- Home
- Domestic appliances
- Climate control
- Split-system air conditioners
- Quasar
- HQ-2051SH
- Service manual
1.3 LOCATIONS OF CONTROLS. Friedrich HQ-2051SH, KP05A10 KP06A10, KP06A10
Add to My manuals27 Pages
Quasar HQ-2051SH is an efficient air conditioning unit that will maintain the desired temperature in your room. With its neat compact size it will fit almost any space and it's easy to install. Unit's Washable One-Touch Filter keeps the air clean and fresh. It is controlled by an adjustable thermostat and has three fan settings: low, high and off. You can select the desired temperature and the fan speed to create the perfect climate in your room.
advertisement
![1.3 LOCATIONS OF CONTROLS. Friedrich HQ-2051SH, KP05A10 KP06A10, KP06A10 | Manualzz 1.3 LOCATIONS OF CONTROLS. Friedrich HQ-2051SH, KP05A10 KP06A10, KP06A10 | Manualzz](http://s3.manualzz.com/store/data/055019769_1-458279dcb3fb7398efc59e1144ba096a-360x466.png)
1.3 LOCATIONS OF CONTROLS
LOW
FAN
HIGH
OFF
COOL
HIGH
LOW
FA
N
OFF
Off — Turns air conditioner off.
High Fan — High speed fan operation without cooling.
Low Fan — Low speed fan operation without cooling.
High Cool — Cooling with high speed fan operation.
Low Cool — Cooling with low speed fan operation.
3
THERMOSTAT
5 6
4 7
8
C
O
O
2 9
1
10
3
TEMP CONTROL
5
6
4
7
C
O
O
8
E
L
R
2
9
1 10
This automatically controls the temperature of the indoor air.
Turn the knob so that the arrow points to the larger marks for greater cooling. Point the arrow to the smaller marks for more moderate cooling.
(i.e. the higher the number, the greater the cooling)
CAUTION : After switching the air conditioner from Cool to Off or Fan, wait at least 3 minutes before switching it back to Cool.
1.4 SAFETY PRECAUTIONS
1. When servicing, set the ROTARY SWITCH to
Off and unplug the power cord.
2. Observe the original lead dress.
If a short circuit is found, replace all parts which have been overheated or damaged by the short circuit.
3. After servicing, make an insulation resistance test to prevent the customer's exposure to shock hazards.
1.5 INSULATION RESISTANCE TEST
1. Unplug the power cord and connect a jumper between 2 pins (black and white).
2. The grounding conductor (green or green and yellow) is to be open.
3. Measure the resistance value with an ohm meter between the jumpered lead and each exposed metallic part on the equipment at all positions
[except Off] of the ROTARY SWITCH.
4. The value should be over 1 M
Ω
.
—4—
advertisement
Related manuals
advertisement
Table of contents
- 3 1.2 SPECIFICATIONS
- 4 1.3 LOCATIONS OF CONTROLS
- 4 1.4 SAFETY PRECAUTIONS
- 4 1.5 INSULATION RESISTANCE TEST
- 5 2.1 MECHANICAL PARTS
- 5 2.1.1 FRONT GRILLE
- 5 2.1.2 CABINET
- 5 2.1.3 CONTROL BOARD
- 6 2.2 AIR HANDLING PARTS
- 6 2.2.1 AIR GUIDE UPPER
- 6 2.2.2 ORIFICE, TURBO FAN AND FAN
- 7 2.2.3 MOTOR
- 7 2.2.4 AIR GUIDE
- 7 2.3.1 OVERLOAD PROTECTOR
- 8 2.3.2 COMPRESSOR
- 8 2.3.3 CAPACITOR
- 8 2.3.4 THERMOSTAT
- 8 2.3.5 ROTARY SWITCH
- 9 2.3.6 POWER CORD
- 9 2.4 REFRIGERANT CYCLE
- 9 2.4.1 CONDENSER
- 10 2.4.2 EVAPORATOR
- 10 2.4.3 CAPILLARY TUBE
- 12 3.1 SELECT THE BEST LOCATION
- 12 3.2 HOW TO INSTALL
- 15 3.3 ELECTRICAL DATA
- 15 4.1 OUTSIDE DIMENSIONS
- 16 4.2 PIPING SYSTEM
- 17 4.3 TROUBLESHOOTING GUIDE