advertisement
ELECTRICAL INSTALLATION
Power Switch Location
The gate operator uses a built-in power switch to control power to the operator and controller. This switch should be turned OFF during installation and service. Failure to use this switch can result in unexpected gate movement. Please note:
1. The switch is located on the LEFT side of the control box.
2. DOWN position = OFF. UP position = ON.
3. This switch must be used to turn OFF AC and battery power. Only disconnecting AC power still allows battery power to the operator, controller, and accessories.
4. Turn OFF until the installation is complete.
AC Power Guidelines
Under normal conditions, the gate operator will use a single phase AC power line to operate the gate, charge the batteries, and power gate accessories. Use the following guidelines when installing the AC power:
1. Check the local wiring codes in all cases and follow all local building codes. Wiring and hookup should be performed by a qualified electrician/installer only.
2. AC power should be supplied from a circuit breaker panel and must have its own dedicated circuit breaker. This supply must include a green ground conductor.
3. Only use U.L. approved 14 AWG or larger 600 Volt Insulated Wire. Use the following chart to determine the AC wire size. This information is for suggested use only - Check your local codes before installation.
4. Properly ground the gate operator to minimize or prevent damage from power surges and/or lightning. Use a grounding rod if necessary. A surge suppresser is recommended for additional protection.
Wire Size (AWG)
14
12
10
8
Distance (feet)
250
400
650
1000
AC Power Connection
To connect AC power to the gate operator:
1. Turn the circuit breaker for the AC gate operator power OFF before connecting the AC input wires.
2. Turn the Power Switch OFF located on the left side of the controller before connecting the AC input wires.
3. Connect the AC input wires to the AC terminal located on the bottom/center of the control box. See diagram below.
4. Batteries must be installed after the AC power is on. See Battery Power Connection.
L N
GREEN = Earth Ground
WHITE = Neutral
BLACK = 120 VAC
15
advertisement
Related manuals
advertisement
Table of contents
- 4 Important Safety Instructions
- 4 Important Installation Instructions
- 5 General Safety Precautions
- 6 UL325 Gate Operator Classification
- 6 Installing the Warning Signs
- 7 Restrictions and Warnings
- 7 Precautions
- 8 Entrapment Protection
- 9 Manual release
- 9 Preinstallation Guidelines
- 10 Gate Operator Specifications
- 10 Gate Operator Location
- 11 Concrete Pad Size & Location
- 12 Gate Operator Bolt Down
- 12 Chain Connection - Front Mount
- 13 Chain Connection - Rear Mount
- 14 Limit Switch Setup
- 14 Gate Operator Direction
- 15 Power Switch Location
- 15 AC Power Guidelines
- 15 AC Power Connection
- 16 Battery Power Connection
- 16 Accessory Power
- 17 Master/Slave Connection
- 18 Reverse Sensitivity Adjustment
- 18 Reverse Sensitivity Shutdown
- 19 Close Time Delay Adjustment
- 19 DIP Switch Settings
- 20 Overview
- 21 Photocell Sensor Connections
- 22 Edge Sensor Connections
- 23 Standard Reverse Connection
- 23 Open, Close, Stop Connections
- 23 External Reset Connection
- 24 Access Control Connection
- 24 Fire Lock Connection
- 25 Radio Receiver Connections
- 25 MagLock & Solenoid Lock Connections
- 26 Warning Light Connections
- 26 Solar Panel Connections
- 27 Basic Loop Layout
- 27 Loop Installation Guidelines
- 28 Plug-In Loop Detector Connections
- 28 External Loop Detector Connections
- 29 Fault Light Count