Arrow GS83 C, VGS83 B storage building Owner's Manual & Assembly Instructions
Реклама
Реклама
RE01
Owner's Manual & Assembly Instructions
Model No.
GS83-C VGS83-B
697.68600
Missing Parts, Questions on Assembly?
Call: 1-800-851-1085 or [email protected]
Do not return to dealer, they are not equipped to handle your requests.
712010111
Storage Area: 23 Sq. Ft.
2,1 m 2
122 Cu. Ft.
3,5 m 3
CAUTION: SOME PARTS HAVE SHARP EDGES. CARE
MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES
TO AVOID A MISHAP. FOR SAFETY SAKE, PLEASE READ
SAFETY INFORMATION PROVIDED IN THIS MANUAL
BEFORE BEGINNING CONSTRUCTION. WEAR GLOVES
WHEN HANDLING METAL PARTS.
BUILDING DIMENSIONS * Size rounded off to the nearest foot
Exterior Dimensions Interior Dimensions Door
*Approx. Base (Roof Edge to Roof Edge) (Wall to Wall) Opening
Size Size Width Depth Height Width Depth Height Width Height
8' x 3' 96 7/8" x 38" 99 3/8" 39 1/4" 65 5/8" 94 1/8" 35 3/16" 64 7/16" 50 1/4" 59 3/4"
2,4 m x 0,9 m 246,1 cm x 96,4 cm 252,4 cm 99,7 cm 166,7 cm 239,1 cm 89,4 cm 163,7 cm 127,6 cm 151,8 cm
BEFORE YOU BEGIN....
A2
Owner's Manual
Before beginning construction, check local building codes regarding footings, location and other requirements. Study and understand this owner's manual.
Important information and helpful tips will make your construction easier and more enjoyable.
Assembly Instructions: Instructions are supplied in this manual and contain all appropriate information for your building model. Review all instructions before you begin, and during assembly, follow the step sequence carefully for successful results.
Flooring and Anchoring: Your storage building must be anchored to prevent wind damage. A base is necessary to construct a square and level building. Anchoring and base materials are not included with your building. We recommend the combined use of an Arrow Floor Frame Kit and an Arrow Anchoring Kit as an effective method of securing your building to the ground (Available by mail order or at your local dealer) or you may construct a base and anchoring system of your choice. Your assembly instructions provide information on a few methods commonly used to secure and level a storage building.
Parts and Parts List: Check to be sure that you have all the necessary parts for your building.
•All part numbers can be found on the parts. All of these numbers (before the -) must agree with the numbers on the Parts List page.
•If you find that a part is missing, include the model number of your building and contact:
Arrow Shed, LLC Customer Service Department
1101 North 4th Street Breese, Illinois 62230
1-800-851-1085 or [email protected]
•Separate contents of the carton by the part number while reviewing parts list. The first few steps show how to join related parts to make larger sub assemblies which will be used later.
•Familiarize yourself with the hardware and fasteners for easier use during construction. These are packaged within the carton. Note that extra fasteners have been supplied for your convenience.
PLAN AHEAD....
A3
Watch the Weather: Be sure the day you select to install your building is dry and calm.
Do not attempt to assemble your building on a windy day. Be careful on wet or muddy ground.
Teamwork: Whenever possible, two or more people should work together to assemble your building. One person can position parts or panels while the other is able to handle the fasteners and the tools.
Tools and Materials: These are some basic tools and materials you will need for the construction of your building. Decide which method of anchoring and the type of base you wish to use in order to form a complete list of the materials you will need.
Required
• Eye Goggles
• No. 2 Phillips Screwdriver
(With Hardened Magnetic Tip)
Note: A power screwdriver or variable speed drill with Phillips-tip attachment can speed assembly by as much as 40%.
Required
• Work Gloves
• Step Ladder
• Utility Knife / Scissors
• Pliers
• Carpenter's Level
• Tape Measure
Optional Time-Savers
• Wrench / Nut Driver
• Electric / Cordless Drill
• Square
• String (for squaring frame)
Base Preparation
• Hammer and Nails
• Spade or Shovel
• Hand Saw / Power Saw
• Lumber and/or Concrete
Selecting and Preparing Your Site: Before assembly, you will want to decide on a location for your building. The best location is a level area with good drainage.
•Allow enough working space for ease of moving parts into position during assembly. Be sure there will be enough space at entrance for doors to open fully and enough space around the building to be able to fasten the panel screws from the outside.
•Before you begin the first steps in assembling your parts, a base should be constructed and an anchoring system should be ready to use.
SAFETY FIRST....
A4
Safety precautions are important to follow throughout the construction of your building.
•Care must be taken when handling various pieces of your building since some contain sharp edges. Please wear work gloves, eye protection and long sleeves when assembling or performing any maintenance on your building.
•Practice caution with the tools being used in the assembly of this building. Be familiar with the operation of all power tools.
safety edge sharp edge sharp edge safety edge
•Keep children and pets away from worksite to avoid distractions and any accidents which may occur.
•Do not attempt to assemble the building if parts are missing because any building left partially assembled may be seriously damaged by light winds. Call 1-800-851-1085 or [email protected]
•Never concentrate your total weight on the roof of the building. When using a step ladder make sure that it is fully open and on even ground before climbing on it.
•Do not attempt to assemble the building on a windy day, because the large panels acting as a
"sail", can be whipped about by the wind making construction difficult and unsafe.
CARE & MAINTENANCE....
A5 Web
Finish: For long lasting finish, periodically clean and wax the exterior surface. Touchup scratches as soon as you notice them on your unit. Immediately clean the area with a wire brush; wash it and apply touch-up paint per manufacturer's recommendation.
Roof: Keep roof clear of leaves and snow with long handled, soft-bristled broom. Heavy amounts of snow on roof can damage building making it unsafe to enter. In snow country,
Roof Strengthening Kits are available for most Arrow Buildings for added protection against heavy snow accumulation.
Doors: Always keep the door tracks clear of dirt and other debris that prevent them from sliding easily. Lubricate door track annually with furniture polish or silicone spray. Keep doors closed and locked to prevent wind damage.
Fasteners: Use all washers supplied to protect against weather infiltration and to protect the metal from being scratched by screws. Regularly check your building for loose screws, bolts, nuts, etc. and retighten them as necessary.
Moisture: A plastic sheet (vapor barrier) placed under the entire floor area with good ventilation will reduce condensation.
Other Tips....
• Wash off inked part numbers on coated panels with soap and water.
• Silicone caulking may be used for watertight seals throughout the building.
Do not store swimming pool chemicals in your building. Combustibles and corrosives must be stored in air tight approved containers.
Keep this Owner's Manual and Assembly Instructions for future reference.
ACCESSORIES....
A6 WEB
ROOF STRENGTHENING
(heavy snow load) KITS
Extra roof beams and gable braces designed for added protection against heavy snow accumulation. Increases the strength of your roof by 50%.
ANCHOR KITS
Model No. AK4
Anchor Kit contains heavy-duty steel augers, 60' (18 m) of steel cable and
4 cable clamps. No digging or concrete pouring, just insert cable under roof, over roof beams, into augers and twist augers into the ground. For buildings larger than 10'x9' (3,0 m x 2,6 m), use 2 kits.
Model No. AK100
New concrete anchor system permits anchoring any size Arrow building directly to a concrete slab. Each kit contains heavy-duty, hot-dipped galvanized steel corner gussets and perimeter clips which fit over the floor frame and lag bolt into a concrete slab.
Full assembly instructions and a 1/4" masonary drill bit are included.
Model No. AK600
Earth Anchor Kit anchors any size
Arrow building to the ground.
Each kit contains heavy duty, hot-dipped galvanized steel corner gussets and 4 earth anchors.
TOOL HANGING RACK
Model No. TH100
The perfect tool organizer. Twin
25 1/2" (64,8 cm) steel channels plus five heavy-duty snap-in hangers and a small tool holder for screwdrivers, pliers, etc. Holders slide along channel for fully adjustable spacing. Great for garage, basement, or the back of any door. Fits all Arrow storage buildings.
FLOOR FRAME KITS
MODELS FB47410, FB5465, FB106-A
FB109-A and FB1014-A
A simple new floor frame system made of heavy-duty, hot-dipped galvanized steel. Use as base for plywood, sand or stone.
ATTIC KIT / WORKBENCH KIT
Model No. AT101
Heavy-duty galvanized steel bars that fit all 10' (3,0 m) wide Arrow buildings.
They install quickly and easily to help organize space and create more useable space as an attic or workbench. Will hold up to 250 lbs.
(113 kg) evenly distributed.
Some drilling required to fit buildings without mid-wall bracing.
SHELF UNITS
Heavy-duty, galvanized steel shelf units help organize storage space. They easily mount on the wall or sit on the floor. Fits all
Arrow buildings.*
Model No. SS404
• Makes 8" to 12" (20,3-30,5 cm)
wide shelves in any length.
• Brackets, braces,
hardware included.
Lumber is not included.
Model No. SS900-A
• Grey color
• 3 shelves
• Holds up to 85 lbs. (38 kg)
(even weight distribution)
* Some drilling required to fit buildings without mid-wall bracing.
THIS
PAGE
WAS
LEFT
BLANK
INTENTIONALLY
7
8
THIS
PAGE
WAS
LEFT
BLANK
INTENTIONALLY
Anchoring
BE09
Anchoring Down The Building
It is important that the entire floor frame be anchored after the building is erected.
Below are recommended ways of anchoring.
Anchoring into Wood/Post:
Use 1/4" (6 mm) Wood Screws. There are 1/4" (6 mm) dia. holes provided in the frames for proper anchoring.
1.
2.
Anchoring into Concrete:
1. For poured concrete slab or footing or patio blocks:
Use 1/4" x 2" (6 mm x 51 mm) Lag Screws.
2. For Anchor Post of Concrete poured after building is erected: Use 1/4" x 6" (6 mm x 152 mm) Lag Screws.
1.
2.
9
QR10
27
28
29
30
23
24
25
26
19
20
21
22
15
16
17
18
Assembly
Key No.
1
2
3
4
5
6
11
12
13
14
7
8
9
10
35
36
37
38
31
32
33
34
39
40
10
9947
9945
9889
9890
9891
9892
9893
9940
9879
9880
9881
9927
9883
9884
9885
10184
9941
10183
9897
9898
9899
10200
9905
10176
67734
9944
9871
9872
9873
9874
9875
9876
9877
9878
Part
Number
10202
9866
10201
9868
10199
9870
Parts List
Part
Description
Side Floor Frame
Outer Front Floor Frame
Center Front Floor Frame
Rear Floor Frame
Floor Brace
Right Front Corner Panel
Quantity Check
in Carton List
2
2
2
1
1
2
Left Front Corner Panel
Right Rear Corner Panel
Left Rear Corner Panel
Wall Panel
Front Wall Panel
Wall Panel
Wall Panel
Right Roof Panel
Left Roof Panel
Roof Panel
Roof Panel
Rear Wall Channel
Rear Wall Angle
Shelf
Roof Beam
Main Door Header
1
1
1
2
2
2
1
1
1
2
1
2
2
4
2
1
Outer Door Header
Main Header
Outer Header
Right Gable
Left Gable
Right Door Jamb
Left Door Jamb
Right Door
Left Door
Door Latch Brace
Tool Bar
Right Roof Trim
Left Roof Trim
Floor Channel
Door Brace
Astragal
Foam Board
Vertical Door Brace
4
1
2
4
2
2
1
2
1
1
1
1
1
1
1
1
1
1
QR11
Assembly by Key No.
11
Hardware
QR12
65103
#8-32 Hex Nut (108)
65941
#6-32 Hex Nut (24)
(Packed with Screws)
65923
#8-32x3/8" (10 mm)
Bolt (108)
65004
#8Ax5/16" (8 mm)
Screw (242)
66714
#6-32x7/16" (11 mm)
Flat Hd Bolt (24)
(Packed with Screws)
65958
#8-32x7/8" (22 mm)
Bolt (2)
(Packed with Screws)
66684
Spring Latch (2)
66646
Washer (257)
(7 sheets of 40)
67468
Peak Cap (1)
66054
Latch - Attic Door (1)
66609
Hinge (4)
66183
Roof Trim Cap
(2 right & 2 left)
66148
Cap Protector (14)
67236
Adhesive Pad (2)
12
66043
Locking Handle (1)
66149
Tool Hook (5)
66150
Screw Driver Holder (1)
66082
Corner Cap (2)
Step 1
BE13
The front floor frame is made up of three pieces. The rear floor frame is made up of two pieces. The holes in these pieces will align when the pieces are positioned with correct amount of overlap. The illustrations below show the proper overall length for the rear and front. Proceed as follows:
1
Place the outer front floor frames as shown. Position the center front
floor frame on top of the two outer front floor frames. Join the frames by inserting six bolts and nuts.
2
Overlap the rear floor frames as shown. The holes in these pieces will align when the pieces are positioned with correct amount of overlap. See the illustrations below for the proper overall length of the rear floor frame. Join the frames by inserting three bolts and nuts as shown.
3
Double check the length of each.
● Parts Needed For ●
Floor Frame Assemblies
●
●
●
9866
9868
STEP
2
10201
STEP
1
Front Floor Frame 95 1/4" 241,9 cm
9866
Rear Floor Frame 95 1/4"
241,9 cm
9868
STEP
3
95 1/4" 241,9 cm Rear
95 1/4" 241,9 cm Front
13
Step 2
BE14
● Parts Needed For ●
Floor Frame
1
Place the floor frame pieces that you assembled on the ground. Assemble the four corners of the floor frame using two screws at each corner as shown.
2
Measure the floor frame diagonally. When the diagonal measurements are equal, the floor frame is square.
The floor frame must be square
and level or holes will not align.
10202
●
●
●
9868
10202
Rear Floor Assembly
STEP
1
FRONT
Front Floor Assembly
10202
When Diagonal Measurements are Equal the Floor Frame is Square
FRONT
STEP
2
14
Step 3
BE15
● Parts Needed For ●
Floor Frame Kit
1
Snap channels 10200 together as shown. Join the channels by inserting four nuts and bolts. Make two complete assemblies.
FRONT
15
16
Step 4
BE16
● Parts Needed For ●
Attaching Floor
Frame Kit
1
Do not attach decking material at this time!
NOTE: FLOOR FRAME MUST BE LEVEL AND
SQUARE BEFORE PROCEEDING!
2
Check floor frame for slots.
3
Bend tabs and assemble parts.
4
Overlap slots on 10199 and attach to front floor frame using eight screws.
●
●
●
STEP
3
STEP
4 factory slot
STEP
2
Bend Tabs
Install
10199 FRONT 10199
FRAME MUST BE SQUARE
AND LEVEL
Step 5
BE17
Finishing Material
Select one of the suggested finishing materials. Be sure Floor Frame Kit lies flat on the ground. To prepare the earth bed, remove sod and other organic debris, level the high spots with a flat shovel, and tamp the bed down.
LAY EXTERIOR PLYWOOD OR ANY SUITABLE DECK MATERIAL (5/8" 15,5 mm MINIMUM THICK-
NESS)
NOTE: Pressure Treated Lumber must not be used where it will make contact with your storage building.
The properties of Pressure Treated Lumber will cause accelerated corrosion. If Pressure Treated
Lumber comes in contact with your storage building your warranty will be voided.
IMPORTANT NOTE: If leveling blocks are required due to uneven ground conditions, the floor frame kit must be completely supported, because the kit is not self supporting. Plywood rests on top of the floor frame.
Step 6 Placement & Amount of Material
94"
238,8 cm
CORRECT
INCORRECT
32 5/8"
82,9 cm
Drill and fasten wood to steel frames using dry wall screws
NOTE: ALIGN EDGE
OF PLYWOOD WITH
SIDE AND REAR
FLOOR FRAMES.
FRONT
1-4x8 1220x2440 mm SHEET
DECK MATERIAL
SUGGESTION: Use remaining decking material for shelving or entry ramp.
FRAME MUST BE SQUARE AND LEVEL
BEFORE ATTACHING PLYWOOD.
17
Step 7
QR18
● Parts Needed For ●
Header/Door Header
Assembly
●
●
●
●
●
●
●
The header assembly is made up of two pieces. The door header assembly is made up of two pieces. The illustrations below show the proper overall length for the header/door header assembly. Proceed as follows:
1
Place the outer header as shown.
Snap the main header over the outer header. See the illustration for the proper overall length of the header assembly.
2
Place the outer door header as shown. Snap the main door header over the outer door header. See the illustration for the proper overall length of the door header assembly.
3
Double check the length of each.
The header/door header combo reinforces the front wall and roof. It is made up of two assemblies.
4
Positioning the door header as shown, attach the header to the door header using 13 screws along entire length. Set this piece aside for later use.
Header Assembly
Door Header Assembly
9947
END VIEW
Header Assembly
Door Header Assembly
9945
95 13/16"
243,4 cm
10184
Header Assembly
92 3/4"
235,6 cm
9889
Door Header Assembly
STEP
1
STEP
2
STEP
3
STEP
4
18
Step 8
BE19
The main frame pieces reinforce the walls and roof. These pieces will later be installed in the center of the roof and at the top edge of the rear wall.
Proceed as follows:
1
Overlap the roof beam pieces as shown in the figure (large hole on top) and fasten the two pieces together with four bolts and nuts where shown.
2
Overlap the rear wall angle pieces as shown in the figure and fasten them together with four bolts and nuts where shown.
3
Set the assemblies aside. You will use them later.
● Parts Needed For ●
Roof Beam/Rear
Wall Angle Assembly
9885
●
●
STEP
1
Roof Beam Assembly
9883
95 7/8"
243,5 cm
STEP
2
Rear Wall Angle Assembly
9883
9885
19
20
Step 9
QR20
The steps on this page tell how to assemble the right door. Proceed as follows:
1
Position hinges on side of right
door panel as shown and fasten with
7/16" (11 mm) flat head bolts outside and #6 hex nuts inside.
2
Slip foam board under lip of door, away from hinges, foil facing outward. See caution. Hold the vertical
door brace against the long edge of the foam board inside the door and fasten to door using five bolts and nuts.
3
Position astragal to door, as shown, and fasten to side of door using six screws.
● Parts Needed For ●
Right Door Assembly
10176
STEP
3
10176
9905
●
●
●
●
●
●
Foam Board (1)
● 9944 Vertical Door Brace (1)
67734
9940
67734
9944
Hinge
STEP
1
9940
CAUTION:
SHARP EDGE
Hinge
Flat Head Bolt
7/16" (11 mm)
9944 Screw
9905
Foil Side
STEP
2
STEP
4
4
Cover ends of door panel with
door braces. Edge of door panel slides into brace. Fasten braces to door using two screws on each brace.
5
Fasten door latch brace to door and astragal using four screws. Using an awl, ice pick or nail, push holes through foam board at the handle holes. Attach locking handle to door using 7/8" (22 mm) bolts.
6
Attach latch by inserting onto square shaft of handle.
7
Set the door aside for later use.
Screw
10183
STEP
5
STEP
6
Step 10
QR21
The steps on this page tell how to assemble the left door. Proceed as follows:
1
Position hinges on side of left
door panel as shown and fasten with
7/16" (11 mm) flat head bolts outside and #6 hex nuts inside.
2
Slip foam board under lip of door, away from hinges, foil facing outward. Hold the vertical door brace against the long edge of the foam board inside the door and fasten to door using five bolts and nuts.
3
Cover ends of door panel with
door braces. Edge of door panel slides into brace. Fasten braces to hinged side of door using one screw on each brace.
4
Attach spring latches to door braces and door using three screws on each latch.
5
Set the door aside for later use.
9905
● Parts Needed For ●
Left Door Assembly
Door
(Top)
STEP
4
9944
Door
(Bottom)
●
●
● ●
●
●
END VIEW
STEP
2
67734
9941
Screw
STEP
1
9941
Hinge
67734
7/16" (11 mm)
Flat Head
Screw Hinge
9944
Foil Side
9905
STEP
3
21
Step 11
BE22
NOTE
The remainder of the building assembly requires many hours. Do not continue beyond this point if you do not have enough time to complete the assembly today. A partially assembled building can be severely damaged by light winds.
Each screw and bolt in the wall requires a washer.
● Parts Needed For ●
Corners/Gables
STEP
2
REAR
●
●
●
●
●
●
●
Wide Side
STEP
3
SIDE
CORRECT INCORRECT
1
Position right & left front corner
panels at the corners of the floor frame as shown. The widest part of each corner panel must be placed along the front of the building. Fasten the corner panels to the floor frame with four screws, where shown.
Support the corner panel with a step ladder until next panel is fastened.
2
Attach the right & left rear corner
panels to the rear corners, as shown.
NOTE
Be careful to install the correct panel in each position as shown
3
Fasten wall panels 9874 to the sides of building using four screws into side floor frame. The crimped rib should go under the rib of adjacent panel. Fasten overlapping rib using two screws and a bolt with nut.
4
Fasten the right & left gables across the top of the side panels using five screws on each gable.
5
Double-check the part numbers of the wall panels, before proceeding.
22
9871
STEP
1
9891
9874
TOP VIEW
FRONT
9872
Attach panels with extra holes facing up.
Washer
STEP
4 9890
9873
Panels rest on frame as shown
Crimped Rib
Underneath
9870
Narrow
Side
SIDE
9874
The floor frame must be square
and level or holes will not align.
Step 12
BE23
The main frame pieces give rigidity to the front and rear walls.
1
Fasten the rear wall angle as-
sembly across the top of the rear wall using eight screws.
2
Fasten the header/door header
assembly across the top of the front walls using six screws, where shown.
3
Join gables to header in the front corners, using a bolt and nut.
STEP
3
● Parts Needed For ●
Frames
●
●
STEP
1
Rear Wall Angle Assembly
Header/Door Header Assembly
STEP
2
23
Step 13
BE24
Each wall panel has a crimped rib on one side. The crimped rib should go under the rib of the adjacent panel that follows it.
1
Fasten all the wall panels at the top and bottom with screws. Attach panels with extra holes facing up.
2
Fasten overlapping ribs using two screws and a bolt with nut.
● Parts Needed For ●
Wall Panels
STEP
1
9877
9876
●
●
●
Be sure that you have the correct panel in each position. Do this by overlapping the panels and determining if the holes line up with the holes in the frame.
9876
24
9875
Panels rest on frame as shown
STEP
2
9875
Crimped Rib
Underneath
Step 14
BE25
The door jambs reinforce the door opening and provide an attractive trim. Follow these steps for both door jambs.
1
Fasten a right door jamb to the front wall panel with three bolts and nuts as shown.
2
Fasten the top of the door jamb to the door header with two screws. Do the same for the bottom into frame.
Repeat steps 1 through 2 for the opposite left door jamb.
● Parts Needed For ●
Door Jambs
●
●
Screw
TOP VIEW
Door Header
Screw
TOP VIEW
Door Header
Bolt STEP
2
9893
9892
STEP
1
25
26
Step 15
BE26
1
Bend tab at each end of roof beam
assembly upward. Position beam across width of building, down on the ledge of gables at center hole location, but do not fasten at this time.
● Parts Needed For ●
Roof Beam
STEP
1
Roof Beam Assembly
Step 16
BE27
● Parts Needed For ●
Right/Left Roof Panels
●
●
Installing the roof panels is best done with a step ladder. Begin installing roof panels at the right side of the building. Each screw and bolt in the roof requires a washer.
Note: Tab of roof beam is fastened between roof panel and gable using the center hole.
NOTE
Measure the building diagonally again and make adjustments to make sure the building is square and level. This will make the roof panels fit better, and holes will align.
3
Install the left roof panel 9879 on the left side in the position shown below.
Screws To
Rear Wall
Angle
Fasten At
Overlap With
Bolt (Later)
Bolts To
Gable
1
Locate the roof panels and find the
right roof panel part number 9878.
2
Position a right roof panel at the right side and fasten to the gable, header and roof beam and rear wall angle using screws and bolts with nuts as shown.
9879 Left Roof Panel
STEP
3
Screws To
Roof Beam
Screws To
Header
Nut
Washer
Roof Beam
Bolt
STEP
2
9878 Right Roof Panel
FRONT
27
28
Step 17
BE28
● Parts Needed For ●
Roof Panels
1
Install a wide roof panel 9880, narrow roof panel 9881, and a wide
roof panel 9880 in the positions shown. Fasten middle of rib overlap with a bolt and nut.
Note:
Narrow roof panel crimped rib is overlapped by wide rib of adjacent panel where possible
STEP
1
9880 Roof Panel
9881 Roof Panel
●
●
9880 Roof Panel
FRONT
Step 18
BE29
● Parts Needed For ●
Roof Trim
●
●
1
Overlap the right & left roof trim pieces as shown in the figure and fasten them together with one screw.
Make two assemblies.
2
Attach the roof trim assemblies to the ends of the roof panels on the front and rear of the building using screws at each roof panel overlap.
4
Fasten the roof trim caps to the roof trim using a screw.
5
Fasten the roof trim and peak cap together using bolts and nuts.
6
Fasten the corner caps to the ends of the header, using adhesive pads.
3
Using your thumb and index finger, overbend the bottom flange of the roof trim at the corner inward enough so the right and left roof trim
caps fit onto right and left corners.
9899 Left Roof Trim
STEP
4 Roof Trim Cap
98 1/8"
249,2 cm
STEP
2
Roof Trim Assembly
STEP
1
9898 Right Roof Trim
Adhesive Pad
STEP
6
STEP
3
Peak Cap
STEP
5
Tuck Flange
Inward to Fit
Inside of
Roof Trim Cap
Corner Cap
29
30
Step 19
BE30
● Parts Needed For ●
Shelving/Channel/Tool Bar
1
Overlap the rear wall channel pieces as shown in the figure to the correct overall dimension.
2
Fasten the rear wall channel as-
sembly across the middle of the rear wall using 13 screws.
3
Position a shelf inside rear wall channel and slide to the end of building. Fasten using ten bolts and nuts through panels.
Repeat Step 3 for the opposite shelf.
4
Install remaining two shelves above the first two at the holes provided, using ten bolts and nuts.
5
Fasten the tool bar across the upper rear wall using eleven screws from the outside.
●
●
●
Screw Driver Holder(1)
Tool Hook (5)
Tool Hooks slide along track to any desired position.
Keeps rakes, shovels, brooms and much more in a safe and accessible location.
The Screw Driver Holder is engineered for all types of hand tools such as screwdrivers and pliers. A total of seven hand tools may be stored.
9927
STEP
1
77 5/8"
197,2 cm
Rear Wall Channel Assembly
STEP
5
9897
Cap Protector
Install Cap Protectors to the ends of the Tool Hooks and Screw Driver Holder.
9927
STEP
4
9884
9884
Rear Wall
Channel Assembly
STEP
2
9884
9884
STEP
3
Step 20
QR31
1
Position doors in corners of door opening as shown and fasten hinges to jambs with 7/16" (11 mm) flat hd bolts and #6 hex nuts.
2
Close doors. Adjust so that latch engages behind left door, then tighten set screw. The unit is locked. Turn key and remove.
● Parts Needed For ●
Installing Door
Congratulations, you have completed assembly of your storage building.
●
●
Set Screw
STEP
2
STEP
1
Keep this Owner's Manual and Assembly Instructions for future reference.
31
GS83-C
RE32
ANCHORING
Anchor your building at this time.
VGS83-B 697.68600
SOME FACTS ABOUT RUST
Rusting is a natural oxidizing process that occurs when bare metal is exposed to moisture. Problem areas include screw holes, unfinished edges, or where scrapes and nicks occur in the protective coating through normal assembly, handling and use. Identifying these natural rusting problem areas and taking some simple rust protection precautions can help to stop rust from developing, or stop it quickly as soon as it appears.
1. Avoid nicking or scraping the coating surface, inside and out.
2. Use all the washers supplied. In addition to protecting against weather infiltration, the washers protect the metal from being scraped by the screws.
3. Keep roof, base perimeter and door tracks free of debris and leaves which may accumulate and retain moisture. These can do double damage since they give off acid as they decay.
4. Touch up scrapes or nicks and any area of visible rust as soon as possible. Make sure the surface is free of moisture, oils, dirt or grime and then apply an even film of high quality touch-up paint.
712010111