Quincy Compressor Unloader Valve Kit Instructions
PDF
Documento
Pubblicità
Pubblicità
UNLOADER VALVE KIT INSTALLATION DO NOT ALTER ! These instructions are provided to assist a qualified technician to rebuild a malfunctioning unloader valve. Refer to the instruction manual provided with the compressor unit before attempting to service any component on the unit. Follow all safety precautions as outlined in the instruction manual. Step 1 load adjustment screw assembly Make a note of how the control tubing is connected to the unloader valve to facilitate re-assembly. Do not alter the load adjustment screw assembly on the valve! Tampering with this assembly will affect the control settings of the valve. Step 2 Disconnect the tubing from the valve with correctly sized wrenches and remove the valve from the unit. Step 3 Remove 4 screws from the valve housing. Separate the load adjustment screw housing from the valve. Clean all surfaces with a non-flammable solvent. Replace the round diaphragm, metal plunger, screen and small o-ring (bottom of housing). Re-assemble with 4 screws and tighten evenly. Step 4 Remove the large hex head fitting on the bottom of the valve (labeled “OUT”). Clean all surfaces with a non-flammable solvent. Replace the poppet, spring and o-ring (see photo for proper orientation of components). Screw the large hex head fitting back into the valve and tighten. Step 5 Remove the other large hex head fitting on the side or top of the valve (labeled “IN”). Clean all surfaces with a nonflammable solvent. Replace the poppet (w/ recess), spring and o-ring (see photo for proper orientation of components). Note that the poppet must fit over the end of the piston shaft inside the valve, the spring must must slide over the smaller diameter of the poppet, and the locating knob of the large hex head fitting. Screw the large hex head fitting back into the valve and tighten. Step 6 Replace the existing muffler (located on the side of the valve) with the new muffler included in the kit. Tighten securely. Step 7 Remove old thread sealant from all pipe fittings. Inspect and replace any damaged fittings. Apply fresh pipe compound to the threads of the valve assembly. Re-install the valve on the compressor unit and connect all tubing. Step 8 Refer to the instruction manual provided with the unit to start the compressor and check for proper operation of the unloader valve and the relief valve. plunger diaphragm o-ring screen poppet screws spring o-ring relief valve poppet (w/ recess) spring o-ring locating knob muffler typical photos / variations of valves exist 112711UVKI, 5/05 ">
/
Scarica
Solo un promemoria. Puoi visualizzare il documento qui. Ma soprattutto, la nostra IA l''ha già letto. Può spiegare cose complesse in termini semplici, rispondere alle tue domande in qualsiasi lingua e aiutarti a navigare rapidamente anche nei documenti più lunghi o complicati.
Pubblicità