Chance Foundation Solutions Daily Project In Installation Manual
PDF
Dokument
Annons
Annons
DAILY PROJECT INSPECTION CHECKLIST Project: Date: Recorded by: Item Comments Certified Installer Card Checked Expiration, valid for project type Inspection Equipment BEFORE INSTALLATION Plans, Specifications, Tape Measures, Installation Log, Cell Phone w/ Camera, Stop Watch & Calculator, Small Hand Level PPE Inspection and Proper Use Product Verified Quantity, sizes, configurations, brand Drive tooling inspected Proper hardware, good condition Machine Properly Sized Output torque, flow rate, & operating pressure Machine weight At least 1:1 weight ratio to required installation torque Type of Torque Indicator to be Used Battery Health Checked Fill out Installation Log Sheet AFTER INSTALLATION DURING INSTALLATION Include Pile Depth & Torque Monitor RPM and Rate of Penetration 5-20 RPM and 3” per revolution Check coupling bolt torque & connections for pile extensions Verify and record pile termination per construction plan and required torque Measure and record torque in 1-foot intervals for the last 3 to 5 feet prior to the pile termination depth Complete Project Field Report Complete As-built drawings (location, # of piles) Record additional information required by engineer or owner Complete any special documentation in compliance with building codes www.chancefoundationsolutions.com TD04367E_2/24 ">
/
Ladda ner
Bara en vänlig påminnelse. Du kan visa dokumentet här. Men viktigast av allt, vår AI har redan läst det. Den kan förklara komplexa saker på ett enkelt sätt, svara på dina frågor på vilket språk som helst och hjälpa dig att snabbt navigera även de längsta eller mest komplicerade dokumenten.
Annons