advertisement
Prior to Initial Start-Up
1
Before connecting the appliance to the mains and putting it into operation for the first time, leave the appliance to stand for 30 minutes if was transported upright. After transport on its side, the appliance must be left to stand for 2 hours before putting it into operation. This is necessary to allow the oil to flow back into the compressor. Otherwise the compressor may be damaged.
0
1. Please clean the appliance interior and all accessories prior to initial start-up (see section: "Maintenance and Cleaning").
2. The appliance must be correctly installed in accordance with the chapter "Installation" before it is put into operation for the first time. Care should be especially taken that the mains voltage and frequency available correspond with the appliance’s rating plate.
3. Remove the cold accumulation block from the appliance.
4. Place the cold accumulation block into a drawer only after the optimal storage temperature of -18 °C has been reached, and allow to freeze.
5. After 24 hours place the cold accumulation block at the front of the upper drawer.
6. Re-freeze the thawed cold accumulation block in the same fashion, e.g. after cleaning the appliance.
818 36 55-00/3
19
advertisement
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Related manuals
advertisement
Table of contents
- 10 Installation
- 10 Installation Location
- 11 The refrigerator/freezer needs ventilation
- 11 Appliance Alignment
- 12 Electrical Connection
- 13 Carbon filter
- 13 Reversing The Door
- 14 Appliance Description
- 14 View of Appliance
- 15 Freezer tray
- 15 Cold Accumulation Block
- 16 Control panel
- 16 Temperature setting buttons
- 17 Temperature Displays
- 17 RESET button
- 18 MODE button
- 18 Text display
- 19 Prior to Initial Start-Up
- 20 Initial Start-Up
- 20 Temperature Adjustment
- 22 Operating modes
- 22 SHOPPING
- 22 FROSTMATIC
- 23 COOLMATIC
- 23 FROSTMATIC and COOLMATIC
- 24 HOLIDAY
- 24 Switching the Appliance Off
- 26 Control and Information Systems
- 26 Power cut warning
- 26 “Open door” warning
- 27 Temperature warning
- 28 Function Errors
- 28 Opening the Freezer Compartment Door
- 29 Interior Accessories
- 29 Storage Shelves
- 29 Variable Inner Door
- 29 LONGFRESH 0 °C cold zone
- 30 Quick Chill Shelf
- 30 Bottle- and Can Holder
- 30 Dismantling of the Bottle- and Can Holder
- 31 Quick chill
- 31 Bottle Holder
- 32 Correct storage
- 35 Freezing
- 36 Frozen Storage
- 37 Storage Goods Symbols/Freezing Calendar
- 37 Preparation of Ice Cubes
- 37 Defrosting
- 39 Maintenance and Cleaning
- 39 Internal Cleaning
- 40 External Cleaning
- 41 Replacing the light bulb
- 42 Hints and Tips
- 42 Normal Operating Sounds
- 42 Food Storage
- 42 Energy Saving Advice
- 43 What to do if ...
- 44 Regulations, Standards, Guidelines
- 45 Technical Terminology
- 46 Guarantee Conditions
- 47 Service & Spare Parts