- No category
C2000 and C4000 Hardware Guide Release 3.0.x C-series Platforms Juniper Networks, Inc.
Add to my manuals
86 Pages
advertisement
Part 4
Index
■
Index
■ 69
C2000 and C4000 3.0.x Hardware Guide
70 ■
Index
Index
A
access, management................................................6, 21
airflow..........................................................................51
rack-mounted installation and..............................14
antistatic bags and containers......................................29
assembly numbers, locating.........................................64
C
C-series Controllers
cabling recommendations.....................................56
cleaning................................................................30
environmental requirements................................51
equipment rack requirements...............................55
safety guidelines...................................................54
space requirements..............................................56
unpacking.............................................................11
cables
recommendations.................................................56
Case Manager..............................................................63
circulation, air..............................................................14
cleaning the system.....................................................30
CLI (command-line interface).........................................6
command-line interface.................................................6
compliance
product reclamation and recycling........................57
regulatory.............................................................58
components
configuring
cables...................................................................56
management access.............................................21
console management port.............................................6
conventions
notice icons............................................................ix
text........................................................................ix
customer support..................................................xiii, 63
contacting JTAC....................................................xiii
D
damaged components, returning.................................12
distribution rack.....................................................14, 55
documentation set
comments on.......................................................xiii
E
EIA distribution rack....................................................14
electronic equipment, recycling...................................57
environmental requirements........................................51
Ethernet interfaces.........................................................6
F fan
failure...................................................................33
hot-swapping........................................................33
removing..............................................................33
H hardware
cable configuration...............................................56
reclamation and recycling.....................................57
hazardous materials, reclamation and recycling...........57
heat dissipation............................................................51
I
installing................................................................13, 51
IPMI
configuring with SRC CLI......................................43
overview.........................................................43, 47
user account
configuring..............................................45, 48
deleting.........................................................49
renaming.......................................................49
viewing..........................................................44
IPMI SOL......................................................................46
connecting............................................................46
disconnecting........................................................46
J
JTAC, contacting...........................................................63
Index
■ 71
C2000 and C4000 3.0.x Hardware Guide
L
lead in equipment, reclamation and recycling..............57
M
maintenance, system...................................................29
management access.................................................6, 21
SNMP......................................................................7
Management Information Bases.....................................7
manuals
comments on.......................................................xiii
mechanical requirements for distribution rack.............55
MIBs (Management Information Bases)..........................7
models...........................................................................3
modules
storing..................................................................29
mounting kits...............................................................55
mounting posts for rack...............................................55
site planning................................................................51
size of rack...................................................................56
SNMP for management access.......................................7
space requirements................................................14, 51
specifications.........................................................35, 36
distribution rack....................................................55
static electricity, protecting against..............................29
storing, modules and components...............................29
support, technical See technical support
system maintenance....................................................29
T
technical support.........................................................63
contacting JTAC....................................................xiii
temperature requirements...........................................51
text conventions defined...............................................ix
thermal protection mode.............................................33
tools required
troubleshooting
safety guidelines...................................................54
N
network management..............................................6, 21
notice icons...................................................................ix
P
packaging, recycling.....................................................57
packing instructions.....................................................65
preinstallation responsibilities......................................51
product numbers, locating...........................................64
U
unpacking C-series Controller.......................................11
USB port........................................................................6
USB storage device.........................................................6
V
ventilation....................................................................14
R
rack, distribution..........................................................14
reclamation and recycling............................................57
recycling Juniper Networks equipment.........................57
regulatory requirements...............................................58
remote user.................................................................46
removing components.................................................29
repacking components.................................................65
replacing components..................................................29
Restriction of Hazardous Substances (RoHS) Directive,
recycling equipment.................................................57
Return Materials Authorization.....................................63
returning product.........................................................63
RMA (Return Materials Authorization)..........................63
RoHS (Restriction of Hazardous Substances) Directive,
recycling equipment.................................................57
S
safety guidelines..........................................................54
serial numbers, locating...............................................64
serial over LAN.............................................................46
SFPs (small form-factor pluggable transceivers)
storing..................................................................29
W
Waste Electrical and Electronic Equipment (WEEE)
Directive, recycling equipment.................................57
WEEE (Waste Electrical and Electronic Equipment)
Directive, recycling equipment.................................57
weight of rack..............................................................55
72 ■
Index
advertisement
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Related manuals
advertisement
Table of contents
- 5 Table of Contents
- 9 About This Guide
- 9 SRC Guides and Release Notes
- 9 Audience
- 9 Documentation Conventions
- 11 Related Juniper Networks Documentation
- 13 Obtaining Documentation
- 13 Documentation Feedback
- 13 Requesting Technical Support
- 15 Product Overview
- 17 C-series Controller Overview
- 17 System Description
- 17 C-series Controller Models
- 19 C-series Model Components
- 20 Network Management Tools
- 20 CLI Management
- 21 SNMP MIB Management
- 23 Initial Installation
- 25 Unpacking and Inspecting the C-series Controller
- 25 Before You Begin
- 25 Unpacking the Units
- 25 Inspecting System Components and Accessories
- 26 If You Detect or Suspect Damage
- 26 Contacting Juniper Networks
- 26 The Next Step
- 27 Installing and Cabling the C-series Controller
- 27 Before You Begin
- 27 Freestanding Installation
- 28 Rack-Mounted Installation
- 28 Installation Guidelines
- 28 Preparing the Equipment Racks
- 28 Installing the System
- 29 Cabling the System
- 29 Cabling the Management Console
- 29 Management Ports
- 30 Connecting to the Network
- 30 Connecting to a Console Terminal
- 30 Cabling Ethernet Interfaces
- 30 Cabling the System for Power
- 31 The Next Step
- 33 Powering Up the C-series Controller
- 33 Powering Up
- 34 Status LEDs
- 34 The Next Step
- 35 Setting the Initial Configuration
- 35 Configuration Overview
- 35 Setting Up Management Access and Logging In
- 36 Configuring the Juniper Networks Database
- 37 Configuring Hostname and Domain Parameters
- 38 Configuring the System for Remote Access
- 39 Configuring the System to Accept SSH and Telnet Connections
- 39 Adding an Admin User Account
- 40 The Next Step
- 41 Hardware Maintenance Procedures and Specifications
- 43 Maintaining the System
- 43 Required Tools and Items
- 43 Storing Modules and Components
- 44 Cleaning the System
- 44 Installing or Replacing an SFP
- 45 Tools and Parts Required
- 45 Removing an SFP
- 46 Installing an SFP
- 47 Removing and Installing a Fan
- 47 Removing and Installing a Power Supply Module
- 48 Removing and Installing a Hard Drive
- 49 System Specifications
- 49 C2000 Model Specifications
- 50 C4000 Model Specifications
- 53 Managing RAID Disks on a C-series Controller
- 53 C-series Controller Data Storage
- 53 Managing Disks in a C-series Controller
- 54 Replacing or Swapping a Disk
- 55 Reinitializing an Active Disk
- 55 Viewing Information About Disks on a C-series Platform
- 57 Configuring IPMI on a C-series Platform (SRC CLI)
- 57 Overview of IPMI
- 57 Commands to Manage an IPMI Interface
- 58 Configuring IPMI with the SRC CLI
- 58 Viewing IPMI User Accounts
- 59 Creating IPMI User Accounts
- 60 Connecting to a Serial Console Using IPMI Serial over LAN (SOL)
- 60 Disconnecting from a Serial Console Using IPMI Serial over LAN (SOL)
- 61 Configuring IPMI on a C-series Platform (C-Web Interface)
- 61 Overview of IPMI
- 61 Configuring IPMI with the C-Web Interface
- 62 Viewing IPMI User Accounts with the C-Web Interface
- 62 Creating an IPMI User Account with the C-Web Interface
- 63 Deleting an IPMI User Account with the C-Web Interface
- 63 Renaming an IPMI User Account with the C-Web Interface
- 65 Installation Guidelines and Requirements
- 65 Your Preinstallation Responsibilities
- 65 Environmental Requirements
- 66 Regulatory Compliances
- 66 Safety Notices
- 66 Lithium Battery
- 66 Power Disconnection
- 67 Power Cable Warning
- 67 Power Cable Warning (Japanese)
- 67 Working with Lasers
- 68 VCCI Compliance
- 68 Safety Guidelines
- 69 Equipment Rack Requirements
- 69 Mechanical Requirements
- 70 Space Requirements
- 70 Proper Rack Installation
- 70 Cabling Recommendations
- 71 Product Reclamation and Recycling Program
- 72 Hardware Compliance
- 72 Federal Communications Commission (FCC) Statement
- 72 FCC Requirements for Consumer Products
- 72 Food and Drug Administration, Center for Devices and Radiological Health
- 73 Canadian Department of Communications Radio Interference Regulations
- 73 Réglement sur le brouillage radioélectrique du ministère des communications
- 73 Industry Canada Notice CS-03
- 73 Avis CS-03 d'Industrie Canada
- 74 D.O.C. Explanatory Notes: Equipment Attachment Limitations
- 75 Notes explicatives du ministère des Communications: limites visant les accessoires
- 75 EC Declaration of Conformity
- 75 Voluntary Control Council for Interference (VCCI) Statement for Japan
- 77 Contacting Customer Support and Returning Hardware
- 77 Contacting Customer Support
- 77 Return Procedure
- 78 Locating Component Serial Numbers
- 78 Information You Might Need to Supply to JTAC
- 79 Tools and Parts Required
- 79 Returning Products for Repair or Replacement
- 79 Packing Instructions for Returning a Chassis
- 81 Declaration of Conformity
- 81 Declaration of Conformity – C2000 Controller
- 82 Declaration of Conformity – C4000 Controller
- 83 Index
- 85 Index
- 85 A
- 85 C
- 85 D
- 85 E
- 85 F
- 85 H
- 85 I
- 85 J
- 86 L
- 86 M
- 86 N
- 86 P
- 86 R
- 86 S
- 86 T
- 86 U
- 86 V
- 86 W