outbound order line pegs of the warehousing order related to the purchase return order. LN selects the pegs having a quantity in quarantine. The quarantine quantities are displayed in the Quarantine Inventory field of the Receipt Line Peg Distribution (whinh3528m000) and Outbound Order Line Peg Distribution (whinh2190m000) sessions. The quantities to be returned are subtracted from the quarantine inventory and subsequently the project inventory. For the pegs involved, the return quantity is first subtracted from the pegs whose original receipt line or outbound order line peg quantity exceeded the ordered quantity. The overdelivered quantity to be subtracted is equally apportioned to each peg. If this does not cover the entire return quantity, the remaining quantity to be returned is subtracted from the pegs whose original receipt line or outbound order line peg quantity exceeded the required quantity in sequence of peg line number: first line number 10, then 20, and so on. Next, if this still leaves a quantity to be returned, the return quantity is subtracted from the remaining pegs starting with the peg with the latest requirement date. You cannot manually change the quantities to be returned on the purchase return order. You can only change these quantities by changing the purchase return order line pegs. 36 | Infor LN | User Guide for Project Pegging Chapter 7 Warehousing 7 Peg distributions Peg distribution in the inbound and inspection processes Receiving project pegged goods into a warehouse results in inventory transactions that are based on the underlying peg distribution of the related receipt line. Inbound and pegging This results in an update of the pegged inventory levels in the Project Pegged Inventory (whwmd2560m000) session. The planned quantity of the inbound order line is updated in the Planned Inventory Transactions (whinp1500m000) session, which also includes the peg data. Planned inventory transactions are also generated for each peg. If the receipt line is marked for inspection, the received quantity is blocked. Depending on the parameter settings, the quantity can also be blocked for usage by Enterprise Planning. Any quantity, rejected (or destroyed) during receipt inspection are assigned to the pegs having the latest required date to make sure that the approved items are assigned as much as possible to the pegs with the earliest required date in order to meet the demand in time. Project warehouses For a ship-from or ship-to warehouse, that is a project or a project-WIP warehouse, no inbound/outbound order line peg distribution is created. Instead, the project fields on the inbound/outbound order lines are used. When however, an inbound/outbound order line is created for a project pegged item related to a normal warehouse, a peg distribution is applicable and the project fields on the inbound/outbound order lines are disabled. Inbound order line peg distribution For an inbound order line, the peg distribution data can only be viewed and not maintained. In case of manual transfer orders, the peg distribution can only be maintained (manually) on the outbound order Infor LN | User Guide for Project Pegging | 37 Warehousing line. When an outbound transfer line is saved after the peg distribution is modified, the inbound transfer order line peg distribution changes accordingly. Cost and service Items For order lines with a cost or service item, also a peg distribution can exist, but assigning the received quantities of these item types to the peg lines is always performed pro-rata. This peg distribution data is only essential for proper cost allocation to projects/pegs and has no logistic purpose as these items are non-physical entities. When ordering zero pieces of a certain cost/service item, also a peg distribution can be created, consisting of only one peg line. Warehouse receipts ▪ Receipt line peg distribution When confirming a receipt line, LN creates a peg distribution under the receipt line. In addition, peg distribution receipt data is recorded for future auditability in the Receipt Line Peg Distribution Audit (whinh3579m000) session if the Project Peg Receipt Transactions check box is selected in the Project Pegging Parameters (tcpeg0100m000) session. The sequence of assigning received items to pegs is based on the earliest required dates and required quantities retrieved from Enterprise Planning. If an inbound line contains multiple pegs and the received quantity deviates from the ordered quantity, the received quantity must be apportioned to the peg distribution lines according to the priority determined by the earliest required date as specified in Enterprise Planning. The peg distribution lines are generated when the receipt is confirmed. Sometimes, the order quantity of the order exceeds the total required quantity of the item, resulting in an excess quantity. The excess is determined in Enterprise Planning, in which case the distribution lines have no demand order reference and an empty required date. Any excess on top of the required quantity (not exceeding the ordered quantity) is assigned to the pegs in peg line sequence. Any excess that is received on top of the ordered quantity is proportionally distributed to the peg lines based on the ratio of ordered quantities. ▪ Updating planned inventory transactions/inventory levels When confirming a receipt line, the planned inventory transactions are updated, based on the received quantities of the corresponding receipt line peg distribution. So, the planned inventory transactions are recorded on project peg level. When confirming a receipt line, the inventory on hand is increased in the Warehouse - Item Inventory (whwmd2515m000) session. Similarly, the inventory on hand must be increased in the Project Pegged Inventory (whwmd2560m000) session, based on the received quantities of the corresponding receipt line peg distribution. 38 | Infor LN | User Guide for Project Pegging Warehousing ▪ Assigning received quantities to project pegs In case of a full, partial or over receipt on an expected inbound order line containing multiple peg lines, LN decides to which pegs the received quantity is assigned, based on the following sequence: a. The pegs having the earliest required date are received first, until all required quantities are fulfilled. b. The pegs having unfulfilled ordered quantities (and no required quantities anymore) are received in sequence of peg line. c. Any excess on top of the ordered quantity is proportionally assigned to the pegs. When the full order line quantity is received on the linked receipt line, for each order line peg, a receipt line is created and the total of the received quantities per peg line is equal to the ordered quantity. ▪ Back Orders For a confirmed receipt line, if the received quantity is less than the expected quantity, the difference must be resolved in Purchase Control by processing the created back order (if allowed). This back order is received on another inbound line with a peg line distribution for the pegs that are not fully received. When the back order line is received and confirmed, a receipt line peg distribution is created for the remaining pegs received. ▪ Receipt Corrections You can use the Receipt Correction (whinh3121s000) session to change the confirmed received quantity. Increasing the already received quantity leads to a positive receipt correction. The additional received quantity is assigned to the pegs in the same way as the initial receipt. a. The pegs having the earliest required date are received first. b. The pegs having unfulfilled ordered quantities are received in sequence of peg line. c. Any excess on top of the ordered quantity is proportionally assigned to the pegs. Decreasing the already received quantity leads to a negative receipt correction. When the received quantity is decreased, the change in received quantity is distributed across the received pegs as follows: a. Any excess on top of the ordered quantity is decreased proportionally. b. The received excess on top of the required quantity, but less than the ordered quantity, is decreased in sequence of the peg line. c. Any remaining received quantity is decreased in the sequence of the latest required date. Inbound procedure - inspection The Warehouse Inspections (whinh3122m000) session does not have a peg distribution. Registration of inspected/rejected quantities takes place in the peg distribution available under the receipt lines which roll up into the inbound order line peg distribution. Infor LN | User Guide for Project Pegging | 39 Warehousing Generally, inventory subject to warehouse inspections remains blocked. Similarly, the project pegged inventory to be inspected remains blocked. After processing the inspection, the planned inventory transactions and the inventory levels are updated accordingly, by peg level. Approved quantities are assigned first to peg lines having the earliest required date. Rejected or destroyed quantities are assigned first to the peg lines having the latest required dates. In case of excess quantities, the excess quantities must be utilized first. The rejected or destroyed quantities are distributed based on the actual received quantities of the receipt line (not on the total values of the related inbound order line). The updated receipt line peg information is rolled up to the level of the inbound order line peg distribution. Outbound procedure - inspection The Warehouse Inspections (whinh3122m000) session does not have a peg distribution. There is also no specific peg distribution related to the outbound advice. Inspected rejected quantities are registered in the Outbound Order Line Peg Distribution (whinh2190m000) session. Generally, inventory scheduled for outbound inspections remains blocked. Similarly, the project pegged inventory to be inspected remains blocked. After processing the inspection, the planned inventory transactions and the inventory levels are updated accordingly, by peg level. Update outbound order line pegs The To be Inspected in Inventory Unit field in the Outbound Order Line Peg Distribution (whinh2190m000) session includes the advised peg quantity that is already released and is subject to inspection. The following conditions are applicable to handle the outbound order line pegs during warehouse inspections: ▪ ▪ ▪ ▪ ▪ ▪ For each released outbound advice, an inspection line is created. At this point, the To be Inspected in Inventory Unit is defined and apportioned to the pegs in sequence of earliest required date. When the advised quantity of the earliest peg is fully assigned as To be Inspected in Inventory Unit, the remainder of the released quantity is assigned to the To be Inspected in Inventory Unit of the next peg with the earliest required date and so on. Any approved quantities are assigned to the pegs in sequence of the earliest required date. Any rejected quantities are assigned to the pegs in sequence of latest required date. But in case of over delivery (Advised quantity > Ordered Quantity), the excess must be consumed first in sequence of earliest required date. The To be Inspected in Inventory Unit of the pegs is blocked for inspection. While processing an inspection record, any approved or rejected quantity is apportioned only to the pegs that have a To be Inspected in Inventory Unit. This To be Inspected in Inventory Unit is consumed by the approved and rejected quantities assigned to the peg. Effectively, the blocked quantity is decreased for the quantity processed. 40 | Infor LN | User Guide for Project Pegging Warehousing Peg distribution in the outbound process During the outbound process, issuing project pegged goods from a warehouse results in inventory transactions that are based on the peg distribution. During the outbound advice and during inspections, the outbound order line cost peg distribution is updated with the advised quantities, approved quantities and the rejected quantities. When the goods arrive at the staging location and are shipped, the actual pegs are created. During the confirmation process, the shipment line peg distribution is created. Generating outbound advice While generating an outbound advice for a pegged outbound order line, additional inventory checks are performed to determine the pegged inventory that must be advised. LN first searches for the available stock points. If the stock point is identified, the outbound order line cost peg distribution is advised based on the available quantity at the stock point and the available quantity in the project pegged inventory. The peg distribution is based on the earliest required date. When determining the quantity that must be advised for each separate peg line, this calculation is performed before searching for the project pegged inventory: Quantity to be advised = Required Quantity - Advised Quantity - Rejected Quantity - Shipped Quantity - Not Shipped Quantity - Expected Not Shipped Quantity Quantity to be advised = Minimum (To be distributed (Stock point Quantity), To be Advised ) This table explains the quantity that must be advised: Infor LN | User Guide for Project Pegging | 41 Warehousing Required Quantity Advised Quantity Shipped Quantity Not Shipped Quantity To be Advised Quantity 10 10 10 0 0 (10 – (10 – 0)) 20 10 10 0 10 (20 – (10 – 0)) 20 20 10 10 10 (20 – (20 – 10)) 20 20 10 0 0 (20 – (20 – 0)) 20 20 15 5 5 (20 – (20 – 5)) 20 20 0 20 20 (20 – (20 – 20)) After the to be advised quantity is retrieved, the project pegged inventory search engine is activated. These scenarios exist: ▪ ▪ ▪ No shortages, full advise Shortage on project pegged inventory Shortage on stock point inventory Part that can be advised has no shortage in project pegged inventory Part that can be advised has a shortage in project pegged inventory ▪ ▪ No shortages, full advise Initial position of the inventory: 42 | Infor LN | User Guide for Project Pegging Warehousing Warehouse - Item Inventory (whwmd215) Warehouse Item Inventory on hand Location Allocated Available Quantity Quantity WH01 item001 100 0 100 Project Pegged Inventory (whwmd260) Warehouse Item Project Element Activity Extension Cost Inventory Location Available Compo- on Hand Allocated Quantity nent Quantity WH01 item001 proj1 elem1 acti1 40 0 40 WH01 item001 proj2 elem2 acti2 40 0 40 WH01 item001 proj2 elem3 acti2 20 0 20 Outbound Order Line (whinh220) Order Origin Order Line Sales SLS000001 10 Sequence Item Warehouse Ordered Quantity Status 1 WH01 Open item001 40 Outbound Order Line cost peg Distribution (whinh290) Order Origin Order Line Sales SLS000001 10 SePeg quence Line Project Element Activity Ordered Advised ReQuantity Quantity quired Date 1 proj1 10 elem1 acti1 10 0 10/30/ 2011 Infor LN | User Guide for Project Pegging | 43 Warehousing Sales SLS000001 10 1 20 proj2 elem2 acti2 20 0 11/1/ 2011 Sales SLS000001 10 1 30 proj2 elem3 acti2 10 0 10/29/ 2011 In the example, you can see that the outbound order line can be advised because the inventory levels are sufficient. This example displays results after an outbound advice is created: 44 | Infor LN | User Guide for Project Pegging Warehousing Warehouse - Item Inventory (whwmd215) Warehouse Item Inventory on hand Location Allocated Available Quantity Quantity WH01 item001 100 40 60 Project Pegged Inventory (whwmd260) Warehouse Item Project Element Activity Extension Cost Inventory Location Available Compo- on Hand Allocated Quantity nent Quantity WH01 item001 proj1 elem1 acti1 40 10 30 WH01 item001 proj2 elem2 acti2 40 20 20 WH01 item001 proj2 elem3 acti2 20 10 10 Outbound Order Line (whinh220) Order Origin Order Line Sales SLS000001 10 Sequence Item Warehouse Ordered Quantity Status 1 WH01 Advised item001 40 Outbound Advice (whinh225) Order Origin Order Line Sequence Item Warehouse Advised Quantity Sales 10 1 item001 WH01 40 SLS000001 Outbound Order Line Cost Peg Distribution (whinh290) Infor LN | User Guide for Project Pegging | 45 Warehousing Order Origin Order Sales Line SePeg quence Line Project Element Activity Ordered Advised ReQuantity Quantity quired Date SLS000001 10 1 10 proj1 elem1 acti1 10 10 10/30/ 2011 Sales SLS000001 10 1 20 proj2 elem2 acti2 20 20 11/1/ 2011 Sales SLS000001 10 1 30 proj2 elem3 acti2 10 10 10/29/ 2011 Note Only one outbound advice is created. The outbound order line cost peg distribution is updated with the advised quantity for each peg. Shortage on project pegged inventory The cost peg transfer functionality enables you to track the shortages in project pegged inventory. For more information, refer to Cost peg transfers in Warehousing (p. 76) . Initial position of the inventory: 46 | Infor LN | User Guide for Project Pegging Warehousing Warehouse - Item Inventory (whwmd215) Warehouse Item Inventory on hand Location Allocated Available Quantity Quantity WH01 item001 100 60 40 Project Pegged Inventory (whwmd260) Warehouse Item Project Element Activity Extension Cost Inventory Location Available Compo- on Hand Allocated Quantity nent Quantity WH01 item001 proj1 elem1 acti1 20 0 20 WH01 item001 proj2 elem2 acti2 10 0 10 WH01 item001 proj2 elem3 acti2 70 60 10 Outbound Order Line (whinh220) Order Origin Order Line Sales SLS000001 10 Sequence Item Warehouse Ordered Quantity Status 1 WH01 Open item001 40 Outbound Order Line Cost Peg Distribution (whinh290) Order Origin Order Line Sales SLS000001 10 SePeg quence Line Project Element Activity Ordered Advised ReQuantity Quantity quired Date 1 proj1 10 elem1 acti1 10 0 10/30/ 2011 Infor LN | User Guide for Project Pegging | 47 Warehousing Sales SLS000001 10 1 20 proj2 elem2 acti2 20 0 11/1/ 2011 Sales SLS000001 10 1 30 proj2 elem3 acti2 10 0 10/29/ 2011 In the example, peg line 20 has a higher priority, because the required date is earlier. The resulting inventory after the outbound advice is created (without the use of transfer logic) is listed in these tables: 48 | Infor LN | User Guide for Project Pegging Warehousing Warehouse - Item Inventory (whwmd215) Warehouse Item Inventory on hand Location Allocated Available quantity Quantity WH01 item001 100 90 10 Project Pegged Inventory (whwmd260) Warehouse Item Project Element Activity Extension Cost Inventory Location Available Compo- on Hand Allocated Quantity nent Quantity WH01 item001 proj1 elem1 acti1 20 10 10 WH01 item001 proj2 elem2 acti2 10 10 0 WH01 item001 proj2 elem3 acti2 70 70 0 Outbound Order Line (whinh220) Order Origin Order Line Sales SLS000001 10 Sequence Item Warehouse Ordered Quantity Status 1 WH01 Partially Advised item001 40 Outbound Order Line Cost Peg Distribution (whinh290) Order Origin Order Line Sales SLS000001 10 SePeg quence Line Project Element Activity Ordered Advised ReQuantity Quantity quired Date 1 proj1 10 elem1 acti1 10 10 10/30/ 2011 Infor LN | User Guide for Project Pegging | 49 Warehousing Sales SLS000001 10 1 20 proj2 elem2 acti2 20 10 11/1/ 2011 Sales SLS000001 10 1 30 proj2 elem3 acti2 10 10 10/29/ 2011 Outbound Advice (whinh225) Order Origin Order Line Sequence Item Warehouse Advised Quantity Sales 10 1 item001 WH01 30 SLS000001 Shortage on stock point inventory The possible scenarios for stock point inventory shortage: The part that can be advised has no shortage in the project pegged inventory In this example, there is not enough inventory available. However, the part of the inventory that can be advised must also be handled. Initial position of the inventory: 50 | Infor LN | User Guide for Project Pegging Warehousing Warehouse - Item Inventory (whwmd215) Warehouse Item Inventory on hand Location Allocated Available quantity Quantity WH01 item001 50 20 30 Project Pegged Inventory (whwmd260) Warehouse Item Project Element Activity Extension Cost Inventory Location Available Compo- on Hand Allocated quantity nent Quantity WH01 item001 proj1 elem1 acti1 10 0 10 WH01 item001 proj2 elem2 acti2 30 20 10 WH01 item001 proj2 elem3 acti2 10 0 10 Outbound Order Line (whinh220) Order Origin Order Line Sales SLS000001 10 Sequence Item Warehouse Ordered Quantity Status 1 WH01 Open item001 40 Outbound Order Line cost peg Distribution (whinh290) Order Origin Order Line Sales SLS000001 10 SePeg quence Line Project Element Activity Ordered Advised ReQuantity Quantity quired Date 1 proj1 10 elem1 acti1 10 0 10/30/ 2011 Infor LN | User Guide for Project Pegging | 51 Warehousing Sales SLS000001 10 1 20 proj2 elem2 acti2 20 0 11/1/ 2011 Sales SLS000001 10 1 30 proj2 elem3 acti2 10 0 10/29/ 2011 A shortage of 10 pieces is present on the inventory level. The advice can be created only for the available pegged inventory. LN generates a message for shortage and an outbound advice of the available inventory is created. Following is the resulting inventory after the outbound advice is generated: 52 | Infor LN | User Guide for Project Pegging Warehousing Warehouse - Item Inventory (whwmd215) Warehouse Item Inventory on hand Location Allocated Available quantity Quantity WH01 item001 50 50 0 Project Pegged Inventory (whwmd260) Warehouse Item Project Element Activity Extension Cost Inventory Location Available Compo- on Hand Allocated quantity nent Quantity WH01 item001 proj1 elem1 acti1 10 10 0 WH01 item001 proj2 elem2 acti2 30 30 0 WH01 item001 proj2 elem3 acti2 10 10 0 Outbound Order Line (whinh220) Order Origin Order Line Sales SLS000001 10 Sequence Item Warehouse Ordered Quantity Status 1 WH01 Partially Advised item001 40 Outbound Order Line cost peg Distribution (whinh290) Order Origin Order Line Sales SLS000001 10 SePeg quence Line Project Element Activity Ordered Advised ReQuantity Quantity quired Date 1 proj1 10 elem1 acti1 10 10 10/30/ 2011 Infor LN | User Guide for Project Pegging | 53 Warehousing Sales SLS000001 10 1 20 proj2 elem2 acti2 20 10 11/1/ 2011 Sales SLS000001 10 1 30 proj2 elem3 acti2 10 10 10/29/ 2011 Outbound Advice (whinh225) Order Origin Order Line Sequence Item Warehouse Advised Quantity Sales 10 1 item001 WH01 30 SLS000001 The part that can be advised has a shortage in the project pegged inventory There is a shortage in the project pegged inventory. Initial position of the inventory: 54 | Infor LN | User Guide for Project Pegging Warehousing Warehouse - Item Inventory (whwmd215) Warehouse Item Inventory on hand Location Allocated Available quantity Quantity WH01 item001 50 20 30 Project Pegged Inventory (whwmd260) Warehouse Item Project Element Activity Extension Cost Inventory Location Available Compo- on Hand Allocated quantity nent Quantity WH01 item001 proj1 elem1 acti1 10 0 10 WH01 item001 proj2 elem2 acti2 5 0 0 WH01 item001 proj2 elem3 acti2 35 20 15 Outbound Order Line (whinh220) Order Origin Order Line Sales SLS000001 10 Sequence Item Warehouse Ordered Quantity Status 1 WH01 Open item001 40 Outbound Order Line cost peg Distribution (whinh290) Order Origin Order Line Sales SLS000001 10 SePeg quence Line Project Element Activity Ordered Advised ReQuantity Quantity quired Date 1 proj1 10 elem1 acti1 10 0 10/30/ 2011 Infor LN | User Guide for Project Pegging | 55 Warehousing Sales SLS000001 10 1 20 proj2 elem2 acti2 20 0 11/1/ 2011 Sales SLS000001 10 1 30 proj2 elem3 acti2 10 0 10/29/ 2011 There is a shortage of 10 pieces on the inventory level. In the part that can be advised, a shortage of 5 pieces is also identified on the project pegged inventory. In this situation, LN determines that 30 pieces can be advised. However, an additional shortage of 5 pieces is identified. Hence, only 25 pieces are available to be advised. The resulting inventory is explained in these examples: 56 | Infor LN | User Guide for Project Pegging Warehousing Warehouse - Item Inventory (whwmd215) Warehouse Item Inventory on hand Location Allocated Available quantity Quantity WH01 item001 50 45 5 Project Pegged Inventory (whwmd260) Warehouse Item Project Element Activity Extension Cost Inventory Location Available Compo- on Hand Allocated Quantity nent Quantity WH01 item001 proj1 elem1 acti1 10 10 0 WH01 item001 proj2 elem2 acti2 5 5 0 WH01 item001 proj2 elem3 acti2 35 30 5 Outbound Order Line (whinh220) Order Origin Order Line Sales SLS000001 10 Sequence Item Warehouse Ordered Quantity Status 1 WH01 Partially Advised item001 40 Outbound Order Line cost peg Distribution (whinh290) Order Origin Order Line Sales SLS000001 10 SePeg quence Line Project Element Activity Ordered Advised ReQuantity Quantity quired Date 1 proj1 10 elem1 acti1 10 10 10/30/ 2011 Infor LN | User Guide for Project Pegging | 57 Warehousing Sales SLS000001 10 1 20 proj2 elem2 acti2 20 5 11/1/ 2011 Sales SLS000001 10 1 30 proj2 elem3 acti2 10 10 10/29/ 2011 Outbound Advice (whinh225) Order Origin Order Line Sequence Item Warehouse Advised Quantity Sales 10 1 item001 WH01 25 SLS000001 Create outbound advice despite inventory shortage LN does not allow you to generate an outbound advice with an advised quantity higher than the total advised quantities of the related outbound order line cost peg distribution. Outbound advice ownership LN automatically generates the outbound advice ownership when the outbound advice is created if the outbound line is project pegged. LN does not allow you to change the ownership distribution for the project pegged order lines. The ownership distribution is based on the issue ownership set on the outbound order line. LN does not allow you to generate ownership distribution or insert, modify, delete records for pegged outbound order lines in the Outbound Advice Ownership (whinh4128m000) session. Inventory search engine Inventory selection during the process of generating an outbound advice must be changed to support the project pegged inventory. When demand for a pegged item is advised, the process takes care of these peg distribution lines. So, the inventory search engine logic is extended to support the project pegged inventory. The initial point of these steps is that the inventory on item warehouse level is found. The search sequence for inventory: ▪ ▪ ▪ ▪ ▪ Search for available inventory with the required peg. Search for available cost peg transfer orders (cost peg transfer orders created by Enterprise Planning or manually entered). Search for available excess. Search for available to transfer (non-excess inventory). Unpegged inventory. 58 | Infor LN | User Guide for Project Pegging Warehousing ▪ Alternative Items. Manual outbound advice For a manually created outbound advice, when there is insufficient inventory to allocate for the manually entered advised quantity, LN displays an error message. The cost peg transfer logic is also executed. Manual changes on outbound advice When you modify the outbound advice quantity, LN updates the advised quantity on the underlying peg distribution. In case of a decrease in the quantity, a peg redistribution is initiated. The decrease in advised quantity must be based on the latest required date. For example: Infor LN | User Guide for Project Pegging | 59 Warehousing Warehouse - Item Inventory (whwmd215) Warehouse Item Inventory on hand Location Allocated Available quantity Quantity WH01 item001 50 50 0 Project Pegged Inventory (whwmd260) Warehouse Item WH01 WH01 Project Element Activity Extension Cost Inventory Location Available Compo- on Hand Allocated Quantity nent Quantity item001 proj1 elem1 acti1 100 100 20 20 0 item001 proj2 elem2 acti2 100 100 30 30 0 Outbound Order Line (whinh220) Order Origin Order Line Sales SLS000001 10 Sequence Item Warehouse Ordered Quantity Status 1 WH01 Advised item001 50 Outbound Order Line cost peg Distribution (whinh290) Order Origin Order Sales Sales Line SePeg quence Line Project Element Activity Ordered Advised ReQuantity Quantity quired Date SLS000001 10 1 10 proj1 elem1 acti1 20 20 10/30/ 2011 SLS000001 10 1 20 proj2 elem2 acti2 30 30 11/1/ 2011 60 | Infor LN | User Guide for Project Pegging Warehousing Outbound Advice (whinh225) Order Origin Order Line Sequence Item Warehouse Advised Quantity Sales 10 1 item001 WH01 50 SLS000001 When you change the advised quantity to 45, the following is the result: Warehouse - Item Inventory (whwmd215) Warehouse Item Inventory on hand Location Allocated Available quantity Quantity WH01 item001 50 45 5 Outbound Advice (whinh225) Order Origin Order Line Sequence Item Warehouse Advised Quantity Sales 10 1 item001 WH01 60 SLS000001 Undo outbound advice When an advice is removed, the advised quantity on the deleted outbound advice line must be removed from the outbound order line cost peg distribution. Process pick When the user processes the picking list, LN also processes the pending cost peg transfers for the outbound advice that is picked. Outbound advice for returns Advising is done based on the latest required date; the pegs with the latest required date are advised first. Infor LN | User Guide for Project Pegging | 61 Warehousing Creation of shipment line cost peg distribution When the shipment lines are confirmed, the shipment line cost peg distribution is created for shipment lines related to an outbound order line that is pegged. The shipped quantities are distributed over the pegs for the shipment lines. The distribution is explained in these examples: 62 | Infor LN | User Guide for Project Pegging Warehousing Warehouse - Item Inventory (whwmd215) Warehouse Item Inventory on hand Location Allocated Available quantity Quantity WH01 item001 50 50 0 Project Pegged Inventory (whwmd260) Warehouse Item Project Element Activity Extension Cost Inventory Location Available Compo- on Hand Allocated Quantity nent Quantity WH01 item001 proj1 elem1 acti1 20 20 0 WH01 item001 proj2 elem2 acti2 10 10 0 WH01 item001 proj2 elem3 acti2 20 20 0 Outbound Order Line (whinh220) Order Origin Order Line Sales SLS000001 10 Sequence Item Warehouse Ordered Quantity Status 1 WH01 Open item001 50 Outbound Advice (whinh225) Order Origin Order Line Sequence Item Warehouse Advised Quantity Sales 10 1 item001 WH01 50 SLS000001 Outbound Order Line cost peg Distribution (whinh290) Infor LN | User Guide for Project Pegging | 63 Warehousing Order Origin Order Sales Line SePeg quence Line Project Element Activity Ordered Advised ReQuantity Quantity quired Date SLS000001 10 1 10 proj1 elem1 acti1 20 20 10/30/ 2011 Sales SLS000001 10 1 20 proj2 elem2 acti2 10 10 11/1/ 2011 Sales SLS000001 10 1 30 proj2 elem3 acti2 20 20 10/29/ 2011 For this situation the following shipment lines are created: Shipment Lines (whinh431) Shipment Shipment Line Order Origin Order SHIP00001 10 Sales SHIP00002 10 Sales Line Sequence Item Shipped Quantity SLS000001 10 1 item001 30 SLS000001 10 1 item001 20 Peg Line Project Element Activity Required Date Shipped Quantity SHIP00001 10 10 proj1 elem1 acti1 10/30/2011 10 SHIP00001 10 30 proj2 elem2 acti1 10/29/2011 20 Shipment Lines (whinh428) Shipment Shipment Line When the shipment is confirmed, the shipped quantity is updated on the outbound order line cost peg distribution Outbound Order Line cost peg Distribution (whinh290) 64 | Infor LN | User Guide for Project Pegging Warehousing Order Origin Order Sales Line SePeg quence Line Project Element Activity Ordered Quantity AdReShipped vised quired QuantiQuanti- Date ty ty SLS000001 10 1 10 proj1 elem1 acti1 20 20 10/30/ 10 2011 Sales SLS000001 10 1 20 proj2 elem2 acti2 10 10 11/1/ 2011 Sales SLS000001 10 1 30 proj2 elem3 acti2 20 20 10/29/ 20 2011 0 Underdeliveries and overdeliveries For underdeliveries, the quantity not delivered must be distributed on the peg distribution, beginning with the peg line with the latest required date. For overdeliveries, the quantity overdelivered must be distributed equally over the available peg lines for the outbound order line. Not shipped quantities The peg line distribution data is transferred to the transfer order / adjustment order only if a not-shipped quantity exists on peg distribution. During the confirmation process the not-shipped quantity is updated on the outbound order line cost peg distribution and the shipment line cost peg distribution. Shipments for returns When the items are not shipped to the destination, but are shipped back to the origin, a reverse required date priority is applied when generating the shipment line cost peg distribution during the confirmation of the return shipment line. As item inventory is decreased, LN changes the pegged inventory with the latest required dates. Cost peg transfers Cost peg transfers enable transfer of costs between two different pegs (pegged to unpegged and vice versa). The cost peg transfers do not physically move the inventory but only transfer the costs of the inventory. Cost peg transfers are performed within the same warehouse. It is not possible to transfer the goods across warehouses. For more information, refer to Cost peg transfers in Warehousing (p. 76) Transfer (manual) orders / Transfer orders LN allows you to use an inbound and outbound cost peg distribution to specify transfer manual orders to transfer actual goods between warehouses. LN generates the outbound order line cost peg distribution based on the project pegged inventory. The cost peg distribution can also be created manually and transferred to the inbound line cost peg distribution. Infor LN | User Guide for Project Pegging | 65 Warehousing Change warehouse order at a later stage LN allows you to modify the outbound warehousing order data related to the sales order/schedule. The data can be modified for warehousing orders of all origins. You can also define up to which outbound procedure step the data can be modified. For more information, refer to To modify the outbound warehousing order data. Additional costs on shipment header/line When the cost item that is mandatory pegged is added as additional cost to the shipment, the cost item is not displayed because LN cannot decipher which pegs must be added to the additional cost line. When the cost item that is mandatory pegged is added as additional costs on the shipment line, or when the parent shipment line has a peg distribution, LN copies the peg distribution data to the additional cost line. The cost peg distribution of this additional cost line is transferred to the sales cost order. For more information, refer to Additional costs - shipment based Interchangeable effectivity units for outbound process The effectivity units can be interchanged when there is no inventory available for the ordered effectivity unit. For project pegged outbound order lines, when there is no inventory available for the ordered effectivity unit, LN allows you to interchange effectivity units. 66 | Infor LN | User Guide for Project Pegging Warehousing Example Warehouse - Item Inventory (whwmd215) Warehouse Item Inventory on Hand Location Allocated Available Quantity Quantity WH01 item001 50 0 50 Warehouse - Item - Effectivity Unit Inventory (whwmd216) Warehouse Item Effectivity Unit Inventory on Hand Location Allocat- Available Quaned Quantity tity WH01 item001 1 50 0 50 Project Pegged Inventory (whwmd260) Warehouse Item Effectivity Project Unit Element Activity Inventory Location Available on Hand Allocated Quantity Quantity WH01 item001 1 proj1 elem1 acti1 30 0 30 WH01 item001 1 proj2 elem2 acti2 20 0 20 Outbound Order Line (whinh220) Order Ori- Order gin Sales Line SLS000001 10 Sequence Item Effectivity WareUnit house Ordered Quantity Status 1 3 40 Open item001 WH01 Outbound Order Line Peg Distribution (whinh290) Infor LN | User Guide for Project Pegging | 67 Warehousing Order Origin Order Sales Sales Line SePeg quence Line Project Element Activity Ordered Advised Need Quantity Quantity Date SLS000001 10 1 10 proj1 elem1 acti1 30 0 10/30/ 2011 SLS000001 10 1 20 proj2 elem2 acti2 10 0 11/1/ 2011 Planned Inventory Transactions (whinp100) Order Origin Order Line Sequence Peg Line Effectivity Unit Ordered Quantity Sales SLS000001 10 1 10 3 30 Sales SLS000001 10 1 20 3 10 Generate Outbound Advice The ordered effectivity unit (3) is not in the inventory, so another effectivity unit is advised and the Planned Inventory Transaction (PIT ) is updated. The result of generate outbound advice: 68 | Infor LN | User Guide for Project Pegging Warehousing Example Outbound Advice (whinh225) Order Origin Order Line Sales SLS000001 10 Sequence Item Effectivity Unit Warehouse Advised Quantity 1 1 WH01 item001 40 Warehouse - Item Inventory (whwmd215) Warehouse Item Inventory on Hand Location Allocated Available Quantity Quantity WH01 item001 50 40 10 Warehouse - Item - Effectivity Unit Inventory (whwmd216) Warehouse Item Effectivity Unit Inventory on Hand Location Allocat- Available Quaned Quantity tity WH01 item001 1 50 40 10 Project Pegged Inventory (whwmd260) Warehouse Item Effectivity Project Unit Element Activity Inventory Location Available on Hand Allocated Quantity Quantity WH01 item001 1 proj1 elem1 acti1 30 30 0 WH01 item001 1 proj2 elem2 acti2 20 10 10 Ordered Status Outbound Order Line (whinh220) Order Ori- Order Line Sequence Item Effectivity Ware- Infor LN | User Guide for Project Pegging | 69 Warehousing gin Sales SLS000001 10 1 item001 Unit house Quantity 3 WH01 40 Advised Outbound Order Line Peg Distribution (whinh290) Order Origin Order Sales Sales Line SePeg quence Line Project Element Activity Ordered Advised Need Quantity Quantity Date SLS000001 10 1 10 proj1 elem1 acti1 30 30 10/30/ 2011 SLS000001 10 1 20 proj2 elem2 acti2 10 10 11/1/ 2011 Outbound Order Line Peg Distribution - Advised Effectivity Units (whinh291) Order Origin Order Sales Sales Line SePeg quence Line Effectiv- Project Eleity Unit ment Activity Ordered Quantity AdNeed vised Date Quantity SLS000001 10 1 10 1 proj1 elem1 acti1 30 30 10/30/ 2011 SLS000001 10 1 20 1 proj2 elem2 acti2 10 10 11/1/ 2011 70 | Infor LN | User Guide for Project Pegging Warehousing Planned Inventory Transactions (whinp100) Order Origin Order Line Sequence Peg Line Effectivity Unit Ordered Quantity Sales SLS000001 10 1 10 1 30 Sales SLS000001 10 1 20 1 10 When the outbound advice is released, a shipment is created: Shipment Lines (whinh431) Shipment Line Item Effectivity Unit Shipped Quantity Status SHP000001 10 item001 1 Open 40 Confirm Shipment When the shipment is confirmed: Infor LN | User Guide for Project Pegging | 71 Warehousing Example Shipment Lines (whinh431) Shipment Line Item Effectivity Unit Shipped Quantity Status SHP000001 10 item001 1 Confirmed 40 Shipment Line Peg Distribution (whinh428) Shipment Line Peg Line Project Element Activity Staged Quantity Shipped Quantity Need Date SHP000001 10 10 proj1 elem1 acti1 30 30 10/30/ 2011 SHP000001 10 20 proj2 elem2 acti2 10 10 11/1/2011 Warehouse - Item Inventory (whwmd215) Warehouse Item Inventory on Hand Location Allocated Available Quantity Quantity WH01 item001 10 0 10 Warehouse - Item - Effectivity Unit Inventory (whwmd216) Warehouse Item Effectivity Unit Inventory on Hand Location Allocat- Available Quaned Quantity tity WH01 item001 1 10 0 10 Project Pegged Inventory (whwmd260) Ware- Item Effectivity Project 72 | Infor LN | User Guide for Project Pegging Element Activity Inventory Location Available Warehousing house Unit on Hand Allocated Quantity Quantity WH01 item001 1 proj1 elem1 acti1 0 0 0 WH01 item001 1 proj2 elem2 acti2 10 0 10 Outbound Order Line (whinh220) Order Ori- Order gin Sales Line SLS000001 10 Sequence Item Effectivity WareUnit house Ordered Quantity Status 1 3 40 Shipped item001 WH01 Outbound Order Line Peg Distribution (whinh290) Order Origin Order Sales Sales Line SePeg quence Line Project Element Activity Ordered Advised Need Quantity Quantity Date SLS000001 10 1 10 proj1 elem1 acti1 30 30 10/30/ 2011 SLS000001 10 1 20 proj2 elem2 acti2 10 10 11/1/ 2011 Planned Inventory Transactions (whinp100) Order Origin Order Line Sequence Peg Line Effectivity Unit Ordered Quantity The planned inventory transaction (PIT) is removed because the line is shipped. Interchangeable effectivity units When interchangeable effectivity units are advised, stock point details are created to confirm shipments without the use of handling units. Infor LN | User Guide for Project Pegging | 73 Warehousing Peg distribution for cycle counting and adjustment orders The implementation of the project pegging functionality impacts the cycle counting and adjustment processes due to inventory variances. Note The Based on field shows how project pegs are generated: ▪ ▪ For a cycle counting order line in the Cycle Counting Order Line Peg Distribution (whinh5107m000) session. For an adjustment order line in the Adjustment Order Line Peg Distribution (whinh5127m000) session. If project pegging is implemented, LN creates a peg distribution line before the cycle counting order or adjustment order is processed. The peg distribution line can also include a blank peg. The remaining quantity or the total quantity is then processed as unpegged. Note Blank pegs are not allowed if the Mandatory Project Peg check box in the Items (tcibd0501m000) session is selected. After the cycle counting orders or adjustment orders are generated, the proposed peg distribution can be generated only if the warehouse is not a project warehouse. To generate a peg distribution for: ▪ ▪ A cycle counting order, use the Cycle Counting Order Line Peg Distribution (whinh5107m000) session. An adjustment order, use the Adjustment Order Line Peg Distribution (whinh5127m000) session. If the peg distribution is not correct, the processing of the cycle counting order or adjustment order is discontinued and a message is displayed. If the peg distribution is incomplete, LN creates the peg distribution with the remaining data, which is saved in the: ▪ ▪ Cycle Counting Order Line Peg Distribution (whinh5107m000) session for cycle counting orders Adjustment Order Line Peg Distribution (whinh5127m000) session for adjustment orders Note When adjustment orders are generated as part of another process in LN, for example, rejection of goods during inspection, the peg distribution is created by this process and is processed by LN. Peg distribution - gains and losses When a pegged balance is impacted as a result of cycle counting or an inventory adjustment, the inventory at the peg level must also be adjusted. An increase of the inventory quantity at peg level is referred to as a gain and a decrease of the inventory quantity is referred to as a loss. The gain and loss balances can be viewed in the Project Pegged Inventory (whwmd2560m000) session. The pegged 74 | Infor LN | User Guide for Project Pegging Warehousing inventory that is affected by the gain or loss in the inventory is also recorded. LN applies a priority sequence when assigning gains and losses to the project cost pegs. Priority sequence for gains 1. For pegs that were previously subject to a loss: a. Pegs without excess inventory and without available to transfer (ATT) inventory, with an economic shortage and in sequence of earliest requirement date. LN considers economic shortage quantity. b. Pegs without excess and without available to transfer inventory and without an economic shortage, in alphabetical order. LN considers full quantity for the peg. c. Pegs without excess and with available to transfer inventory, in alphabetical order. LN considers full quantity for the peg. d. Pegs with excess (in alphabetical order). LN considers full quantity for the peg. e. Inventory associated with a blank peg. 2. For pegs that were not previously subject to a loss: a. Pegs without excess and without available to transfer inventory and with an economic shortage and in sequence of earliest requirement date. LN considers economic shortage quantity. b. Pegs without excess and without available to transfer inventory and without an economic shortage, in alphabetical order. LN considers full quantity for the peg. c. Pegs without excess and with available to transfer inventory, in alphabetical order. LN considers full quantity for the peg. d. Pegs with excess (in alphabetical order). LN considers the full quantity for the Peg. e. Inventory associated with a blank peg. Priority sequence for losses 1. For pegs that were previously subject to a gain. In case of multiple pegs, the pegs are selected in alphabetical order. LN checks for pegs: a. With excess, LN considers the excess quantity. b. With available to transfer inventory, LN considers the available to transfer inventory quantity. c. Without excess and without available to transfer inventory in sequence of latest requirement date first and considers full quantity for the peg d. Inventory associated with a blank peg. 2. Pegs that were not previously subject to a gain, LN checks for pegs: a. With an excess inventory balance greater than zero and LN considers the excess quantity. b. With an available to transfer inventory balance and LN considers the available to transfer inventory quantity. Infor LN | User Guide for Project Pegging | 75 Warehousing c. Without excess and available to transfer inventory in sequence of latest requirement date first and LN considers the full quantity for the Peg. d. Inventory associated with a blank peg. Cost peg transfers Cost peg transfers in Warehousing The cost peg transfer functionality enables the transfer of costs between two different pegs, from pegged to unpegged and vice versa. The cost peg transfers do not physically move the inventory but only transfer the costs of the inventory. Cost peg transfers are performed within the same warehouse. It is not possible to transfer the goods across warehouses. When a cost peg transfer is processed, the changes are permanent (when excess inventory is moved). However, the inventory can be transferred back. The source peg and the target peg can be either unpegged inventory (no project, element and activity filled) or pegged inventory (belonging to a project, element and/ or activity). For a cost peg transfer line, either the source peg or the target peg must be specified. The cost peg transfer also changes the allocations within the inventory - Transfer Allocated (from peg) and Transfer on Order (to peg). Cost peg transfers can be generated from these sources within LN: ▪ ▪ ▪ ▪ Enterprise Planning Outbound Advice Manual Mass Project Cost Peg Transfer Enterprise Planning The cost peg transfers are created in Enterprise Planning during the planning runs and can be transferred to Warehousing by the user or by LN. The cost peg transfers are generated to handle shortages, using the Project Pegged Inventory (whwmd2560m000) session, identified during the planning run. When you process the cost peg transfer, the cost is transferred from the source peg to the target peg. Financial transactions are created during the processing of the cost peg transfer. Outbound Advice Cost peg transfers can be created to handle shortages when outbound advice is generated. If shortages occur, LN searches for an open cost peg transfer and links it to the outbound advice. The cost peg transfer is processed when the outbound advice is picked, or can be processed manually. If the shortage is not met, a cost peg transfer is created if excess inventory or available to transfer (ATT) inventory is present for a different peg. The excess inventory and ATT inventory is transferred to the pegs with the inventory shortage. 76 | Infor LN | User Guide for Project Pegging Warehousing Manual LN allows you to manually create cost peg transfers. These are not created by a specific process. You can determine which pegged inventory must be transferred. Mass Project Cost Peg Transfer Mass cost peg transfers are created by executing a separate process that allows the user to transfer all excess inventories from a source peg to a target peg. Processing cost peg transfers While processing the cost peg transfer, LN: 1. Checks the inventory level of the source peg. In case of insufficient inventory, the cost peg transfer is not processed. 2. Moves the quantity of the cost peg transfer from the source peg to the target peg. 3. Creates financial transactions for the cost peg transfer. The cost peg transfer can be processed manually or automatically during the picking process. Manual processing can be performed using an option or by a batch session available in all the cost peg transfer sessions. Changes on the cost peg transfer LN allows you to modify the cost peg transfer of all origins. In case of insufficient inventory, the cost peg transfers are not processed. The cost peg transfer that is linked to an outbound advice cannot be modified. In case the cost peg transfer quantity increases, and the excess and ATT inventory of the source peg no longer meets the requirement, LN checks for the inventory available on the source peg. If inventory is available, LN displays a warning message that the transfer includes the goods that are not moved from excess and ATT inventory. In case the inventory is not sufficient, LN displays an error message. Changes on the outbound advice If the advised quantity is increased on the outbound advice, the cost peg transfers linked to the outbound advice are also updated (if there is enough inventory), or a new cost peg transfer is created to match the advised quantity. Example Increase the advised quantity: When you change the advised quantity on the outbound advice from 20 to 25: Infor LN | User Guide for Project Pegging | 77 Warehousing Cost Peg Transfer Lines (whinh145) Cost Peg Transfer From Peg To Peg Quantity Required Date Processed TRF000001 AAA-01 BBB-02 8 (5+3) 11/30/2011 No The project pegged inventory: Project Pegged Inventory (whwmd260) Peg on order on Hand Allocated Location Available Available Transfer Transfer Allocated Excess to Trans- Allocated on order fer AAA-01 0 20 10 12 (10+2) 2 (5-3) 0 8 (5+3) 0 BBB-02 0 5 10 13 (10+3) 0 0 0 8 (5+3) Outbound Advice is updated: Outbound Advice (whinh225) Outbound Advice Advised Quantity 1 25 (20+5) The Outbound Order Line Cost Peg Distribution: Outbound Order Line Cost Peg Distribution (whinh290) Peg Ordered Quantity Required Quantity Need Date Advised Quantity BBB-02 10 10 11/30/2011 13 (10+3) AAA-01 10 10 12/01/2011 12 (10+2) Decrease the advised quantity: 78 | Infor LN | User Guide for Project Pegging Warehousing When you change the advised quantity from 20 to 14: The cost peg transfer: Cost Peg Transfer Lines (whinh145) Cost Peg Transfer From Peg To Peg Quantity Required Date Processed TRF000001 AAA-01 BBB-02 5 11/30/2011 No The cost peg transfer remains unchanged, because the decrease in advised quantity is removed from the location allocated based on the latest required date. The project pegged inventory: Project Pegged Inventory (whwmd260) Peg On order On Hand Allocated Location Available Available Transfer Transfer Allocated Excess to Trans- Allocated on order fer AAA-01 0 20 10 4 5 0 5 0 BBB-02 0 5 10 10 0 0 0 5 Outbound advice is updated: Outbound Advice (whinh225) Outbound Advice Advised Quantity 1 14 (20-6) The outbound order line cost peg distribution: Outbound Order Line Cost Peg Distribution (whinh290) Peg Ordered Quantity Required Quantity Need Date Advised Quantity Infor LN | User Guide for Project Pegging | 79 Warehousing BBB-02 10 10 11/30/2011 10 AAA-01 10 10 12/01/2011 4 (10-6) Splitting the cost peg transfer During the generate outbound advice run, shortages if identified, are met using the existing cost peg transfers. The two scenarios are: ▪ ▪ Quantity on the cost peg transfer is more than the shortage quantity Quantity on the cost peg transfer is less than the shortage quantity If the cost peg transfer quantity is more than the shortage quantity, the total cost peg transfer quantity is not utilized. A new cost peg transfer is created (with the same origin) with a quantity equal to the shortage quantity. Therefore, the quantity of the original cost peg transfer is reduced. If the cost peg transfer quantity is less than the shortage quantity, the cost peg transfer must be updated with the outbound advice. LN checks for other cost peg transfers that can be used to handle the shortage. Example Starting point: Project Pegged Inventory (whwmd260) Peg On order On Hand Allocated Location Available Available Transfer Transfer Allocated Excess to Trans- Allocated on order fer AAA-01 0 20 10 0 0 0 10 0 BBB-02 0 5 10 0 0 0 0 10 An order is created with this outbound order line cost peg distribution data: Outbound Order Line Cost Peg Distribution (whinh290) Peg Ordered Quantity Required Quantity Need Date Advised Quantity AAA-01 10 10 11/30/2011 0 BBB-02 10 10 12/01/2011 4 (10-6) 80 | Infor LN | User Guide for Project Pegging Warehousing This cost peg transfer is present, origin can be Enterprise Planning, Manual, Mass Cost Peg Transfer: Cost Peg Transfer Lines (whinh145) Cost Peg Transfer Order Line From Peg To Peg Quantity Required Date Processed TRF00001 10 AAA-01 BBB-02 10 12/10/2011 No As per the data, there is a shortage of five pieces for the Peg BBB-02 which can be handled with the cost peg transfer TRF000001. The outbound advice is created with this data: Cost Peg Transfer Lines (whinh145) Cost Peg Transfer Order Line From Peg To Peg Quantity Required Date Processed TRF00001 10 AAA-01 BBB-02 5 (10-5) 12/10/2011 No TRF00001 20 AAA-01 BBB-02 5 12/01/2011 No For cost peg transfer line 20 the required date was changed to match the outbound order line cost peg distribution record. For the cost peg transfer TRF000001, line 20 of the outbound advice is also populated. Within the inventory table, this data is updated: Project Pegged Inventory (whwmd260) Peg On order On Hand Allocated Location Available Available Transfer Transfer Allocated Excess to Trans- Allocated on order fer AAA-01 0 20 10 10 0 0 10 0 BBB-02 0 5 10 10 0 0 0 10 Only the location allocated is changed, because the cost peg transfer is already present before the outbound advice was created. Splitting the cost peg transfer does not impact the Project Cost Peg Infor LN | User Guide for Project Pegging | 81 Warehousing Transfer On Order and Project Cost Peg Transfer Allocated quantities in the Project Pegged Inventory (whwmd2560m000) session. 82 | Infor LN | User Guide for Project Pegging Chapter 8 Service 8 Project pegging in depot repair Overview In Service, you can implement project pegging in the Depot Repair module. You can peg the service cost to a project, element, and/or an activity. To peg a project, specify the project, element, and/or activity information for the call, the contract, the maintenance sales quotation, maintenance sales orders or work orders. You must select the Mandatory Project Peg check box in the Item (tcibd0101s000) session if defining the PCA ID is mandatory to peg the cost of the item to the project. Initiation of the pegged transaction The peg is initiated only when a business process is started for transactions that register actual costs. For Example Calls and Maintenance Sales orders. Project Cost Account is an account where the cost is pegged. Costs are pegged through Project Cost Account ID. You can populate the PCA ID: ▪ By entering the PCA ID when you create a new call, contract, maintenance sales quotation, maintenance sales order, or an external work order. ▪ By specifying the PCA ID on the service contract. You can also enter the PCA ID manually. Propagation of the peg in the depot repair process The PCA ID is propagated to the resulting transaction ( Example, from call to MSO to Work order). You can change the PCA ID until the status of the call / contract / maintenance sales quotation / maintenance sales order / work order changes. Infor LN | User Guide for Project Pegging | 83 Service Propagation of the peg to service contract and configuration lines In Service, the service contract can determine whether the call / contract / maintenance sales quotation / maintenance sales order / work order, linked to the service contract, retrieves the PCA ID from the contract. By default, the configuration lines retrieve the PCA ID from the service contract header. These PCA IDs on the configuration line are propagated to the maintenance sales quotation lines, maintenance sales order part lines, and work orders. Note You can define the PCA ID for service contracts that have the status 'Free' or 'Active'. Propagation of the peg to a call The PCA ID of the call is retrieved from the service contract header by default, if the call is related to a service contract. You can specify or modify the PCA ID if the call status is ‘Free’. You must specify the reason for the modification. If the call is solved without being transferred ( Example to a maintenance sales order or service order), the call can be invoiced. The costs are booked to the corresponding PCAs. The cost component is used to identify the appropriate project cost type using cost mapping in the Cost Mappings (tcmcs0149m000) session. Propagation of the peg to the maintenance sales quotations LN defaults the PCA ID of the quotation header line either from a service call, or a maintenance sales order part line, or a work order. If the PCA ID is not defaulted from these origins, LN defaults the ID from the service contract configuration line if the serialized item is linked to a service contract. You can specify or change the PCA ID, if the maintenance sales quotation status is ‘Free’. Propagation of the peg to the maintenance sales order LN defaults the PCA ID of the maintenance sales order from the originating call or maintenance sales quotation. The PCA ID of the order part line is defaulted from a service call or maintenance sales order part line. If the PCA ID is not defaulted from these origins, LN defaults the ID from the service contract configuration line in case the serialized item is linked to a service contract. You can enter or change the PCA ID, if the maintenance sales quotation status is ‘Free’. Propagation of the peg to the work order for MSO part line By default, the PCA ID is retrieved from the maintenance sales order. If the installation group or the item is linked to a service contract, the PCA ID is retrieved from the service contract configuration line. If the PCA ID is not defaulted from these origins, LN defaults the ID from the service contract configuration line in case the serialized item is linked to a service contract. You can specify or change the PCA ID, if the maintenance sales quotation status is ‘Free’. 84 | Infor LN | User Guide for Project Pegging Service Propagation of the peg to the work order linked /originating from a maintenance sales order LN defaults the PCA ID of the work order (linked/originating from maintenance sales order) from the service contract configuration line, if the serialized item is linked to a service contract. If the PCA ID is not defaulted from these origins, LN defaults the ID from the service contract configuration line in case the serialized item is linked to a service contracts. You can specify or change the PCA ID, if the maintenance sales quotation status is ‘Free’. Propagation of the peg to the follow-up work order By default, the PCA ID is retrieved from the initiating work order. If the installation group or the item is linked to a service contract the PCA ID is retrieved from the service contract configuration line. If the PCA ID is not defaulted from these origins, LN defaults the ID from the service contract configuration line in case the serialized item is linked to a service contract. The user can specify or change the PCA ID, if the work order status is ‘Free’. Propagation of a material request to LN Warehousing from depot repair When warehouse orders are generated from Service, in order to request material from a warehouse, the PCA ID is propagated to Warehousing only if the Inherit Project Peg check box in the Item (tcibd0101s000) session is selected. Warehousing uses the PCA ID for financial bookings to LN Project. Warehousing handles the potential peg transfers: Example Service needs materials B and material C to be used in the repair of item A. For item B, LN Service requests inventory with a peg. For item C, Service requests material with a peg, because the cost for B and C have to be reported to the project. Warehousing checks if there is inventory of item B with the corresponding PCA. In the case of an inventory shortage, Warehousing checks whether transfer rules apply to meet the LN Service request. Warehousing handles the potential peg transfers in the background. For item C, the process is the same. Service requests the material with a PCA, though there is inventory for item C without a peg. For Example, a demand transaction for item A has a peg123 that requires material B and C. When the Inherit Project Peg check box in the Item (tcibd0101s000) session for Material B is set to Yes and for Material C is set to No: Infor LN | User Guide for Project Pegging | 85 Service Inherit Peg Cost Pegged To Request to Warehouse Material B Yes P1E10A10 Financially peg costs to: P1E10A10 Inventory from: P1E10A10 Material C No P1E10A10 Financially peg costs to: P1E10A10 Inventory from: <empty peg > Since material C is without a peg in inventory, the costs are not yet pegged to the project. However, since material B is already cost pegged to the project, the cost do not have to be booked again to the project when the actual outbound process is executed. Propagation of the Peg to generate purchase order For project pegged items when purchase orders are generated, the PCA ID from Service ( Example Subcontracting), is propagated to LN Order Management to generate the purchase order with the corresponding peg. For material request of type Via Purchase, the PCA ID is propagated only if the Inherit Project Peg check box in the Item (tcibd0101s000) session is selected. Propagation of the peg to book hours When hours are booked in Service, the PCA is processed to LN People to book hours on the work order. Book other costs or bench stock material costs When actual other costs or Bench stock material costs are defined in Service, the costs are logged in the PCL. If the item is defined for the maintenance sales coverage line, the item is used to identify the appropriate project cost type. In case the item is not defined, the cost component is used to identify the appropriate project cost type using cost mapping in the Cost Mappings (tcmcs0149m000) session. Propagation of the peg to a maintenance sales order coverage line When the maintenance sales order coverage lines are costed, the invoice is created in LN Invoicing. The revenues and costs are booked to the corresponding PCAs. If the item is defined for the maintenance sales coverage line, the item is used to identify the appropriate project cost type. In case the item is not defined, the cost component is used to identify the appropriate project cost type using cost mapping in the Cost Mappings (tcmcs0149m000) session. LN Invoicing receives the related PCA IDs for the actual costs. 86 | Infor LN | User Guide for Project Pegging Chapter 9 People 9 Costs distribution of production order hours – examples Example 1 Peg distribution on the production order: Peg Quantity A 2 B 3 C 5 Operation rates: Type of Operation Cost Rate ($) Cost Component Labor 40 LB1 Overhead on Labor 4 LB2 Machine 50 MC1 Overhead on Machine 10 MC2 If, for this production order, 20 man hours and 10 machine hours are entered when these hours are processed, costs and hours are retrieved per peg and cost component: Infor LN | User Guide for Project Pegging | 87 People Cost Component LB1 LB2 MC1 MC2 A $160 (4h) $16 (4h) $100 (2h) $20 (2h) B $240 (6h) $24 (6h) $150 (3h) $30 (3h) C $400 (10h) $40 (10h) $250 (5h) $50 (5h) Peg Example 2 If different types of operation have the same cost component, costs and hours are aggregated. Operation rates: Type of Operation Cost Rate ($) Cost Component Labor 40 LAB Overhead on Labor 4 OVH Machine 50 MACH Overhead on Machine 10 OVH If, for this production order, 20 man hours and 10 machine hours are entered when these hours are processed, costs and hours are retrieved per peg and cost component: 88 | Infor LN | User Guide for Project Pegging People Cost Component LAB MACH OVH A $160 (4h) $100 (2h) $36 (4+2=6h) B $240 (6h) $150 (3h) $54 (6+3=9h) C $400 (10h) $250 (5h) $90 (10+5=15h) Peg Infor LN | User Guide for Project Pegging | 89 People 90 | Infor LN | User Guide for Project Pegging Chapter 10 Borrow/Loan and Payback 10 Cost peg transfers - borrow/loan and payback To handle shortages of project pegged inventory identified during the outbound process, you can use the borrow/loan and payback procedure to temporarily transfer available to transfer (ATT) inventory from other projects with minimum cost impact on either project. The borrow/loan and payback process The borrow/loan and payback process constitutes the temporary transfer of inventory between two projects. LN can temporarily transfer cost pegged items from one project, the lending project, to another, the borrowing project, to fulfill an urgent demand. After the inventory is replenished, the borrowing project transfers the borrowed item quantities back to the lending project. Manual finalization and aging The borrow/loan and payback procedure is carried out automatically, but you can set an aging period or manually intervene to finalize the procedure before the automatic payback is due. Manual finalization is used for individual borrow/loan transfers and aging is used for collective finalization. Manual finalization and aging result in the permanent transfer of the inventory to the borrowing project and a financial compensation to the lending project. Cost aspects Item values can fluctuate between the moments of borrowing and paying back. To prevent that the lending project is affected by cost increases, inventory is paid back at the inventory value at which it was borrowed. Infor LN | User Guide for Project Pegging | 91 Borrow/Loan and Payback Tracking borrow/loan and payback information Various sessions provide insight into the progress of borrow/loan and payback transfers, both logistically and financially. These sessions help you decide whether borrow/loan transfers must be manually finalized, before the payback is due. To set up borrow/loan and payback transfers To use the borrow/loan and payback procedure and/or permanent cost peg transfers, you must set the required parameters and transfer rules. To set up borrow/loan and payback transfers The setup of borrow/loan and payback transfers includes both company wide and planning-group level settings. Note Before setting up borrow/loan and payback transfers, you must set up project pegging. 1. Company level In the Planning Parameters (cprpd0100m000) session, select the Use Available to Transfer check box. 2. Company level In the Project Pegging Parameters (tcpeg0100m000) session: Select the Borrow/Loan and Payback check box to activate borrow/loan and payback transfers. ▪ In the Cost Peg Transfer Rules (tcpeg1100m000) session, you can deactivate borrow/loan transfers for individual planning groups, projects, elements or activities. ▪ ▪ ▪ ▪ 3. Select the Aging check box to enable finalization of borrow/loan transfers after a fixed period. Set the Period. Select the Log Borrow/Loan Transactions in Project check box if borrow/loan and payback transactions must be displayed in the Financial Transactions (tpppc2100m100) session. Select the Ignore Cost Peg Transfer Rules for Paybacks check box if transfer rules must not be applied to payback transfers. For more information, refer to the next step. Planning group level In the Cost Peg Transfer Rules (tcpeg1100m000) session: Specify the planning groups, projects, elements or activities to which or from which cost peg transfers must be allowed. ▪ 92 | Infor LN | User Guide for Project Pegging Borrow/Loan and Payback ▪ ▪ Select the Use Available to Transfer check box to allow available to transfer (ATT) inventory to be transferred. Specify Permanent or Borrow / Loan in the Cost Peg Transfer Type field. Important Borrow/loan transfers are generated if: ▪ ▪ ▪ The parameters and transfer rules are defined. Available to transfer (ATT) inventory is present for one or more projects. The potential lending project can be paid back before the original demand is due. However, you can ignore the lending project's replenishment lead times by selecting the Ignore ATT Time Fence during Outbound check box in the Project Pegging Parameters (tcpeg0100m000) session. If more than one project is available from which to borrow inventory, LN selects the project with the latest demand date. This is to prevent shortages for the lending project. However, if other projects have excess inventory, LN creates permanent transfers first. If none of the projects for which the setup allows cost peg transfers has sufficient ATT or excess inventory, LN creates an inventory shortage report. The borrow/loan and payback process The borrow/loan and payback process constitutes the temporary transfer of inventory between two projects. LN can temporarily transfer cost pegged items from one project, the lending project, to another, the borrowing project, to fulfill an urgent demand. After the inventory is replenished, the borrowing project transfers the borrowed item quantities back to the lending project. Borrow/loan transfers are generated if: ▪ ▪ ▪ The parameters and transfer rules are defined. Available to transfer (ATT) inventory is present for one or more projects. The potential lending project can be paid back before the original demand is due. However, you can ignore the lending project's replenishment lead times by selecting the Ignore ATT Time Fence during Outbound check box in the Project Pegging Parameters (tcpeg0100m000) session. If more than one project is available from which to borrow inventory, LN selects the project with the latest demand date. This is to prevent shortages for the lending project. However, if other projects have excess inventory, LN creates permanent transfers first. If none of the projects for which the setup allows cost peg transfers has sufficient ATT or excess inventory, LN creates an inventory shortage report. Infor LN | User Guide for Project Pegging | 93 Borrow/Loan and Payback Borrow/loan Sometimes incidents, such as damages inflicted during movement to the docking area, cause inventory shortages just before shipping. Therefore, when an item for a project peg is issued from inventory to fulfill an order, and the outbound process detects a shortage, a borrow/loan transfer is automatically created to transfer inventory from another project to compensate for the shortage. The project that borrowed the inventory can then issue the items to fulfill the order. The borrow/loan transfer is created only if the conditions described previously apply. LN creates the borrow/loan transfer together with payback records during the creation of outbound advice. The borrow/loan transfer is carried out immediately. After the borrowing project is replenished with new items, LN performs a payback transfer based on the payback records. Payback The lending project is replenished by a payback that transfers the borrowed inventory quantity back to the lending project. LN creates and carries out a payback transfer after the borrowing project is replenished, for example, after receiving a replenishment order created by the planning engine from Enterprise Planning. The Enterprise Planning replenishment order is based on the borrowing project’s replenishment lead times and inventory present after the issue, minus the borrowed inventory. The planning engine does not consider the borrowed inventory. The planning engine does not create replenishment orders for lending projects, because the lending projects are replenished by the payback transfers from the borrowing projects. Note Positive adjustment or cycle counting orders will not trigger payback transfers. For a borrowing project, multiple outstanding paybacks to various lending projects can be present. After a receipt of project pegged items is confirmed, LN checks if there are any outstanding paybacks. If found, LN first creates a payback transfer for the lending project with the earliest demand date. This is because the most urgent demand must be fulfilled first. Partial paybacks If the received quantity is smaller than the borrowed quantity, LN processes a partial payback for the lending project. The payback quantity still outstanding is fulfilled after the borrowing project has received one or more consecutive replenishment orders. These follow-up paybacks are distinguished by higher sequence numbers. 94 | Infor LN | User Guide for Project Pegging Borrow/Loan and Payback Manual finalization and aging The borrow/loan and payback procedure is carried out automatically, but you can set an aging period or manually intervene to finalize the procedure before the automatic payback is due. Manual finalization is used for individual borrow/loan transfers and aging is used for collective finalization. Manual finalization and aging result in the permanent transfer of the inventory to the borrowing project and a financial compensation to the lending project. The borrowed items are not returned to the lending project. The borrowed items and their value are added to the borrowing project’s inventory as described in Borrow - example of cost aspects, but permanently. The payback is a purely financial compensation for the lending project. Reasons to finalize borrow/loans manually or by aging: ▪ ▪ The difference of the inventory value between the moment of borrowing and (forecasted) payback is negligible. Outstanding loans are finalized after a fixed period according to policy. Impact The consequence of aging or manual finalization is that the lending project is not replenished by the borrowing project and consequently there is an inventory shortage. The lending project must now (urgently) reorder the missing inventory, often at higher costs than it would have incurred by the automatic payback. In addition, this new shortage may also trigger new project cost peg transfers. Finalizing the borrow/loan procedure while a supply order is present for the borrowing project may result in excess inventory for the borrowing project cost peg. However, Enterprise Planning can identify this forecasted excess and allocate the expected receipt to another demand. If no supply order is present when you finalize a borrow/loan transfer, Enterprise Planning identifies the shortage of the lending project and creates new supply orders – at a rather late stage. Manual finalization To finalize an individual borrow/loan transfer, in the Borrow/Loan (whinh1146m000) or Borrow/Loan (whinh1646m000) session, select the relevant transfer and using the appropriate menu, select Finalize. You are then prompted to specify a reason. Aging You can use the Aging of Borrow/Loan Cost Peg Transfers (whinh1246m000) session to finalize a range of borrow/loan transfers. Infor LN | User Guide for Project Pegging | 95 Borrow/Loan and Payback Cost aspects of borrow/loan and payback transfers When a borrow/loan transfer is carried out, the inventory value is transferred from the lending project to the borrowing project. The payback transfer returns the inventory value to the lending project. The transferred items are valuated against the inventory value of the lending project and the borrowing project. The inventory value of both projects is determined by the inventory valuation method used. Item values can fluctuate between the moments of borrowing and paying back. To prevent that the lending project is affected by cost increases, inventory is paid back at the inventory value at which it was borrowed. The borrowed and loaned inventory has no impact on the project costs. For the lending project, the loaned inventory is returned at the original value. For the borrowing project, the difference between the payback value and the replenishment value is posted to the Project Costs and Commitments / WIP Costs and not to the project costs. Borrow/loan and payback transfers are non-billable transactions. Cost aspects of borrow transfers A borrow transfer does not affect the inventory value per item of the lending project, but the aggregated loaned inventory is subtracted from the total inventory value. The total inventory of the borrowing project is increased with the aggregated borrowed inventory value. The value per item is affected only if the item value of the borrowed inventory is different from the item value of the borrowing project. Example The inventory valuation method is MAUC by project. Project A has four items in inventory, each with a value of 20. Therefore, the total value is 80. Project A borrows 4 items with a total value of 40 to fulfill a job shop requirement of 8 items. The total inventory value of project A is now 120, and the value per item is 15. The moment the borrow transfer is carried out, the 8 items are issued to the shop floor and no items are left in inventory. Cost aspects of paybacks The borrowed inventory is paid back at the value at which it was borrowed. The borrowed and loaned inventory has no impact on the project costs. For the lending project, the loaned inventory is returned at the original value. For the borrowing project, the difference between the payback value and the replenishment value is posted to the Project Costs and Commitments / WIP Costs and not to the project costs. Borrow/loan and payback transfers are non-billable transactions. 96 | Infor LN | User Guide for Project Pegging Borrow/Loan and Payback Example The inventory valuation method is MAUC by project. Project A had borrowed four items from project B at a value of 10 each. The borrowed items have meanwhile been issued to fulfill a job shop requirement, so there is no inventory left. Then, project A is replenished with four items. The items have become more expensive: the value per item is now 30. After replenishment, the inventory value of project A is 4 * 30 = 120. The payback transfer is then carried out. The borrowed items are returned to project B at the value 40, which equals the value at which the items were borrowed. The inventory of project A becomes 0. The difference between the replenishment value and the payback value (120-40=80) are booked at the Project Costs and Commitments / WIP Costs of project A. For the lending project, the result of the payback is that the total inventory value and the value per item are the same again as before the inventory was loaned. Note In case of partial paybacks, the values of the installments may differ. Cost aspects of aging or manual finalization The borrowed items are not returned to the lending project. The borrowed items and their value are added to the borrowing project’s inventory as described in Borrow - example of cost aspects, but permanently. The payback is a purely financial compensation for the lending project. The financial compensations are required because, for example, payments are made to the lending project’s supplier before the borrow transfer is finalized. Tracking borrow/loan and payback transfers Various sessions provide insight into the progress of borrow/loan and payback transfers, both logistically and financially. These sessions help you decide whether borrow/loan transfers must be manually finalized, before the payback is due. ▪ ▪ ▪ ▪ The Project Cost Peg Transfer Lines (whinh1145m000) details session displays general information about the borrow/loan and payback transfers. The Borrow/Loan (whinh1146m000) and Borrow/Loan (whinh1646m000) sessions display more specific borrow/loan and payback details. The Paybacks (whinh1148m000) session displays payback details. This session is accessed from the Borrow/Loan (whinh1646m000) session. Historic information is provided in the Project Cost Peg Transfer - Borrow/Loan History (whinh1596m000) and Project Cost Peg Transfer - Payback Lines History (whinh1598m000) sessions. Infor LN | User Guide for Project Pegging | 97 Borrow/Loan and Payback ▪ The Integration Transactions (tfgld4582m000) session displays the financial integration transactions generated from borrow/loan and payback transfers. ▪ The Financial Transactions (tpppc2100m100) session displays the project cost transactions generated from borrow/loan and payback transfers. The following posting types relate to borrow/loan and payback transfers: Posting type Description Loan The value of the loaned inventory, an entry for the lending project. Borrow The value of the borrowed inventory, an entry for the borrowing project. Payback Result The difference between the value of the borrowed inventory and the inventory that the borrowing project received on a replenishment order, which will be used to pay back the lending project. Loan Reversal The value of the inventory that the borrowing project pays back to the lending project, from the lending project’s perspective. Borrow Reversal The value of the inventory that the borrowing project pays back to the lending project, from the borrowing project’s perspective. Note To display borrow/loan transactions in the Financial Transactions (tpppc2100m100) session, you must select the Log Borrow/Loan Transactions in Project check box in the Project Pegging Parameters (tcpeg0100m000) session. Examples of integration transactions for borrow/loan and payback transfers The Integration Transactions (tfgld4582m000) session displays the financial integration transactions generated from borrow/loan and payback transfers. In the following examples, project A is the borrowing project, and project B is the lending project. 98 | Infor LN | User Guide for Project Pegging Borrow/Loan and Payback The inventory valuation method is MAUC by project. Borrow/loan transfer Project A borrows four items with a total value of 40. In each of the following examples, the Business Object is Inventory Transaction. Integration D/C Document Type Reconciliation Project group Amount Description Cost Peg Transfer/ Loan D Borrow/ Loan B Loan Ac- Accrucrual /1 al 40 The borrow/loan transfer, from the lending project’s perspective. C Invento- Inven- B ry/1 tory 40 D Invento- Inven- A ry/1 tory 40 C Borrow/ Bor- A Loan Ac- row crual/2 Accrual 40 Cost Peg Transfer/ Borrow The borrow/loan transfer, from the borrowing project’s perspective. Payback transfer Project A had borrowed four items from project B at a value of 10 each. The borrowed items have meanwhile been issued to fulfill a job shop requirement, so there is no inventory left. Then, project A is replenished with four items. The items have become more expensive: the value per item is now 30. After replenishment, the inventory value of project A is 4 * 30 = 120. The payback transfer is then carried out. The borrowed items are returned to project B at the value 40, which equals the value at which the items were borrowed. The inventory of project A becomes 0. The difference between the replenishment value and the payback value (120-40=80) are booked at the Project Costs and Commitments / WIP Costs of project A. Integration D/C Document Type Reconciliation Project group Amount Description Infor LN | User Guide for Project Pegging | 99 Borrow/Loan and Payback Cost Peg D Transfer/Borrow Reversal Borrow/ Bor- A Loan Ac- row crual/2 Accrual 40 C Invento- Inven- A ry/1 tory 40 Cost Peg D Transfer/ Payback Result Invento- Inven- A ry/1 tory -80 C Interim Inter- A Transit/1 im Transit -80 Project WIP/1 Project A WIP 80 C Interim Inter- A Transit/1 im Transit 80 Cost Peg D Transfer/ Loan Reversal Invento- Inven- B ry/1 tory 40 C Borrow/ Loan B Loan Ac- Accrucrual/1 al 40 Project D Costs & Commitments/Payback Result The payback transfer, from the borrowing project’s perspective. The difference between the value of the borrowed inventory and the value of the inventory that the borrowing project received on a replenishment order, which will be used to pay back the lending project. The payback result, booked to the project WIP. The payback transfer, from the lending project’s perspective. Finalization by aging or manual intervention The borrowed items are not returned to the lending project. The borrowed items and their value are added to the borrowing project’s inventory as described in Borrow - example of cost aspects, but permanently. The payback is a purely financial compensation for the lending project. 100 | Infor LN | User Guide for Project Pegging Borrow/Loan and Payback Integration D/C Document Type Reconciliation Project group Amount Description Cost Peg D Transfer/ Borrow Reversal Borrow/ Bor- A Loan Ac- row crual/2 Accrual 40 The payback transfer, from the borrowing project’s perspective. C Invento- Inven- A ry/1 tory 40 Cost Peg D Transfer/ Loan Reversal Invento- Inven- B ry/1 tory 40 C Borrow/ Loan B Loan Ac- Accrucrual/1 al 40 Cost Peg D Transfer/Issue Interim Inter- B Transit/1 im Transit 40 C Invento- Inven- B ry/1 tory 40 Cost Peg D Transfer/Receipt Invento- Inven- B ry/1 tory C Interim Inter- A Transit/1 im Transit The payback transfer, from the lending project’s perspective. The issue of the loaned inventory made permanent. The receipt of the borrowed inventory made permanent. Infor LN | User Guide for Project Pegging | 101 Borrow/Loan and Payback 102 | Infor LN | User Guide for Project Pegging Chapter 11 Costing Breaks 11 Costing Breaks For projects involving production or service of an item (such as depot repair service), the user is required to monitor costs at various levels. Costing breaks provide a flexible method to view the breakup of costs at various levels in a project WBS. You can use costing breaks to move the costs from the top demand project pegs to other project WBS levels. You can also identify other specific cost types such as labor, material, subcontracting, and so on to redirect the costs to the other WBS levels. You can register the costing breaks for: ▪ ▪ Manufacturing: for the Bill of Material (BOM) components of the item Service: for the As-built structure of the service item Infor LN allows you to create the multiple costing breaks for a project. When you create a costing break at a particular level in a project WBS, all the lower levels of the BOM inherit the costing break WBS links unless another costing break exists at the lower level in the BOM structure. Example A project PRJ001, with the element E and activity A, involves production of the End Item with the following components in the bill of material (BOM): ▪ ▪ ▪ ▪ Assembly Sub-Assembly 1 & Sub-Assembly 2 MFG Comp 1, MFG Comp 2, MFG Comp 3 and MFG Comp 4 Pur Comp 1 and Pur Comp 2 Infor LN | User Guide for Project Pegging | 103 Costing Breaks The peg distribution for the project is initially at the top demand item level (in this example at the End Item). Costing breaks are created at the following levels: ▪ ▪ ▪ ▪ Costing Break 1 - at Sub-Assembly 1 Costing Break 2 - at MFG Comp 1 Costing Break 3 - at MFG Comp 2 Costing Break 4 - at Pur Comp 2 You can collect and view the costs for: ▪ ▪ ▪ ▪ MFG Comp 1 at the Costing Break 2 (linked to peg PRJ001, E10, A105) instead of the Costing Break 1 (linked to peg PRJ001, E10, A101) as the Costing Break 1 is replaced by the lower level Costing Break 2. MFG Comp 2 at Costing Break 3 (linked to peg PRJ001, E10, A110) instead of Costing Break 1 (linked to peg PRJ001, E10, A101). Pur Comp 1 at Costing Break 2 (linked to peg PRJ001, E10, A105) as there is no costing break created at Pur Comp 1. Pur Comp 2 at Costing Break 4 (linked to peg PRJ001, E10, A115). For the Sub-Assembly 2, MFG Comp 3, and MFG Comp 4, you can view the break up of costs at the top demand item level (the End Item linked to the peg (PRJ001, E10, A100)). Pre-requisites to create costing breaks Infor LN allows you to create costing breaks for projects only if the Costing Breaks check box in the Implemented Software Components (tccom0100s000) session is selected. Costing breaks cannot be created for the projects of the type Internal and Template. 104 | Infor LN | User Guide for Project Pegging Costing Breaks You must specify the element/activity to create costing breaks for a project. The activities used to create costing breaks must be of the type Control Account or Work Package. Setting up costing breaks Use the Costing Breaks (tppdm3600m000) session to create/set up costing breaks for the production material and resource costs, service depot repair material, labor, and other costs, for the project. Note You can also create costing breaks for blank projects with the project code not specified in the Project field in the Costing Breaks (tppdm3600m000) session. However, you must specify the standard element or a standard activity. Search criteria for costing breaks The search criteria that Infor LN follows; for costing breaks: 1. Costing breaks defined for the production resources for the specific project. 2. Costing breaks set up for the production resources for a blank project. 3. Costing breaks set up for the production material for the specific project. 4. Costing breaks set up for the production material for a blank project. The hierarchical search sequence applicable for production (material and resources): Production type I II III IV V Production Material Main item / Item group only the Main BOM Com- / Main item item ponent item only the BOM Component Item group item Production Resources Main item / Main item / Work center Routing / Routing Operations Cost type / Main item Note 1. For production material; you can use the Import Item Groups and the Import Components options to set up costing break for multiple item groups and component items of the main item. 2. For production resources; you can use the Import Operations and the Import Work Centers options to set up costing break for multiple routing operations and work centers. The hierarchical search sequence applicable for service depot repair: Infor LN | User Guide for Project Pegging | 105 Costing Breaks Service type I II III Service Depot Service item Installation Service item Repair Material group group (Main Item) IV V Serialized item (Item) Item serial number Service Depot Master rout- Routing op- Reference activi- Task Repair Labor ing tion ty Service Depot Item group Repair Other Item Cost Type level for Tooling, Subcontracting and Other costs. Note 1. For service depot repair material; you can use the Import Service Item Groups and the Import Installation Groups options to set up costing break for multiple service item groups and installation groups. 2. For service depot repair labor; you can use the Import Master Routings option to set up costing break for multiple master routings. 3. For service depot repair other; you can use the Import Item Groups option to set up costing break for multiple item groups. Copying costing breaks Infor LN allows you to manually copy the costing break to a target project using the Copy to Other Project option in the References menu of the Costing Breaks (tppdm3600m000) session. The Copy to Other Project window opens wherein you can specify the target project. You can also use the Replace existing Costing Breaks check box to replace the existing costing breaks in the target project, if any. Note The Replace existing Costing Breaks check box is not displayed when you use the Copy to Other Project option from the MMT sessions. Infor LN allows you to copy the costing break: ▪ ▪ ▪ ▪ from an existing project to a new project from a template to a new project from an existing project to a template project from an existing project to another existing project 106 | Infor LN | User Guide for Project Pegging Costing Breaks Removing empty costing breaks Use the Remove empty Cost Pegs in the Costing Breaks (tppdm3600m000) session, to delete the costing break lines that are not linked to a project peg (element/activity). Costing breaks in Enterprise Planning and Manufacturing In Manufacturing, the cost on a project is absorbed by a project account. With costing breaks, you can model dedicated project accounts for specific items and operations. You can define costing breaks at the lowest level such as item code or routing and operation, or at a generic level such as item group, assembly, operation type, or work center. You can specify costing breaks for production resources and materials in the Costing Breaks (tppdm3600m000) session. When a production order is created, Enterprise Planning searches for costing breaks that can be applied to the new production order. Costing breaks in the bill of material Costing breaks override a project peg distribution of actual supply orders and move the related costs to different WBS levels on the same project. Costing breaks are used to assign and track costs in Project. On a multilevel bill of material, costing breaks can be added on different levels. These costing breaks are indicated by lower level project peg codes for components, which differ from their parent item's project peg. Costs are moved from the main project peg to pegs that collect specific types of costs such as labour, material, subcontracting, or machine costs. In the BOM, you can apply costing breaks to routings, operations, work centers, or cost types. Multiple costing breaks can be applied to a BOM at the same time. Costing breaks for nonpegged items If the Costing Breaks check box is selected in the Implemented Software Components (tccom0100s000) session, before you can apply costing breaks to items, items must have a project peg distribution linked. You can apply Costing breaks to nonpegged items. If the item is nonpegged, the Inherit Project Peg check box in the Item (tcibd0101s000) session determines how a project peg distribution is linked to these items. If this check box is selected, the item is treated as pegged and will have a peg distribution generated. If this check box is cleared, and no costing break is found for the nonpegged item during creation in, for example, the estimated materials, the order header project pegs are copied to the project peg distribution of the nonpegged item. Infor LN | User Guide for Project Pegging | 107 Costing Breaks SFC Status Cost Type Action Planned Operations Adding a new operation or copying an existing one. Changing the work center on an operation (nonsubcontracting) in case of machine breakdown or lack of resources. Changing a work center of the type Subcontracting in case of machine breakdown or lack of resources. Changing the work center from the type Subcontracting to Company Owned. Material Adding a material. Changing the material from one item to another. Released Operations Adding an operation or copying an existing one. Changing the work center from the type Subcontracting to Company Owned. Changing the work center from the type Subcontracting to Company Owned. Material Adding a material. Changing a material. This table shows the actions after which a costing break lookup takes place or the order header project peg is copied: Note If an operation with the status Planned is deleted all project pegs are removed. 108 | Infor LN | User Guide for Project Pegging Costing Breaks Project Pegging Costing Breaks in Depot Repair The costing break functionality allows you to collect costs at different Physical Breakdown levels for Depot Repair to redirect costs from project peg for service contract to another project peg. Setup Costing Breaks for Depot Repair Costing breaks must be defined in the Costing Breaks (tppdm3600m000) session for material, labor and other resources lines for depot repair. Create Work Order from MSO Part Maintenance Line When MWO is created from a MSO and costing breaks are defined in the Costing Breaks (tppdm3600m000) session, LN identifies the existing costing breaks and implement them to the project peg for the material lines, labor lines and other lines. The project pegs are defaulted in the following sequence: 1. If the project is defined on the MWO header and the Costing Breaks check box is selected in the Implemented Software Components (tccom0100s000) session, the Element and Activity are defaulted from the Costing Breaks (tppdm3600m000) session based on the material ( Costing Breaks - Service Depot Repair Material (tppdm3103m000)), labor ( Costing Breaks Service Depot Repair Labor (tppdm3104m000)) and other resource line data ( Costing Breaks - Service Depot Repair Other (tppdm3105m000) sessions. LN identifies existing costing breaks and follows a hierarchy to implement them to the project pegs for the material lines, labor lines and other lines. When a costing break applies to the material, labor or other cost line the Project Peg Origin is set to Costing Break. For more information refer to Service Costing Break Hierarchy and Search Path (p. 112) . 2. If the Costing Breaks check box is not selected in the Implemented Software Components (tccom0100s000) session, the Element and Activity are defaulted from the Work Orders (tswcs2100m000) session. The Project Peg Origin field is set to Top Demand. Note ▪ ▪ When a Maintenance Work Order (MWO) is created from a Maintenance Sales Order (MSO) - part maintenance line, the pegging (project, element, activity) data on the work order header is defaulted from the part maintenance line. When MWO is created from a MSO part maintenance line and a reference activity or master routing is defined on the part maintenance line or resource lines are defined manually, all material, labor, tooling and other requirement lines linked to the reference activity are copied to work order activity resource lines. Update Peg Data on MSO Part Maintenance Line If the project pegging data changes on the MSO Part Maintenance Line and a Maintenance Work Order is already created before receiving the main part for repair on the MSO Part Maintenance Line, changes Infor LN | User Guide for Project Pegging | 109 Costing Breaks on the MSO Part Maintenance Line automatically update the project peg on the related MWO header and on MWO resource lines. Note After the MSO Receipt Line is generated, the peg data cannot be modified. Plan Work Order If the Project Pegged Inventory check box is selected in the Work Orders (tswcs2100m000) session, to issue the main item from warehouse, the project peg data is transferred to Warehousing for processing and a warehouse order is created with an outbound line. If the Project Pegged Inventory check box is selected in the Work Orders (tswcs2100m000) session, to create the planned inventory transactions for the receipt of the main item or for each material line (with Delivery Type set to From Warehouse or From Kit or To Warehouse or Via Purchase in the Work Order Material Resources (tswcs4110m000) session), the project pegs of the MWO header are transferred to Warehousing. Project Pegged Inventory check box is not selected in the Work Orders (tswcs2100m000) session for the items (to be issued from the warehousing) which are not project peg. The project peg is also not applicable for processing planned inventory transaction for such items. If the Project Pegged Inventory check box is selected in the Work Orders (tswcs2100m000) session, for checking the availability of dedicated project inventory when performing the ATP check, the project pegs of the work order material resource line are used. Note When planning the MWO, LN checks the validity of the project pegs. In case a peg is not valid, an error message is displayed. Release Work Order If the Project Pegged Inventory check box is selected in the Work Orders (tswcs2100m000) session, at the time of releasing a work order, the work order planned inventory transaction are updated and warehouse outbound lines are created for the required material. The project pegs of the material lines are transferred to warehousing. Register Actual Work Order Costs Financial transactions are created when actual materials, labors or other cost are registered on the work order resource lines. The project peg data is also defaulted from the work order resource line. When actual costs are registered and the cost line is pegged, the costs are posted to the Project. For a new labor line that is created, MWO is project pegged, and Costing Breaks check box is selected in the Implemented Software Components (tccom0100s000) session, the pegging data are defaulted from the Costing Breaks (tppdm3600m000) session. When costing breaks are not defined, the pegging data is defaulted from the Work Orders (tswcs2100m000) session. For a new actual resource lines, the standard project peg defaults mechanism, described above is applicable. 110 | Infor LN | User Guide for Project Pegging Costing Breaks Subcontract Work Order Activity When you subcontract a work order activity, a work order other resource line with Cost Type set to Subcontracting is created in the Work Order Other Resources (tswcs4130m000) session. The project peg is defaulted from the applicable costing break or MWO header to the purchase order created for subcontracting. Create Related Work Order When a MWO is created for department transfer, the project peg data of the existing MWO must be transferred to the new related MWO. When you create a related MWO which is transferred within the same department (disassemble-assemble scenario), the project peg and the project peg origin of the material resource line in the Work Order Material Resources (tswcs4110m000) session, are defaulted on the new related MWO. Close Work Order When closing a work order, a warehouse order is created to receive the repaired item back in the warehouse. Return delivery lines are created for warehouse deliveries that are not fully consumed. The standard project peg defaults mechanism, described above is applicable. Post Work Order to History Canceled and closed work orders are posted to history. The project peg data is also copied. Add MSO Coverage Line Additional Costs When you manually add a coverage line for the additional costs, the project pegs are defaulted from the MSO header or the Lines which the coverage line is linked. Note If the coverage line is linked to a Part Maintenance Line and the Costing Breaks check box is selected in the Implemented Software Components (tccom0100s000) session , the Element and Activity are defaulted from Costing Breaks - Service Depot Repair Other (tppdm3105m000) session, overwriting the project peg data defaulted from MSO header/line. Cost MSO Coverage Line When the Status of MSO or individual coverage lines is set to Costed in the Maintenance Sales Orders (tsmsc1100m000) session, invoice lines are created and the project peg of the coverage lines are transferred to Invoicing. Infor LN | User Guide for Project Pegging | 111 Costing Breaks Service Costing Break Hierarchy and Search Path The project, element and activity are retrieved from the Costing Breaks (tppdm3600m000) session. LN follows hierarchy for the various cost types, based on the following attributes. Material Resource Lines Costing Breaks - Service Depot Repair Material (tppdm3103m000). 1. Installation Group of the MWO Header 2. Item of the MWO header (main item) 3. Item of the material line 4. Serial Number of the material line item 5. Project of the material line item The following search order is applied: 1. Material line item and serial number 2. Main item and material line item 3. Material line item 4. Installation group and main item 5. Main item 6. Installation group 7. Service item group Labor Resource Lines Costing Breaks - Service Depot Repair Labor (tppdm3104m000). 1. Master Routing of the MWO Activity the labor line is linked to 2. Routing Options of the MWO Activity the labor line is linked to 3. Reference Activity of the labor line 4. Task of the labor line 5. Project of the labor line The following search order is applied: 1. Reference activity and task 2. Task 3. Reference activity 4. Master routing, routing option and reference activity 5. Master routing and routing option 6. Master routing Other Resource Lines Costing Breaks - Service Depot Repair Other (tppdm3105m000). 1. Cost Type (Tooling / Subcontracting / Other) 2. Item Group of the cost line item 112 | Infor LN | User Guide for Project Pegging Costing Breaks 3. Item 4. Serial Number 5. Project of the cost line The following search order is applied: If cost type is tooling 1. (Tool) Item and (Tool) serial number 2. (Tool) item If cost type is subcontracting 1. Item 2. Item group If cost type is other 1. Item 2. Item group Infor LN | User Guide for Project Pegging | 113 Costing Breaks 114 | Infor LN | User Guide for Project Pegging Appendix A Glossary A activity The smallest part of the activity structure used for a time-scaled budget. An entity that is used to represent a part of a project in an activity structure. LN distinguishes these activity types: ▪ ▪ ▪ ▪ ▪ WBS Element Control Account Work Package Planning Package Milestone See: activity structure appropriate menu Commands are distributed across the Views, References, and Actions menus, or displayed as buttons. In previous LN and Web UI releases, these commands are located in the Specific menu. as-built structure The actually built structure of a product including the serial numbers. ATT See: available to transfer (ATT) (p. 115) available to transfer (ATT) Inventory on-hand allocated to a particular project cost-peg demand, but not needed just yet. Therefore the inventory is available for other project cost pegs, provided that the inventory is replenished in time to fulfill the original demand. Abbreviation: ATT Infor LN | User Guide for Project Pegging | 115 Glossary backflushing The automatic issue of materials from inventory, or accounting for the hours spent manufacturing an item, based on theoretical usage and the quantity of the item reported as complete. backorder An unfilled customer order, or partial delivery at a later date. A demand for an item whose inventory is insufficient to satisfy demand. bill of material (BOM) A list of all parts, raw materials, and subassemblies that go into a manufactured item and show the quantity of each of the parts required to make the item. The BOM shows the single-level product structure of a manufactured item. blanket warehousing order A warehousing order that is generated during the creation of a push schedule and that contains: ▪ ▪ ▪ ▪ ▪ A position number and sequence number of zero. An item as defined on the purchase schedule. An order quantity equal to the quantity as defined on the purchase contract line. An empty planned delivery date and planned receipt date, but a contract date similar to the purchase contract date. A lot selection defined as Any. budget 1) A commercial cost estimate in the preproduction stage of projects. 2) A plan that includes an estimate of future costs and revenues related to expected activities. change reason The reason that can be assigned to a changed purchase document (line) or sales document (line). costing breaks Are used to break up and redirect costs related to a project, to project pegs that are linked to specific attributes, such as items, item groups, or work centers. The project costs are no longer linked only to the top demand project peg, but are spread over lower level pegs for the specified attributes (breaks), which improves project management. customer furnished material An item supplied by the customer being used as material in the production of an end-item for that same customer. 116 | Infor LN | User Guide for Project Pegging Glossary effectivity unit A reference number, for example a sales order line or a project deliverable line, that is used to model deviations for a unit effective item. element The smallest part of an element structure. An element is used to define the (structure of the) work of the project, so that you can carry it out. excess inventory Inventory for which no demand is present. For example, excess inventory can result from fixed order quantities, when the received quantity exceeds the present demand. Excess inventory can be: ▪ ▪ On hand Physically present in the warehouse On order Present on planned or scheduled receipts export license A license required by the authorities before selling and/or shipping of items (high-tech, classified or potentially dangerous) which are regulated by law. Items requiring this license have restrictions applied to them in Enterprise Planning. Supply for export license required items or items containing an export licensed item can only be commingled with supply for the same project. Similar restrictions exist for cost transfer rules. inventory valuation method A method to calculate the inventory value. The inventory is valued at either its fixed price or its actual receipt price. Because inventory value can change with time, the age of inventory needs to be noted. In LN, the following inventory valuation methods are available: ▪ ▪ ▪ ▪ ▪ ▪ Fixed Transfer Price (FTP) First In First Out (FIFO) Last In First Out (LIFO) Lot Price (Lot) Moving Average Unit Cost (MAUC) Serial Price (Serial) item subcontracting The entire production process of an item is outsourced to a subcontractor. Infor LN | User Guide for Project Pegging | 117 Glossary moving-average unit cost (MAUC) An inventory valuation method for accounting purposes. The MAUC is the average value for each unit of the current inventory. For each new receipt the MAUC is updated. multilevel bill of material A BOM that lists the subcomponents of the components, and any eventual subcomponents. In the multilevel BOM, the final product is at level zero. operation subcontracting The work on one or more operations in an item's production process is outsourced to a subcontractor. opportunity Used by a sales person to record and monitor sales information related to a business partner with the purpose of selling a product or service to this business partner. peg A combination of project/budget, element and/or activity, which is used to identify costs, demand, and supply for a project. planned distribution order An order in Enterprise Planning for an internal supplier or sister company to deliver a quantity of an item. planned inventory transactions The expected changes in the inventory levels due to planned orders for items. project An endeavor with a specific objective to be met within the prescribed time and financial limitation, and that has been assigned for definition or execution. purchase catalog Identifies purchasable items. A purchase catalog is defined as a main category and as a purchase category. 118 | Infor LN | User Guide for Project Pegging Glossary push schedule A list of time-phased requirements, generated by a central planning system, such as Enterprise Planning or Project, that are sent to the supplier. Push schedules contain both a forecast for the longer term and actual orders for the short term. A push schedule can use one of the following release types: ▪ ▪ ▪ Material Release: only material releases are sent. Shipping is performed based on the Firm and Immediate requirements in the material release. Shipping Schedule: both material releases and shipping schedules are sent. Shipping is carried out based on the Firm and Immediate requirements in the shipping schedule. The material release only sends forecasting data. Shipping Schedule Only: only shipping schedules are sent. Shipping is carried out based on the Firm and Immediate requirements in the shipping schedule. No forecasting data is sent to the supplier. reason A user-defined standardized description of the reason for a particular decision or choice. A reason's type determines for which purpose you can use that reason. To give additional information about an action, you can select and enter a reason from a list. LN can also print the reason in the relevant report. response line A response to a request for quotation line, which includes a bidder's bid for the RFQ line. A bid offers goods or services for a certain price and terms of sale and can be considered as an offer to sell. safety stock The buffer inventory necessary to meet fluctuations in demand and delivery lead time. In general, safety stock is a quantity of inventory planned to be in inventory to protect against fluctuations in demand or supply. In the context of master production scheduling, safety stock is the additional inventory and capacity planned as protection against forecast errors and short-term changes in the backlog. SSP See: supplier stage payments (p. 120) Infor LN | User Guide for Project Pegging | 119 Glossary subassembly An intermediary product in a production process that is not stored or sold as an end product, but that is passed on to the next operation. For subcontracting purposes, a manufacturer can send a subassembly to a subcontractor to carry out work on the subassembly. This subassembly has its own item code defined in the Item Base Data. After work is finished, the subcontractor sends the subassembly back to the manufacturer. Also this reworked subassembly has its own item code defined in the Item Base Data. subcontracting Allowing another company (the subcontractor) to carry out work on an item. This work can concern the entire production process, or only one or more operations in the production process. supplementary unit An extra unit in which the quantity of goods must be reported for the EU Intrastat declaration. The main reporting unit is kilogram in all cases. For some goods, a reporting unit must be used such as pairs (of shoes and so on), liters, head or pieces (for cattle), or square meters. Quantities of goods to which kilograms do not apply are only reported in the supplementary unit. supplier stage payments Spread payments that are made by customers to suppliers over a period of time. With stage payments, customers can make payments for an item before or after the item is actually received. An item's invoice flow is separated from its goods flow. Abbreviation: SSP supplying relationship A distribution link between a supplying warehouse cluster and a receiving cluster. The clusters involved can be in the same site, or in different sites. Enterprise Planning uses supplying relationships for distribution planning: the supplying relationships represent valid supply paths for particular items or groups of items. You can specify supplying relationships at the level of individual items, but also at more general levels. The supplying relationships also determine the costs of supply, lot size rules, and other parameters. warehouse transfer A warehousing order to move an item between warehouses. A warehouse transfer consists of a warehousing order of inventory transaction type Transfer. WBS See: work breakdown structure (p. 121) 120 | Infor LN | User Guide for Project Pegging Glossary work breakdown structure The top layer of the activity structure. The WBS can consist of a hierarchy of activities of the WBS element type. Abbreviation: WBS Infor LN | User Guide for Project Pegging | 121 Glossary 122 | Infor LN | User Guide for Project Pegging Index activity, 115 Adjustment Orders peg distribution, 74, 74 appropriate menu, 115 as-built structure, 115 ATT, 115 available to transfer (ATT), 115 backflushing, 116 backorder, 116 bill of material (BOM), 116 blanket warehousing order, 116 borrow/loan payback, 91 Borrow/loan integration transactions, 98 payback, 13, 14, 16, 17, 92, 93, 95, 96, 96, 96, 97, 97, 98 budget, 116 change reason, 116 Change reason cost peg transfer, 16 peg distribution, 16 Cost aspects borrow/loan, 96, 96, 96, 97 Costing Break Hierarchy, 112 costing breaks, 116 Costing Breaks, 103 Costing breaks Enterprise Planning and Manufacturing, 107 Cost Peg, 76 Cost pegging Procurement, 29 Sales, 19 Cost peg supplying relationships using, 21 cost peg transfer, temporary, 91 Cost peg transfer, temporary, 16, 17, 92, 93, 95, 96, 96, 96, 97, 97 transfer rules, 13, 14 Cost peg transfer change reason, 16 Cost Peg Transfer, 76 Enterprise Planning, 24 Costs distribution production order hours, 87 customer furnished material, 116 Cycle Counting Orders peg distribution, 74, 74 effectivity unit, 117 element, 117 Enterprise Planning cost peg transfer, 24 Enterprise Planning Manufacturing costing breaks, 107 excess inventory, 117 export license, 117 Gains and losses peg distribution, 74 Inbound process, peg distribution, 37 inventory valuation method, 117 item subcontracting, 117 Manual finalization and aging borrow/loan, 95 Material supply lines pegging, 33 moving-average unit cost (MAUC), 118 multilevel bill of material, 118 operation subcontracting, 118 opportunity, 118 Outbound, Effectivity Units, 66 outbound process, 41 Overview pegging in manufacturing, 27 payback borrow/loan, 91 Payback borrow/loan, 13, 14, 16, 17, 92, 93, 95, 96, 96, 96, 97, 97, 98 peg, 118 peg distribution, 41 Peg distribution adjustment orders, 74, 74 change reason, 16 cycle counting orders, 74, 74 Pegging in Manufacturing overview, 27 planned distribution order, 118 planned inventory transactions, 118 Production order hours costs distribution, 87 project, 118 Project Pegging, Costing Breaks, Depot Repair, 109 Project pegging overview, 9 Procurement, 29 Sales, 19 Projects costing break set-up, 103 purchase catalog, 118 push schedule, 119 reason, 119 response line, 119 safety stock, 119 Search Path for Costing Break, 112 Setup borrow/loan, 16, 17, 92 cost peg transfers, 16, 17 SSP, 120 subassembly, 120 subcontracting, 120 supplementary unit, 120 supplier stage payments, 120 supplying relationship, 120 The process borrow/loan, 93 Tracking borrow/loan, 97 Transfer rules, cost peg transfer, 13, 14 Using cost peg supplying relationships, 21 warehouse transfer, 120 WBS, 121 work breakdown structure, 121 ">
/
डाउनलोड
बस एक दोस्ताना अनुस्मारक. आप दस्तावेज़ को यहीं देख सकते हैं. लेकिन सबसे महत्वपूर्ण बात यह है कि हमारे AI ने इसे पहले ही पढ़ लिया है. यह जटिल चीजों को सरल शब्दों में समझा सकता है, किसी भी भाषा में आपके सवालों के जवाब दे सकता है, और सबसे लंबे या सबसे जटिल दस्तावेजों को भी जल्दी से नेविगेट करने में आपकी मदद कर सकता है.
विज्ञापन