advertisement
Phoenix Duo Control quick start reference
up = on down = off
Victron Energy
De Paal 35
1351 JG Almere
The Netherlands
T : +31 (0)36 5359700
F : +31 (0)36 5311666 [email protected]
With the Phoenix Duo Control it is possible to set the maximum shore current as well as the maximum current of your generator.
If the generator is started the ‘Phoenix Duo
Control’ will know how much current your generator can provide. If you want to use more power the unique power assist© functionality of the MultiPlus will provide you with the extra energy from your batteries without overloading the generator.
In this Quick Start Reference you will find everything you need to make the nessacery settings for your system. Please see the simple three step installation guide on the right.
For safety reasons you should always read the manual !
Panel / Multi / Nr of Multies
16 / 16 / 1
16 / 16 / 2
16 / 16 / 3
16 / 16 / 4
16 / 16 / 5
16 / 16 / 6
32 / 16 / 1
32 / 16 / 2
32 / 16 / 3
32 / 16 / 4
32 / 16 / 5
32 / 16 / 6
16 / 32 / 1
16 / 32 / 2
16 / 32 / 3
32 / 32 / 1
32 / 32 / 2
32 / 32 / 3
32 / 32 / 4
32 / 32 / 5
32 / 32 / 6
X
Close
Open
Close
Open
Close
SW 1
Close
Close
Close
Close
Close
Close
Close
Close
Close
Close
Close
Close
Close
Close
Close
1.
2.
3.
Connect the potential free relay contact
Contact open = Variable setting
Contact closed = Fixed setting from jumpers
This connection can be made by using a 2 wire cable of 0,75 - 1,5mm²
Configure the dipswitches with the table below
16 / 16 / 1 panel scale - maximum output multi - number of multi’s
Control the settings of the Multi with
VE Configure (www.victronenergy.com)
Number of slaves = 0 (General)
Recommended settings with the use of a generator
Accept wide input range = on (General)
AC waveform check = off (General)
SW 2
Close
Open
Close
Open
Close
Open
X
Close
Close
Open
Open
Close
Open
Open
Open
Close
Open
Close
Open
Close
Open
X
Close
Close
Close
Close
Open
SW 3
Close
Close
Open
Open
Close
Close
Close
Open
Close
Close
Close
Open
Open
Close
Close
X
Close
Close
Close
Close
Close
SW 4
Close
Close
Close
Close
Open
Open
Close
Close
Open
Close
Close
Close
Close
Open
Open
www.victronenergy.com
advertisement
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Related manuals
advertisement