visidec
freestanding quad
Installation Instructions
Important Notes l Each Donut Clamp Assembly supports a maximum weight of 11.5kg (25lbs) l This product suits VESA compliant displays with 75mm x 75mm (3” x 3”) and
100mm x 100mm (4” x 4”) mounting hole patterns.
l The manufacturer does not accept responsibility for incorrect installation
Component Checklist
Check you have received all parts against this component checklist prior to installation
Bits Box
Upright Pole
Donut
Clamp (x4)
Horizontal
Support Donut(x1)
A Attach Upright Pole to Base
Attach the Upright Pole to the Base as shown below. Ensure the Cable
Slot faces towards the rear.
Base
M8x50mm
Screw
(x1)
2.5mm Allen
Key (x1)
Cable
Ball (x8)
5mm Allen
Key (x1)
Cable
Clip (x4)
Extension
Clip (x16)
Mounting Screws
M4x10mm (x16)
M4x12mm (x16)
M4x16mm (x16)
TOOLS REQUIRED: l Phillips Head Screw Driver
B Install Horizontal Support and Donut Clamp
Follow steps below to attach the Horizontal Support and Donut Clamp assembly onto the Upright Pole. Ensure the Cable Slots in all the Poles are facing to the rear.
B.2.
Slide the Horizontal Support to desired position
B.1.
Loosen the Hex screws in the
Horizontal Support Donut using the supplied 5mm Allen Key
LOOSEN
LOOSEN
Back
Upright Pole
Cable Slot
User
POSITION
Cable
Slot
IMPORTANT:
When tightening the Donut Clamp, each of the Donut bolts must be tightened evenly, as failure to do so will damage the Donut Clamp. Do not over-tighten as this may also result in damage.
TIGHTEN
B.3.
Tighten supports firmly using the supplied 5mm
Allen Key
TIGHTEN
TIGHTEN
FIRMLY
M8x50mm Screw
5mm Allen Key
Repeat steps B.1, B.2 and B.3 for the 2nd set of Horizontal
Support and Donut Clamp
C Adjust Donut Clamps
Follow steps below to adjust the position of Donut Clamps. Ensure the Cable Slots in all the Poles are facing to the rear.
C.1.
Loosen Donut Bolts evenly using the supplied 5mm
Allen Key
C.2.
Slide the Donut Clamp to desired position
C.3.
Tighten Donut Bolts firmly using the supplied 5mm
Allen Key
IMPORTANT:
When tightening the Donut
Clamp, each of the Donut bolts must be tightened evenly, as failure to do so will damage the Donut Clamp.
Do not over tighten as this may also result in damage.
POSITION
LOOSEN TIGHTEN
D Mount Displays
Choose the correct Mounting Screws supplied in the bits box and attach the display as shown.
Note: Extension
Clips are included to suit VESA 100mm x 100mm (4” x 4”)
Mounting Hole
Patterns.
100mm (4”)
75mm (3”)
75mm
(3”)
100mm
(4”)
F Cable Management
Insert display cables into the slots in each pole, using
Cable Balls to hold them in place.
Note: When the slot in each pole cannot be used, use the supplied Cable Clip’s to secure the display cables.
Cable
Balls
Cable
Clips
E Adjust Ball Joint Mechanism
Adjust the Ball Joint
Mechanism to suit the weight of your display.
Tighten or loosen screws evenly with the supplied 2.5mm Allen
Key, 1/4 turn at a time.
LOOSEN
2.5mm
Allen Key
TIGHTEN
Note: Ensure enough slack is left in cables to allow for movement.
As LCD Manufacturers are constantly releasing new monitor models, Atdec does not accept responsibility it the mounting hole pattern does not comply with the international VESA standards.
Due to continuing product development, the manufacturer reserves the right to alter specifications without notice. Published: 29.08.07©