– Input and Output Connections. Carmanah SpeedCheck Series, SpeedCheck-15, SpeedCheck-18
Add to My manuals46 Pages
advertisement
SPEEDCHECK-15/18 USER MANUAL
3.0 COMPONENTS AND PREPARATION
3.6 SpeedCheck Controller – Input and Output Connections
•
Turn off the external source powering the display sign
•
Open the fuse block in the display sign
•
Wire harness connectors have ramp and clip features to hold the connector in place. If inserting connectors, ensure the connector ramp engages with the corresponding mating features.
•
For more information on the external input options, see the SpeedCheck Manager Software User Guide.
When the input is open, Mode 1 is set. When the input it closed, Mode 2 is set. Route input cables through the SpeedCheck-15 junction box or SpeedCheck-18 back panel.
•
No voltage should be applied to the input connections. The input is activated by shorting the input pins.
Connector Ramp
(shown not fully mated)
OUTPUT 1 - RED (+)
OUTPUT 1 - BLACK (-)
OUTPUT 2 - BLACK (-)
OUTPUT 2 - RED (+)
INPUT - GREEN (GND)
INPUT - WHITE (IN)
THE CONTROLLER CAN BE DAMAGED IF VOLTAGE IS APPLIED TO THE INPUT.
ENSURE THE NOTES ABOVE ARE CAREFULLY REVIEWED BEFORE MAKING ANY
CONNECTIONS. CONTACT CUSTOMER SERVICE IF THERE IS ANY UNCERTAINTY
BEFORE MAKING ANY CONNECTIONS, MODIFICATIONS OR ALTERATIONS.
Carmanah Technologies Corp. | 250 Bay St, Victoria, BC V9A 3K5, Canada | 1.250.380.0052 | [email protected]
| carmanah.com
16
advertisement
Related manuals
advertisement
Table of contents
- 4 1.0 Introduction
- 4 Warranty Disclaimer
- 4 Standards
- 5 Safety and Usage Precautions
- 6 System Components
- 7 2.0 System Overview
- 7 SpeedCheck-15/18 Display Sign Enclosure Dimensions
- 8 – Overview
- 9 – SpeedCheck-15 with AC Power routed to sign
- 10 – SpeedCheck-15/18 with Solar Power from Cabinet
- 11 – SpeedCheck-15/18 with AC Power from Cabinet
- 12 – SpeedCheck-15/18 – External Beacons
- 13 3.0 Components and Preparation
- 13 Components Supplied
- 13 Other Components Required
- 14 Tools Required
- 14 Banding Recommendations
- 15 Overview of Cabinet Connection Terminals
- 16 – Input and Output Connections
- 17 4.0 Installation
- 17 Pole Preparation
- 18 Round Pole Installation
- 19 Flat Surface Mount Installation
- 20 Quick Change Pole Mount
- 21 Tilt Mount
- 22 Cabinet Installation
- 23 Solar Panel Mount Installation
- 27 Solar Power System Wiring
- 28 Circular Beacon Installation
- 29 5.0 Display Alignment
- 29 – Overview
- 31 – Hill Alignment
- 33 – Curve Alignment
- 34 – Rotational Display Sign Alignment
- 35 6.0 Commissioning Checklist
- 36 7.0 Maintenance and Product Care
- 36 Sign Inspection
- 37 Battery Replacement (Solar-Powered System)
- 37 Internal Components
- 38 8.0 Troubleshooting
- 40 9.0 Service & Repair
- 40 Accessing Internal Components
- 41 Accessing SpeedCheck-15 Display Boards
- 42 Releasing Locking Features
- 43 Removing Display Boards
- 44 SpeedCheck Controller Cable Connections (Legacy)
- 44 – without Slow Down)
- 45 Programmable Board Display Cable Connections (with Slow Down)
- 46 10.0 Customer Service and Warranty