Dixon Rotary Lobe Pumps - JRZL-300 Series Manual


Add to my manuals
80 Pages

advertisement

Dixon Rotary Lobe Pumps - JRZL-300 Series Manual | Manualzz

Operating & Maintenance Manual for

JRZL-300 Series

Rotary Lobe Pumps

Dixon Sanitary

N25 W23040 Paul Road • Pewaukee, WI 53072 ph: 800.789.1718 • fx: 800.789.4046

dixonvalve.com

2

Thank you for purchasing a Dixon Sanitary Product!

This manual contains installation, operation, disassembly and assembly instructions, maintenance procedures, troubleshooting and a complete parts list for all JRZL-Series positive displacement pumps.

READ THIS MANUAL carefully to learn how to service these pumps. Failure to do so could result in person injury or equipment damage.

Table of Contents

Safety ................................................................................................................................................................................................... 3

Care of Stainless Steel ......................................................................................................................................................................... 4

Technical Specifications ....................................................................................................................................................................... 5

Curves ...............................................................................................................................................................................................6-9

Unpacking Installation & Start Up ..................................................................................................................................................10-19

Tools needed ...................................................................................................................................................................................... 20

Maintenance ..................................................................................................................................................................................20-58

Pump Housing Disassembly ......................................................................................................................................................20-51

Single Mechanical Seal ..........................................................................................................................................................20-28

Double Mechanical Seal.........................................................................................................................................................29-38

Single O-ring Seal ..................................................................................................................................................................39-44

Triple Lip Seal ........................................................................................................................................................................45-51

Inspection........................................................................................................................................................................................ 52

Pump Housing Assembly ................................................................................................................................................................ 52

Rotor Clearance .........................................................................................................................................................................53-55

Shimming ...............................................................................................................................................................................54-55

Rotor Timing ................................................................................................................................................................................... 56

Gear Box Disassembly ................................................................................................................................................................... 57

Gear Box Assembly ........................................................................................................................................................................ 58

Scheduled Maintenance ................................................................................................................................................................. 58

Maximum RPM ................................................................................................................................................................................... 59

Maximum Solids ................................................................................................................................................................................. 59

Dimensions ......................................................................................................................................................................................... 60

Troubleshooting .............................................................................................................................................................................61-63

Repair Kits .......................................................................................................................................................................................... 64

BOM ..............................................................................................................................................................................................65-76

Certificates .....................................................................................................................................................................................77-78

Warranty ............................................................................................................................................................................................. 79

800.789.1718

Rotary Lobe Pumps - JRZL-300 Series

Safety Information

DO’S & DON’TS

DO read and understand these instructions before installing or using the pump.

DO use Dixon spare parts when replacing a component of the pump.

DO NOT service the pump while it is running.

DO NOT place the pump in an application where the service ratings are exceeded.

DO NOT modify the pump. Modifying the pump creates unsafe conditions and voids all warranties.

SAFETY PRECAUTIONS WHEN INSTALLING PUMP

DO use an authorized electrician when connecting the pump.

DO observe the mechanical limits of the pump (refer to the pump performance sheet).

DO install a throttling valve in the discharge line.

DO NOT install a throttling valve in the suction line.

SAFETY PRECAUTIONS WHEN OPERATING PUMP

DO allow only qualified personnel to operate this pump.

DO NOT start the pump until all personnel are clear.

DO NOT touch the pump or the lines when pumping hot fluids or when performing Clean In Place (CIP) procedures.

DO NOT run the pump with BOTH the suction inlet and discharge outlet blocked. Running the pump with the inlet blocked will cause serious damage to the pump.

DO NOT check pump rotation with liquid in the pump.

DO NOT run the pump with the front cover removed. The rotors and rotor case could be damaged or may cause severe injury.

DO NOT operate the pump with the safety guard removed.

SAFETY PRECAUTIONS WHEN SERVICING PUMP

DO ensure the pump is cool to touch before performing service.

DO relieve all pressure and drain all fluids from pump and connected piping before performing service.

DO ENSURE POWER TO THE UNIT HAS BEEN DISCONNECTED PRIOR TO PERFORMING ANY PUMP

MAINTENANCE OR CLEANING.

DO exercise caution and wear protective clothing when using lye or acid for cleaning.

Rotary Lobe Pumps - JRZL-300 Series 800.789.1718

3

Care of Stainless Steel

The stainless steel components in Dixon Sanitary equipment are machined, welded and assembled by skilled craftsmen using manufacturing methods that preserve the corrosion-resistant quality of the stainless steel.

Retention of corrosion-resistant qualities under processing conditions requires regular attention to the precautions listed below.

1.

Regularly check all electrical devices connected to the equipment for stray currents caused by improper grounding, damaged insulation or other defects. Corrosion: Pitting often occurs when stray currents come in contact with moist stainless steel.

2.

Never leave rubber mats, fittings, wrenches, etc. in contact with stainless steel. Corrosion: Pitting or galvanic action. Objects retard complete drying, preventing air from reforming the protective oxide film. Galvanic corrosion occurs when two dissimilar metals touch when wet.

3.

Immediately rinse equipment after use with warm water until the rinse water is clear. Clean the equipment (manual or CIP) as soon as possible after rinsing. Corrosion: discoloration, deposits, pitting. Product deposits often cause pitting beneath the particles.

4.

Use only recommended cleaning compounds. Purchase chemicals from reputable and responsible chemical manufacturers familiar with stainless steel processing equipment, they continuously check the effects of their products on stainless steel.

5.

Use cleaning chemicals exactly as specified by the manufacturer. Do not use excessive concentrations, temperatures or exposure times. Corrosion: Pitting, discoloration, stress cracks. Permanent damage often occurs from excessive chemical concentrations, temperatures or exposure times.

6.

For manual cleaning, use only soft non-metallic brushes, sponges or pads. Brush with the grain on polished surfaces, avoid scratching the surface. Corrosion: Pitting, scratches. Metal brushes or sponges will scratch the surface and promote corrosion over a period of time. Metal particles allowed to remain on a stainless steel surface will cause pitting.

7.

Use chemical bactericides exactly as prescribed by the chemical manufacturer in concurrence with local health authority. Use the lowest permissible concentration, temperature and exposure time possible. Flush immediately after bacterial treatment. In no case should the solution be in contact with stainless steel more then 20 minutes. Corrosion: Protective film destroyed. Chlorine and other halogen bactericides can destroy the protective film. A few degrees increase in temperature greatly increases chemical activity and accelerates corrosion.

8.

Regularly inspect the joints in pipelines. Be sure all connections are tight fitting without binding. Corrosion: Crevice corrosion.

Small crevices caused by improperly seated gaskets will promote crevice corrosion. Stainless steel under stress will develop stress cracking especially in the presence of bactericides containing chlorine.

9.

Regularly inspect equipment for surface corrosion (i.e. pitting deposits, stress cracks, etc.). If deposit or color corrosion is detected, remove it immediately using mild scouring powder and detergents. Rinse thoroughly and allow to air dry. Review production and cleaning procedures to determine the cause. Note: If corrosion is not removed, the protective film cannot be restored and corrosion will continue at an accelerated rate.

4 800.789.1718

Rotary Lobe Pumps - JRZL-300 Series

JRZL 300-Series Technical Data

Specifications:

Maximum Flow Rate

(GPM)

161

Temperature

Range

14°F to 356°F (-10°C to 180°C)

330 174

340 116 228 above 248°F (120°C) may require

Hot Clearance Rotors

1 Up to 435 PSI (30 bar) is available with Front Bearing Cover

Viscosity

Range

Up to

1,000,000 cPs

Materials:

• Product wetted steel part: AISI 316L Stainless Steel (standard)

• Product wetted elastomers: EPDM (standard)

• Optional seals: Buna, FKM

Shaft Seals:

• Seal options: Single and Double Mechanical, Single and Double O-Ring and Triple Lip-seal

• Maximum flushing water pressure: 7 PSI (0.5 bar)

• Flushing water consumption: 30~60 cubic inches/min (0.25~0.5 liter/min)

• Flush inlet at lowest port on casing

• Stationary seal ring material: Tungsten Carbide

• Rotating seal ring material: Tungsten Carbide (standard) or Silicon Carbide (optional)

• O-ring material: EPDM (standard)

• Optional O-ring material: Buna, FKM

• Triple lip seal material: PTFE(Polytetrafluoroethylene)+Glass (standard) or PTFE+Copper (optional)

Rotor Information: Not all rotors available in all models.

• Single/bi-wing and bi-lobe/tri-lobe/heli-lobe are interchangeable

• Optional rotors: Multi-lobe, Hardened & Rubber Heli-lobe

Optional Information:

• Ultra clean version

• High pressure version up to 435 PSI (30 bar)

• Heating jacket on rotor case and front cover

• Rectangular inlet version

• Pressure relief front cover (not 3A)

• Surface hardening

Noise

Level

60 ~ 80 dB

Rotary Lobe Pumps - JRZL-300 Series 800.789.1718

5

JRZL 330 Curves

Rotary Lobe Pump JRZL330

APPLIES TO BI-WING, BI-LOBE, AND SINGLE WING* ROTORS

* SINGLE WING ROTOR MAX 100 RPM

PORT SIZE: 3 X 3

6

(𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸)𝐸𝑻𝑻𝑻𝑻𝑻𝑻𝑻𝑻𝑻𝑻𝐸𝑻𝑻𝑻𝑻𝑻𝑻𝑻𝑻𝑻𝑻𝐸(𝑯𝑯𝑻𝑻) = (0.0007 × 𝑝𝑝 𝑝 0.0051 × 𝑣𝑣) × 𝐸𝐸 × 𝑛𝑛

(𝑀𝑀𝑀𝑀𝐸𝐸𝑀𝑀𝐸𝐸𝑛𝑛𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸)𝐸𝑻𝑻𝑻𝑻𝑻𝑻𝑻𝑻𝑻𝑻𝐸𝑻𝑻𝑻𝑻𝑻𝑻𝑻𝑻𝑻𝑻𝐸(𝑲𝑲𝑻𝑻) =

(2 × 𝑝𝑝 𝑝 𝑣𝑣) × 𝐸𝐸 × 𝑛𝑛

1000 𝑝𝑝 = 𝑝𝑝𝑀𝑀𝑀𝑀𝐸𝐸𝐸𝐸𝐸𝐸𝑀𝑀𝑀𝑀𝐸(𝑝𝑝𝐸𝐸𝐸𝐸𝐸𝑜𝑜𝑀𝑀𝐸𝑏𝑏𝑏𝑏𝑀𝑀) 𝑣𝑣 = 𝑣𝑣𝐸𝐸𝐸𝐸𝑛𝑛𝑜𝑜𝐸𝐸𝐸𝐸𝐸𝐸𝑣𝑣𝐸𝑛𝑛𝑜𝑜𝑀𝑀𝑀𝑀𝑀𝑀𝑛𝑛𝐸𝐸𝐸𝐸𝑜𝑜𝐸𝐸𝐸𝑣𝑣𝑏𝑏𝑛𝑛𝐸𝐸𝑜𝑜𝑀𝑀𝐸(𝑣𝑣𝑀𝑀𝑜𝑜𝑓𝑓𝐸𝐸𝐸𝑀𝑀𝑏𝑏𝑝𝑝𝐸)

𝐸𝐸 = 𝐸𝐸𝑝𝑝𝑀𝑀𝑀𝑀𝑛𝑛𝐸(𝑅𝑅𝑅𝑅𝑀𝑀)

𝐸𝑜𝑜𝑀𝑀𝐸1.02𝐸 𝐿𝐿 𝑀𝑀𝑀𝑀𝑣𝑣 )

Rotary Lobe Pumps - JRZL-300 Series

Dixon Sanitary

N25 W23040 Paul Road • Pewaukee, WI 53072

Customer Service: 800.789.1718

Fax: 800.789.4046

dixonvalve.com

15

10

5

0

0

JRZL 330 NPSH Curves

Rotary Lobe Pump JRZL330

NET POSITIVE SUCTION HEAD REQUIRED

PORT SIZE: 3 X 3

25

20

100 200 300

SPEED (RPM)

400 500 600

Rotary Lobe Pumps - JRZL-300 Series

Dixon Sanitary

N25 W23040 Paul Road • Pewaukee, WI 53072

Customer Service: 800.789.1718

Fax: 800.789.4046 dixonvalve.com

7

JRZL 340 Curves

Rotary Lobe Pump JRZL340

APPLIES TO BI-WING, BI-LOBE, AND SINGLE WING* ROTORS

* SINGLE WING ROTOR MAX 100 RPM

PORT SIZE: 4 X 4

8

(𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸)𝐸𝑻𝑻𝑻𝑻𝑻𝑻𝑻𝑻𝑻𝑻𝐸𝑻𝑻𝑻𝑻𝑻𝑻𝑻𝑻𝑻𝑻𝐸(𝑯𝑯𝑻𝑻) = (0.0007 × 𝑝𝑝 𝑝 0.0051 × 𝑣𝑣) × 𝐸𝐸 × 𝑛𝑛

(𝑀𝑀𝑀𝑀𝐸𝐸𝑀𝑀𝐸𝐸𝑛𝑛𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸)𝐸𝑻𝑻𝑻𝑻𝑻𝑻𝑻𝑻𝑻𝑻𝐸𝑻𝑻𝑻𝑻𝑻𝑻𝑻𝑻𝑻𝑻𝐸(𝑲𝑲𝑻𝑻) =

(2 × 𝑝𝑝 𝑝 𝑣𝑣) × 𝐸𝐸 × 𝑛𝑛

1000 𝑝𝑝 = 𝑝𝑝𝑀𝑀𝑀𝑀𝐸𝐸𝐸𝐸𝐸𝐸𝑀𝑀𝑀𝑀𝐸(𝑝𝑝𝐸𝐸𝐸𝐸𝐸𝑜𝑜𝑀𝑀𝐸𝑏𝑏𝑏𝑏𝑀𝑀) 𝑣𝑣 = 𝑣𝑣𝐸𝐸𝐸𝐸𝑛𝑛𝑜𝑜𝐸𝐸𝐸𝐸𝐸𝐸𝑣𝑣𝐸𝑛𝑛𝑜𝑜𝑀𝑀𝑀𝑀𝑀𝑀𝑛𝑛𝐸𝐸𝐸𝐸𝑜𝑜𝐸𝐸𝐸𝑣𝑣𝑏𝑏𝑛𝑛𝐸𝐸𝑜𝑜𝑀𝑀𝐸(𝑣𝑣𝑀𝑀𝑜𝑜𝑓𝑓𝐸𝐸𝐸𝑀𝑀𝑏𝑏𝑝𝑝𝐸)

𝐸𝐸 = 𝐸𝐸𝑝𝑝𝑀𝑀𝑀𝑀𝑛𝑛𝐸(𝑅𝑅𝑅𝑅𝑀𝑀)

𝐸𝑜𝑜𝑀𝑀𝐸1.44𝐸 𝐿𝐿 𝑀𝑀𝑀𝑀𝑣𝑣 )

800.789.1718

Dixon Sanitary

N25 W23040 Paul Road • Pewaukee, WI 53072

Customer Service: 800.789.1718

Fax: 800.789.4046

dixonvalve.com

Rotary Lobe Pumps - JRZL-300 Series

20

15

10

5

0

0

JRZL 340 NPSH Curves

Rotary Lobe Pump JRZL340

NET POSITIVE SUCTION HEAD REQUIRED

PORT SIZE: 4 X 4

25

100 200 300

SPEED (RPM)

400 500 600

Rotary Lobe Pumps - JRZL-300 Series

Dixon Sanitary

N25 W23040 Paul Road • Pewaukee, WI 53072

Customer Service: 800.789.1718

Fax: 800.789.4046 dixonvalve.com

9

Unpacking

Carefully unpack all parts of the pump and inspect for damage that may have occurred during shipment. Report any damages to the carrier immediately.

The ports on the pump are protected with a plastic cover. If any covers are missing or damaged, inspect the ports on the pump thoroughly for any damage.

If you are receiving a complete base mounted unit, please check shaft alignment as it may have changed during shipment.

The drawing below shows how the pump should be lifted. Ensure that the lifting equipment is correctly rated.

10 800.789.1718

Rotary Lobe Pumps - JRZL-300 Series

Installation & Start Up

Mounting Configurations

Pump Mounting Adjustable:

• Adjustable leg base, commonly used for sanitary pumps for wash down under base. Can be easily moved or repositioned.

Pump Mounting Casters:

• Portable bases – for movement to different locations. Can also be mounted on a cart with handles.

Rotary Lobe Pumps - JRZL-300 Series 800.789.1718

11

Installation & Start Up

Proper Installation

Piping Support :

Weight of piping and fluid – support piping independently with hangers or pedestals. On rectangular inlet flange pumps, hopper should also be supported independently.

12 800.789.1718

Rotary Lobe Pumps - JRZL-300 Series

Installation & Start Up

Proper Installation (continued)

Piping Slope:

• Inlet side – slope piping up to inlet to avoid air pocket.

Rotary Lobe Pumps - JRZL-300 Series 800.789.1718

13

Installation & Start Up

Proper Installation (continued)

Pressure Gauges:

Pressure and vacuum gauges provide the easiest way to tell you something about the pump operation.

• Normal or abnormal pressures

• Overflow conditions

• Indication of flow

• Changes in pump condition

• Changes in system conditions

• Changes in fluid viscosity

14 800.789.1718

Rotary Lobe Pumps - JRZL-300 Series

Installation & Start Up

Proper Installation (continued)

Inlet Check Valve:

• Inlet side – use check valves to keep inlet line full, particularly with low viscosity fluids, and in start-stop operation.

Outlet Check Valve:

• Inlet Vacuum Service – use check valve on outlet side.

• Prevents backflow (air or fluid)

• Facilitates initial start-up (minimizes differential pressure pump must supply to start flow)

Rotary Lobe Pumps - JRZL-300 Series 800.789.1718

15

Installation & Start Up

Proper Installation (continued)

Thermal Expansion:

Thermal expansion of piping can cause tremendous forces. Use thermal expansion joints to minimize forces on pump. Flexible joints can also be used to limit the transmission of mechanical vibration. Anchor free ends of any flexible hose in system.

Isolation Valves:

• Isolation Valves – permit pump maintenance and removal safely without emptying entire system.

16 800.789.1718

Rotary Lobe Pumps - JRZL-300 Series

Installation & Start Up

Proper Installation (continued)

Relief Loop:

Relief Valve – To protect the pump and piping system against excessive pressure, a relief valve should be installed. An integral relief valve, designed to bypass the fluid internally from the pump outlet to the inlet, should not be used on applications where the discharge must be closed for more than a few minutes. Prolonged operation of the pump with closed discharge with cause heating of the fluid circulating through the relief valve.

Rotary Lobe Pumps - JRZL-300 Series 800.789.1718

17

Installation & Start Up

At Start Up

Pump Flow:

All pumps are labeled with flow direction based on motor being wired for clockwise rotation. If motor is wired for counterclockwise rotation, flow direction will be opposite of what is indicated on pump head.

18 800.789.1718

Rotary Lobe Pumps - JRZL-300 Series

Installation & Start Up

At Start Up

Pump Alignment:

A flexible coupling is used to compensate for end play and small differences in alignment. The pump and drive shaft should be aligned as closely as possible.

• Check angular alignment using feeler or taper gauge.

Adjust to get equal dimension at all points – at the same time, set space between coupling halves to the coupling manufacturer’s recommended distance.

• Note: Pump is aligned prior to shipping, after installation verify alignment as misalignment may have occurred during shipment.

Rotary Lobe Pumps - JRZL-300 Series 800.789.1718

19

Tools Needed

• Rotor tool

• Plastic dowel

• Open ended wrench set

• Rubber mallet

• Flat head screw driver

• Feeler gauges

• Hex keys

• O-ring pick

• Spanner wrench

• Rotor extraction tool (optional)

Additional tools needed when assembling or disassembling gear box

• Spanner wrench

• Arbor press or bearing puller

Maintenance

Pump Housing Disassembly - Single Mechanical Seal

Prior to removal of pump, the shut-off valves in the suction and discharge lines must be closed. If there is any risk that product may harden, crystallize or freeze in the pump it should be thoroughly drained and cleaned immediately after use. Same attention applies if there is a seal flush option. Power needs to be locked out to prevent unintended start of the pump.

Note: Reference numbers are listed in the sectional view located on pages 61-73.

1.

Loosen and remove the four hex nuts (33) from the front cover.

20 800.789.1718

Rotary Lobe Pumps - JRZL-300 Series

Maintenance

Pump Housing Disassembly - Single Mechanical Seal (continued)

2. Remove the cover (32). If it is stuck, tap the cover with a soft hammer.

3. Remove the cover O-ring (34).

Rotary Lobe Pumps - JRZL-300 Series 800.789.1718

21

Maintenance

Pump Housing Disassembly - Single Mechanical Seal (continued)

4. Remove the rotor retaining bolts (35). To remove the rotor retaining bolts, place the dowel between the rotors. Turn the first rotor bolt counter-clockwise.

5.

Remove the rotor bolts (35), spring washers (36) and O-ring (37).

22 800.789.1718

Rotary Lobe Pumps - JRZL-300 Series

Maintenance

Pump Housing Disassembly - Single Mechanical Seal (continued)

6. Remove the rotors (38) from the pump housing (31) by pulling straight.

6a.

If the rotors (38) will not come out freely, remove the stud bolt hex nuts (46) and then tap on the back of the inlet and outlet ports with a soft hammer. Once the rotors (38) are loose, then push the casing (31) back towards the gear box and remove the rotors.

Rotary Lobe Pumps - JRZL-300 Series 800.789.1718

23

6a, continued

Maintenance

Pump Housing Disassembly - Single Mechanical Seal (continued)

24 800.789.1718

Rotary Lobe Pumps - JRZL-300 Series

Maintenance

Pump Housing Disassembly - Single Mechanical Seal (continued)

7.

Remove the seal ring (52) from the back of the rotor (38).

8. Remove the rotor O-rings (51).

Rotary Lobe Pumps - JRZL-300 Series 800.789.1718

25

Maintenance

Pump Housing Disassembly - Single Mechanical Seal (continued)

9. Remove the casing seal rings (52).

10.

Remove the stud bolt hex nuts (46).

26 800.789.1718

Rotary Lobe Pumps - JRZL-300 Series

Maintenance

Pump Housing Disassembly - Single Mechanical Seal (continued)

11.

Remove the rotor case (31).

12.

Remove the rotor case O-ring (53). This can be done before you remove the casing or after.

Rotary Lobe Pumps - JRZL-300 Series 800.789.1718

27

Maintenance

Pump Housing Disassembly - Single Mechanical Seal (continued)

13.

On the back of the rotor case, remove the four mechanical seal gland wrench bolts (42 & 43).

14.

Remove the single seal body cases (54).

28 800.789.1718

Rotary Lobe Pumps - JRZL-300 Series

Maintenance

Pump Housing Disassembly - Double Mechanical Seal

Prior to removal of pump, the shut-off valves in the suction and discharge lines must be closed. If there is any risk that product may harden, crystallize or freeze in the pump it should be thoroughly drained and cleaned immediately after use. Same attention applies if there is a seal flush option. Power needs to be locked out to prevent unintended start of the pump.

Note: Reference numbers are listed in the sectional view located on pages 61-73.

1.

Loosen and remove the four hex nuts (33) from the front cover.

2. Remove the cover (32). If it is stuck, tap the cover with a soft hammer.

Rotary Lobe Pumps - JRZL-300 Series 800.789.1718

29

Maintenance

Pump Housing Disassembly - Double Mechanical Seal (continued)

3. Remove the cover O-ring (34).

4. Remove the rotor retaining bolts (35). To remove the rotor retaining bolts, place the dowel between the rotors. Turn the first rotor bolt counter-clockwise.

30 800.789.1718

Rotary Lobe Pumps - JRZL-300 Series

Maintenance

Pump Housing Disassembly - Double Mechanical Seal (continued)

5.

Remove the rotor bolts (35), spring washers (36) and O-ring (37).

6. Remove the rotors (38) from the pump housing (31) by pulling straight.

Rotary Lobe Pumps - JRZL-300 Series 800.789.1718

31

Maintenance

Pump Housing Disassembly - Double Mechanical Seal (continued)

6a.

If the rotors (38) will not come out freely, remove the stud bolt hex nuts (46) and then tap on the back of the inlet and outlet ports with a soft hammer. Once the rotors (38) are loose, then push the casing (31) back towards the gear box and remove the rotors.

32 800.789.1718

Rotary Lobe Pumps - JRZL-300 Series

6a, continued

Maintenance

Pump Housing Disassembly - Double Mechanical Seal (continued)

7.

Remove the seal ring (52) from the back of the rotor (38).

Rotary Lobe Pumps - JRZL-300 Series 800.789.1718

33

Maintenance

Pump Housing Disassembly - Double Mechanical Seal (continued)

8. Remove the rotor O-rings (51).

9. Remove the casing seal rings (52).

34 800.789.1718

Rotary Lobe Pumps - JRZL-300 Series

Maintenance

Pump Housing Disassembly - Double Mechanical Seal (continued)

10.

Remove the stud bolt hex nuts (46).

11.

Remove the rotor case (31).

Rotary Lobe Pumps - JRZL-300 Series 800.789.1718

35

Maintenance

Pump Housing Disassembly - Double Mechanical Seal (continued)

12.

Remove the rotor case O-ring (53). This can be done before you remove the casing or after.

13.

Remove seal body case (61) and seal O-ring (62).

36 800.789.1718

Rotary Lobe Pumps - JRZL-300 Series

Maintenance

Pump Housing Disassembly - Double Mechanical Seal (continued)

14. Remove casing O-ring (53).

15.

Remove shaft seal base (63).

Rotary Lobe Pumps - JRZL-300 Series 800.789.1718

37

Maintenance

Pump Housing Disassembly - Double Mechanical Seal (continued)

16.

Remove shaft O-ring (64).

38 800.789.1718

Rotary Lobe Pumps - JRZL-300 Series

Maintenance

Pump Housing Disassembly - Single O-ring Seal

Prior to removal of pump, the shut-off valves in the suction and discharge lines must be closed. If there is any risk that product may harden, crystallize or freeze in the pump it should be thoroughly drained and cleaned immediately after use. Same attention applies if there is a seal flush option. Power needs to be locked out to prevent unintended start of the pump.

Note: Reference numbers are listed in the sectional view located on pages 61-73.

1.

Loosen and remove the four hex nuts (33) from the front cover.

2. Remove the cover (32). If it is stuck, tap the cover with a soft hammer.

Rotary Lobe Pumps - JRZL-300 Series 800.789.1718

39

Maintenance

Pump Housing Disassembly - Single O-ring Seal (continued)

3. Remove the cover O-ring (34).

4. Remove the rotor retaining bolts (35). To remove the rotor retaining bolts, place the dowel between the rotors. Turn the first rotor bolt counter-clockwise.

40 800.789.1718

Rotary Lobe Pumps - JRZL-300 Series

Maintenance

Pump Housing Disassembly - Single O-ring Seal (continued)

5.

Remove the rotor bolts (35), spring washers (36) and O-ring (37).

6. Remove the rotors (38) from the pump housing (31) by pulling straight.

Rotary Lobe Pumps - JRZL-300 Series 800.789.1718

41

Maintenance

Pump Housing Disassembly - Single O-ring Seal (continued)

6a.

If the rotors (38) will not come out freely, remove the stud bolt hex nuts (46) and then tap on the back of the inlet and outlet ports with a soft hammer. Once the rotors (38) are loose, then push the casing (31) back towards the gear box and remove the rotors.

42 800.789.1718

Rotary Lobe Pumps - JRZL-300 Series

6a. continued

Maintenance

Pump Housing Disassembly - Single O-ring Seal (continued)

7.

Remove O-ring (51) from the rotor.

Rotary Lobe Pumps - JRZL-300 Series 800.789.1718

43

Maintenance

Pump Housing Disassembly - Single O-ring Seal (continued)

8.

Remove the rotor case O-ring (53). This can be done before you remove the casing or after. Note: This is easier to do after you remove the casing.

9. Remove sleeve (57) from shaft.

44 800.789.1718

Rotary Lobe Pumps - JRZL-300 Series

Maintenance

Pump Housing Disassembly - Triple Lip Seal

Prior to removal of pump, the shut-off valves in the suction and discharge lines must be closed. If there is any risk that product may harden, crystallize or freeze in the pump it should be thoroughly drained and cleaned immediately after use. Same attention applies if there is a seal flush option. Power needs to be locked out to prevent unintended start of the pump.

Note: Reference numbers are listed in the sectional view located on pages 61-73.

1.

Loosen and remove the four hex nuts (33) from the front cover.

2. Remove the cover (32). If it is stuck, tap the cover with a soft hammer.

Rotary Lobe Pumps - JRZL-300 Series 800.789.1718

45

Maintenance

Pump Housing Disassembly - Triple Lip Seal (continued)

3. Remove the cover O-ring (34).

4. Remove the rotor retaining bolts (35). To remove the rotor retaining bolts, place the dowel between the rotors. Turn the first rotor bolt counter-clockwise.

46 800.789.1718

Rotary Lobe Pumps - JRZL-300 Series

Maintenance

Pump Housing Disassembly - Triple Lip Seal (continued)

5.

Remove the rotor bolts (35), spring washers (36) and O-ring (37).

6. Remove the rotors (38) from the pump housing (31) by pulling straight.

Rotary Lobe Pumps - JRZL-300 Series 800.789.1718

47

Maintenance

Pump Housing Disassembly - Triple Lip Seal (continued)

6a.

If the rotors (38) will not come out freely, remove the stud bolt hex nuts (46) and then tap on the back of the inlet and outlet ports with a soft hammer. Once the rotors (38) are loose, then push the casing (31) back towards the gear box and remove the rotors.

48 800.789.1718

Rotary Lobe Pumps - JRZL-300 Series

6a. continued

Maintenance

Pump Housing Disassembly - Triple Lip Seal (continued)

7.

Remove O-ring (51) from the rotor.

Rotary Lobe Pumps - JRZL-300 Series 800.789.1718

49

Maintenance

Pump Housing Disassembly - Triple Lip Seal (continued)

8. Remove lip seal cover (56).

50 800.789.1718

Rotary Lobe Pumps - JRZL-300 Series

Maintenance

Pump Housing Disassembly - Triple Lip Seal (continued)

9.

Remove triple lip seal (55)

Rotary Lobe Pumps - JRZL-300 Series 800.789.1718

51

Maintenance

Inspection

1.

Inspect O-rings and seals for reuse. Worn O-rings and seals should be replaced.

2.

Inspect seal faces for scoring or cracks. Replace any seal faces that are damaged.

3.

Inspect rotors for any damage or abnormal wear.

4.

Inspect rotors for wear on splines and that they fit snuggly on the shafts.

5.

Inspect shafts for wear on splines and make sure they are not loose in the gear case.

6.

Inspect rotor galling sign among the rotor housing, front cover and rotors. Must be removed or replaced.

7.

Inspect burr of the rotor bolt groove. Must be removed or replaced.

Pump Housing Assembly

Before installing the pump housing (31) to the gearbox make sure that the surface of the pump hosing and gear box are clean and check the shim plate between pump housing and gear box. Install the pump housing (31) onto the gear box (1A) and secure the four housing set nuts (46).

When installing the ceramic shaft sleeve onto the pump shaft, align sleeve with fit pin.

Follow the disassembly instructions in reverse for all types of seals and rotor assembly.

Assemble a rotor onto shaft engaging the shallow groove with small spline in rotor and seal side first in to the shaft.

Place the plastic dowel between the rotors. Tighten the first rotor bolt with a special tool to the recommended torque.

Model

JRZL 105

JRZL 110

JRZL 115

JRZL 120

JRZL 220

JRZL 225

JRZL 330

JRZL 340

Rotor Nut Torque Specification

116.3 in. lbs.

116.3 in. lbs.

116.3 in. lbs.

116.3 in. lbs.

277.8 in. lbs.

277.8 in. lbs.

434.0 in. lbs.

434.0 in. lbs.

JRZL 440 651.0 in. lbs.

JRZL 450 651.0 in. lbs.

To tighten the second rotor place the plastic dowel on the opposite side of the rotor and tighten the second rotor bolt to the proper torque.

Install the cover (32) and tighten the cap nuts (33).

52 800.789.1718

Rotary Lobe Pumps - JRZL-300 Series

Maintenance

Rotor Clearance

Use feeler gauges to verify the back and radial clearances between the rotors and the housing. A depth gauge should be used to verify the front clearance.

Rotor clearance must be precisely maintained to provide maximum pumping efficiency, prevent contact between rotors, rotor housing and front cover during operation. If pumping efficiency is below expectations or if parts contact has occurred during operation (within rated differential pressure) check rotor clearances and adjust if incorrect.

Shims

Back

Face

Rotor to Housing

Front

Face

Radial Top & Bottom

Rotor to Rotor

Radial Sides

Figure 20

Model

RZL 105

RZL 110

RZL 115

RZL 120

RZL 220

RZL 225

RZL 330

RZL 340

RZL 440

RZL 450

Back Face

0.05/0.002

0.05/0.002

0.15/0.006

0.15/0.006

0.2/0.008

0.2/0.008

0.3/0.012

0.3/0.012

0.45/0.018

0.45/0.018

Standard Rotor Clearances (mm/in)

Clearances for Rotor Timing

Front Face

Radial Sides

Radial

Top & Bottom

Rotor to Rotor

0.05/0.002

0.05/0.002

0.15/0.006

0.15/0.006

0.2/0.008

0.2/0.008

0.3/0.012

0.3/0.012

0.45/0.018

0.45/0.018

There are two areas of rotor clearances as illustrated following:

• Rotor tip clearance – not adjustable set by manufacturer

• Front and back face clearance – adjustable by shim

0.07/0.003

0.07/0.003

0.27/0.011

0.3/0.012

0.3/0.012

0.4/0.016

0.4/0.016

0.5/0.020

0.55/0.022

0.7/0.028

0.07/0.003

0.07/0.003

0.12/0.005

0.15/0.006

0.15/0.006

0.2/0.008

0.2/0.008

0.3/0.012

0.3/0.012

0.45/0.018

0.1/0.004

0.1/0.004

0.15/0.006

0.15/0.006

0.2/0.008

0.2/0.008

0.3/0.012

0.3/0.012

0.4/0.016

0.4/0.016

Rotary Lobe Pumps - JRZL-300 Series 800.789.1718

53

Maintenance

Rotor Clearance (continued)

Rotor width and body depth are fixed at manufacturer. Therefore, with the correct rotor size selected, the only maintenance adjustment that can be made is the proportion of front and rear clearance. Measure the front clearance as follows:

1.

The rotor to rotor housing back face clearance is maintained by the shim (45).

2.

Check that the rotor housing (31) is tight to gearbox (1A). And check the rotor bolts (35) are tight.

3.

Measure the clearance between the back face of the pump housing and the back of the rotor with a feeler gauge. Check the reading with the recommended back face clearance.

54 800.789.1718

Rotary Lobe Pumps - JRZL-300 Series

Maintenance

Rotor Clearance (continued)

4.

If incorrect, adjust by adding or removing shim plates (45) from behind the pump housing.

5.

Check each rotor and adjust as necessary.

Rotary Lobe Pumps - JRZL-300 Series 800.789.1718

55

Maintenance

Rotor Timing

Rotor timing must be precisely maintained to provide maximum pumping efficiency, prevent contact between rotors during operation.

If pumping efficiency is below expectations or if rotors contact during operation (within rated differential pressure), check rotor timing and adjust if incorrect. Also check rotor timing after any gearbox dismantling when the gears are removed and/or replaced.

Check Rotor timing as follows:

1.

Assemble each rotor in its normal location on the drive shaft and the idle shaft. Assemble each rotor bolt and tighten hand tight.

2.

Rotate the shafts 30 degrees and measure gap as illustrated by arrows. Rotate the shafts 60 degrees the opposite direction and measure gap as illustrated.

3.

The rotors are correctly timed when the gap measured, using a feeler gauge, at both locations are equal. If the gap is unequal, adjust the timing as follows.

4.

Rotor timing is determined by the relative location of the two helical gears (14) on the shafts. Gear spacers (16) are used to adjust the location and the timing. When adjusting timing, move only one of the two gears.

5.

Place the wooden dowel between the rotors.

6.

Bend away the tab of the lock washer (12) on one shaft. Loosen the lock nut and temporarily insert shim stock between the gear and gear spacer. Tighten the lock nut, reassemble the rotor in its correct location, and recheck rotor timing.

• If rotor timing is correct, remove the gear and replace added other spacer or add a shim equal in thickness to the shim stock temporarily added. Reassemble the gear and gear nut, tighten to the correct torque, and check rotor timing again to confirm that it is correct.

• If rotor timing is incorrect, but closer to equal than original measurement, repeat previous step adding additional shim stock.

• If rotor timing is incorrect and more unequal than original measurement, remove temporary shim stock from one shaft and add instead to the other shaft.

7.

Repeat above procedures until the timing gap is equal after gear spacers are in place and gear nuts are tightened to correct torque.

8. Reassemble pump.

56 800.789.1718

Rotary Lobe Pumps - JRZL-300 Series

1.

Remove the oil drain plug 5) and drain the oil.

Maintenance

Gearbox Disassembly

2.

Remove the gear box cover bolts (6) from the rear cover (4).

3.

Pull the rear cover off the drive shaft extension. If the cover is stuck use a soft hammer carefully to loosen it.

4.

Remove the rear cover oil seal (11) from the rear cover.

5.

Remove the paper gasket (26) from the rear cover or gear box.

6.

Straighten the locking tab of the bearing lock washer (12). Reinstall the rotors (38) on the drive (8) and idle (9) shafts. Lock the rotor with a plastic dowel. Remove the lock nut (12-1) and lock nut washer from the drive shaft (8) and idle shaft (9).

7.

Pull the two helical-gears (14) off the pump shafts. Remove the gear keys (7).

8.

Remove the front bearing gland set bolts (23).

9.

Place the gearbox (1), wet end (rotor side) down, on an arbor press.

10.

Protect the shaft ends with a wood block and press the drive and idle shaft out of the gearbox.

11.

Remove the bearings (17) and spacers (18) together by pressing them out from the shafts.

12.

Or remove bearings by puller.

13.

The taper roller bearings for 400 series must be keep together with in-outside spacer and separated for drive and idle shafts.

Rotary Lobe Pumps - JRZL-300 Series 800.789.1718

57

Maintenance

Gearbox Assembly

1.

Clean and lubricate the front and rear bearing areas of the drive (8) and idle shafts (9) with oil.

2.

Fit the front bearing (20), spacer (18) and rear bearing (17) on the shaft by arbor press or heat 120C (250F) up by heater.

3.

Lubricate and install the front bearing oil seals (22) in to the bearing gland.

4.

Position the gearbox (1) with wet end up.

5.

Clean and lubricate the front and rear bearing areas with oil.

6.

Insert the shaft perpendicularly to the gearbox properly. There should be a tight sliding fit between the gearbox and the bearing outer rings. Press or soft hammer could be used.

7.

Place the front bearing gland set bolt (23) and washer and tighten.

8.

Lubricate and install the rear oil seal cover (24) into gear box.

9.

Place the gear spacer (16) over the shafts.

10.

Clean and lubricate the gear area of the shaft and the face of the lock washer with oil.

11.

Position both shaft gear keys (7) to the 12:00 position.

12.

Place the gear, lock washer (12) and lock nut (12-1) onto the shafts and hand tighten.

13.

After the gears are installed, turn the shafts to make sure they turn freely and that the rotors (38) are timed correctly. (rotor alignments are required)

14.

Use a spanner wrench to tighten the gear lock nut on the drive shaft. You can install the rotors to hold the shafts in place while you tighten the nut.

15.

Tighten the locknut on the idle shaft, following the previous steps.

16.

Install the paper gasket to rear cover (26) and mount the rear cover assembly over the drive shaft extension onto the gearbox.

17.

Set the cover bolts, oil window and pressure relieve valve.

18.

Fill the oil reservoir with oil to the middle of the oil window.

Scheduled Maintenance

• After initial startup – change oil after 4,000 hours.

• After, change oil annually based on 8 hrs a day, 5 days a week run time.

• Every two years, change oil seals

Recommended Spare Parts:

• 1 Year – (2) Seal sets and (1) O-ring set

• 2 Years – (4) Seal sets and (2) O-ring sets and (1) set rotors

58 800.789.1718

Rotary Lobe Pumps - JRZL-300 Series

JRZL Series Maximum RPM

Viscosity (cP)

1 - 100

100 - 1,000

1,000 - 5,000

5,000 - 10,000

10,000 - 20,000

20,000 - 50,000

50,000 - 100,000

110

1000

667

417

250

167

117

83

115

800

533

333

200

133

93

67

120

800

533

333

200

133

93

67

220

Model No. JRZL

225 330

Recommended Maximum RPM

700 700 600

467

292

175

117

82

58

467

292

175

117

82

58

400

250

150

100

70

50

340

Note:

1. This maximum RPM speed is calculated and estimated within the ideal operational condition.

2. Pressure, solid(particle), operation hour and other operational conditions effect on this maximum rpm.

3. High RPM is not recommended for pump durability.

600

400

250

150

100

70

50

440

500

333

208

125

83

58

42

Maximum Solids with Bi-Wing Rotors

This is intended to be a guideline only, please contact Dixon Sanitary’s Engineering Department to verify specific applications for the best selection of pump and rotor type.

Series No.

JRZL 100

JRZL 200

JRZL 300

JRZL 400

Maximum Solid Size (in)

2 x ¾

2½ x 1

3 x 2

5 x 2

The following formulas will also help in determining the best pump and rotor type for applications involving solids in the product.

High Discharge Pressure = Mashed Solid

Low RPM = Increased Possibility of Mashed Solid

450

500

333

208

125

83

58

42

Rotary Lobe Pumps - JRZL-300 Series 800.789.1718

59

Dimensional Drawing

Model

JRZL 105

JRZL 110

JRZL 115

JRZL 120

JRZL 220

JRZL 225

JRZL 330

JRZL 340

JRZL 440

JRZL 450

Model

A B C D E F G H

Dimensions (in)

H1

(mm)

J

JRZL 105 10.40

5.98

7.80

8.62

3.78

3.31

5.28

1.54

JRZL 110 10.40

5.98

7.68

8.35

3.78

3.31

5.28

1.54

12

12

K L M

1.85

5.55

3.03

4.29

1.85

5.55

3.03

4.29

JRZL 115 10.80

5.98

7.80

8.74

3.78

3.31

5.28

1.65

JRZL 120 11.42

5.98

7.80

9.02

3.78

3.31

5.28

1.93

JRZL 220 14.84

7.40

10.12 12.09

5.08

5.20

7.09

1.81

JRZL 225 15.75

7.40

10.12 12.60

5.08

5.20

7.09

2.13

JRZL 330 18.70

9.53

13.54 15.32

6.06

6.30

9.53

2.95

JRZL 340 19.69

9.53

13.54 15.83

6.06

6.30

9.53

3.47

JRZL 440 24.41 12.76 18.03 19.88

7.80

8.27

12.60

3.94

JRZL 450 25.79 12.76 18.03 20.55

7.80

8.27

12.60

4.61

12

12

15

15

22

22

30

30

1.85

5.55

3.03

4.29

1.85

5.55

3.03

4.29

2.32

7.28

3.98

5.63

2.32

7.28

3.98

5.63

2.76

9.59

5.06

7.32

2.76

9.59

5.06

7.32

3.15

12.76

6.69

9.72

3.15

12.76

6.69

9.72

N

(mm)

22

22

22

22

32

45

55

32

45

55

Y 2

(mm)

8

8

8

8

10

14

14

10

14

14

X 1

(mm)

34

34

34

34

53

57

67

53

57

67

Z

(mm)

9

9

9

9

11

13

15

11

13

15

1 X = Key Length

2 Y = Key Width

Ports

2"

2½"

3"

4"

4"

5"

1"

1"

1½"

2"

Clamp

0.79

0.79

0.87

0.87

0.87

1.02

1.10

1.10

1.10

1.18

BS

1.02

1.02

1.02

1.02

1.02

1.02

1.02

1.02

1.02

1.02

Dimension B1 (in)

DIN

0.98

1.18

1.18

1.18

1.18

1.46

1.65

1.77

1.77

1.81

SMS

1.10

1.10

0.79

0.87

0.87

1.10

1.10

1.38

1.38

1.38

FLANGE

1.18

1.18

1.18

1.18

1.18

1.38

1.57

2.13

2.13

2.13

AJ

16.73

16.73

16.93

17.32

23.82

24.80

28.35

29.29

32.68

35.28

J1

4.80

4.80

4.80

4.80

6.77

6.77

9.69

9.69

14.09

14.09

J2

7.09

7.09

7.09

7.09

9.25

9.25

12.13

12.13

16.54

16.54

93

106

207

227

496

551

Weight

LB

37

37

42

44

60 800.789.1718

Rotary Lobe Pumps - JRZL-300 Series

Troubleshooting

Problem

No Flow, Pump Rotors Are

Not Turning

Possible Cause

Drive motor not running.

Suggested Action

Check resets, fuses, circuit breakers.

No Flow, Pump Rotors Are

Turning

Key sheared or missing.

Drive belts, power transmission components slipping or broken.

Pump shaft, keys or gears sheared.

Rotors turning in the wrong direction.

Replace.

Replace or adjust.

Inspect and replace parts as necessary.

Check motor hookup to reverse motor rotation.

No Flow, Pump Not Priming

Insufficient Flow

Insufficient Flow – Flow Being

Bypassed Somewhere

Relief valve not properly adjusted or held open by foreign material.

Suction port is blocked, not allowing flow to the pump.

Valve closed in inlet line.

Inlet line clogged or restricted.

Air leaks due to bad gaskets or pipe connections.

Pump speed too slow.

Pump speed to fast for high viscosity liquid.

Liquid drains or siphons from system during off periods.

"Air" lock caused by fluids which "gas off" or vaporize or allow gas to come out of material during off periods.

Extra clearance rotors, worn pump.

NPSHA too low.

Adjust or clear valve.

Check all inlet valves, strainers and tank outlet ports.

Open valve.

Clear line, clean filters, etc.

Replace gaskets, check lines for leakage (can be done by air pressure or by filing with liquid and pressurizing with air.

Increase pump speed.

Decrease pump speed.

Use foot valve or check valves. Filling inlet lines with material before startup may solve startup priming problems due to no material in system.

Install and use a manual or automatic air bleed from pump or lines near pump.

Increase pump speed within limits, use foot valve to improve priming.

Replace worn rotors.

Check net inlet pressure available against net inlet pressure required. Change inlet system as needed.

Install check valve in discharge line.

On "Vacuum" inlet system: On initial start-up, atmospheric "blow back" prevents pump from developing enough differential pressure to start flow.

Speed too low or too high to obtain desired flow.

Air leak due to bad seals, pipe connections or other equipment.

Flow diverted in branch line, open valve, etc.

Check curve and adjust as necessary.

Replace seals, check inlet fittings.

Check system and controls.

Insufficient Flow – High Slip

Relief valve not adjusted or jammed.

Hot (HC) or extra clearance rotors being used on "cold" fluid and/or low viscosity fluid.

Worn pump.

Clear or adjust valve.

Replace with standard clearance rotors.

Rotary Lobe Pumps - JRZL-300 Series

High pressure.

800.789.1718

Increase pump speed (within limits).

Replace rotors

Reduce pressure by adjusting system settings or hardware.

61

62

Cavitation

Problem

Noisy Operation

Noisy Operation Caused By

Mechanical Problems

Troubleshooting

Possible Cause

Strainers, foot valves, inlet fittings or lines clogged.

Inlet line size too small, inlet line too long. Too many fittings or valves. Foot valve, strainers too small.

NPSHA too low.

Fluid viscosity greater than expected.

Fluid temperature higher than expected (vapor pressure higher).

Suggested Action

Clear lines. If problem continues, inlet system may require changing.

Increase inlet line size. Reduce length, minimize direction and size changes, reduce number of fittings.

Raise liquid level in source tank to increase net inlet pressure.

Increase net inlet pressure by raising or pressurizing source tank.

Select larger pump size with lower net inlet pressure required.

Reduce pump speed and accept lower flow or change system to reduce line losses.

Change temperature of product to reduce viscosity.

Reduce temperature, reduce speed and accept lower flow or change system to increase net inlet pressure available.

Cavitation

High fluid viscosity

High vapor pressure fluid

High temperature.

Slow down pump, reduce temperature, change system setup.

NPSHA less than NPSHR.

Air or gas in fluid .

Leaks in the pump or piping.

Increase NPSHA or decrease NPSHR.

Fix leaks.

Dissolved gas or naturally aerated products.

Minimize discharge pressure (also see

"Cavitation" above).

Rotor to Body Contact

Improper assembly of pump.

Distortion of pump due to improper piping installation.

Check clearances and adjust shimming.

Change piping installation to eliminate piping stress and distortion on body.

Reduce discharge pressure required.

Pressures required higher than the pump is rated for.

Worn bearings.

Rebuild with new bearings and lubricate regularly.

Rotor to Rotor Contact

Loose or incorrectly-timed gears.

Sheared keys.

Worn gear splines.

Drive noise caused by gear trains, chains, couplings or bearings.

Rebuild with new parts. Note: This will cause severe damage.

Rebuild with new parts. Note: This will cause severe damage.

Rebuild with new parts. Note: This will cause severe damage.

Repair or replace drive parts. Check bearings for damage and replace as necessary.

800.789.1718

Rotary Lobe Pumps - JRZL-300 Series

Troubleshooting

Problem

Pump Requires Excessive

Power (overheats, stalls, high current draw, breakers trip)

Possible Cause

Higher than expected viscosity losses.

Higher than expected pressures.

Fluid is colder with a higher viscosity than expected.

Fluid sets in line and pump during shutdown.

Short Pump Service Life

Any Other Issue

Fluid builds up on pump surfaces.

Pumping abrasives.

Speeds and pressures higher than rated.

Worn bearings and gears due to lack of lubrication.

Misalignment of drive and piping. (Excessive overhung load or misaligned couplings.)

Suggested Action

If within pump rating, increase drive size

Reduce pump speed. Increase line sizes.

Heat fluid, insulate lines or heat trace lines.

Increase line sizes.

Insulate lines or heat trace lines.

Install a "soft start" drive.

Install a recirculating bypass system.

Flush system with a nonsetting fluid.

Replace the pump with more running clearances.

Larger pumps at slower speeds.

Reduce speeds and pressures by making changes in the system.

Replace pump with a larger model with higher pressure ratings.

Check and replace bearing and gears as necessary. Adjust lubrications schedule to decrease time between lubrication.

Modify external wash down method to reduce water entering into gear case.

Check alignment of piping and drive. Adjust as necessary.

Contact: Dixon Sanitary 800-789-1718

Rotary Lobe Pumps - JRZL-300 Series 800.789.1718

63

64

Part Number

RZL-330B-3E-KIT

RZL-330B-3V-KIT

Repair kits include items 51, 55, 56 & 57

RZL-330B-2E-KIT

RZL-330B-2V-KIT

Repair kits include items 51, 52 & 53

RZL-330B-4E-KIT

RZL-330B-4V-KIT

Repair kits include items 51, 52, 53, 62 & 64

RZL-330B-1E-KIT

RZL-330B-1V-KIT

Repair kits include items 51, 53 & 57

RZL-330B-5E-KIT

RZL-330B-5V-KIT

Repair kits include items 51, 53, 57, 62 & 71

Repair Kits

Description

Complete Replacement Seal Kits

Triple Lip Seal Repair Kit

Triple Lip Seal Repair Kit

Single Mech. Seal Repair Kit TC/TC

Single Mech. Seal Repair Kit TC/TC

Double Mech. Seal Repair Kit TC/TC

Double Mech. Seal Repair Kit TC/TC

Single O-ring Seal Repair Kit

Single O-ring Seal Repair Kit

Double O-ring Seal Repair Kit

Double O-ring Seal Repair Kit

Pump Elastomers Only

Triple Lip Seal EPDM Elastomers

Triple Lip Seal FKM Elastomers

RZL-330B-3E-EK

RZL-330B-3V-EK

Repair Kits include items 34, 37, 51 & 55

RZL-330B-2E-EK

RZL-330B-2V-EK

Repair Kits include items 34, 37, 51 & 53

RZL-330B-4E-EK

RZL-330B-4V-EK

Repair kits include items 34, 37, 51, 53, 62 & 64

RZL-330B-1E-EK

RZL-330B-1V-EK

Repair Kits include items 34, 37, 51 & 53

RZL-330B-5E-EK

RZL-330B-5V-EK

Repair Kits include items 34, 37, 51, 53 & 62

Single Mech. Seal EPDM Elastomers

Single Mech. Seal FKM Elastomers

Double Mech. Seal EPDM Elastomer

Double Mech. Seal FKM Elastomers

Single O-ring Seal EPDM Elastomers

Single O-ring Seal FKM Elastomers

Double O-ring Seal EPDM Elastomers

Double O-ring Seal FKM Elastomers

RZL-330B-TC-SET

Includes item 52

Set of TC Seats

TC Seal Ring

Material

EPDM

FKM

EPDM

FKM

EPDM

FKM

EPDM

FKM

EPDM

FKM

EPDM

FKM

EPDM

FKM

EPDM

FKM

EPDM

FKM

EPDM

FKM

800.789.1718

Rotary Lobe Pumps - JRZL-300 Series

Parts List for JRZL-300 Series Pumps

Basic Assembly (Single M/Seal)

Rotary Lobe Pumps - JRZL-300 Series 800.789.1718

65

66

11

19

20

21

16

17

18

12

12-1

13

14

15

22

27

28

29

30

23

24

25

26

9

10

4

5

6

Item

1

2

3

7

8

Parts List for JRZL-300 Series Pumps

Gear Box Assembly (Basic)

Used Dixon Sanitary Part #

RZL-330B-GBSS

RZL-330B-GBSSB

RZL-330B-BWB

RZL-330B-GBCSS

RZL-330B-PLD

RZL-330B-GBWB

RZL-330B-DSKEY

RZL-330-DSHAFT

RZL-340-DSHAFT

RZL-330-ISHAFT

RZL-340-ISHAFT

RZL-330B-GKEY

RZL-330B-OSCB

RZL-330B-OSCV

RZL-330B-TGWASH

RZL-330B-TGNUT

RZL-330B-RVLV

RZL-330B-TGHELG

RZL-330B-GBDOW

RZL-330B-GSPAC

RZL-330B-RBEAR

RZL-330B-BSPAC

RZL-330B-IBOLT

RZL-330B-FBEAR

RZL-330B-OSGOV

RZL-330B-OSGB

RZL-330B-OSGV

RZL-330B-OSGWB

RZL-330B-OSGLD

RZL-330B-DSPIN

RZL-330B-GCGP

RZL-330B-PLUG

RZL-330B-VADPT

RZL-115B-LFP

RZL-115B-ERT

Description

Gear Box

Base, Gear Box

Wrench Bolt, Base (M12x30L)

Cover, Gear Box

Plug, Level, Drain

Wrench Bolt, Gear Box Cover (M8x70L)

Key, Shaft (14x9x53)

Shaft, Drive

Shaft, Drive

Shaft, Idle

Shaft, Idle

Key, Gear (14x9x35)

Oil Seal, Cover (45x70x12t)

Oil Seal, Cover (45x70x12t)

Lock Washer

Lock Nut

Breather, Gearbox

Hellical Gear

Dowel, Gear Box (Φ8)

Spacer, Gear (Φ35x6L)

Bearing, Rear (#5210)

Spacer, Bearing

I-bolt / M8

Bearing, Front (#5212)

O-ring, Oil Seal Gland (AN045)

Oil Seal, Gear box (65x90x12t)

Oil Seal, Gear box (65x90x12t)

Wrench Bolt, Oil Seal Gland (M12x25L)

Gland, Oil Seal

Pin, Double Seal

Gasket

Plug (M12)

Vertical Adapter

Pad, Leg feet

Rotor tool, Extraction

Material

SUS304

SUS304

SUS304

SUS304

PE

S45C

SUS304

S45C

S45C

S45C

SUS304

S45C

FKM

NBR

FKM

SUS304

SUS304

S45C

SUS304

SUS304

SUS304

SUS304

S45C

NBR

FKM

S45C

S45C

SUS304

SUS304

Paper

PE

SUS304

SS+Rubber

FCD40

RZL300

RZL300

RZL330

RZL340

RZL330

RZL340

RZL300

RZL300

RZL300

RZL Series

RZL Series

2

2

2

2

2

2

1

2

2

1

2

2

Quantity Per Pump

1

1

4

1

3

4

1

2

1

1

1

1

1

8

4

4

1

2

2

1

2

2

6

800.789.1718

Rotary Lobe Pumps - JRZL-300 Series

45

46

47

51

36

37

38

39

40

41

44

1A

31

32

33

34

Item

53

Dixon Sanitary

Part #

RZL-330-GBASS

RZL-340-GBASS

See page 65

RZL-330B-FCVR

RZL-330B-CNUT

RZL-330B-FCORB

RZL-330B-FCORE

RZL-330B-FCORV

RZL-330B-RBW

RZL-330B-RBORB

RZL-330B-RBORE

RZL-330B-RBORV

See page 68

RZL-330B-RTSLP

RZL-330B-CSSLP

RZL-330B-RCDOW

RZL-330-CSSB

RZL-340-CSSB

RZL-330B-SHIM05

RZL-330B-SHIM1

RZL-330B-SHIM2

RZL-330B-SBHXN

RZL-330B-FSNIP

RZL-330B-RTORB

RZL-330B-RTORE

RZL-330B-RTORV

RZL-330B-RCORB

RZL-330B-RCORE

RZL-330B-RCORV

Parts List for JRZL-300 Series Pumps

Pump Assembly

Description

Gear Box Ass'y - Stainless Steel

Gear Box Ass'y - Stainless Steel

Rotor Case

Front Cover

Cap Nut

O-ring, Front Cover (AN271)

O-ring, Front Cover (AN271)

O-ring, Front Cover (AN271)

Rotor Bolt & Spring Washer

O-ring, Rotor Bolt (AN225)

O-ring, Rotor Bolt (AN225)

O-ring, Rotor Bolt (AN225)

Rotor

Seal Pin , Rotor

Seal Pin, Case

Dowel, Rotor Case (Φ13)

Stud Bolt, Case

Stud Bolt, Case

Shim (0.05mm)

Shim (0.1mm)

Shim (0.2mm)

Hex Nut, Stud Bolt (M14)

Nipple, Flush (PT 1/8")

O-ring, Rotor (AN142)

O-ring, Rotor (AN142)

O-ring, Rotor (AN142)

O-ring, Rotor Case (AN230)

O-ring, Rotor Case (AN230)

O-ring, Rotor Case (AN230)

Material

SUS304

SUS304

SUS304

SUS304

SUS304

SUS304

SUS304

NBR

EPDM

FKM

NBR

EPDM

FKM

SUS304

SUS304

SUS316L

SUS316L

SUS304

NBR

EPDM

FKM

SUS304

NBR

EPDM

FKM

SUS316L

SUS304

SUS304

SUS304

Used

RZL330

RZL340

RZL300

RZL330

RZL340

RZL300

RZL300

RZL300

RZL300

RZL300

RZL300

• Please contact Dixon Sanitary or local distributor for purchased product before 2011 October.

- Rotor case, Front cover, Gear box, Stud bolt, and Shim.

Quantity

1

1

1

1

1

1

2

1

1

1

1

1

1

1

3

2

1

1

1

1

1

1

Assembly

1

1

1

1

1

1

1

2

2

2

4

2

2

4

4

2

2

2

2

2

4

2

2

6

2

2

2

2

1

1

4

1

1

1

1

1

Rotary Lobe Pumps - JRZL-300 Series 800.789.1718

67

Parts List for JRZL-300 Series Pumps

Rotor Case / Rotor

Item

31

31

38

38

Dixon Sanitary Part #

RZL-330-RCCLMP

RZL-330-RCFLNG

RZL-340-RCCLMP

RZL-340-RCFLNG

RZL-330-SWA

RZL-330-BWA

RZL-330-BWTIA

RZL-330-HWA

RZL-330-BLA

RZL-330-3LA

RZL-330-H3LA

RZL-330-HELIA

RZL-340-SWA

RZL-340-BWA

RZL-340-BWTIA

RZL-340-HWA

RZL-340-BLA

RZL-340-3LA

RZL-340-H3LA

RZL-340-HELIA

RZL-340-RHELIA

Description

Rotor Case - 3" TRICLAMP

Rotor Case - 3" FLANGE

Rotor Case - 4" TRICLAMP

Rotor Case - 4" FLANGE

Rotor Set (2), Single-Wing

Rotor Set (2), Bi-Wing

Rotor Set (2), Bi-Wing, PTFE Inserted

Rotor Set (2), Bi-Wing, High Temp Clearance

Rotor Set (2), Bi-Lobe

Rotor Set (2), Tri-Lobe

Rotor Set (2), Tri-Lobe, High Temp Clearance

Rotor Set (2), Heli-Lobe

Rotor Set (2), Single-Wing

Rotor Set (2), Bi-Wing

Rotor Set (2), Bi-Wing, PTFE Inserted

Rotor Set (2), Bi-Wing, High Temp Clearance

Rotor Set (2), Bi-Lobe

Rotor Set (2), Tri-Lobe

Rotor Set (2), Tri-Lobe, High Temp Clearance

Rotor Set (2), Heli-Lobe

Rotor Set (2), Heli-Lobe

Material

SUS316L

SUS316L

SUS316L

SUS316L

SUS316L

SUS316L

SUS316L PTFE

SUS316L

SUS316L

SUS316L

SUS316L

SUS316L

SUS316L

SUS316L

SUS316L/PTFE

SUS316L

SUS316L

SUS316L

SUS316L

SUS316L

EPDM

• All standard rotor cases do not have tap holes for flushing on jacketed options.

Used

RZL330

RZL340

RZL330

RZL340

Quantity Per Pump

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

68 800.789.1718

Rotary Lobe Pumps - JRZL-300 Series

Parts List for JRZL-300 Series Pumps

Triple Lip Seal

55

56

57

Item

43

51

Dixon Sanitary Part #

RZL-330B-MSGWB

RZL-330B-RTORB

RZL-330B-RTORE

RZL-330B-RTORV

RZL-330B-TRPLSC

RZL-330B-TRPLS

RZL-330B-LSC

RZL-330B-CERCS

Description

Wrench Bolt, M/Seal Gland (M6x10L)

O-ring, Rotor (AN142)

O-ring, Rotor (AN142)

O-ring, Rotor (AN142)

Triple Lip Seal, Product

Triple Lip Seal, Product

Lip Seal Cover

Ceramic Coated Sleeve, Product

Material

SUS304

NBR

EPDM

FKM

PTFE+Copper

PTFE+Glass

SUS304

CERAMIC

SUS304

Used

RZL300

Quantity Per Pump

4

2

2

2

2

2

2

2

Rotary Lobe Pumps - JRZL-300 Series 800.789.1718

69

Parts List for JRZL-300 Series Pumps

Single Mechanical Seal

70

Item

42

43

51

52

53

54

Dixon Sanitary Part #

RZL-330B-MSGFW

RZL-330B-MSGWB

RZL-330B-RTORB

RZL-330B-RTORE

RZL-330B-RTORV

RZL-330B-TCSEAL

RZL-340-RHLTCSR

RZL-330B-RCORB

RZL-330B-RCORE

RZL-330B-RCORV

RZL-330B-CSSB

Description

Flat Washer, M/Seal Gland (Φ6)

Wrench Bolt, M/Seal Gland (M6x10L)

O-ring, Rotor (AN142)

O-ring, Rotor (AN142)

O-ring, Rotor (AN142)

Seal Ring

Seal Ring, Rubber Heli-lobe

O-ring, Rotor Case (AN230)

O-ring, Rotor Case (AN230)

O-ring, Rotor Case (AN230)

Single Seal Body, Case

Material

SUS304

SUS304

NBR

EPDM

FKM

TC

TC

NBR

EPDM

FKM

SUS304

Used

RZL300

RZL340

RZL300

Quantity Per Pump

4

4

2

2

2

2

2

2

4

4

2

800.789.1718

Rotary Lobe Pumps - JRZL-300 Series

Parts List for JRZL-300 Series Pumps

Double Mechanical Seal

Item

53

61

62

63

64

51

52

Dixon Sanitary

Part #

RZL-330B-RTORB

RZL-330B-RTORE

RZL-330B-RTORV

RZL-330B-TCSEAL

RZL-340-RHLTCSR

RZL-330B-RCORB

RZL-330B-RCORE

RZL-330B-RCORV

RZL-330B-CDSBTC

RZL-330B-CDHPTC

RZL-330B-CORDSB

RZL-330B-CORDSE

RZL-330B-CORDSV

RZL-330B-SDSBC

RZL-330B-SORDSB

RZL-330B-SORDSE

RZL-330B-SORDSV

Description

O-ring, Rotor (AN142)

O-ring, Rotor (AN142)

O-ring, Rotor (AN142)

Seal Ring

Seal Ring, Rubber Heli-lobe

O-ring, Rotor Case (AN230)

O-ring, Rotor Case (AN230)

O-ring, Rotor Case (AN230)

Double Seal Body,Case

Double Seal Body, Case, High Pressure

O-ring, Case, Double seal (AN043)

O-ring, Case, Double seal (AN043)

O-ring, Case, Double seal (AN043)

Rotation part, Double Seal, Shaft

O-ring, Shaft, Double Seal (AN033)

O-ring, Shaft, Double Seal (AN033)

O-ring, Shaft, Double Seal (AN033)

Material

NBR

EPDM

FKM

TC

TC

NBR

EPDM

FKM

TC/SUS304

TC/SUS304

NBR

EPDM

FKM

Carbon/SUS304

NBR

EPDM

FKM

Used

RZL300

RZL340

RZL300

Quantity Per

Pump

2

2

2

2

2

2

2

2

2

2

2

4

2

2

4

2

2

Rotary Lobe Pumps - JRZL-300 Series 800.789.1718

71

Parts List for JRZL-300 Series Pumps

Single O-ring Seal

Item

51

53

57

Dixon Sanitary Part #

RZL-330B-RTORB

RZL-330B-RTORE

RZL-330B-RTORV

RZL-330B-RCORB

RZL-330B-RCORE

RZL-330B-RCORV

RZL-330B-CERCS

Description

O-ring, Rotor (AN142)

O-ring, Rotor (AN142)

O-ring, Rotor (AN142)

O-ring, Rotor Case (AN230)

O-ring, Rotor Case (AN230)

O-ring, Rotor Case (AN230)

Ceramic Coated Sleeve

Material

NBR

EPDM

FKM

NBR

EPDM

FKM

CERAMIC/

SUS304

Used

RZL300

Quantity Per Pump

2

2

2

2

2

2

2

72 800.789.1718

Rotary Lobe Pumps - JRZL-300 Series

Parts List for JRZL-300 Series Pumps

Single Mechanical Seal with Flush

62

81

83

53

54

82

84

Item

43

51

52

Dixon Sanitary Part #

RZL-330B-MSGWB

RZL-330B-RTORB

RZL-330B-RTORE

RZL-330B-RTORV

RZL-330B-TCSEAL

RZL-330B-RCORB

RZL-330B-RCORE

RZL-330B-RCORV

RZL-330B-CSSB

RZL-330B-CORDSB

RZL-330B-CORDSE

RZL-330B-CORDSV

RZL-330B-CERFL

RZL-330B-LSFLT

RZL-330B-ORFLB

RZL-330B-ORFLE

RZL-330B-ORFLV

RZL-330B-SLPFLG

Description

Wrench Bolt, Lip Seal Gland (M6x10L)

O-ring, Rotor (AN142)

O-ring, Rotor (AN142)

O-ring, Rotor (AN142)

Mech. Seal Ring

O-ring, Rotor Case (AN230)

O-ring, Rotor Case (AN230)

O-ring, Rotor Case (AN230)

Seal Base, Single Mech.

O-ring, Flushed Seal Case (AN042)

O-ring, Flushed Seal Case (AN042)

O-ring, Flushed Seal Case (AN042)

Ceramic Sleeve, Flushing

Lip seal, flushing

O-ring, Ceramic Sleeve, Flushing (AN033)

O-ring, Ceramic Sleeve, Flushing (AN033)

O-ring, Ceramic Sleeve, Flushing (AN033)

Gland, Flushing

Material

SUS304

NBR

EPDM

FKM

TC

NBR

EPDM

FKM

SUS304

NBR

EPDM

FKM

Ceramic

PTFE

NBR

EPDM

FKM

SUS304

Used

RZL300

RZL340

RZL300

Quantity Per Pump

4

2

2

2

2

2

2

2

2

2

2

2

2

2

2

4

2

2

Rotary Lobe Pumps - JRZL-300 Series 800.789.1718

73

Parts List for JRZL-300 Series Pumps

Pressure Relief Front Cover

Item

91

91A

92

93

94

95

96

97

98

99

100

Dixon Sanitary Part #

RZL-330B-RVFC

RZL-330B-C

RZL-330B-OR1B

RZL-330B-OR1E

RZL-330B-OR1V

RZL-330B-OR2B

RZL-330B-OR2E

RZL-330B-OR2V

RZL-330B-VP

RZL-330B-RVSP

RZL-330B-SPGP

RZL-330B-RVWB

RZL-330B-RVC

RZL-330B-RVLN

RZL-330B-RVAB

• Must supply setting pressure

Description

Front Cover, Relief Valve

Pressure Relief Front Cover Ass'y

O-ring, 1 Stage, Plate (AN242)

O-ring, 1 Stage, Plate (AN242)

O-ring, 1 Stage, Plate (AN242)

O-ring, 2 Stage, Plate (AN239)

O-ring, 2 Stage, Plate (AN239)

O-ring, 2 Stage, Plate (AN239)

Plate, Valve

Spring

Plate, Spring

Wrench Bolt

Cover, Relief Valve (M8x25)

Lock Nut (M20)

Adjusting Bolt (M20x80L)

Material

SUS316L

SUS316L

NBR

EPDM

FKM

NBR

EPDM

FKM

SUS316L

SS41 + Cr

SUS304

SUS304

SUS304

SUS304

SUS304

Used

RZL300

Quantity Per Pump

1

1

1

1

1

1

1

1

4

1

1

1

1

1

1

74 800.789.1718

Rotary Lobe Pumps - JRZL-300 Series

Parts List for JRZL-300 Series Pumps

Jacket Front Cover and Case

Item

111

112

113

114

Dixon Sanitary Part #

RZL-330B-FCJ

RZL-330-CTJ

RZL-330-CBJ

RZL-340-CTJ

RZL-340-CBJ

RZL-330-JT

RZL-340-JT

RZL-330B-JWB

Description

Front Cover Jacket

Jacket, Case Top

Jacket, Case Bottom

Jacket, Case Top

Jacket, Case Bottom

Tube, Jacket

Tube, Jacket

Wrench Bolt, Jacket

Material

SUS316L

SUS304

SUS304

SUS304

SUS304

SUS304

SUS304

SUS304

Used

RZL300

RZL330

RZL340

RZL330

RZL340

RZL300

Quantity Per Pump

1

1

1

1

1

1

1

4

Rotary Lobe Pumps - JRZL-300 Series 800.789.1718

75

76

Parts List for JRZL-300 Series Pumps

Rectangular Inlet

Item

151

152

153

154

31

Dixon Sanitary Part #

RZL-330-RCRIA

RZL-330-RCRIA

RZL-330-RIORB

RZL-330-R10R

RZL-330-RIORV

RZL-340-RIORB

RZL-340-RIOR

RZL-340-RIORV

RZL-330B-RIHB

RZL-330-ROORB

RZL-330-ROOR

RZL-330-ROORV

RZL-340-ROORB

RZL-340-ROOR

RZL-340-ROORV

RZL-330-RCRI2C

RZL-330B-RFLG

Description

Adapter, Rectangular Inlet

Adapter, Rectangular Inlet

O-ring, Rectangular Inlet (AN248)

O-ring, Rectangular Inlet (AN248)

O-ring, Rectangular Inlet (AN248)

O-ring, Rectangular Inlet (AN253)

O-ring, Rectangular Inlet (AN253)

O-ring, Rectangular Inlet (AN253)

Hex Bolt & S/W (M10x30)

O-ring, Rectangular Adapter (AN257)

O-ring, Rectangular Adapter (AN257)

O-ring, Rectangular Adapter (AN257)

O-ring, Rectangular Adapter (AN260)

O-ring, Rectangular Adapter (AN260)

O-ring, Rectangular Adapter (AN260)

Rotor Case - RECT /3" TRICLAMP

Rotor Case - RECT / 3" JISFLANGE

Material

SUS304

SUS304

NBR

EPDM

FKM

NBR

EPDM

FKM

SUS304

NBR

EPDM

FKM

NBR

EPDM

FKM

SUS316L

SUS316L

Used

RZL330

RZL340

RZL330

RZL340

RZL300

RZL330

RZL340

RZL300

Quantity Per Pump

1

1

1

1

1

4

1

1

1

1

1

1

1

1

1

1

1

800.789.1718

Rotary Lobe Pumps - JRZL-300 Series

Certificates

Rotary Lobe Pumps - JRZL-300 Series 800.789.1718

77

Certificates

78 800.789.1718

Rotary Lobe Pumps - JRZL-300 Series

Limited Warranty

DIXON VALVE AND COUPLING COMPANY (herein called "Dixon") warrants the products described herein, and manufactured by Dixon to be free from defects in material and workmanship for a period of one (1) year from date of shipment by Dixon under normal use and service. It's sole obligation under this warranty being limited to repairing or replacing, as hereinafter provided, at its option any product found to Dixon's satisfaction to be defective upon examination by it, provided that such product shall be returned for inspection to Dixon's factory within three (3) months after discovery of the defect. The repair or replacement of defective products will be made without charge for parts or labor. This warranty shall not apply to: (a) parts or products not manufactured by Dixon, the warranty of such items being limited to the actual warranty extended to Dixon by its supplier; (b) any product that has been subject to abuse, negligence, accident, or misapplication; (c) any product altered or repaired by others than Dixon; and (d) to normal maintenance services and the replacement of service items (such as washers, gaskets and lubricants) made in connection with such services. To the extent permitted by law, this limited warranty shall extend only to the buyer and any other person reasonably expected to use or consume the goods who is injured in person by any breach of the warranty. No action may be brought against Dixon for an alleged breach of warranty unless such action is instituted within one (1) year from the date the cause of action accrues. This limited warranty shall be construed and enforced to the fullest extent allowable by applicable law.

Other than the obligation of Dixon set forth herein, Dixon disclaims all warranties, express or implied, including but not limited to any implied warranties of merchantability or fitness for a particular purpose, and any other obligation or liability.

The foregoing constitutes Dixon's sole obligation with respect to damages, whether direct, incidental or consequential, resulting from the use or performance of the product.

Some products and sizes may be discontinued when stock is depleted, or may require a minimum quantity for ordering.

NOTE: Reasonable care has been taken in preparing this catalog. Dixon Sanitary, a division of Dixon Valve & Coupling Company, reserves the right to make corrections and any dimensional changes.

Rotary Lobe Pumps - JRZL-300 Series 800.789.1718

79

Dixon ® , founded in 1916, is a premier manufacturer and supplier of hose couplings, valves, dry-disconnects, swivels, and other fluid transfer and control products. The company’s global reach includes a wide range of products for numerous industries including petroleum exploration, refining, transportation, chemical processing, food & beverage, steel, fire protection, construction, mining and manufacturing.

Dixon ® ’s strategic objective is to create solutions that make products safer, leak-free, longer lasting, and always available. dixonvalve.com •

Customer Service:

800.789.1718

®

Dixon Sanitary

N25 W23040 Paul Road • Pewaukee, WI 53072

Customer Service: 800.789.1718

Fax: 800.789.4046

© 2018 DVCC Rotary Lobe Pump-_RZL-300 series_inhouse0518

advertisement

Was this manual useful for you? Yes No
Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Related manuals