INSTALLATION SECTION
Clearances
The boiler can be installed with the following clearances:
25 mm either side of the boiler
50 mm to the front of the boiler
300 mm below the boiler
200 mm above the boiler
The above clearances are minimum clearances, consideration must be given to allow adequate space for servicing.
The recommended servicing clearances are:
50 mm either side of the boiler
600 mm to the front of the boiler
300 mm below the boiler
200 mm above the boiler
Terminal position
The minimum acceptable spacings from the terminal to obstructions and ventilation openings are shown in diagram 5 below:
8
Diagram 5
Minimum dimensions (in mm) for the positioning of flue terminals
a Under a window . . . . . . . . . . . . . . . . . . . . . . . . 300 b Under an air vent . . . . . . . . . . . . . . . . . . . . . . . 300 c Under a gutter . . . . . . . . . . . . . . . . . . . . . . . . . . 75 d Under a balcony . . . . . . . . . . . . . . . . . . . . . . . . 300 f e From an adjacent window . . . . . . . . . . . . . . . . . 300
From an adjacent air vent . . . . . . . . . . . . . . . . . 300 g From vertical drain pipes or soil pipes . . . . . . . . 75 h From an external corner of the building . . . . . . 300 l i From an internal corner of the building . . . . . . . 300
From the ground or from another floor . . . . . . . 300 m Between two terminals vertically . . . . . . . . . . 1500 n Between two terminals horizontally . . . . . . . . . 300
advertisement
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Related manuals
advertisement
Table of contents
- 2 Introduction
- 2 Controls and lighting
- 3 Draining and filling
- 3 Heating safety valve
- 3 Servicing/maintenance
- 3 Cleaning
- 3 Boiler casing
- 4 Introduction
- 5 Technical data
- 6 Dimensions
- 6 Pump capacity
- 7 Boiler schematic
- 8 Installation section
- 8 Terminal positions
- 9 Heating and hot water system design
- 10 Boiler installation
- 12 Horizontal flue installation
- 13 Vertical flue installation
- 14 Flue configurations
- 15 Electrical connection
- 16 Commissioning
- 18 Routine cleaning and inspection
- 19 Replacement of parts
- 22 Schematic wiring diagram
- 23 Fault finding
- 24 Conversion to LPG