PPA BV Condominium Jetflex Owner's Manual
Add to My manuals14 Pages
PPA BV Condominium Jetflex is an overhead gate operator designed for residential and commercial use. This powerful and durable operator can handle gates weighing up to 400 kg and measuring up to 4 meters in length. With a maximum speed of 16.4 meters per minute, the Jetflex is one of the fastest operators in its class. It also features a soft start and stop function, which helps to reduce wear and tear on the gate and operator.
advertisement
BV
CONDOMINIUM
Technical Manual
WARNING:
Do not operate the equipment without first reading the instruction manual.
INDEX
IMPORTANT SECURITY INSTRUCTIONS ................................................................................... 3
TECHNICAL CHARACTERISTICS .................................................................................................. 4
TOOLS REQUIRED FOR INSTALLATION ..................................................................................... 5
ELECTRICAL INSTALLATION ....................................................................................................... 5
PRECAUTIONS WITH THE GATE BEFORE INSTALLATION ................................................ 7
FIXATION AND INSTALLATION OF THE OPERATOR .............................................................. 7
ANALOGIC LIMIT SWITCH INSTALLATION .............................................................................11
MAINTENANCE ...............................................................................................................................13
2
IMPORTANT SECURITY INSTRUCTIONS
Recommendation:
For the installation of the equipment, it is important that a PPA specialist installer follow all instructions given in this technical manual and in the user manual.
With the user’s manual , the installer must present all the information, uses and safety items of the equipment to the user.
Before using the automation, read and follow all instructions contained in this manual carefully.
-Before installing the operator, make sure that the local power supply is compatible with that required on the equipment identification label;
- Do not connect the electrical grid until installation / maintenance is complete. Always make electrical connections to the control unit with the electrical grid switched off;
-After installation, make sure that the parts of the gate do not extend through the roads and public walk;
-It is mandatory to use full shutdown devices in the automation system
3
TECHNICAL CHARACTERISTICS
BV CONDOMINIUM SP / BV CONDOMINIUM JET FLEX
OPERATOR TYPE
MODEL
RATED VOLTAGE
NOMINAL FREQUENCY
NOMINAL POWER
RPM
NOMINAL CURRENT
REDUCTION
LINEAR SPEED
MANEUVER
PROTECTION LEVEL
RAIL
TEMPERATURE RANGE
ISOLATION TYPE
LIMIT SWITCH
MAX. WEIGHT OF
GATE LEAF
OVERHEAD
Single Phase
220 V
60 Hz
350 W
1740 RPM
1,65 A
2:32
6,5 m/min
60 cycles/h
IPX4
Aluminum
-5°C / +50 °C
Class B, 130° C
Hybrid
320 Kg
OVERHEAD
Jet Flex
220 V
60 Hz
160 W
4365 RPM
1,4 A
2:32
16,4 m/min
Continuous
IPX4
Aluminum
-5°C / +50 °C
Class B, 130° C
Hybrid
400 Kg
OVERHEAD
Jet Flex
127 V
60 Hz
170 W
4365 RPM
2 A
2:32
16,4 m/min
Continuous
IPX4
Aluminum
-5°C / +50 °C
Class B, 130° C
Hybrid
400 Kg
MAX. DIMENSION OF
THE GATE
*HEIGHT = (Value in meters - 0,15) x 2
LENGTH = 4,0 m
*HEIGHT = (Value in meters - 0,15) x 2
LENGTH = 4,0 m
*HEIGHT = (Value in meters - 0,15) x 2
LENGTH = 4,0 m
4
TOOLS REQUIRED FOR INSTALLATION
Here are some tools required to install the automation:
PLIERS HACKSAW NUT DRIVER SCREWDRIVER WRENCH
LADDER SQUARE DRILLER PENCIL SANDER
WELDING MACHINE HAMMER LEVEL MEASURING TAPE
ELECTRICAL GRID
For electrical installation, the network shall contain the following characteristics:
- Electric network 127 V or 220 V;
- Have 5 A circuit breakers in the electrical distribution box;
- 3/4 “diameter conduit between the electrical distribution box and the total disconnect device;
- 3/4 “diameter conduit between the total shut-off device and the automator’s connection point;
- 1/2 “diameter conduits for external and optional push button;
- Theres of 1/2 “diameter for safety photocells (optional).
5
- The cable for the fixed wiring must comply with NBR NM 247-3;
- The power conductor of a product for internal use must be a flexible cable 3 x 0.75 mm²; 500 V, according to the norm NBR NM
247-5;
- The power conductor of a product for external use must be a flexible cable 3 x 0.75 mm²; 500 V, according to IEC 60245-57.
It is mandatory that the ground terminal is connected to the ground.
IMPORTANT
The device must be powered by a residual current (DR) device, with a rated residual current exceeding 30 mA.
6
PRECAUTIONS WITH THE GATE BEFORE AUTOMATION
Before applying the automation to the gate, some procedures should be taken:
-Check the mechanical conditions, whether the balancing is correct and whether the opening and closing are suitable. Remove any equipment not necessary for the operation of the machine, such as locks, ropes, chains, tools, among others;
-The unlocking (manual release) must be installed at a height of less than 1.8 m;
-In the case of push button installations (optional fixed control), install at a height of at least 1.5 m from the floor and in view of the door, further away from moving parts;
-Fix crush risk warning, available in the automation kit, in places visible or near the button (fixed control);
-Check the manual release system, fastened next to the actuation element of the unlocking;
-Move the door leaf manually (opening and closing) and observe the required effort. The leaf should rise and fall, throughout the course, with the minimum of effort;
-Check the balance of the gate leaf. Lift the sheet up to the middle of the path and observe whether it remains stationary. If the sheet remains stationary, the gate will be satisfactorily balanced. This equilibrium condition must occur for approximately 80% of the course, with imbalance close to the extremes of the course being permissible.
-The gate shall have a sturdy and, as far as possible, non-deformable structure.
FIXATION AND INSTALLATION OF THE OPERATOR
Before installing the automation system, remove any unnecessary cables and disable any equipment or system connected to the electrical grid.
7
To install the equipment, follow the steps below:
Step 1: The gate axis shall be between 100 mm and 300 mm below the central point of the gate leaf.
ARTICULATING
ARM
GATE LEAF
HALF OF
GATE LEAF
GATE AXIS
Step 2: Remove the top rail cover and install the securing brackets on the opposite side to the drive nut pin.
8
Step 3: Insert the closing stop with the rubber facing the drive nut.
Step 4: Insert the opening stop with the rubber facing the drive nut.
Step 5: Place back the top cover on the rail.
9
Step 6: Position the automation vertically on the door column and weld the mounting brackets on the column, respecting the measurements in the figure below.
270 mm
Step 7: Attach the drive lever to the pin of the drive nut of the operator.
Step 8: Weld the drive lever on the gate leaf, keeping the distance of 250 mm between the center of the gate shaft and the center of the lever’s turning point.
TRACTION
LEVER
TRIGGERING
NUT
LEVER
TURNING POINT
GATE AXIS
10
Step 9: With the gate closed, maintain a 50 mm tilt on the drive lever, respecting a distance from the center of the turning point of the drive lever and the center of the drive nut pin.
PIN CENTER OF
THE TRIGGERING
NUT
TURNING POINT
OF THE DRIVE
LEVER
Step 10: Still with the gate closed, adjust the closing stop, so that the rubber of the gate cushion the drive nut in the closing of the gate. Then, with the gate open, perform the same procedure for the opening stop.
ANALOGIC LIMIT SWITCH INSTALLATION
Step 1: Position the limit switch magnet into the drive nut housing. Position the opening and closing limit switches so that they activate when the gate leaf completes its movement. Connect the limit switch to the control unit.
Step 2: Place the protective rubber of the wires into the reed housing, traversing the entire rail profile.
11
BORRACHA
DE PROTEÇÃO
Prior to the operation of the operator, it is mandatory to screw the panel cover with 4 x 3.5 x 12 mm screws (available in the kit).
12
COMMAND BOARD:
Check the label attached to the product (according to the model on the side) which is the command board part of the operator. Once this is done, consult the board manual that is available for download at www.
ppa.com.br and make all connections and configurations.
Code:
Model:
Reduction:
Technology:
Voltage:
Board:
Size:
Assembly:
Fairing:
Gear:
MAINTENANCE
In the table below, we will mention some PROBLEMS - DEFECTS, PROBABLE CAUSES
AND CORRECTIONS - which may occur in your operator. Before any maintenance, it is necessary to completely disconnect the electricity.
DEFECTS
Engine does not start / does not move
Motor blocked
Command board does not accept command
Motor only turns to one side
PROBABLE CAUSES
A) Power off
B) Open / burned fuse
C) Locked gate
D) Defective limit switch
A) Inverted motor connection
B) Blocked gate or trigger
A) Fuse blown
B) Power line off (power)
C) Defect on remote control unloaded
D) Transmitter range (remote control)
A) Inverted motor wires
B) Inverted end-of-course system
C) Defect in the command center
CORRECTIONS
A) Make sure that the power supply is connected correctly
B) Replace fuse with the same specification
C) Make sure that there is no object blocking the operation of the gate
D) Replace the limit switch system
(analog and / or digital)
A) Check the motor wires
B) Set to manual mode and check separately
A) Replace the fuse
B) Connect the power supply
C) Check and replace battery
D) Check the position of the receiver's antenna and, if necessary, reposition it to ensure the reach
A) Check the motor connection
B) Invert the limit switch connector
(analog and / or digital)
C) Replace the board
13
www.ppaamerica.com
+55 (14) 3407-1000 [email protected]
MOTOPPAR INDÚSTRIA E COMÉRCIO DE AUTOMATIZADORES LTDA.
Av. Dr. Labieno da Costa Machado, 3526 - Distrito Industrial - CEP 17400-000 - Garça - SP - Brazil
advertisement