- Industrial & lab equipment
- Electrical equipment & supplies
- Power conditioning
- Uninterruptible power supplies (UPSs)
- Eaton
- Powerware 9390
- Installation and Operation Manual
advertisement
Table of Contents
Maintenance Bypass and Maintenance Isolation Breakers . . . . . . . 1-2
Output Transformer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2
Installation Features. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2
Bypass Input Breaker. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2
Rectifier Input Breaker . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2
Distribution Panel. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2
Distribution Breakers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2
Remote Emergency Power-off . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2
Output Isolation Transformer. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3
Conventions Used in This Manual . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-4
Symbols, Controls and Indicators . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-5
SECTION 1 — INSTALLATION
Environmental Considerations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1
Preparing for Wiring the IDC . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1
Inspecting and Unpacking the IDC . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-2
Preliminary Installation Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1
Unloading the Cabinet from the Pallet. . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1
Line-up-and-Match IDC Installation . . . . . . . . . . . . . . . . . . . . . . . . . 3-4
Standalone IDC Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-10
Completing the Installation Checklist . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-12
SECTION 2 — OPERATION
Maintenance Bypass Mode. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1
Using the UPS when an IDC is Installed . . . . . . . . . . . . . . . . . . . . . 5-8
Transferring the UPS to Maintenance Bypass . . . . . . . . . . . . . . . . . 5-8
Transferring the UPS from Maintenance Bypass. . . . . . . . . . . . . . . 5-9
Using the Remote Emergency Power-off (REPO) Switch . . . . . . . . 5-9
Eaton 9390 IDC (40–80 kVA) Installation and Operation Manual 164201690 Rev 3 www.eaton.com/powerquality i
Table of Contents
Performing Preventive Maintenance. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1
Daily Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1
Periodic Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1
Annual Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1
Environmental Specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-1
ii Eaton 9390 IDC (40–80 kVA) Installation and Operation Manual 164201690 Rev 3 www.eaton.com/powerquality
advertisement
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Related manuals
advertisement
Table of contents
- 3 Table of Contents
- 5 List of Figures
- 8 1.1 IDC Features
- 8 1.1.1 Maintenance Bypass and Maintenance Isolation Breakers
- 8 1.1.2 Output Transformer
- 8 1.1.3 Installation Features
- 8 1.1.4 Expansion
- 8 1.2 IDC Options
- 8 1.2.1 Bypass Input Breaker
- 8 1.2.2 Rectifier Input Breaker
- 8 1.2.3 Distribution Panel
- 8 1.2.4 Distribution Breakers
- 8 1.2.5 Lug Output
- 8 1.2.6 Remote Emergency Power-off
- 9 1.2.7 Output Isolation Transformer
- 9 1.3 IDC Configurations
- 9 1.4 Safety Warnings
- 10 1.5 Conventions Used in This Manual
- 11 1.6 Symbols, Controls and Indicators
- 11 1.7 For More Information
- 12 1.8 Getting Help
- 13 Section 1
- 13 Installation
- 15 Chapter 2 IDC Installation Plan and Unpacking
- 15 2.1 Creating an Installation Plan
- 15 2.2 Preparing the Site
- 15 2.2.1 Environmental Considerations
- 15 2.2.2 Preparing for Wiring the IDC
- 16 2.3 Inspecting and Unpacking the IDC
- 19 Chapter 3 Installing the IDC
- 19 3.1 Preliminary Installation Information
- 19 3.2 Unloading the Cabinet from the Pallet
- 22 3.3 IDC Installation
- 22 3.3.1 Line-up-and-Match IDC Installation
- 28 3.3.2 Standalone IDC Installation
- 30 3.4 Initial Startup
- 30 3.5 Completing the Installation Checklist
- 33 Section 2
- 33 Operation
- 35 Chapter 4 Understanding IDC Operation
- 35 4.1 UPS Mode
- 35 4.2 Maintenance Bypass Mode
- 39 Chapter 5 IDC Controls and Operation
- 39 5.1 IDC Controls
- 46 5.2 IDC Operation
- 46 5.2.1 Using the UPS when an IDC is Installed
- 46 5.2.2 Transferring the UPS to Maintenance Bypass
- 47 5.2.3 Transferring the UPS from Maintenance Bypass
- 47 5.2.4 Using the Remote Emergency Power-off (REPO) Switch
- 51 Chapter 6 Maintaining the IDC
- 51 6.1 Important Safety Instructions
- 51 6.2 Performing Preventive Maintenance
- 51 6.2.1 Daily Maintenance
- 51 6.2.2 Periodic Maintenance
- 51 6.2.3 Annual Maintenance
- 52 6.3 Short Circuits
- 52 6.4 Maintenance Training
- 53 Chapter 7 Product Specifications
- 53 7.1 Model Number
- 53 7.2 IDC Input
- 53 7.3 IDC Output
- 53 7.4 Environmental Specifications
- 55 Chapter 8 Warranty
- 57 Appendix 9 Installation Reference