Easy Heat ADKS Roof & Gutter De-Icing Kit Owner's Manual
Annons
Annons
1
....
Tel: +44 (0)191 490 1547
Fax: +44 (0)191 477 5371
Email: [email protected]
Website: www.heattracing.co.uk
www.thorneanderrick.co.uk
Roof & Gutter De-Icing Kit
Model ADKS Owner's Manual
Trousse de degivrage de toits et de gouttieres
Guide de I'utilisateur mod le ADKS
Kit descongelante para techos y canalones
Model° ADKS guia del usuario
Linn
ADKS Owner's Manual 1
2
ENGLISH, I - 23
FRENCH, 25 - 46
SPANISH, 49 - 69
ADKS Owner's Manual
TABLE OF CONTENTS
L Important Safety Information
II. Pre-Installation Planning & Information
Purpose of this Product
Who Should Install the Cable
When to Install the Cable
Determining What Areas Need Cable
Checking Cable Length
III. Roof, Gutter & Downspout Requirements
IV. Electrical Requirements
V. Materials Needed for Installation
ADIOS Kit Materials
Additional Tools & Materials Required
I. Installing the Cable
Planning Your Cable Arrangement
6 — 7
7
7
7
8 — IS
Proper Handling & Care of the Cable
Testing the Cable
Preparing Your Roof. Gutters & Downspouts
Attaching the Cable
I
I 1
I I
I I
Final Installation Steps
VII. Use & Maintenance of the Cable
Pre-Season Checks
Turning the Cable On and Off
12 — I 5
15
16 — 17
16
Checking Operation and Condition of Cable
Resetting Circuit Breaker/Replacing Blown Fuse
Off-Season Instructions
I 6
I 7
I 7
I 7
I 7 VIII. Removing the Cable
IX. Limited Warranty
18
X. Appendix A: Basic Information About
Ice Dam Formation and Prevention 19
XI. Appendix B: Estimating the Cable Length You Need ...20 — 23
5
5
5
6
4
5
5
ADKS Owner's Manual 3 rn
I. IMPORTANT SAFETY INFORMATION
Improper installation, use. operation or mainterlanCe Of this product may result in injury or death from electric shock or fire. It may also result in property damage from ice darns. Read and follow the Instructions in this manual. tf you have questions. call toll-free
800/562-6587 for assistance. Give this manual to anyone who will be using this cable, including future isersihomeowners.
To reduce the risk of ice darn formation or injury or death from electric shock or fire:
• Follow a electrical requirements for using this product.
See Electrical Requirements section on pagim. 6- 7 for details. In summary. these requirements include using a 120 volt NC outdoor receptacle that meets all of the following:
Is grounded.
Is ground fault protected.
Is on a circuit that has an appropriate current (amp) rating.
Has an on off switch that has an indicator light (pilot light),
Is protected from the weather.
Is within 6 beet of the cable starring point on the root.
Easy Heat recommends that you do nor use an extension card
with this cable.
If you are unsure whether your electrical receptacle meets these requirements, contact your local electrical inspector or a licensed electrician.
• Avoid overheating the cable. For example!
— Do not allow the heated portion of an operating cable to touch, cross over or overlap itself or to touch another deicing cable.
— Do not operate the cable in warm weather (above 50°F or I 0°C),
— Do not install cable where it might be warmed by sources of heat, such as an exhaust vent or chimney.
• Do not alter or modify the cable in any way.
For example! do not cut or splice the cable, or paint or expose it to chemicals, such as glue, caulk or adhesive.
• keep all combustible materials away from the cable, such as leaves, pine needles, seeds or windblown trash. Do not attach the cable to a combustible material, such as any wooden parts of the eave.
• It using gutter guards, ensure that there is at !east OH clearance between the gutter guard and cables.
• Do not use a cable that is damaged or has deteriorated.
Dispose of it Signs of damage include: cuts, brittleness, charring, cracking, discolored surfaces, or bare wires,
• Use this product only as intended and described in this manual.
• To prevent creases, it should be assured that the minimum bending radius is 1 inch.
4
ADKS Owner's Manual
II. PRE-INSTALLATION PLANNING & INFORMATION
A. PURPOSE OF THIS PRODUCT
This deicing cable is designed to prevent ice buildup, known as ice dams. from forming on roofs and in gutters and downspouts. When properly installed and operated, this product creates a path for melted snow or ice
("melt water") to drain from the roof to the ground.
Do not install this product to remove Ice darns that have already formed or to clear the roof of ice and snow,
Do not use this deicing cable for any other purposes. such as to melt snow on sidewalks or to protect pipes from freerting. Easy Heat offers other products designed for these purposes. See your local dealer or call Easy
Heat toll-free at 800/S62-6587,
Improved ventilation (cooling) of the space underneath the roof surface, if possible, can also reduce the likelihood of ice dam formation. To avoid ice dams, the entire roof surface should be kept at the same tern peratu re as the outside air. Consult a professional roofer for expert advice on roof venting., refer to Appendix A on page 19.
B. WHO SHOULD INSTALL THE CABLE
Although the installation of the cable does not require special skills, you may wish to hire a professional for a variety of reasons. For example. if you are uncertain about any of the Electrical Regoirernents on pages 6 - 7. or if you are not comfortable working on a ladder or on the roof. you may need to hire a professional, such as a licensed electrician.
Visit easyheat.corn for more information.
C. WHEN TO INSTALL THE CABLE
The deicing cable may be installed when; a
There is no ice or snow on the roof
Do not use this cable to melt snow and ice that has already formed on your roof or in your gutters or downspouts. as you would not be able to attach the cable properly with the dips. Additionally, this cable was not designed to melt snow: rather, it simply provides a path for snow or Ice that has already melted {meltwater} to flow to the ground.
To solve ice dam problems when snow and ice are on the roof, contact a professional roofer for expert advice.
To prevent future ice dams, you can Install the deicing cable once the ice and snow have melted and before the next winter season.
The temperature allows for rifting of the shingle tabs
In general, the temperature should be between 32' and 80°F
(0°C and 27DC). Below 32°F (0°C). shingles are brittle and may break off when lifted to install the cable clips, Above 80'F
(27°C). shingles may be warm and may tear when liked to install the cable clips.
D. DETERMINING WHAT AREAS NEED CABLE
In general the cable should be installed on roof areas where ice dams are likely to form. Depending on the exposure to the sun, prevailing wind direction and roof shape, the susceptible area may be the entire roof edge, or it may he specific areas, such as underneath skylights. in roof valleys or around dormers, Ice dams can be identified at points where snow has melted on an upper roof surface, but the area below is still snow and/or ice covered. Icicles are also a sign of ice dams.
Cable should also be installed in any nearby gutters, downspouts and/or valleys
50 that a clear path is provided for melt water to drain.
If your previous ice darn problems have only included ice forming in the gutter and there are rio ice darn problems on the roof. install the cable in the gutter and downspouts only.
See Planning Your Cade Arrangement on pages B - 11 for details on the proper layout of the cable and Apperid+.x rit on page 19 for more information about ice dam formation and prevention.
E. CHECKING CABLE LENGTH
After you have determined what areas need cable (see above), see
Appendix A on pages 20 - 23 to check your estimation of the length of cable that you need.
ADKS Owner's Manual
5
III. ROOF, GUTTER & DOWNSPOUT
REQUIREMENTS
This kit is only designed for use on:
• inclined roofs. An inclined roof is acre where the water is expected to flow off the roof edge,
* roofs with noncombustible tab shingles (such as asphalt shingles) that meet national building codes.
- metal or plastic gutterdownspouts.
•
3
Use of this kit on any other type of roof, gutter or downspout increases the risk of ice darn formation or injury or death from electric shock or fire.
Do not use this kit on any other type of roof, gutter and downspout, it eluding
• Roofs with wooden shingles.
• Rubber or rubber membrane roofs.
- Composite (tar and gravel) roofs.
• Wooden gutters or downspouts.
- Flat roofs.
- AO KS cable cannot be used on sine. stone, metal and ceramic roofs.
These
Types of roofs require speciaJ consideration. Visit easyheat.corn for more information.
If you are unsure
if
your roof, gutters, and downspouts meet these requirements, call a professional roofing contractor.
.• Is ground-fault protected. A ground-fault protected receptacle reduces the risk of lire or electric shock by stopping the flow of electricity (current) when it senses that current is flowing through something other than the cable (for example. a person or downspout). This unintended current:
• can be caused by a damaged cable.
• may not be large enough to trip a circuit breaker.
• can lead to overheating of the cable, which can result in lire. and
• may result in electrocution due to exposed electrical parrs.
One type of ground-fault protection is a ground-fault circuit•interrupter
(GFCI). Some, but not all, outdoor receptacles are equipped with a G
rc
1.
If you are not sure if your
receptacle has ground
-
Fault
protection, check with your local electriud inspector or a licensed electrician.
.• Is on a circuit that has an appropriate current (amp) rating. Do not use this cable on a circuit whose circuit breaker or Fuse is rated at more than 20 amps. Limiting the circuit to a maximum of 20 amps will reduce the risk of fine and electric shock if the cable becomes damaged.
While a 20 amp circuit is the maximum allowed, you also need to check that the circuit can supply enough current without being overloaded. Overloading a circuit can lead to a tripped breaker or a blown fuse. To avoid overloading
the
circuit, do not use mare than
80% of the circuit's
rated
capacity (for example, do not load a 20 amp circuit more than 16 amps, and do not load a 15 amp circuit above 12 amps),
See Table I below for the current needed for your cable length. If you do not have a circuit with an appropriate rating, contact a licensed electrician.
IV. ELECTRICAL REQUIREMENTS
There are several requirements for the electrical system that supplies power SO this deicing cable. Check with your local electrical inspector or a licensed electrician if you are unsure about the requirements listed below or what you may need to do in order to meet all applicable electrical codes and ordinances.
Failure to meet these electrical system requirements may result irk ice darn formation or injury or death from electric shock or fire.
This cable must be plugged into a 120 volt NC outdoor receptacle that:
• Is grounded. This cable is equipped with a three•procs plug that has a grounding prong. To reduce the risk of fire and electric sbock, this cable must be grounded. To do this, the plug must be plugged into an outlet that is properly installed and grounded in accordance
with
all local electrical codes and ordinance
s
_
Do not modify the plug provided with the cable, if it will not fit the outlet, have a proper outlet installed by a licensed electrician.
6
Table I
Current Needed for Easy He De-lcins . Products
Catalog
Number
ARKS-100
ADKS-I50
Current Needed
(Amps).
0.83
I.3
MKS-300
...6,01(S-400
ADKS-500
2.5
3.3
4,2
ADKS-600
AOKS-$00
ADK5-I 000
ADKS-I2G0
5.0
6.7
10.0
ADKS
Owner's
Manual
• Has an oreloff switch that has an indicator light (pilot light ). The indicator light should be wired to light up when your cable is energized. This will help you rnlinirnize energy COnSionprtiOn and Make sure that the cable is rev energled in warm weather Turning on the cable in warm weather can cause it to overheat and may increase the risk of fire or electric shock.
• Is protected from the weather. The connection between the plug and receptacle must be protected from rain, snow or other elements. You may use either:
— a receptacle in a location that is protected from the elements_
Sometimes an eave can provide adequate protection,
— a receptacle that has a weatherproof enclosure, similar to that shown below. This rype of enclosure is some times called an "in-use receptacle cover"
• Is within 6 feet of the cable starting point on the roof. [Refer to Nanning
Your
Cable Arrangement on pages ES - I I .] The power cord of the cable is 6 feet long. and the remainder of the cable is heated.
Choosing .a receptacle that is within 6 feet of the start point will make sure that the heated portion of the cable is entirely on the roof. This will also avoid contact by persons or equipment such as yard tools) that can move or damage the cable.
V. MATERIALS NEEDED FOR
INSTALLATION
A.
ARKS KIT MATERIALS
This Kit contains:.
Cable
Cable spacers
Shingle clips
Labels for circuit breaker and 0.NfoFF switch
0+1.1.1.1.
Labe Is
The use of a properly located receptacle will also eliminate the need for an extension cord. Easy Heat recommends that you
do not we
an
extension cord
with this cable. The use
of
an extension cord with this cable may increase the risk of Fire or electric shock.
Remember, there may be different or additional requirements related so local or national codes and ordination. Check with your local electrical inspector or a licensed electrician if you are unsure about these codes and ordinances. Any metal structure or surface . excluding spacers and clips - used for supporting the cable must be grounded In accordance wish CSA Standard C22. I Sec. I
IL
Power Cord
Cable
\AAAAAAL
Heated Portion of Cable
Figure 2, ADKS Kit
Materials
If any components of this kit are missing or damaged, contact Easy Heat for assistance soil-free as 800/562-6S87.
B.
ADDITIONAL TOOLS & MATERIALS REQUIRED
You will also need the following:
Tape Measure, to measure lengths of rod edge, overhang. etc_
Ladder, or other access to roof
Putty Knife, so pry up shingles
Marking Chalk, so mark cable pattern on shingles
Weighted String (with string at least as long as the longest downspout),
110 measure
table needed in downspouts and to pull the cable through downspouts
File. to remove sharp or lagged edges along gutters and downspouts
PiLOY-LiCHT
Figure la,
ON/OFF switch with indicator
(pilot light)
ADKS Owner's Manual
Figure lb
.
In-use receptacle cover
7
ITI
2
Cl
VI. INSTALLING THE CABLE
If an electrical outlet already exists in an appropriate location near the eave, then that defines your starting point. Otherwise. select an appropriate starting point and have an electrical outlet Installed.
(See Electrical Requirements on pages 6 - 7)
Failure to handle, arrange and install the cable according to these instructions may result in ice darn formation or Inilury or death from electric shock or fire.
A. PLANNING YOUR CABLE ARRANGEMENT
pattern for different parts of ehe rod are provided on the following pages.
The cable does not have to be i nstal
led In
aJI of Owe sections. — only in The sections that have been susceptible to ice darns in the past (see Determining
Whet Areas Need Catlike on page 5). You may or may not need to install Gible along the roofline or near skylights or dormers. However, always install cable in valleys that are a part of any problem area on your roof.
Before laying out and attaching the cable to your roof, it is important to plan how the cable will be arranged.
To prevent Ice darns, the cable parcern must he arranged so that ft routes meltwater to flow from 'Warm areas- of the roof through the 'cold areas. and down to the ground. A "warm area" of your roof is one where snow and ice on the roof thaws because of heat loss through inadequate roof venting andior Insufficient ceiling insulation, 'Cold areas" of your roof are area where ice typically builds up, such as the roof surfaces above overhangs and in gutters. (See Appendix A on page 19 for more information on the warm and cold areas.)
In general, you need to apply the tables in the following areas:
= On roof areas, including:
- along the rootline
-
* in valleys
• in problem areas. such as skylights and dormers {if needed}
In nearby gutters and downspouts
WARNING? To GrvOid overheating the cable and increasing the risk of fire
OF etectrit shock, do not allow any port of a cable to pass through the inside of
any area of a building. including an attic. For example. do not install the cable
in a downspout that hos a section that passes through a building_ in addition. do not install cable where it might be wormed by sources of heat, such as an exhaust Vent or chimney Keep the cable at least 12 inches from these sources of heat.
This section will also describe how to treat separate areas with multiple cables, and how to handle cable shortage or excess.
0
Figure 3- Typical pattern along roofline and in gutters/ downspouts
TIP: If you will be working directly on the roof during the Installation, you may want to mark the cable pattern with chalk before attaching the cable.
If working from a ladder, you will probably want to lay out the pattern as you attach the cable with the clips. Making a drawing of your roof and your planned pattern on paper may be helpful. entrance areas, sidewalks, etc. to avoid contact by persons or equipment
(such as yard tools) that can more or damage the cable. You may also want to avoid having the cable power cord routed in front of windows or high-visibility areas of your home. For more information on selecting a location for an electrical outlet, see Electricat Requirements on pages 6 7.
8 ADIOS Owner's Manual
• Pattern for the roollinc Cable laid along the roolline is arranged in a triangular pattern (see Figure 4). The cable must extend above the overhang into the warm section of the roof. To determine the height of the triangles, measure the depth of the overhang, The triangle heights are measured by the number of s hingle rows from the roof edge (based on the standard 5'h inch tab shingles). Using Table 2. determine the height or each triangle. Using this method, the triangles will extend at least one shingle row (57t inches) into the warm roof area,
The base of each triangle is always 15 inches wide. if you have nonstandard shingles (110.t 5'J inches wide) call easy
FIBRE toll-Free at
800/562-6567 for assistance.
Triangle Height
(See Table 2)
Table 2 Triangle Heights for Various Overhangs
Overhang
12
or less
I] 113
18
24
24 • 30
30 - 36
36 — 42
42 -14}
Triangle Height
(Shin& Rows)
3
4
5
6
7
9
48- 54
54 — 60
10
II
66 - 72
12
13
Triangle Base
Jnches)
Figure 4. Triangle pattern along rooliine
• Pattern for skylights: Problem skylight areas are also treated with the "triangle pattern" approach. However, the height of the triangles rnay need to be greater rhan those along the roofiine. Increase the triangle height so that it eKtends to one shingle row (S'tz inches) below the skylight. The triangle base is maintained at IS inches (See Figure
5).
Triangle heights must not exceed 20 feet. The clips provided with the kit are not designed to attach triangles this large. For problem areas that are more than 20 feet from the roof edge, commercial grade deicing cable should be Installed by a professional installer. Call Easy
Heat toll-free at 800/562-6567 for more information.
Triangle Base
(IS inches)
Figure 5. Triangle pattern near skylight
ADK5
Owner's
Manual 9
■
Pattern for valleys: If a valley exists in a problem area of your roof, you muss route cable up and back down the valley a minimum of 3 Feet, as shown in Figure 6. Extend she cable higher if the warm area of your roof is higher.
Figure 4. Cable pattern In a valley
• Pattern for dormers To treat a problem dormer area, the cable should be arranged up and around the dormer as shown in
Figure 7.
* Pattern for other special roof areas: Other problem roof areas not previously described may also be treated with deicing cable to
prevent ice darn formation. Triangltn—Similar to those used for she rOOfline—ain also be used to treat these special areas.
In treating these special problem areas, the height of the triangles may be greaser than those used at the roof edge. Keep the triangle base at 15 inches, but increase the triangle height so it extends at least one shingle row (5'i, inches) into the warm roof section.
Triangle heights muss
not
exceed 20 feet The clips provided with the kit are not designed to attach triangles this large, For problem areas that are more than 20 feet from the roof edge. commercial grade deicing cable should be installed by a professional installer.
Call Easy Heat toll-free at 800/562-45E7 For more information.
Pim the cable pattern
IP the ,gutters and
ckWnSPI2M14. FOP" each roof area that has cable, the corresponding gutter (if present) muss also have cable After arranging the cable along the roolllne, the cable will need to be
installed back along the treated roofline through the gutter. Plan to install the
cable down into and back up the inside of any downspouts along the way. if there is a downspout as she end of the roorline, you need only rouse the cable down the inside of the downspout and back up. However. if there is a shortage
of
cable, you need only route the cable down the inside of the downspout and not back up. The cable must terminate at the end of the downspout. Remember, to avoid overheating the cable and Increasing the risk of lire or electric shock, no part of the downspout may pass through a building.
Figure 7, Cable pattern around a dormer
10
Figure B. Cable routed
back along
the rootiirie
in the gutter and downspouts
ADIOS Owner's Manual
If your icing problems are only in the gutter, cable would be routed only in the gutter and downspouts using the recommended "double run" of cable, as shown in Figure 9. This Frgu re shows an alternate -single end of run".
B. PROPER HANDLING & CARE OF THE CABLE
Improper handling can damage the cable and may result in ice
dam formation or injury or death from electric shock or lire.
Along run
Properly handle and care for the cable:
• Do not step on the cable.
• Do not bend cable more sharply than required for use with the clips included with the kit and according to the installation instructions. Sharp bends can damage the heating element.
• Do out allow the heated portion of an operating cable to touch, cross over or overlap itself or to touch another deicing cable.
Alternate
Single
\
End of run
1.
Figure 9. "*Double cable run" in gutter and downspouts
Convider the number of cables. If separate areas are being treated, it
may
be more practical to use separate cables. When planning your cable arrangement, consider where each cable will be routed given its length.
It is also possible to use one common cable for both areas: the cable can
be routed from one area to the next either in the gutter or horizontally attached to the shingles, Do not route the cable over the roof peak. because the clips are not designed for this purpose.
Consider cable shortage or excess. Consider how you will handle any excess or slight shortage of cable. For excess cable, triangles can be made larger (up to 20 feet in height) or cable loops in valleys can be extended. For slight shortages, triangles can be made smaller In areas less sensitive to ice dams. Alternatively. if a downspout is present at the end of the roofline being treated, cable may be routed in a single run down, or as recommended run down and back up. In either scenario the cable must terminate at the end of the downspout. See figure 22.
WARNING!
To reduce the risk of fire,
electric shock, or ice dam
formation,
do
not art, splice
or otter the deicing cable in anyway, The
cable
'length tanner he thingeri.
• Do not cover or insulate any part of the cable.
• Do not paint or expose the cable to chemicals such as glue, caulk or adhesive.
C. TESTING THE CABLE
Although it is not necessary, you may wish to test the cable before
Installation. To do so, uncoil it completely so It clais not touch, cross over or overlap on itself. Do not plug in the cable until it has been completely uncoiled.
Plug cable in, and in approximately 5 minutes, it should feel slightly warm to the touch. Then unplug the cable.
D. PREPARING YOUR ROOF, GUTTERS &
DOWNSPOUTS
Follow these steps BEFORE installing the deicing cable:
I. Remove any existing deicing cablim., or heating cables. clips and cable spacers in the area where the new cable will be installed. (See
Remoyfrig the Cot* on page 17.)
2. Remove any combustible debris from the roof, gutters and down spouts, such as leaves, pine needles, seeds or windblown trash.
3. Look and feel for sharp or jagged edges along gutters and downspouts that could damage the cable. Sharp or lagged edges could include gutter edges. downspout fittings or screws. Remove sharp or jagged edges by either Rling or bending them down.
ADK5 Owner's Manual
E. ATTACHING THE CABLE
Improper handling can damage the cable and may result in ice
dam formation or injury or death from electric shock or fire.
This section describes how to use the clips and cable spacers to attach the cable to each area of your roof and route it through the gutters and downspouts, Use only the clips and spacers provided to attach the cable,
Do not attempt to maple or nail the cable or attach the cable with materials such as glue, caulk or adhesive.
While the cable is being laid-out on the roof. loose attachment of the clips and spacers is recommended in case adjustments must be made.
LimoMing the cable.
To mach the cable properly, It must fie flat on the roof
To do this, uncoil the cable so it is not twisted or tangled, If not properly uncoiled, the cable may be hard to clip to your roof.
Attaching the cable at the starting point. Near the outlet. first. attach the cable to the edge of the roof near the outlet using the clips as shown in Figure 10 or I Do not plug in the cable at this time.
Then, route your cable as planned on your roof or in your gutter and downspouts. Details on clip and spacer attachment are provided in the following sections.
Figure
I
I.
Starting point along gutter edge
Attaching the cable to your roof with cribs and cable spacers,. This section
describes how to attach the cable to the roof using the clips and spacers.
Taking care not to tear the shingle tab. lift it gently and evenly using a putty knife. Lift the shingle just enough to insert clip.
Press shingle back down firmly. Note;
Shingles will reseal in hot weather,
Figure
12.
Attaching
cl
ips to shingles at top of triangles
At bottoms of triangles
along edge of roof
Form a "drip loop" over roof edge to direct melt water into the gutter or to the ground. There should be a minimum of 2 inches between the bottom of the drip loop and the bottom of the gutter,
Drip
Loop
Figure 10. Starting point near roof edge
12
Figure 13. Attaching clips to shingles at edge or roof with gutters
Drip
Loop
Figure 14. Attaching clips to shingles at edge of roof
without gutte
rs
ADKS Owner's Manual
• Along the rise of large triangles
For triangles that are larger than 3 feet in height, also attach clips every 3 Feet up the height of the roof.
Routing the cable along the gutter using cable spacers. This section describes how to route the cable along the gutter using spacers.
• While the cable is being laid in the gutter, the spacers can be tightened with fingers or pliers. If you use pliers, squeeze gently and use care to avoid pinching. crimping, cutting into or otherwise damaging the cable (see Figure I8). 1:)o riot use a hammer
ro
tighten the clips and spacers. z
Figure 15, Attaching clips along rise of larger triangles
• Around dormers
Figure 16 shoves how
ro
use a clip to mach the cable when the cable
is
running vertically around a dormer, Lift the side edge of the shingle gently co insert dip sideways.
Figure 18. Squeezing spacers with pliers
• Route the cable in the gutter along a treated area of roofline.
Using a spacer, fasten the gutter cable to the bottom of each drip loop you have formed. See Figure 19. Keep the cable in the gutter tight and off the bottom of the gutter to prevent heat foss.
Figure 16, Attaching dips around dormers
• Near skylights
Triangles of cable are attached near skylights the same way as shown in Figures 12, 13 and 14. If the skylight is high up the roof {making the triangles larger than 3 feet In height). clips
MUSE
also be attached
every 3 feet up the height of the roof, as shown in Figure 15,
• Up and dawn valleys
Figure 17 shows how to use a clip to attach the cable up and down the valley. Lift the side edge of the shingle gently to insert dip sideways.
Figure 17, Attaching clips In valleys
ADKS Owner's Manual
Figure 19. Attaching dips in gutters
[ 3
• If you are treating only the gutters for ice problems, use a "double-run" of cable in the gutters and downspouts. Figure 20a shows a gutter installed with gutter spikes. Route the cable under and over the gutter spike to keep the cable suspended off of the bottom of the gutter. Spacers should be attached every 12 inches. Figure 20b shows a gutter with external gutter straps. Use the clips and spacers to keep the cable suspended off she bottom of the gutter. Clips should be attached every 3 feet along the roof,
Figure 20a. Double run arable In gutter-onfy applications (gutters with gutter-spikes) floating
the eat* h
downspo
uts
using
cable spacers
• "Along run" downspouts. For downspouts that are along the run of the roofline being treated, the cable must be routed down and back up the inside of the downspout. Do not wrap the cable around the downspout or otherwise attempt to attach it to the outside,
Remember; to avoid overheating the cable and increasing the risk of fire or electric shock, no part of the downspout may pass through a building.
You must first determine the total length of cable needed to go down and back up the downspout. It is important to measure as accurately as possible because the cable must be flush with the end of the downspout.
No cable mart be extended out the end of the downspout,
Several different methods for determining the length may be used.
One is to tie a small weight (such as a washer) to a string and lower it into the downspout. Once the string passes through the bottom of the downspout, mark the string as needed to record the length of the downspout. You will need twice this length of cable. (Note: For accurate results. use a string that does not stretch when the small weight is attached.)
Figure
20b- Double run of cable in gutter-only applications (gutters without gutter spikes)
Alternatively, you could also use a tape measure to measure each section of the downspout. To calculate the total cable needed, add the measurements in each section and multiply by
2.
Lastly, if it is not possible to use either one of these above methods, you may use the cable itself to estimate the length of cable needed in the downspout. However, to avoid snagging or cutting the cable on sharp
edges,
take care when pulling the cable Into and removing it from the downspout. Inspect the cable for damage and do not use a cable that has been damaged.
Once you know the length of cable needed. the next step is to install spacers and teed the cable into the downspout. Spacers must be attached to the cable every 6 inches so that the cable does not touch itself in the downspout. You must tighten the spacers before the cable is installed In the downspout.
You may do this with your fingers or pliers, If you use pliers, squeeze gently and use care to avoid pinching, crimping, cutting into or otherwise damaging the cable (see Figure
I II). Do not hammer to tighten the dips and spacers. pull the cable into the downspout using a weighted string.
Figure 21.
Double cable run in "along run" downspouts
14 AUG
Owner's Manual
• "End of run" downspouts. If a downspout exists at the end of the run of the roofline being treated. it is recommended she cable be routed down the inside of the downspout and back up. Do not wrap the cable around the downspout or attempt to attach it to the outside.
Pull cable into downspouts using weighted string. Pe sure the run of cable is flush with the end of the downspout and that no cable is extended out the end of the downspout (see Figure 22). Remember: to avoid overheating the cable and increasing the risk of fire
Of
electric shock. no part of the downspout may pass through a building.
If at this point you find that you have excess cable. triangles on the roof can be made larger (up to 20 feet in height) or cable loops in valleys can be extended.
If you have a shortage of cable (the end of the cable [olm not reach to the bottom of the downspout), you may reduce the height of the triangles on areas of the roof that are less susceptible to ice dams. It is permissible in this scenario to only have a single run of cable in the end downspout, termination
ar the end as
shown in fig 22.
F. FINAL INSTALLATION STEPS
Check to be sure the cable has not been moved from its intended
position. The heated portion of the cable must be positioned entirely on the roof and must not touch. cross over or overlap itself,
Place the
014OFF switch label provided so that it is clearly visible to
CUP-
rent and future users. The label is provided In three languages- Use the language(s) that are appropriate for you. Pass the labels with other languages onto future usersitionneowners.
Place the labels for the Circuit Breaker/Fuse Panel near the approprkite circuit breakerifuse so that they are clearly visible to current and future users. These labels are provided in three languages. Use the language(s) that are appropriate for you. Pass the labels with other languages onto future users/homeowners-
Give the instructions to the user. If you have installed the cable for someone else's use. give this owner's manual to them.
WARNING!
To reduce the risk of fire electric
shock,
or ice awn forma Lion, do nor cut splice or alter the deicing cable in anyway The cable
length connot
be
chi:rived,
RECOMMENDED
Figure 22. Cable in "end of run" downspouts
Tighten clips and cable
spacers.
Tighten clips and spacers on the roof.
You may do this with your fingers or with pliers. If you use pliers, squeeze gently and use care to avoid pinching. crimping, cutting into, or otherwise damaging the cable see Figure 18). Do not use a hammer to tighten the clips and spacers.
ADKS Owner's
Manual 15
VII. USE & MAINTENANCE OF
THE CABLE
In addition to proper installation. proper use (Atha cable is needed to maintain a path for melted snow or ice to drain all the way to the ground.
,Drip Loop
Failure to use and 'maintain the cable according to these instruc • dons may
result
in ice dam formation or injury or death from
fire or electric shock.
A. PRE-SEASON CHECKS
lure 24. Forming a drip loop near the starting point
At the beginning of the winter season, do the following;
• Check for and remove all combustible debris from roof. gutters and downspouts, such as leaves. pine needles. seeds and windblown tra51-i.
B. TURNING THE CABLE ON AND OFF
During the winter season. turn on the cable only when conditions are favorable for ice dams to form. The cable should only be operated when:
intended position. The heated portion of the cable must be positioned entirely on the roof and must not touch, cross over, or overlap itself.
6
Without removing it from the roof, visually inspect the
entire cable, including the plug. Discontinue use and remove the cable if it shows any evidence of damage or deterioration, including cuts, brittleness, charring. cracking, discolored surfaces, or bare wires.
If there appears to be a problem inside a downspout. remove the cable to inspect it- Take care when removing cable
from
a dovvmpout to avoid snagging or cutting the cable on sharp edges.
& Ifnodarnage is present, plug the power cord into the receptacle.
Arrange the cord to form a drip ioop using a spacer (see Figure 24).
The purpose of the drip loop is to prevent melt water from tracking along die cord and into the receptacle.
a
Test all ground-fault protection devices (see the Instructions provided with the device).
• The outside temperature is between 15°F and 35°F (-9°C and
rC). Below 15"F (-re), very little melting will normally occur, and in very cold conditions, the cable may not generate enough heat in some roof sections to prevent melt water from refreezing. This may result in ice darn formation which may cause water to backup under your shingles.
Once turned on. the cable should be shut off when the melt/freeze condition stops. usually above temperatures of 35°F (2DC).. The cable should be kept
off
until the melt/freeze conditions return.
The cable can be operated using:
• an
0140Fr
switch (with an indicator light), 91
■
an optional Easy Heat Roof Cable Deicing Control (Model RS-2).
The Roof Cable Deicing Control (model number RS-2.) is a moisture and temperature sensor control that provides for operation of deicing cable only when moisture is present and when temperatures drop below freezing, The unit will then remain on until moisture is no longer present or the temperature has risen well above freezing. See your local dealer for details.
16 ADKS Owner's Manual
C. CHECKING OPERATION AND CONDITION D. RESETTING CIRCUIT BREAKER/REPLACING
OF CABLE BLOWN FUSE
• During the winter season and when snOw or ice on root is melting,
check to ensure a complete path is available for melt water on the roof to get to the ground.
There should be no ice buildup above the cables, and gutters should not be clogged with ice. Icicles
should not form
at
the roof edge.
If icing problems persist, the cable pattern may need to be adlusted to better suit rneitifreeze conditions of your roof. Observe these condi-
tions and adjust cable pattern (see Manning Your Col* Arrangement pages 8 - I I) when conditions are suitable (see When to install Coble
on page 5).
To ad just your cable pattern, first unplug the cable, Then, identify areas where there is extra cable. This may include excess cable you had
during the original Installation or you may be able to reduce the cable in an area that Is not as susceptible to ice dams. Remove the cable by opening the clips and spacers with pliers, as needed, to rearrange and supply more cable to the needed areas.
• During operation.
the ground fault protection device may trip if
the cable is damaged or as a result of "nuisance tripping". One way in which nuisance tripping can occur is if parts of the electrical circuitbecome wet. This can happen if driving rain or blowing snow enter the
electrical receptacle. Use of a weatherproof
in-use receptacle may
help eliminate this (see page 7).
Before reseuing the ground fault protection device and when weather and root ice conditions allow. unplug and inspect the entire cable for
damage. Remove and dispose of the cable if it shows any evidence of damage or dererioration, inciuding cuts, brittleness, charring. cracking, discolored surfaces, or bare wires. Do not use a damaged cable. If you cannot see damage on the cable, reset the ground fault protection device. If the device trips again and there is no other explanation for It, call a licensed electrician to check the cable and the circuit. A licensed electrician can
determine if the cable is damaged or if there
is some other problem with your electrical system.
- As needed during winter season,
unplug the cable and check for and remove all combustible debris from roof, gutters and
down spouts, such as leaves, pine needles, seeds and windblown trash,
- About once a month during winter season, unplug the cable and
perform the same checks as outlined in the
Pre-Ceoson Check section on page 16.
Do these checks when weather and roof ice conditions allow.
At any time during operation, if the circuit
breaker
trips
or the fuse blows, stop using the cable.
Unplug and inspect the entire cable for damage when conditions allow. Remove and dispose of the cable if it shows any evidence of damage or deterioration, including curs. brittleness,
charring, cracking,
&catered surfaces, or bare wire4. Do not use a damaged cable. Even if you cannot see damage on the cable, assume it is damaged if you cannot find another cause for the tripped breaker or blown fuse.
E. OFF-SEASON INSTRUCTIONS
The deicing cable may remain on the roof year-round. However. to avoid overheating the cable and increasi rig the risk of lire or electric shock,
do nor operate the cable when outdoor temperatures begin to remain above
SCPP (I CPC) (i.e.. at the end of the winter season). To avoid accidentally turning the cable on, unplug it.
VIII. REMOVING THE CABLE
The deicing cable must be removed prior to replacing roof shingles or
starting roof repair. Other roof alterations. such as additions of antennae,
Ilag poles, etc-
In the area of the cable may
require removal of
Cable may also require removal for adjustment. with it. Do not reuse the clips from the previous kit. The new cable may
nor be designed for use with the old clips. If the old dips are used. the cable may be inadequately
secured or may be damaged.
Note that other models of deicing cable may have different methods of removal. Follow the instructions provided with those cables.
the
cable.
To remove cable,
wail for weather conditions to allow Then, unplug the cable. Open the
clips with pliers and remove the
cable.
Take care when
removing table from a downspout to avoid snagging or cutting the cable on sharp edges.
Inspect the
entire cable
before replacing
it on the roof. If cable is in good
condition (no evidence of cuts, brittleness, charring, cracking, discolored surfaces, bare wires, or other damage). it may be replaced on the roof,
according r0 the instructions.
If a replacement deicing kit is purchased, use only the new clips provided
ADKS Owner's Manual 17
IX. LIMITED WARRANTY AND LIABILITY
Easy Heat warrants that if there are any defects in material or workmanship in this product during the first twenty four (21) months after the date of its purchase, we will replace the product with an equivalent model, not including any labor or other installation costs.
Our obligation to replace the product as described above is conditioned upon .(a) the installation of the product conforms to the specifications set forth in our installation instructions and
OD) the product not having been damaged by unrelated mechanical or electrical activities.
Product replacement as described above shall be your sole and exclusive remedy far a breach of this warranty. This limited warranty does not cover any service costs relating to repair or replacement.
We shall not be liable for any incidental, special or consequential damages as a result of any breach of this warranty or otherwise,
whether or flat caused by negligence. Some states do not allow the exclusion or limitation of incidental or consequential damages. so the above limitation or exclusion may not apply to you,
The warranty above is exclusive and makes no other warranties with respect to description or quality oF the product, No affirmation of fact or promise made by us, by words or action, shall constitute a warranty. If any model Or sample was shown to you, the model or sample was used merely to illustrate the general type and quality of the goods and not to represent that the goods would necessarily be of that type or nature. No agent, employee
or representative of ours has authority to bind us to any affirmation, representation or warranty concerning the goods sold unless such
affirmation, representation or warranty is specifically incorporated by written agreement.
ANY IMPLIED WARRANTY OF MERCHANTABILITY OR FITNESS FOR PARTICULAR PURPOSE THAT MAY ARISE IN CONNECTION
WITH THE SALE OF THIS PRODUCT SHALL BE LIMITED IN DURATION TO TWENTY FOUR (24) MONTHS FROM THE DATE OF
PURCHASE, WE DISCLAIM ALL OTHER IMPLIED WARRANTIES, UNLESS WE ARE PROHIBITED BY LAW FROM DOING SO, IN
WHICH CASE ALL SUCH IMPLIED WARRANTIES SHALL EXPIRE AT THE EARLIEST TIME PERMITTED BY APPLICABLE LAW. Some maces do not allow limitations on how long an Prnplied warranty lasts, so the above limi tat; on may not apply co you,
This warranty gives yo Li specific legal rights. and you rnay also have other rights which vary from state to state or province to province.
addresses
noted herein. Buyer is responsible for all cosis incurred in removal and re-installation of product and rriust ore-pay shipment to factory or point of purchase.
Canada
Heating Cable Warranty Dept,
99 Union Street
Elmira, ON, N313 3L7
In LISA
Heating Cable Warranty Dept.
2 Connecticut South Dr.
East Granby, CT 060261
18
ADKS Owner's Manual
X. APPENDIX A: BASIC INFORMATION ABOUT ICE DAM
FORMATION AND PREVENTION
A. HOW ICE DAMS FORM
Snow and ice on the roof can thaw because of heat loss through the roof due to inadequate roof venting and/or insufficient ceiling insulation. In
these cases, the roof surface above heated areas of the building Is warm
enough to melt the snow, while the roof surface above the overhang is
cool enough to refretze this melt water as it trickles down the roof. As a
result. a layer of Ice forms on this coder, lower roof surface and in glitters.
As
snow continues to melt, the melt water flows downward and re-freezes at the roof edge. As this happens. ice builds up to several inches in thickness forming an ice darn. In addition to having ice darns along the
roofline, structures such as skylights and dormers often have poor venting,
and ice dams may form in the surrounding areas.
B. SIGNS OF ICE DAMS
Ice darns can be identified
at
points where snow
has
melted on an upper
roof surface, but the roof area further down is still snow and/or ice covered.
Icicles are also a sign of ice dams.
C. DAMAGING RESULTS
Ice dams prevent water from flowing off the roof. The melt water will instead "'pond" at the ice dam, and can result in water seeping between
shingles, Water that has seeped under the shingles can leak through
roof penetrations, such as nail holes and sheathing seams, and inside the
building walls and ceiling. The water can also flow along ceiling beams
or wiring. Eventually, water can leak into the building interior at light fixtures or through the ceiling finishing at places other than below the ice dam's orlgjn.
In addition. Ice buildup In gutters can put significant minims on the gutter resulting in gutter damage
D. HOW TO AVOID ICE DAMS
Figure A-11. Roof heat creates potential for ice dams to form
To avoid ice dams, the entire roof surface should be kept at about the
Same temperature as the outside air. The best way to do this is to ventilate
the space under the roof However, this is often costly or impractical. In
these cases, deicing cables can provide a reasonable solution to ice dam
problems. Placing deicing cable on the roof edge above the overhang and in the gutter and downspouts prevents melt water from refreezing. This allows the melt water to have a clear path to flow to the ground and prevents leaking into your home interior or damage to your gutter system.
Figure A-2. Ice dam format iOri and the consequences
ADKS Owner's Manual
19
XI. APPENDIX B: ESTIMATING THE CABLE LENGTH YOU NEED
An accurate estimate of the cable length you need is Important because you cannot change the cable length by cutting, splicing or altering it in any way.
Doing so may result in fire. electrocution, or ice darn formation.
Cable should be installed on roof areas where ice dams form, This can be the entire roof edge or specific areas such as beneath skylights. in valleys or around dormers. Cable should also be installed in any nearby gutters, downspouts and/or valleys. a
If you need to apply the cable on a roof with gutter, downspouts, valleys, and/or dormers, follow A. For Typical Roof Applications" below.
■
If you only need to install the cable in the gutters only, follow "B. For
Problems in the Gutter Only" on page 21.
• If you need to install the cable on a roof with special roof areas such as
a roof with skylights. follow "C. For Roofs with Special Roof Area Ap- plications" on page 22.
A. FOR TYPICAL ROOF APPLICATION
STEP I. For area listed in Table B-1, measure the required dimen- sions (see Figures B-I and B-2) and calculate the length of cable needed- Add each ''area" calculation to determine the total cable length needed,
Table B- I Cable Length Estirnation Formula for Typical Roof Applications
Area
What to measure
How to calculate
Along Rool Overhang IA)
Length along rood
Length of roof (B.) Overhang Multiplier (see Table B
-
2)
Dormer
Val!
-
Downspouts
Dpstance around dormer (Cl
Number of vaJle (D)
Number of downspouts
Length of down5pout5(E)
Number of dormers X Distance around dormer s
(C)
Number of val le (D) X 6 feet or IA meters
Number of downspouts X Length of downspout
(E) X 2
Table
B-2 Overhang Multiplier
ROOF OVERHANG
Inches
Centimeters
Multiplier
For roof
with gutter
Multiplier
For roof
without gutter less than 12 less than 30 4.0 3,0
12 30 4.0 3.0
24
36
48
60
90
120
5.3
6,8
8.1
9.6
4,3
5.9
7.1
8.6 60 150
72 180 11.2 10.2
Note: For overhangs not listed. estimate multiplier. For example. for an 18' overhang with a gutter, multiplier will be about 4.7.
Figure 8-2. Roof Measurements
20
ADKS Owner's Manual
STEP
2. Use the estimated cable length calculated above to select the proper de-icing cable from Table 9,3. In general, choose the longer cable if the length you need is between the sizes offered. If the difference is small (less than S feet or so), the shorter cable can be used. You cannot change the cable length by cutting, splicing or altering it in any way.
If Ice dams are occurring on roof areas that are significant distance apart, you may want to use a separate cable for each location. rather than choosing one large cable. Also, if roof areas are large, separate cables for the roof area and gutter should be used.
Table B-3 Easy Heat De-Icing Kits
Catalog
Number
ADKS-100
ADKS-150
ADKS-300
A D K5-400
ADKS-500
Length
Feet
Meters
20
30
60
6
9
80
100
18
24
31
ADKS•600
ADKS-000
ADKS-I000
A DKS -1200
120
160
200
240
37
49
61
73
B. FOR PROBLEMS IN THE GUTTER ONLY
If ice darns are occurring in gutters only, measure the required dimensions (see Figure B.2) and caku late the length of cable needed for each area listed in Table 9-4, Add each "area" calculation to determine the total cable length needed.
Table B-4 Cable Needed for Gutter Only Ice Problems
Area
Gutter
Downspouts
How to Calculate
Lertgth of gutter (B) X 2
Number of downspouts X Length
of dowrespauc
(E) X 2
ADKS
Owner's Manual 21
C. FOR ROOFS WITH SPECIAL ROOF AREA APPLICATIONS
STEP I. For 0ch area listed in Table B-5, measure the required dimensions (see Figure B. I on page 20 and Figure B-3) and calculate the length of cable needed. Add each -area" calculation to determine the total cable length needed.
Table B-S Cable Length Estimation Formula for a Roof with Special Roof Areas
Area What to measure How to calcu;ate
Along Roof Length of roof (B) X Overhang Multiplier (see Table R-2)
Dormer
Valley
Downspouts
C./el-hang (A)
Length along roof (B)•
Dissance around dormer (C)
Number or valleys (0)
Number
of
downspouts
Length of downspouts from roof to ground (E)
Number or dormers X Distance around clorrner(s) (C)
Number of valleys (D) .X 6 feet or f-B meters
Number of downspouts X Length of downspout (E) X 2
Special roof areas
(such as skylights)
Distance from roof edge to bottom of special roof area (F)
Width of ice darns that form along special roof area (G)
Distance from roof edge to bottom of special roof area (F) X
Width of ice dams that farm along special roof area (G)
Special Roof Area Multiplier (see Table B.6)
'Nom. Do not include the width of special areas (G) in this measurement.
STEP
2,
Use the estimated cable length calculated above to select the proper de-icing cable from Table B-3 on page 21. In general. choose the longer cable if the length you need is between the sizes offered. If the difference is small (less than 5 feet or so). the shorter cable can be used You cannot change the cable length by cutting, splicing or altering it in any way.
If ice dams are occurring on roof areas that area significant distance apart. you may want to use a separate cable for each location. rather than choosing one large cable. Also, if roof areas are large, separate cables for the roof area and gutter should be used.
Table B-6 Special Roof Area Multiplier
Multi i lier Multi • lien
for roof
with
gutter for
roof without
gutter
2,6 1.6
Figure B-3. Roof Measurements
22
ADKS Owner's Manual
D. EXAMPLE # I — EXAMPLE OF TYPICAL ESTIMATION
Consider a roof section (See Figure B-2 on page 20) that you want to treat that has;
• 32 feet of roof
• an overhang of 12 inches with a gutter
• I dormer (30 feet around)
• I valley
• 2 downspouts (each 1 D feet brig)
From Table B-2, the multiplier for a roof with a gutter and an over hang of 12 inches is 4.
Using Table 8-1. the cable length needed = (32 x 4) + ( I x 30) + ( I x + (2 x 14 x 2) = 204
Using Table B-3, you would select the ADKS- 1 000 (200 feet of cable). You would select the smaller cable because the difference between the cable length and your calculation is less than S feet.
E. EXAMPLE #2 — EXAMPLE OF SPECIAL ROOF AREA ESTIMATION
This example shows how to estimate the cable length needed for a limited problem roof area — a skylight (see Figure B-3
{:}ri page 22). For this roof, you would like to treat only the problem area underneath the skylight
This roof section has=
▪
downspout (10 feet long)
• I skylight (the distance from the bottom of the skylight to the roof edge is 12.5 feet, and the width of the ice dams tha[ form beneath the
Skylien Is about
6 feet)
• 1 gutter
From Table B-6, the special roof area multiplier for a roof with a gutter is Z.G.
Using Table B-5. the cable length needed = ( I A 10 x 2) + (12,5 x 6 x 2.6) = 215
From Table B-3, you would select the ADKS- 1 MD (24D feet of cable) to ensure complete coverage.
Note! If you are only treating one special roof area and the problem area Is a significant distance from the downspout, you may wish to add extra cable to your estimation to account for the cable in the gutter.
ADKS Owner's Manual
23
Ladda ner
Annons