advertisement
The Vent system chart provides venting requirements that will help to achieve the best drying performance.
Vent system chart
Number of 90º turns or elbows
0
Type of vent
1
2
3
4
Rigid metal
Flexible metal
Rigid metal
Flexible metal
Rigid metal
Flexible metal
Rigid metal
Flexible metal
Rigid metal
Flexible metal
Box or louvered hoods
64 ft (20 m)
36 ft (11 m)
54 ft (16.5 m)
31 ft (9.4 m)
44 ft (13.4 m)
27 ft (8.2 m)
35 ft (10.7 m)
25 ft (7.6 m)
27 ft (8.2 m)
23 ft (7 m)
Angled hoods
58 ft (17.7 m)
28 ft (8.5 m)
48 ft (14.6 m)
23 ft (7 m)
38 ft (11.6 m)
19 ft (5.8 m)
29 ft (8.8 m)
17 ft (5.2 m)
21 ft (6.4 m)
15 ft (4.6 m)
Install Vent System
1.
Install exhaust hood. Use caulking compound to seal exterior wall opening around exhaust hood.
2.
Connect vent to exhaust hood. Vent must fit inside exhaust hood. Secure vent to exhaust hood with 4" (10.2 cm) clamp.
3.
Run vent to dryer location. Use the straightest path possible. See “Determine vent path” in
“Plan Vent System.” Avoid 90º turns. Use clamps to seal all joints. Do not use duct tape, screws or other fastening devices that extend into the interior of the vent to secure vent.
Install Leveling Legs
WARNING
Excessive Weight Hazard
Use two or more people to move and install dryer.
Failure to do so can result in back or other injury.
1.
To protect the floor, use a large flat piece of cardboard from the dryer carton. Place cardboard under the entire back edge of the dryer.
2.
Firmly grasp the body of the dryer (not the top or console panel). Gently lay the dryer on the cardboard. See illustration.
3.
Examine the leveling legs. Find the diamond marking.
4.
Screw the legs into the leg holes by hand. Use a wrench to finish turning the legs until the diamond marking is no longer visible.
5.
Place a carton corner post from dryer packaging under each of the 2 dryer back corners.
Stand the dryer up. Slide the dryer on the corner posts until it is close to its final location.
Leave enough room to connect the exhaust vent or gas line.
For mobile home use
Gas dryers must be securely fastened to the floor.
Mobile home installations require a Mobile Home Installation Kit. See “Tools and Parts” section for information on ordering.
Make Gas Connection
1.
Remove the red cap from the gas pipe.
2.
Using a wrench to tighten, connect the gas supply to the dryer. Use pipe-joint compound on the threads of all non-flared male fittings. If flexible metal tubing is used, be sure there are no kinks.
A
B
A. Flared male thread
B. Non-flared male thread
NOTE: For LP gas connections, you must use pipe-joint compound resistant to the action of LP gas. Do not use TEFLON ®† tape.
† ® TEFLON is a registered trademark of E.I. Du Pont De Nemours and Company.
11
advertisement
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Related manuals
advertisement
Table of contents
- 3 DRYER SAFETY
- 5 INSTALLATION INSTRUCTIONS
- 5 Tools and Parts
- 5 Location Requirements
- 7 Electrical Requirements
- 7 Gas Supply Requirements
- 8 Venting Requirements
- 10 Plan Vent System
- 11 Install Vent System
- 11 Install Leveling Legs
- 11 Make Gas Connection
- 12 Connect Vent
- 12 Level Dryer
- 12 Reverse Door Swing (Optional)
- 13 Complete Installation
- 14 DRYER USE
- 14 Starting Your Dryer
- 15 Drying Rack Option
- 15 DRYER CARE
- 15 Cleaning the Dryer Location
- 15 Cleaning the Lint Screen
- 16 Cleaning the Dryer Interior
- 16 Removing Accumulated Lint
- 16 Vacation and Moving Care
- 16 Changing the Drum Light
- 17 TROUBLESHOOTING
- 19 ASSISTANCE OR SERVICE
- 19 ACCESSORIES
- 20 WARRANTY
- 21 SÉCURITÉ DE LA SÉCHEUSE
- 23 INSTRUCTIONS D’INSTALLATION
- 23 Outillage et pièces nécessaires
- 23 Exigences d’installation
- 25 Spécifications électriques
- 25 Spécifications de l'alimentation en gaz
- 27 Exigences concernant l'évacuation
- 28 Planification du système d’évacuation
- 30 Installation du système d’évacuation
- 30 Installation des pieds de nivellement
- 30 Raccordement au gaz
- 31 Raccordement du conduit d’évacuation
- 31 Mise à niveau de la sécheuse
- 31 Inversion du sens d'ouverture de la porte (facultatif)
- 32 Achever l’installation
- 33 UTILISATION DE LA SÉCHEUSE
- 33 Mise en marche de la sécheuse
- 34 Option grille de séchage
- 34 ENTRETIEN DE LA SÉCHEUSE
- 34 Nettoyage de l'emplacement de la sécheuse
- 35 Nettoyage du filtre à charpie
- 35 Nettoyage de l’intérieur de la sécheuse
- 35 Comment enlever la charpie accumulée
- 35 Précautions à prendre pour les vacances et avant un déménagement
- 36 Changement de l’ampoule du tambour
- 36 DÉPANNAGE
- 38 ASSISTANCE OU SERVICE
- 38 ACCESSOIRES
- 39 GARANTIE