Series 300
Automatic Transfer Switches
D–design, 30 through 230 A
Refer to the outline and wiring drawings provided with your ASCO Series 300 ATS for all installation details.
Rating Label
Each automatic transfer switch contains a rating label to define the loads and fault circuit withstand / closing ratings.
Refer to the label on the transfer switch for specific values.
Do not exceed the values on the rating label.
Exceeding the rating can cause personal injury or serious equipment damage.
An experienced licensed electrician must install the
Automatic Transfer Switch (ATS).
TABLE OF CONTENTS
section-page
INSTALLATION . . . . . . . . . . . . . . . . . . . . . . . .
Mounting and Line Connections
Engine Starting Contacts
. . . . . . . . .
. . . . . . . . . . . . . . .
1-1
1-1
1-2
Input / Output Label
Functional Test
. . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . .
1-2
1-3, 1-4, 1-5
SEQUENCE OF OPERATION . . . . . . . . . . .
2-1
TESTING & SERVICE . . . . . . . . . . . . . . . . . .
Preventive Maintenance
Transfer Test
. . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . .
Disconnecting the Controller . . . . . . . . . . . .
Manual Load Transfer
Trouble-Shooting
. . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . .
3-1
3-1
3-1
3-1
3-2
3-2
ADJUSTMENTS . . . . . . . . . . . . . . . . . . . . . . .
Time Delay and Sensor Adjustments . . . . .
How to Change a Setting . . . . . . . . . . . . . . .
4-1
4-1
4-2
CONTROL FEATURES . . . . . . . . . . . . . . . . .
. . . . . .
5-1
Engine Exercisers
Motor Load Transfer
. . . . . . . . . . . . . .
5-1, 5-2, 5-3
. . . . . . . . . . . . . . . . . . .
5-4
Load Disconnect & Remote Control 5-4
INDEX . . . . . . . . . . . . . . . . . . . . .
back of manual
30–200 A sizes
50 Hanover Road, Florham Park, New Jersey 07932–1591 USA
For sales or service call 1 800 800–2726 (ASCO) www.ascopower.com
ASCO POWER TECHNOLOGIES CANADA PO Box 1238, 17 Airport Road, Brantford, Ontario, Canada N3T 5T3
381333–228 H
Nameplate
The Transfer Switch nameplate includes data for each specific ASCO Series 300 ATS. Use the ATS only within the limits shown on this nameplate.
D 300 B 3 200
Catalog Number Identification
A typical Catalog Number is shown below with its elements explained. The example is for a Series 300
ATS with switched neutral, 3 pole, 200 amp, 480 V, in a Type 1 enclosure:
N 1 C
Neutral
B
– switched
C
– overlapping blank – solid
Phase Poles
2
– single Ø
3
– three Ø
Amperes
30
70
104
150
200
*
* 200 ampere is limited to 480 volts
Voltage
A
115
B
120
C
208
D
220
E
230
F
240
H
380
J
400
K
415
L
440
M
460
N
480
Q
575
R
600 terminals for switch position contacts membrane controls
Controller
1
– standard
1X
– if accessories ordered load power connections
Enclosure
C
– type 1
F
– type 3R
G
– type 4
L
– type 12 blank – open type
Controller emergency power connections
Transfer
Switch maintenance handle
(see
WARNING
under
Manual
Operation) terminals for engine start contacts normal power connections cable spacers
(see INSTALLATION)
200 ampere size in typical enclosure with location of customer connections
Catalog Number Identification
A typical Catalog Number is shown below with its elements explained. The example is for a Series 300 ATS with switched neutral, 3 pole, 230 ampere, 480 V, in a Type 1 enclosure:
D 300 B 3 230 N 1 C
Neutral
B
– switched
C
– overlapping blank – solid
Phase Poles
2
– single Ø
3
– three Ø
Amperes
230
**
** 230 ampere is limited to 480 volts terminals for switch position contacts
Voltage
A
115
B
120
C
208
D
220
E
230
F
240
H
380
J
400
K
415
L
440
M
460
N
480
Controller
1
– standard
1X
– if accessories ordered membrane controls load power connections
Enclosure
C
– type 1
F
– type 3R
G
– type 4
L
– type 12 blank – open type emergency power connections
Transfer Switch maintenance handle
(see WARNING under
Manual Operation) terminals for engine start contacts normal power connections cable spacers
(see INSTALLATION)
230 ampere size in typical enclosure with location of customer connections
Controller
Refer to the applicable enclosure outline drawing furnished with this switch and mount the Series 300 according to details and instructions shown on diagram.
NOTICE
Mounting
SECTION 1 INSTALLATION
Series 300 Automatic Transfer Switches are factory wired and tested. Installation requires skid removal then securing the enclosure to the supporting foundation.
Connecting Power Conductors
After the power cables have been tested, connect them to the appropriate terminal lugs on the transfer switch as shown on the wiring diagram provided with this
Series 300. Make sure the lugs provided are suitable for use with the cables being installed. Standard terminal lugs are solderless screw type and will accept the wire sizes listed on the drawings provided with the
Series 300. Be careful when stripping insulation from the cables; avoid nicking or ringing the conductor.
Remove surface oxides from cables by cleaning with a wire brush. When aluminum cable is used, apply joint compound to conductors. Tighten cable lugs to the torque specified on rating label.
Protect the automatic transfer switch from construction grit and metal chips to prevent malfunction or shortened life of the ATS.
Mount the ASCO ATS vertically to a rigid supporting structure. Level all mounting points by using flat washers behind the holes to avoid distortion of the switch.
Three cable spacers are included with 150, 200, and 230 ampere transfer switches. When installing power cables, run the cables through the cable spacers as shown in Figure 1–1. Position cable spacers within 1½ inches from lugs.
NOTICE
Line Connections
Refer to the Wiring Diagram provided with your Series
300 ATS. All wiring must be made in accordance with the National Electrical Code and local codes.
The cable spacers must be located as shown for
150, 200, and 230 ampere transfer switches.
cable spacers
De–energize the conductors before making any line or auxiliary circuitry connections. Be sure that Normal and Emergency line connections are in proper phase rotation. Place engine generator starting control in the OFF position.
Make sure engine generator is not in operation.
It is unnecessary to remove pole covers from the transfer switch. If you do remove them, reinstall them carefully.
Testing Power Conductors
Do not connect the power conductors to the ASCO
Series 300 transfer switch until they are tested.
Installing power cables in conduit, cable troughs and ceiling-suspended hangers often requires considerable force. The pulling of cables can damage insulation and stretch or break the conductor’s strands. For this reason, after the cables are pulled into position, and before they are connected, they should be tested to verify that they are not defective or have been damaged during installation.
1 ½ inch approximate cable spacer
Figure 1–1. Cable spacers for 150, 200, and 230 ampere transfer switches.
1---1
INSTALLATION
(continued)
Engine Starting Contacts Controller Ground
Customer connections for engine control contact connections are located on the transfer switch. Refer to wiring diagram provided with the Series 300 ATS and connect the engine start wires to the appropriate terminals. See Figure 1–2 and Table A.
Table A. Engine start connections.
A grounding wire must be connected to the controller’s lower left mounting stud. Because the controller is mounted on the enclosure door, a conductive strap must be used between the enclosure and the door.
This connection provides proper grounding which does not rely upon the door hinges.
When normal source fails
contact closes contact opens
Terminals on transfer switch
TB14 and TB15
TB14 and TB16
Harnesses
The transfer switch is connected to the left side of the controller by a plug–in harness (two plugs).
ENGINE STARTING CONTACTS
( SHOWN DE–ENERGIZED ) left side of switch
TOP
STUD
MIDDLE
STUD
BOTTOM
STUD
14
15
TS
NR
16
NR
TB 14
TB 16
TB 15
Figure 1–2. Engine starting contact label and terminals located on the transfer switch.
Auxiliary Circuits
Connect auxiliary circuit wires to appropriate terminals on transfer switch as shown on the wiring diagram provided with this Series 300 Automatic Transfer
Switch. Make the necessary auxiliary connections by referring to Section 5, Control Features.
Connections to Controller for other Control Features
(located on bottom of Controller)
Load Disconnect
Feature
Connections
(see Wiring Diagram
& refer to page 5–4 for DIP switch settings)
Programmable
Engine Exerciser connection, if provided
(refer to page 5–2)
Remote Control Features Connections
(refer to the Wiring Diagram & page 5–4 for DIP switch settings)
Each control contact must be suitable for a 5 V DC low energy circuit.
for factory use only
Figure 1–3. Input / output label on the Controller showing possible connections to the lower terminal block.
1---2
INSTALLATION
(continued)
Functional Test
The Functional Test consists of three checks: manual operation, voltage checks, and electrical operation.
Position of the transfer switch is indicated here weight marked
N (normal) and E (emergency)
NOTICE
Do these checks in the order presented to avoid damaging the automatic transfer switch.
maintenance handle
Read all instructions on the Wiring Diagram and labels affixed to the automatic transfer switch. Note the control features that are provided and review their operation before proceeding.
1 – Manual Operation Test
A maintenance handle is provided on the Transfer Switch for maintenance purposes only. Manual operation of the transfer switch should be checked before it is energized (operated electrically).
floating weight weight
With ALL POWER OFF grasp maintenance handle and turn it quickly with your thumb and fingers.
Figure 1–4. Maintenance handle and positions.
Do not manually operate the transfer switch until both power sources are disconnected: open both circuit breakers.
1. After deenergizing both power sources, open the enclosure door. Locate and the maintenance handle on the left side of the transfer switch frame.
See Figure 1–4.
2. Grasp the attached maintenance handle and turn it with thumb and fingers as shown to manually operate it. The maintenance handle turns the opposite direction of the weight. Move it up or down as shown to manually operate the transfer switch. It should operate smoothly without any binding. If it does not, check for shipping damage or construction debris.
3. Return the transfer switch to the Normal position.
Note: If Normal and Emergency connections are reversed this operation is also reversed.
Now continue to 2 – Voltage Checks on next page.
1---3
INSTALLATION
(continued)
observe these lights
Figure 1–5. Standard controls and indicators.
2 – Voltage Checks
First check nameplate on transfer switch; rated voltage must be the same as normal and emergency line voltages.
1
Close the normal source circuit breaker. The
Normal Transfer
Switch Position and the Normal
Source Accepted lights should come on.
Use extreme caution when using a meter to measure voltages in the following steps.
Do not touch power terminals; shock, burns, or death could result !
Perform steps 1 through 6 at the right. Observe the status lights. See Figure 1–5.
O
Black circle means light is on.
P
White circle means light is off.
* If necessary, adjust voltage regulator on the generator according to the manufacturer’s recommendations. The Automatic Transfer Switch will respond only to the rated voltage specified on the Transfer
Switch nameplate.
Also see page 4–1 for the HI–LOW voltage adjust setting in the controller. The LOW setting shifts all voltage settings down 4.2%; for example, 240 V to
230V.
Source Accepted
Normal
Emergency
2
Use an accurate voltmeter to check phase to phase and phase to neutral voltages present at the transfer switch normal source terminals.
3
Close the emergency source circuit breaker. (Start generator, if necessary.) The
Emergency
Source Accepted light should come on.
Source Accepted
Normal
Emergency
4
Use an accurate voltmeter to check phase to phase and phase to neutral voltages present at the transfer switch emergency source terminals.*
A B C
5
Use a phase rotation meter to check phase rotation of emergency source; it must be the same as the normal source.
6
Shut down the engine–generator, if applicable. The
Emergen-
cy Source Accepted light should go off. Then put the starting control selector switch (on the generator set) in the
automatic
position. Close enclosure door.
Source Accepted
Normal
Emergency
Now continue to 3 – Electrical Operation on next page.
1---4
INSTALLATION
(continued)
observe these lights press this button
Figure 1–6. Standard controls and indicators.
3 – Electrical Operation
First check nameplate on transfer switch; rated voltage must be the same as normal and emergency line voltages.
Close the transfer switch enclosure door and tighten the screws before you test electrical operation.
1
2
The normal source must be available and the generator must be ready to start.
Check that the
Normal Source
Accepted light is on.
Press and hold the
Transfer Test
button until the engine starts and runs. This should happen within 15 sec.
Perform steps 1 through 8 at the right. Observe the status lights. See Figure 1–6.
O
Black circle means light is on.
P
White circle means light is off.
NOTE: If Motor Load Transfer feature is activated, then transfer may not occur immediately after the respective time delays. Transfer will only occur when the phase relationship between sources is correct.
This completes the Functional Test of the ASCO
Series 300 Automatic Transfer Switch. Leave the engine–generator starting control in the automatic position.
4
5
6
7
8
The transfer switch should transfer to the Emergency position. The
Emergency
Transfer Switch Position light should come on and the
Normal
light should go off.
If the
transfer to emergency
delay is used the transfer should occurs after a time delay
(up to 5 minutes).
For immediate transfer press the
Bypass Time Delay button.
The transfer switch should transfer back to the Normal position. The
Normal Transfer
Switch Position light should come on and the
Emergency
light should go off.
If the
retransfer to normal delay
is used the retransfer should occur after a time delay
(up to 30 minutes).
For immediate retransfer press the
Bypass Time Delay button.
The
unloaded running delay
keeps the generator running for
5 minutes (cool–down period).
Then the generator should stop and the
Emergency Source
Accepted light should go off.
Source Accepted
Normal
Emergency
Transfer
Test
Source Accepted
Normal
Emergency
Transfer Switch
Position
Normal
Emergency
Bypass
Time Delay
Transfer Switch
Position
Normal
Emergency
Bypass
Time Delay
Source Accepted
Normal
Emergency
1---5
SECTION 2 SEQUENCE OF OPERATION
Transfer To Emergency
When the normal source voltage fails or the Transfer Test button is pressed, the
SE relay de-energizes and relay NR begins its timing cycle (1 or 3 seconds, momentary
normal source outage
Lights show position of transfer switch.
The sequence for load transfer to emergency source begins automatically when normal source voltage falls below the preset dropout point or when Transfer Test button is pressed.
An under voltage condition on any phase of the normal source is detected by the sensor.
Hold 15 sec. to start the engine generator and to transfer the load to emergency.
Press to cancel the active exercise period
(stops engine now or after cooldown) See page 5–1.
delay
). The NR relay is provided with a time delay on dropout to override momentary outages and prevent nuisance starting of the engine-driven generator. If the normal source voltage returns above the sensor dropout setting before the time delay expires, the NR relay timing cycle is reset to zero and relay SE energizes.
Lights show the sources accepted.
Light for built–in engine exercise timer:
Hold 5 sec. to set
20 min. engine exercise period immediately (engine starts) and weekly thereafter.
³ blinks rapidly when button is held 5 sec.
while being set
³ blinks slowly when button is released (set) and during 20 min.
exercise period.
³ stays on after engine stops (exerciser is enabled for weekly operation)
Retransfer to Normal
See page 5–1 for complete instructions
Figure 2–1. Membrane controls and indicator lights.
The sequence for load retransfer to the normal source automatically begins when the voltage sensor detects restoration of the normal source. The voltage level must rise above the preset pickup point on all phases before the sensor will accept the normal source.
If the normal source voltage does not return above the sensor dropout setting before the time delay expires, the
NR relay de-energizes and signals the engine-driven generator to start. At the same time, a voltage and frequency sensor begins monitoring the emergency source. The sensor will accept the emergency source only when both voltage and frequency reach preset pickup points. Usually about ten seconds elapse from dropout of the NR relay to acceptance by the sensor. This time span occurs because the engine-driven generator must crank, start, and run up to nominal pickup points. For this reason, if the
Transfer Test
button is pressed it must be held for 15 seconds. If the emergency source is available immediately, the sensor may accept it as soon as NR relay drops out.
When the normal source is accepted by the sensor, relay SE begins its timing cycle (adjustable 1 sec. to 30 min., retransfer to normal delay). For immediate retransfer press Bypass Time Delay button. SE relay is provided with a time delay on pickup to prevent immediate load retransfer to the normal source. The delay insures that the normal source has stabilized before reconnection of vital loads. If the normal source voltage falls below the present dropout point before the time delay expires, the timing cycle is reset to zero. If the emergency source fails for more than 4 seconds during the timing cycle, ER relay drops out and the load is immediately retransferred to the normal source, if that source is acceptable.
When the emergency source is accepted by the sensor, relay ER begins its timing cycle (transfer to emergency
delay
). ER relay is provided with an adjustable (0 to 5 minutes) time delay on pickup to delay transfer of the load to the emergency source. For immediate transfer press Bypass Time Delay button.
SE relay energizes and ER relay is dropped out. The
TS coil is energized, the transfer switch operates, and all switch contacts (mains, controls, auxiliaries) reverse position. The transfer switch is now supplying the load from the normal source again.
ER relay energizes, the TS coil is energized, the transfer switch operates, and all switch contacts (mains, controls, auxiliaries) reverse position. The transfer switch is now supplying the load from the emergency source.
The transfer switch will remain in the Emergency position until the normal source is restored. If the
Transfer Test
button is used, the transfer switch will remain on emergency until the retransfer to normal
delay
times out.
Upon retransfer to the normal source, NR relay begins its timing cycle (unloaded running delay, engine cooldown).
NR relay is provided with a 5 min. time delay on pickup to keep the engine running for a cool-down period.
NR relay energizes after the time delay and signals the engine-driven generator to shut down. All circuits are reset for any future normal source failure.
Activation of standard control features shown in Section 5 will alter the sequence of operation and introduce additional time delays during transfer operations.
2---1
SECTION 3 TESTING & SERVICE
PREVENTIVE MAINTENANCE
S
Check all cable connections & retighten them.
Torque to values shown on transfer switch label.
For high reliability and long life for the ATS:
Operate the switch at least once a month. Perform this
4–step Electrical Operation Test (test with load transfer).
Replacement parts. When ordering parts provide the
Serial and Catalog Nos. from the transfer switch nameplate. Contact ASI. In the US call
1–800–800–ASCO (2726)).
DISCONNECTING THE CONTROLLER
The harness disconnect plugs are furnished for repair purposes only and should not have to be unplugged.
If the controller must be isolated, follow these steps carefully.
Transfer Switch Test
1.
Press and hold the door-mounted
Transfer Test button until the engine starts and runs. This should happen within 15 seconds.
2.
The transfer switch will operate to the Emergency position. If the Transfer To Emergency Delay is used, the transfer will occur after a time delay (up to 5 minutes). For immediate transfer press
Bypass
Time Delay button.
3.
The Transfer Switch will operate back to the Normal position after the Retransfer To Normal Delay (up to
30 minutes). For immediate retransfer press
Bypass Time Delay button.
4.
Unloaded Running (Engine Cooldown) Delay allows engine to run unloaded for 5 minutes.
Disconnecting the Plugs
1. Observe the position of the transfer switch.
a. If the transfer switch is in the Normal position, place standby engine starting control in the off position. Then open the emergency source circuit breaker.
b. If the transfer switch is in the Emergency position, open the normal source circuit breaker. Place the engine starting control in the test or run position.
2. Separate the quick disconnect plugs by squeezing the latches. Do not pull on the harness wires.
3. Label, remove, and tape the signal wires connected to the engine start terminals on the transfer switch:
TB1 and TB3, or TB1 and TB2.
Checklist for Yearly Inspection
Hazardous voltage capable of causing shock, burns, or death is used in this switch.
Deenergize both Normal & Emergency power sources before performing inspections!
S
Clean the enclosure. De–energize all sources, then brush and vacuum away any excessive dust accumulation. Remove moisture with a clean cloth.
S
Check the transfer switch contacts. De-energize all sources, then remove the transfer switch barriers and check contact condition. The non–replaceable main contacts are designed to last the life of the transfer switch. Reinstall the barriers carefully.
S
Maintain transfer switch lubrication. Under normal operating conditions no further lubricating is required. Renew factory lubrication if the switch is subjected to severe dust or abnormal operating conditions or if TS coil is replaced. Order lubricant
625550–001 (Castrol EndurexR 4000 lubricant).
3---1
Reconnecting the Plugs
1. Observe the position of the transfer switch.
a. If the transfer switch is in the Normal position, be sure that the standby engine starting control is still in the off position. The emergency source circuit breaker still should be open.
b. If the transfer switch is in the Emergency position, normal source circuit breaker still should be open.
2. Reconnect the signal wires connected to the appropriate engine start terminals on the transfer switch. See Section 1, Engine Starting Contacts.
3. The harness plugs and sockets are keyed.
Carefully align the plugs with the sockets and press straight in until both latches click.
4. Restore the opposite source as follows: a. If the transfer switch is in the Normal position, place the standby engine starting control in the
automatic
position. Then close the emergency source circuit breaker.
b. If the transfer switch is in the Emergency position, close the normal source circuit breaker. The load will be automatically retransferred to the normal source after the Retransfer to Normal Delay. For immediate retransfer, press Bypass Time Delay button. Place the engine starting control in the
automatic
position.
TESTING & SERVICE
(continued)
MANUAL LOAD TRANSFER
This procedure will manually transfer the load if the controller is disconnected.
1. Open normal and emergency source circuit breakers.
2. Use the maintenance handle to manually operate transfer switch to the opposite source. See page
1–3, Manual Operation Test.
Do not manually operate the transfer switch until both power sources are disconnected: open both circuit breakers.
3. If the transfer switch is in the Emergency position manually start the engine generator and then close the emergency source circuit breaker.
TROUBLE-SHOOTING
Note the control features that are activated or furnished on the switch and review their operation.
Refer to Section 5, Control Features.
Gen-Set does not start when the
Transfer Test button is pressed and held for 15 seconds or when the normal source fails.
Transfer switch does not transfer the load to emergency source after the gen-set starts.
Transfer switch does not transfer the load to normal source when normal returns or when
Transfer Test button is released.
Gen-Set does not stop after load retransfer to the normal source.
Proceed with care! The automatic transfer switch is energized.
Table 3-1. Trouble-Shooting Checks.
CHECK IN NUMERICAL SEQUENCE
1 OPERATION
Hold the
Transfer Test button
15 sec. or the outage must be long enough to allow for the 1 or 3 sec.
Momentary Normal
Source Outage Delay plus engine cranking and starting time.
2 GEN-SET
Starting control must be in automatic position. Batteries must be charged and connected. Check wiring to engine starting contacts.
Wait for
Transfer to Emergen-
cy Delay (0 to 5 min.) to time out. For immediate transfer, press the
Bypass Time Delay
button. If Motor Load Transfer is active, wait for inphase condition (see below).
Generator output circuit breaker must be closed.
Generator frequency must be at least 57 Hz.
3 VOLTAGE
—
Voltmeter should read at least
90% of nominal phase to phase voltage between transfer switch terminals EA and EC (or EL1 and EL2 for 2 pole switches). *
* These are factory settings.
Wait for
Retransfer to Normal
Delay (1 sec. to 30 min.) to time out. For immediate re– transfer, press
Bypass Time
Delay button. If Motor Load
Transfer is active, wait for inphase condition (see below).
Wait for the 5 minute
Unloaded Running Delay to time out.
—
Starting control must be in automatic position.
Voltmeter should read at least
90% of nominal phase to phase voltage between transfer switch terminals NB and NC, NC and NA, and NA and NB (or NL1 and NL2 for 2 pole switches).
— could result !
Trouble-Shooting the Motor Load Transfer Feature (refer to page 5–4)
Use extreme caution when using a meter to measure voltages in the following steps. Do not touch power terminals; shock, burns, or death
1. Connect a voltmeter (set for twice system phase–to–phase voltage) between Transfer Switch terminals NA and EA.
2. Manually start generator. Voltmeter needle should sweep back and forth at a regular rate between 0 and about twice system voltage.
3. Press and hold Transfer Test button. The load should transfer to emergency source when meter needle is near 0 volts. If transfer does not occur,
Motor Load Transfer feature is not operating.
4. Release the Transfer Test button. The load should retransfer back to the normal source after the
Retransfer to Normal Delay
, if used. The retransfer should occur when the needle is near 0 volts. If retransfer does not occur after the time delay, the
Motor Load Transfer feature is not operating.
5. For immediate retransfer, press the Bypass Time
Delay
button. Then disconnect the voltmeter.
If the problem is isolated to circuits on the controller or the transfer switch, call your local ASCO Power Technologies sales office, representative, or ASI. In the United States, call 1–800–800–2726. Furnish the Serial No., Bill of
Material (BOM) No., and Catalog No. from transfer switch nameplate.
3---2
SECTION 4 ADJUSTMENTS
Time Delay Adjustment
Standard time delays are set to customer specifications
(if none specified, standard factory settings are used).
To change a setting, follow procedure on page 4-2. Use
Table 4-1 as a guide to time delay values and their corresponding adjustment DIP switch or potentiometer.
Table 4-1. Time Delay Settings
DESCRIPTION
Override Momentary
Normal Source Outages
LABELS
TIMER
N/E
FACTORY
SETTING
0 minutes
(full ccw)
ADJUSTMENT
RANGE
1 second
3 seconds
0 to 5 minutes
S3 DIP
SWITCH
Actuator 1 on
Actuator 1 off
— —
ADJUSTMENT
POTENTIOMETER
—
Override Momentary
Emergency S. Outages
— 4 seconds non-adjustable — — —
Unloaded Running
(Engine Cooldown)
TIMER 30 minutes
E/N (full cw)
— 5 minutes
1 second to
30 minutes non-adjustable
—
—
—
— —
Sensor Adjustments
Voltage and frequency sensor pickup and dropout points are set to customer specifications (if none specified, standard factory settings are used). To change a setting, follow procedure on page 4–2. Use Tables 4-2 and 4–3 for settings and corresponding DIP switch actuators.
NOTICE
Any change in these settings may affect the normal operation of the automatic transfer switch. This change could allow the load circuits to remain connected to a low voltage source.
Table 4-2. Voltage and Frequency Settings. (
Shaded DIP switches are standard factory settings).
LABELS SETTING
% of nominal
FACT. SET ADJ RANGE
S1 DIP
SWITCH
95 % * Actuator 3 off
90 %
Normal Source Voltage
Emergency Source
Voltage
Emergency Source eque cy
– –
– –
– –
– –
60 / 50
Hz
Pickup
Dropout
Pickup
Dropout
90 %
75 %
95 %
85 %
90 % *
85 %
80 %
70 % non-adjustable non-adjustable non-adjustable non-adjustable
60 Hz
50 Hz
3 phase
Actuator 3 on
Actuator 1 off
Actuator 2 off
Actuator 1 on
Actuator 2 off
Actuator 1 off
Actuator 2 on
Actuator 1 on
Actuator 2 on
– –
– –
Actuator 4 off
Actuator 4 on
Actuator 6 off
1 phase Actuator 6 on
* If dropout voltage is set to 90%, the pickup voltage must be set to 95%.
Table 4-3. Transformer Voltage Adjust.
(Low setting shifts all voltage settings down 4.2%; for example, 240 V to 230 V, or 480 V to 460 V)
DESCRIPTION LABELS
LOW /
HI
FACTORY SETTING ADJUSTMENT
LOW
HI
S3 DIP SWITCH
Actuator 2 off
Actuator 2 on
4---1
ADJUSTMENTS
(continued)
NOTICE
Do not make any setting changes while the controller is energized.
How to Change a Setting
1. Prevent the transfer switch from operating by disconnecting one source first, then the other, as follows: a.
If the transfer switch is in the Normal position, open the emergency source circuit breaker.
Turn the engine starting control to off. Then open the normal source circuit breaker.
b.
If the transfer switch is in the Emergency position, open the normal source circuit breaker.
Turn engine starting control to test or run. Then open the emergency source circuit breaker.
2. Disconnect both harness plugs from controller by squeezing the latches. Do not pull on the wires.
3. Remove cover from the controller by releasing latch on right side with your thumb. See Figure 4-1.
cover hook on left side
Figure 4-1. Controller cover latch.
thumb latch
9 volt alkaline battery
4. Locate the appropriate adjustment potentiometer or
DIP switch for the setting that you want to change.
Refer to Table 4-1 and Table 4–2 on page 4-1 and
Figure 4-2, Figure 4–3, Figure 4–4 on page 4–2.
5. Use a small screwdriver to turn the potentiometer clockwise to increase the time delay or counterclockwise to decrease it. See Figure 4-3.
6. Use a ball-point pen (or similar pointed tool) to slide the switch actuators left or right so they match the illustration next to the setting (left = off, right = on). Recheck the setting. See Figure 4-4.
7. Install the cover on the controller by hooking it on the left side and latching the right side.
8. Reconnect both harness plugs to the controller by aligning and pressing straight in until latches click.
harness plugs
S3 DIP switch
S1 DIP switch
S2 DIP switch
J5 battery on/off jumper
P1 to normal time delay
P2 emergency time delay
Figure 4-2. Location of potentiometers.
Close the transfer switch enclosure door.
9. Close the enclosure door, then restore both sources: a.
If the transfer switch is in the Normal position first close the normal source circuit breaker, then close the emergency source circuit breaker.
b.
If the transfer switch is in the Emergency position, close the normal source circuit breaker. The load will be automatically retransferred to the normal source. Then close the emergency source circuit breaker.
10. Turn the engine starting control to automatic.
4---2 clockwise to increase
P1 or P2 potentiometer counterclockwise to decrease
Figure 4-3. Changing time delay potentiometers.
DIP switches
SW1
SW2
SW3 actuator
(8 on each DIP switch) off on
Figure 4-4. Setting DIP switch actuators.
SECTION 5 CONTROL FEATURES – ENGINE EXERCISERS
These timers periodically exercise the emergency engine-generator plant. They can be set to exercise with or without load transfer, or they can be completely disabled. The engine-generator should be exercised under load once a week for a minimum time period of 20 minutes, or follow the recommendations of the engine-generator set manufacturer. Refer to page 4–2 for location of DIP switches, battery (provided), and jumper block in the controller.
BUILT–IN ENGINE EXERCISER
The engine exerciser included in ASCO Series 300
Automatic Transfer Switches provides a once a week
20–minute exercise period. It occurs immediately when the
Set Engine Exerciser push button is pressed (and held for at least 5 seconds), and then at the same time weekly thereafter. A 9 volt alkaline battery (Duracell
MN1604, Everready 522, or Panasonic 6AM6) is furnished and installed in the controller to maintain the setting. The battery jumper block must be shifted to the
ON position. See Figure 4–2 on page 4–2.
Fill in day and time set. Week Day ______ Time _______.
FUNCTION
Std. Timer
Enabled
Std. Timer
Disabled
Exercise without
Load
Exercise with Load
DIP Switch Settings
S1 DIP
SWITCH
Actuator
7 on
Actuator
7 off
Actuator
8 off
Actuator
8 on
S2 DIP
SWITCH
Actuator
5 on
Actuator
5 on
Shaded DIP switches are standard factory settings.
status light
Press to cancel an active exercise period (stops generator).
If Exercise with Load is set, retransfers load to
Normal, then stops generator after min. cooldown.
Press and hold for 5 sec. or until status light blinks rapidly to set exercise period immediately and every week hereafter (generator starts).
Figure 5-1. Operator panel pushbuttons and light.
If
Exerciser with Load is set, transfers load to Emergency.
Select below either Exercise without Load or Exercise with Load according to the setting of DIP switch S1, actuator 8. The load transfers from the Normal source to Emergency source (generator) and back again if Exercise with Load is selected.
Exercise without Load, DIP Switch S1, Actuator 8 off
How to Set Built–In Timer
2
3
4
Step
1
Push Button
Set Engine
Exerciser
hold 5 sec.
release press
Bypass
Time Delay
—
Function
Status Light
blinks rapidly
OPOPOP set exercise period blinks slowly
OPPOPP exercise period now active
O stays on cancel active exercise period
O stays on generator off
Explanation
Exercise the generator now and every week at this time hereafter.
Generator starts and runs.
Generator stops.
Exerciser enabled; repeats every 7 days.
Exercise with Load, DIP Switch S1, Actuator 8 on
How to Set Built–In Timer
Step Function Explanation
1
2
3
4
Push Button
Set Engine
Exerciser
hold 5 sec.
release press
Bypass
Time Delay
—
Status Light
blinks rapidly
OPOPOP blinks slowly
OPPOPP blinks slowly
OPPOPP
O stays on set exercise period exercise period now active cancel active exercise period generator off
Exercise the generator now and every week at this time hereafter.
Generator starts and runs; the load transfers to Emergency.
The load retransfers to Normal; then generator runs for 5 minute cooldown
( light blinks slowly during cooldown ).
Exerciser enabled; repeats every 7 days.
NOTE: Every time SET ENGINE EXERCISER push button is pressed (held 5 seconds) the exercise period is changed.
5---1
2–line display
3 buttons
CONTROL FEATURES (continued)
Optional Accessory 11BG – SOURCE AVAILABILITY SIGNAL
& PROGRAMMABLE ENGINE EXERCISER MODULE
connections for source availability signal contacts
Figure 5–2. Accessory 11BG module (mounted behind operator interface and connected to the controller) includes source availability signal contacts and a programmable engine exerciser.
Source Availability Signal Contacts
The module provides one Form C contact each for the normal and emergency sources signal the acceptability of the source as sensed by the controller. The signal contacts operate in conjunction with the Source
Accepted
lights on the operator interface. Field wiring terminals are provided as shown in Figure 5–3 and the wiring diagram.
Contact ratings:
2 amps @ 30 Vdc, 0.5 amp. @ 125 Vac resistive
SOURCE
AVAILABILITY SIGNALS
2 AMPS @ 30 VDC, resistive
0.5 AMP @ 125 VAC, resistive contacts shown de–energized
Figure 5–3. Source availability signal contacts.
Programmable Engine Exerciser
The module includes a programmable engine exerciser that provides for weekly or biweekly operation. This optional exercise timer may have to be turned on
(enabled) by setting the S1 DIP switch actuator 7 to off, and S2 DIP switch actuator 5 to off. A backup battery in the controller (see page 4–2 and page 5–3) must be turned on to maintain the settings and to allow programming with the normal and emergency power turned off (page 5–1).
The programmable engine exerciser incorporates a 7 day or 14 day time base. Proper controller settings must be made to determine whether or not the test will be done with or without load transfer (S1 DIP switch actuator 8).
See next page for instructions on setting the timer.
5---2
DIP Switch Settings in the Controller
FUNCTION
Opt. Timer
Enabled
Opt. Timer
Disabled
Exercise without
Load
Exercise with
Load
(see page 4–2)
S1 DIP
SWITCH
Actuator
7 off
Actuator
7 off
Actuator
8 off
Actuator
8 on
S2 DIP
SWITCH
Actuator
5 off
Actuator
5 on
Shaded DIP switches are standard factory settings.
CONTROL FEATURES (continued)
How to Set Optional Programmable Engine Exerciser
(part of Acc. 11BG module)
Hazardous voltage capable of causing shock, burns, or death is used in this transfer switch.
Deenergize both Normal and Emergency power sources before programming the exerciser.
Navigating the Menu
Use the UP and DOWN arrow keys to move through the displays.
Changing the Parameters
Use the UP and DOWN arrow keys to move though the displays to the parameter to be changed.
Push the ENTER key to start the editing process. The first parameter will flash. Use the UP and DOWN arrow keys to adjust the parameter to the desired value and press the ENTER key to save the value. The next parameter will now flash. Repeat the process until each parameter is properly configured.
Fast/Slow Adjust
Daylight Saving
Time Adjust
Date
Time
Run TIme
Start TIme
Engine Exerciser
NOTE: When choosing bi–weekly operation, the exerciser will always run on the week designated “(1)” on the date display.
Run Time Display
The Run Time Display shows the run time for the engine exerciser. The default setting from the factory is 30 min.
Time Display
The Time Display shows the present system time. The format is “hours:minutes:seconds”.
NOTE: During total power outages, power to the accessory is maintained by a battery in the Controller
(see page 4–2). Be sure that the 9–volt alkaline battery is fresh and enabled (jumper in ON position) so that the time and date settings are not lost.
Date Display
The Date Display shows the present system date. The format is “day of week (week) month/day of month/year”.
NOTE: Week is either week 1 or week 2. This is used in conjunction with the bi–weekly timer.
Daylight Savings Time Adjust Display
This display shows whether the automatic daylight saving time adjustment is active. The factory default is
“NO”. If enabled, the unit will automatically adjust for daylight saving time at 2 AM on Sunday as follows:
Part No. 629857–001*
Start
629857–002* first Sunday in April 2nd Sunday in March
Stop last Sunday in Oct first Sunday in Nov
* Part no. on back of circuit board. New DST starts in 2007.
Engine Exerciser Display
The Engine Exerciser Display shows the status of the engine exerciser. When the unit is shipped from the factory the programmable engine exerciser is
“Disabled” and must be set to “Enabled” by the customer. When the engine exerciser is running, this display will count down the remaining time until the end of the exercise period.
Start Time Display
The Start Time Display shows the engine exerciser start time. There are four parameters that determine the start time: weekly (”Every”) or bi–weekly (”Alt”) operation day of week (”Sun” through “Sat”) start hour (0 through 23) start minutes (0 through 59)
For example, if the user wants the exerciser to run every other Saturday at 3 PM, the proper configuration would be:
“Alt Sat @ 15:00”
Fast / Slow Adjust Display
This display shows the automatic fast/slow adjustment value. The factory default is 0. This feature can be used to trim a clock that runs fast or slow. For example, if your clock runs 10 seconds slow per week, change the fast/slow adjust value to “+10” and the unit will automatically add 10 seconds to the clock every week.
NOTE: Adjustments are made Sunday morning at 2
AM. If you want your exerciser period to start at 2 AM on Sunday, you cannot use this feature and the adjustment must be set to 0.
Date exerciser was set ___________________________
Fill in your settings for future reference
Weekly or Bi–weekly Day of Week
Every = weekly
Alt = bi–weekly
Sun through Sat
Start Time
0 – 23 hour
0 – 59 minute
Run Time
0 – 23 hour
0 – 59 minute
30 min. is default setting
5---3
CONTROL FEATURES (continued)
INPHASE MONITOR
FOR MOTOR LOAD TRANSFER
LOAD DISCONNECT FEATURE
Connect external circuits to the terminals indicated on the Wiring Diagram provided with the ATS.
Inphase monitoring logic controls transfer and retransfer of motor loads, so that inrush currents do not exceed normal starting currents. It avoids nuisance tripping of circuit breakers and mechanical damage to motor couplings.
The Motor Load Transfer feature is built into the controller. DIP switch S1 (actuator 5) activates this feature: right = ON, left = OFF.
The double throw (Form C) contact is rated for
28 VDC or 120 VAC (5 amperes resistive). The contact operates prior to a selectable 0, 3, 10, or 20 second delay before transfer of the Automatic Transfer Switch.
The contact resets either immediately following transfer or after the same delay as set for pre–signal before transfer.
FUNCTION
enable disable
S1 DIP SWITCH
Actuator 5 on
Actuator 5 off
Time delay between the load disconnect control signal and initiation of transfer is set on the controller with
DIP switch S2 (actuators 6, 7, 8) as shown below:
Shaded DIP switches are standard factory settings.
Note
If the Motor Load Transfer feature is enabled, it will be activated following the Load Disconnect
Feature Delay Before Transfer delay.
LD TDBT
0 (disable)
3 seconds
10 seconds
20 seconds
Delay Before Transfer
S2 DIP SWITCH
Actuator 7 on
Actuator 8 on
Actuator 7 on
Actuator 8 off
Actuator 7 off
Actuator 8 on
Actuator 7 off
Actuator 8 off
Shaded DIP switches are standard factory settings.
LD TDAT
enable
Delay After Transfer*
S2 DIP SWITCH
Actuator 6 on disable Actuator 6 off
*Enabling the Delay After Transfer will cause the control signal to reset after the same delay as set for the
Delay Before Transfer.
REMOTE CONTROL FEATURES
These remote control features require a customer–supplied normally closed contact suitable for a 5 V dc low energy circuit. Refer to the Wiring Diagram provided with the ATS. Activate appropriate DIP switch S2 actuators below.
Remote Test (terminals CP6–7)
RTSW
disable
S2 DIP SWITCH
Actuator 3 on enable Actuator 3 off
Remote Transfer to Emergency (CP8–9)
RT /E
disable
S2 DIP SWITCH
Actuator 2 on enable Actuator 2 off
Bypass Transfer Time Delay (CP12–13)
TD E/N BYP.
disable
S2 DIP SWITCH
Actuator 1 on enable Actuator 1 off
Inhibit Transfer to Emergency (CP10–11)
N/E INHIB.
disable
S2 DIP SWITCH
Actuator 4 on enable Actuator 4 off
5---4
CONTROL FEATURES (continued)
OPTIONAL STRIP HEATER (Accessory 44)
Accessory 44 Strip Heater is designed to keep ambient temperatures within the Automatic Transfer Switch enclosure at acceptable levels. This accessory consists of a mounting bracket with strip heater, thermostat, and terminal block. A transformer with fuses is included when the power for the assembly is derived from voltages above 120 V ac. The 120 V ac customer powered assembly does not include a transformer. This optional accessory is available factory installed or in kit form.
Turn the thermostat’s dial to required setting as shown.
thermostat dial turn counterclockwise to lower temperature turn clockwise to raise temperature
Figure 5–4. Thermostat.
Controls
Description
Programmable Engine Exerciser
& Source Availability Contacts
Serial Communication Module
Accessory
AVAILABLE KITS
Strip Heater – Accessory 44
Kit Description Accessory
11BG
72A
K629830
K601110
120 volt customer supplied voltage
(without transformer)
208 – 480 volt
ATS derived voltage
(with transformer)
380 volt
ATS derived voltage
(with transformer)
550 – 600 volt
ATS derived voltage
(with transformer)
44A
44G
44G
44G
Kit
K613127–001
K613127–002
K613127
K613127–003
5---5
A
accessories, 5–2, 5–5 auxiliary circuits, 1–2
B
battery, 4–2, 5–1 buttons, push, 3–1 bypass time delay, 1–5, 2–1, 3–1
C
cable lugs, preparation, 1–1 catalog number, cover cleaning, 3–1 connections engine control contact, 1–2 line, 1–1 contacts auxiliary, 1–2 engine control, 1–2 main, 1–3, 3–1 source availability signal, 5–2 control features, 5–1 load disconnect, 5–4 motor load transfer, 5–4 plant exerciser, 5–1, 5–2, 5–3 controller, 4–1, 4–2 codes, cover cover removal, 4–2 disconnecting, 3–1 time delay potentiometers, 4–2
D
DIP Switches, 4–1, 4–2, 5–1, 5–2, 5–4
E
electrical operation, 1–5 engine exerciser, 5–1, 5–2, 5–3 engine starting contacts, 1–2
F
features, see control features frequency, pickup and dropout, 4–1 functional test, 1–3, 1–4, 1–5
G
ground, controller, 1–1
Printed in U.S.A.
INDEX
H
handle, maintenance, 1–3 warning, 1–3 harness, 1–2 disconnect plugs, 3–1
HELP
800–800–2726 (ASCO) [email protected]
parts, 3–1
P
problem, 3–2 programmable engine exerciser, 5–2,
5–3
I
inphase monitor, 5–4 inspection, 3–1 installation, 1–1
L
labels, engine starting contacts, 1–2 inputs / outputs, 1–2 rating, cover lights, 1–4, 5–1 load disconnect feature, 5–4 lubrication, 3–1
M
maintenance, preventive, 3–1 manual load transfer, 3–2 warning, 3–2 manual operation, 1–3 illustration of, 1–3 warning, 1–3 motor load transfer feature, 5–4
R
rating label, cover remote control features, 5–4 bypass transfer time delay, 5–4 inhibit transfer to emergency, 5–4 remote test, 5–4 remote transfer to emergency, 5–4 replacement parts, 3–1
S
service, call 800–800–2726 (ASCO) set engine exerciser, 5–1, 5–2, 5–3 settings changing, 4–1 factory, 4–1 frequency, 4–1 phase, 4–1 time delay, 4–1 voltage, 4–1 source accepted lights, 1–4, 1–5
N
nameplate, cover
O
operation electrical, 1–5 manual, 1–3 illustration of, 1–3 warning, 1–3 sequence of, 2–1 optional accessories programmable engine exerciser
& source availability signal contacts, 5–2, 5–3 serial communication module, 5–5 strip heater, 5–5
T
terminal block, 1–2 test, functional, 1–3, 1–4, 1–5 time delay adjustment, 4–1 gen–set cooldown, 4–1 how to change, 4–2 override momentary outages, 4–1 settings, 4–1 transfer to emergency, 4–1 transfer to normal, 4–1 timer (plant exerciser), how to set,
5–1, 5–2, 5–3 transfer switch position lights, 1–4,
1–5 transfer test, 1–5, 3–1 trouble–shooting, 3–2
V
voltage, phase, 4–1 voltage, pickup and dropout settings,
4–1
Copyright ASCO Power Technologies, L.P. 2011
Downloaden
Advertentie