Cisco Content Delivery Engine 475 Installation Guide
Cisco Content Delivery Engine 475 is a high-performance appliance that provides advanced video delivery services for cable, satellite, and telecom operators. It offers a comprehensive suite of features to optimize video delivery, including support for multiple video formats, adaptive bitrate streaming, and content caching. With its powerful hardware and software capabilities, the Cisco Content Delivery Engine 475 can deliver high-quality video to a large number of users simultaneously, making it an ideal solution for video service providers looking to improve the quality and reach of their video content.
Advertisement
Advertisement
Cisco Content Delivery Engine
205/220/250/280/285/420/460/475 Hardware
Installation Guide
October 05, 2018
Cisco Systems, Inc.
www.cisco.com
Cisco has more than 200 offices worldwide.
Addresses, phone numbers, and fax numbers are listed on the Cisco website at www.cisco.com/go/offices.
THE SPECIFICATIONS AND INFORMATION REGARDING THE PRODUCTS IN THIS MANUAL ARE SUBJECT TO CHANGE WITHOUT NOTICE. ALL
STATEMENTS, INFORMATION, AND RECOMMENDATIONS IN THIS MANUAL ARE BELIEVED TO BE ACCURATE BUT ARE PRESENTED WITHOUT
WARRANTY OF ANY KIND, EXPRESS OR IMPLIED. USERS MUST TAKE FULL RESPONSIBILITY FOR THEIR APPLICATION OF ANY PRODUCTS.
THE SOFTWARE LICENSE AND LIMITED WARRANTY FOR THE ACCOMPANYING PRODUCT ARE SET FORTH IN THE INFORMATION PACKET THAT
SHIPPED WITH THE PRODUCT AND ARE INCORPORATED HEREIN BY THIS REFERENCE. IF YOU ARE UNABLE TO LOCATE THE SOFTWARE LICENSE
OR LIMITED WARRANTY, CONTACT YOUR CISCO REPRESENTATIVE FOR A COPY.
The Cisco implementation of TCP header compression is an adaptation of a program developed by the University of California, Berkeley (UCB) as part of UCB’s public domain version of the UNIX operating system. All rights reserved. Copyright © 1981, Regents of the University of California.
NOTWITHSTANDING ANY OTHER WARRANTY HEREIN, ALL DOCUMENT FILES AND SOFTWARE OF THESE SUPPLIERS ARE PROVIDED “AS IS” WITH
ALL FAULTS. CISCO AND THE ABOVE-NAMED SUPPLIERS DISCLAIM ALL WARRANTIES, EXPRESSED OR IMPLIED, INCLUDING, WITHOUT
LIMITATION, THOSE OF MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE AND NONINFRINGEMENT OR ARISING FROM A COURSE OF
DEALING, USAGE, OR TRADE PRACTICE.
IN NO EVENT SHALL CISCO OR ITS SUPPLIERS BE LIABLE FOR ANY INDIRECT, SPECIAL, CONSEQUENTIAL, OR INCIDENTAL DAMAGES, INCLUDING,
WITHOUT LIMITATION, LOST PROFITS OR LOSS OR DAMAGE TO DATA ARISING OUT OF THE USE OR INABILITY TO USE THIS MANUAL, EVEN IF CISCO
OR ITS SUPPLIERS HAVE BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGES.
Cisco and the Cisco logo are trademarks or registered trademarks of Cisco and/or its affiliates in the U.S. and other countries. To view a list of Cisco trademarks, go to this
URL: www.cisco.com/go/trademarks . Third-party trademarks mentioned are the property of their respective owners. The use of the word partner does not imply a partnership relationship between Cisco and any other company. (1110R)
This product contains watermarking technology that is licensed from Verimatrix, Inc., and such functionality should not be used or distributed further by you without any additional license(s) required from Verimatrix, Inc.
Any Internet Protocol (IP) addresses used in this document are not intended to be actual addresses. Any examples, command display output, and figures included in the document are shown for illustrative purposes only. Any use of actual IP addresses in illustrative content is unintentional and coincidental.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
© 2018 Cisco Systems, Inc. All rights reserved.
Preface
Safety Warning Information Referral xiii
Obtaining Documentation and Submitting a Service Request xix
Overview of the Content Delivery Engines
Cisco VDS Internet Streamer Overview 1-1
Cisco CDA Visual Quality Experience Application Overview 1-5
VQE Major Software Components 1-7
CDE Storage Drives and Expansion Cards 1-26
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide iii
Contents iv
1-28
1-28
1-29
1-29
1-30
1-30
1-31
1-32
1-32
1-33
1-33
1-34
1-34
1-35
1-35
1-36
1-37
1-37
1-38
1-39
1-39
1-40
1-41
1-41
1-42
1-43
1-44
1-44
1-45
1-45
1-46
1-47
1-48
1-49
Front Panel Control Buttons and LEDs
1-50
Front Panel Control Panel Buttons
1-50
1-51
1-55
1-57
Input/Output Ports and Connectors
1-57
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Contents
Preparing to Install the Content Delivery Engines
2-1
2-1
Preventing Electrostatic Discharge Damage
2-1
Environmental and Physical Specifications
2-2
2-3
2-4
2-7
2-7
2-8
2-9
2-9
If AC Power Supplies Are Installed
2-9
Supplemental Grounding Connection
2-10
If DC Power Supplies Are Installed
2-12
2-13
Installing the Content Delivery Engines
3-1
3-1
3-1
3-2
3-2
Reviewing Rack Installation Safety Guidelines
3-3
Preparing the CDEs for Rack Installation
3-3
Replacing External Storage Drives
3-3
3-8
3-9
Replacing a CDE280 Power Supply
3-12
Device Connection Test in a VDS-TV Environment
3-13
3-13
3-14
Installing a CDE205, CDE220, in the Rack Using a Rev. A Rail Kit
3-14
3-19
3-19
Installing a CDE420 in the Rack Using a Rev. A Rail Kit
3-19
Installing a CDE205, CDE220, CDE420, and CDE460 in the Rack Using a Rev. B Rail
3-24
Installing a CDE280 in the Rack Using a Rail Kit
3-30
Unpacking and Inspecting the Server
3-31
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide v
Contents
Preparing for Server Installation
3-31
3-31
3-32
3-33
3-33
Installing the Server In a Rack
3-33
3-33
Installing the Cable Management Arm (Optional)
3-35
Reversing the Cable Management Arm (Optional)
3-37
3-37
3-38
3-38
3-38
Installing the VDS Internet Streamer Software and Initially Configuring a CDE
4-1
Launching a New CDE for the First Time
4-1
Launching a CDE280 for the First Time
4-3
4-3
4-5
4-7
4-7
4-8
4-14
4-14
4-15
Re-manufacturing and Installing CDE280
4-17
4-23
4-25
4-25
Installing the VDS-IS Software
4-27
4-30
4-32
4-34
Installing the VDS-TV Software and Initially Configuring a CDE
5-39
Hardware/Platform specific performance numbers for VDS-TV
5-39
Installing the VQE and Initially Configuring a CDE
6-1
Launching a New CDE250 for the First Time
6-1
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide vi
Contents
Launching a New CDE280 for the First Time
6-1
6-1
6-2
6-2
6-2
6-2
6-2
6-2
6-3
Re-Manufacturing and Installing CDE280
6-3
6-6
6-7
Technical Specifications
A-1
A-1
A-2
A-3
A-4
A-5
A-6
A-7
A-7
A-8
Connector Pin Assignments
B-1
Serial Console-Interface Connector Pin Assignments
B-1
B-2
B-3
Ethernet Connector Pin Assignments
B-3
B-5
B-5
B-6
Power Cord Specifications
C-1
Supported Power Cords and Plugs
C-1
C-3
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide vii
Contents
CDE280 and CDE285 Troubleshooting Tips
D-1
D-1
Obtaining Show Tech Support to TAC
D-1
Display of System Event Log Events
D-4
D-4
D-5
Common Troubleshooting Scenarios
D-6
Common Troubleshooting Scenarios Host Does not Boot
D-7
Common Troubleshooting Scenarios - BMC
D-7
Accessing CIMC on CDE280 Service Engine
D-7
D-9
Configuring VDS-IS CDE280 Disks
E-1
Changing the Disk Status Using KVM Console
E-1
Changing Drive Status Using CIMC Console
E-9
VDS-IS and VQE CDE280 and CDE285 CIMC / BIOS Firmware
F-1
VDS-IS and VQE CDE 280 CIMC Firmware and BIOS Firmware Upgrade
F-1
VDS-IS and VQE CDE280 CIMC Firmware and BIOS Firmware Downgrade
F-11
OMD CDE285 CIMC Firmware and BIOS Firmware Upgrade
F-15 viii
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Preface
This preface describes the objectives and organization of this guide.
•
Document Revision History, page ix
•
•
Document Organization, page xi
•
•
•
•
•
Related Documentation, page xii
Safety Warning Information Referral, page xiii
Obtaining Documentation and Submitting a Service Request, page xix
Document Revision History
Table 1 records technical changes to this document.
Table 1 Document Revision History
Document Version
—
—
—
Date
October 05, 2018
January 31, 2018
December 09, 2016
—
—
September 29, 2016
June 15, 2016
— March 31, 2016
Change Summary
Added CDE475 support for VDS-TV.
CDE470 is not supported in VDS-TV.
Added CDE285 support for OMD (Open
Media Distribution).
Added CDE280-2U4 support for VDS-TV.
• Added CDE280 support for VDS-TV.
• Added CDE280 support for VQE.
Added Hardware/Platform specific performance numbers for VDS-TV.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide ix
Table 1
—
Document Revision History
Document Version Date
February 29, 2016
—
—
OL-16887-13
OL-16887-12
OL-16887-11
OL-16887-10
OL-16887-09
OL-16887-08
OL-16887-07
OL-16887-05
OL-16887-04
OL-16887-03
OL-16887-02
OL-16887-01
June 5, 2015
April 30, 2015
June 27, 2014
January 13, 2014
October 31, 2013
July 19, 2013
September 14, 2012
June 22, 2012
October 31, 2011
March 31, 2010
October 30, 2009
June 16, 2009
April 4, 2009
March 4, 2009
Change Summary
• Added Configuring VDS-IS CDE280
Disks.
• Added CDE 280 CIMC Firmware and
BIOS Firmware Upgrade and downgrade.
Added Troubleshooting tips for CDE280, and the port cable specifications for CDE.
Added CDE280 support for Internet
Streaming.
Update for VDS-TV Plymouth release.
Updated CDS to VDS, recorder information, and miscellaneous corrections.
Added CDE470.
Added CDE250 2S5 support for Internet
Streaming.
Added CDE460.
Added VQE Server (CDE250, model 2V0) for Visual Quality Experience (VQE), and the Very Dense TV and IS Flash Streamers
(CDE250, models 2S8, 2S9 and 2S10).
Added Dense IS Streamer (CDE250, model
2M0). Updated baud information for the
TV CDS installation, and the storage device removal procedure.
Added Dense Cisco Internet Streamer
(CDE220, model 2S3I).
Added Flash SSD, Entry-Level Cisco TV
Streamer (CDE220, model 2S1), and Dense
Cisco TV Streamer (CDE220, model 2S3).
Added storage drive cautions, additional
DC power connect information, and
CDE220 2A-C, CDE220 2A-F, CDE420
4G-C, and CDE420 4G-F models.
Added CDE220 2G2-C model and additional DC power supply specifications.
Removed CDE remanufacture instructions.
This is the first version of this document.
x
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Document Organization
Table 2 lists the chapters and appendices in this document and provides a description of each chapter and appendix.
Table 2 List of Chapters and Appendices
Chapter Description
Chapter 1, “Overview of the Content Delivery
Chapter 2, “Preparing to Install the Content
Chapter 3, “Installing the Content Delivery
Provides a brief introduction to the Content
Delivery Engines (CDEs).
Contains site requirements and important safety information for working with the CDEs.
Provides the necessary information to install the
Videoscape Distribution Suite (VDS) hardware components.
Chapter 4, “Installing the VDS Internet Streamer
Software and Initially Configuring a CDE”
Describes the initial installation of the VDS-IS software application onto the CDEs, and the initial configuration of the CDEs using the
Content Delivery System Manager (CDSM).
Chapter 5, “Installing the VDS-TV Software and
Describes the initial installation of the VDS-TV software application onto the CDEs, and the initial configuration of the CDEs using the
Content Delivery System Manager (CDSM).
Chapter 6, “Installing the VQE and Initially
Appendix A, “Technical Specifications”
Appendix B, “Connector Pin Assignments”
Describes the initial installation of the VQE software application onto the CDEs, and the initial configuration of the CDEs using the
Content Delivery System Manager (CDSM).
Provides the CDE specifications.
Lists the connector pin assignments for the CDEs.
Describes the power cord specification for CDEs.
Provides the trouble shooting tips for CDE280.
Appendix C, “Power Cord Specifications”
Appendix D, “CDE280 and CDE285
Appendix E, “Configuring VDS-IS CDE280
Appendix F, “VDS-IS and VQE CDE280 and
Describes the configuration details of VDS-IS.
Provides some CIMC troubleshooting tips and common troubleshooting scenarios for CDE-280
Service Engine.
Objectives
This guide documents the hardware features of the next-generation Cisco Content Delivery Engines
(CDEs), which include CDE205, CDE220, CDE250, CDE280, CDE285, CDE420, CDE460, and
CDE475 these platforms are used in Internet Streamer and TV applications. It describes the physical and performance characteristics of each CDE, explains how to install a CDE, and provides troubleshooting information. This guide does not describe system messages that you may receive and provides only initial configuration procedures. For more information, see the
“Related Documentation” section on
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide xi
.
Note •
•
•
The CDE280 engine is supported for both the VDS-IS and VDS-TV Software Applications.
The CDE285 engine is supported with the OMD Software Applications only.
The CDE475 engine is supported with the VDS-TV Software Applications only.
Audience
This guide is for the networking or computer technician responsible for installing the CDE hardware.
You should be familiar with the concepts and terminology of Ethernet and local area networking.
Related Documentation
These documents provide complete information about the VDS (formerly CDS) and are available from cisco.com:
•
•
•
Cisco Internet Streamer CDS Software Configuration Guide
Cisco Internet Streamer CDS Command Reference
Cisco Internet Streamer CDS Alarms and Error Messages Guide
•
•
•
•
•
Cisco Internet Streamer CDS Quick Start Guide
Cisco Internet Streamer CDS API Guide
Release Notes for Cisco Internet Streamer CDS
Cisco Internet Streamer CDS Installation Guide
Cisco TV VDS ISA Configuration Guide
Cisco TV VDS RTSP Configuration Guide •
• Cisco TV VDS API Guide
• Cisco TV CDS Installation, Upgrade, and Maintenance Guide
These documents provide complete information about the Cisco CDA Visual Quality Experience (VQE) and are available from cisco.com:
•
•
•
•
Release Notes for Cisco CDA Visual Quality Experience Application Release 3.11
Release Notes for Cisco CDA Visual Quality Experience Application Release 3.8
Release Notes for Cisco CDA Visual Quality Experience Application, Release 3.6
Cisco CDA Visual Quality Experience Application User Guide, Release 3.3
xii
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
You can access the VDS-IS software documents at the following URL: http://www.cisco.com/en/US/products/ps7127/tsd_products_support_series_home.html
You can access the VDS-TV software documents at the following URL: http://www.cisco.com/en/US/products/ps12653/tsd_products_support_series_home.html
You can access the hardware documents at the following URL: http://www.cisco.com/en/US/products/ps7126/tsd_products_support_series_home.html
These documents provide complete information about the installation and service of the C200 and C210 and are available from cisco.com.
• Cisco UCS C200 Installation and Service Guide http://www.cisco.com/en/US/docs/unified_computing/ucs/c/hw/C200M1/install/c200M1.html
• Cisco UCS C210 Installation and Service Guide http://www.cisco.com/en/US/docs/unified_computing/ucs/c/hw/C210M1/install/C210M1.html
The Cisco UCS C-Series Rack Servers documentation is available from cisco.com at: http://www.cisco.com/en/US/products/ps10493/prod_installation_guides_list.html
The OMD related documents are listed as follows:
• Cisco UCS C240 M4 High-Density Rack Server (Small Form Factor Disk Drive Model)
• Cisco UCS C240 M4 High-Density Rack Server (Large Form Factor Disk Drive Model)
• Cisco UCS C240 M4 Server Installation and Service Guide
Conventions
Note Means reader take note . Notes contain helpful suggestions or references to materials not contained in this publication.
Caution Means reader be careful . In this situation, you might do something that could result in equipment damage or loss of data.
Safety Warning Information Referral
See the foreign language translations of all warnings used in the Regulatory Compliance and Safety
Information for the Cisco Content Delivery Engines document at this URL: http://www.cisco.com/en/US/docs/video/cds/cde/regulatory/compliance/CDE_RCSI.html
See the foreign language translations of all warnings used in the Regulatory Compliance and Safety
Information for the Cisco UCS C-Series, Cisco C880 Series, and C-Series-Based Appliances document at this URL: http://www.cisco.com/c/en/us/td/docs/unified_computing/ucs/c/regulatory/compliance/cseries_regulat ory_compliance_information.html
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide xiii
Warning Definition
Warning IMPORTANT SAFETY INSTRUCTIONS
This warning symbol means danger. You are in a situation that could cause bodily injury. Before you work on any equipment, be aware of the hazards involved with electrical circuitry and be familiar with standard practices for preventing accidents. Use the statement number provided at the end of each warning to locate its translation in the translated safety warnings that accompanied this device.
SAVE THESE INSTRUCTIONS
Waarschuwing
Varoitus
Attention
BELANGRIJKE VEILIGHEIDSINSTRUCTIES
Dit waarschuwingssymbool betekent gevaar. U verkeert in een situatie die lichamelijk letsel kan veroorzaken. Voordat u aan enige apparatuur gaat werken, dient u zich bewust te zijn van de bij elektrische schakelingen betrokken risico's en dient u op de hoogte te zijn van de standaard praktijken om ongelukken te voorkomen. Gebruik het nummer van de verklaring onderaan de waarschuwing als u een vertaling van de waarschuwing die bij het apparaat wordt geleverd, wilt raadplegen.
BEWAAR DEZE INSTRUCTIES
TÄRKEITÄ TURVALLISUUSOHJEITA
Tämä varoitusmerkki merkitsee vaaraa. Tilanne voi aiheuttaa ruumiillisia vammoja. Ennen kuin käsittelet laitteistoa, huomioi sähköpiirien käsittelemiseen liittyvät riskit ja tutustu onnettomuuksien yleisiin ehkäisytapoihin. Turvallisuusvaroitusten käännökset löytyvät laitteen mukana toimitettujen käännettyjen turvallisuusvaroitusten joukosta varoitusten lopussa näkyvien lausuntonumeroiden avulla.
SÄILYTÄ NÄMÄ OHJEET
IMPORTANTES INFORMATIONS DE SÉCURITÉ
Ce symbole d'avertissement indique un danger. Vous vous trouvez dans une situation pouvant entraîner des blessures ou des dommages corporels. Avant de travailler sur un équipement, soyez conscient des dangers liés aux circuits électriques et familiarisez-vous avec les procédures couramment utilisées pour éviter les accidents. Pour prendre connaissance des traductions des avertissements figurant dans les consignes de sécurité traduites qui accompagnent cet appareil, référez-vous au numéro de l'instruction situé à la fin de chaque avertissement.
CONSERVEZ CES INFORMATIONS xiv
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Warnung
Avvertenza
Advarsel
Aviso
¡Advertencia!
WICHTIGE SICHERHEITSHINWEISE
Dieses Warnsymbol bedeutet Gefahr. Sie befinden sich in einer Situation, die zu Verletzungen führen kann. Machen Sie sich vor der Arbeit mit Geräten mit den Gefahren elektrischer
Schaltungen und den üblichen Verfahren zur Vorbeugung vor Unfällen vertraut. Suchen Sie mit der am Ende jeder Warnung angegebenen Anweisungsnummer nach der jeweiligen
Übersetzung in den übersetzten Sicherheitshinweisen, die zusammen mit diesem Gerät ausgeliefert wurden.
BEWAHREN SIE DIESE HINWEISE GUT AUF.
IMPORTANTI ISTRUZIONI SULLA SICUREZZA
Questo simbolo di avvertenza indica un pericolo. La situazione potrebbe causare infortuni alle persone. Prima di intervenire su qualsiasi apparecchiatura, occorre essere al corrente dei pericoli relativi ai circuiti elettrici e conoscere le procedure standard per la prevenzione di incidenti. Utilizzare il numero di istruzione presente alla fine di ciascuna avvertenza per individuare le traduzioni delle avvertenze riportate in questo documento.
CONSERVARE QUESTE ISTRUZIONI
VIKTIGE SIKKERHETSINSTRUKSJONER
Dette advarselssymbolet betyr fare. Du er i en situasjon som kan føre til skade på person. Før du begynner å arbeide med noe av utstyret, må du være oppmerksom på farene forbundet med elektriske kretser, og kjenne til standardprosedyrer for å forhindre ulykker. Bruk nummeret i slutten av hver advarsel for å finne oversettelsen i de oversatte sikkerhetsadvarslene som fulgte med denne enheten.
TA VARE PÅ DISSE INSTRUKSJONENE
INSTRUÇÕES IMPORTANTES DE SEGURANÇA
Este símbolo de aviso significa perigo. Você está em uma situação que poderá ser causadora de lesões corporais. Antes de iniciar a utilização de qualquer equipamento, tenha conhecimento dos perigos envolvidos no manuseio de circuitos elétricos e familiarize-se com as práticas habituais de prevenção de acidentes. Utilize o número da instrução fornecido ao final de cada aviso para localizar sua tradução nos avisos de segurança traduzidos que acompanham este dispositivo.
GUARDE ESTAS INSTRUÇÕES
INSTRUCCIONES IMPORTANTES DE SEGURIDAD
Este símbolo de aviso indica peligro. Existe riesgo para su integridad física. Antes de manipular cualquier equipo, considere los riesgos de la corriente eléctrica y familiarícese con los procedimientos estándar de prevención de accidentes. Al final de cada advertencia encontrará el número que le ayudará a encontrar el texto traducido en el apartado de traducciones que acompaña a este dispositivo.
GUARDE ESTAS INSTRUCCIONES
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide xv
Varning!
VIKTIGA SÄKERHETSANVISNINGAR
Denna varningssignal signalerar fara. Du befinner dig i en situation som kan leda till personskada. Innan du utför arbete på någon utrustning måste du vara medveten om farorna med elkretsar och känna till vanliga förfaranden för att förebygga olyckor. Använd det nummer som finns i slutet av varje varning för att hitta dess översättning i de översatta säkerhetsvarningar som medföljer denna anordning.
SPARA DESSA ANVISNINGAR xvi
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Aviso
Advarsel
INSTRUÇÕES IMPORTANTES DE SEGURANÇA
Este símbolo de aviso significa perigo. Você se encontra em uma situação em que há risco de lesões corporais. Antes de trabalhar com qualquer equipamento, esteja ciente dos riscos que envolvem os circuitos elétricos e familiarize-se com as práticas padrão de prevenção de acidentes. Use o número da declaração fornecido ao final de cada aviso para localizar sua tradução nos avisos de segurança traduzidos que acompanham o dispositivo.
GUARDE ESTAS INSTRUÇÕES
VIGTIGE SIKKERHEDSANVISNINGER
Dette advarselssymbol betyder fare. Du befinder dig i en situation med risiko for legemesbeskadigelse. Før du begynder arbejde på udstyr, skal du være opmærksom på de involverede risici, der er ved elektriske kredsløb, og du skal sætte dig ind i standardprocedurer til undgåelse af ulykker. Brug erklæringsnummeret efter hver advarsel for at finde oversættelsen i de oversatte advarsler, der fulgte med denne enhed.
GEM DISSE ANVISNINGER
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide xvii
xviii
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Obtaining Documentation and Submitting a Service Request
For information on obtaining documentation, submitting a service request, and gathering additional information, see the monthly What’s New in Cisco Product Documentation , which also lists all new and revised Cisco technical documentation, at the following URL: http://www.cisco.com/en/US/docs/general/whatsnew/whatsnew.html
Subscribe to the What’s New in Cisco Product Documentation as a Really Simple Syndication (RSS) feed and set content to be delivered directly to your desktop using a reader application. The RSS feeds are a free service and Cisco currently supports RSS version 2.0.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide xix
xx
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
C H A P T E R
1
Overview of the Content Delivery Engines
This chapter provides an overview of the Cisco Content Delivery Engines (CDEs) and describes their hardware and software features.
•
Cisco VDS Internet Streamer Overview, page 1-1
•
•
•
•
Cisco VDS-TV Overview, page 1-3
Cisco CDA Visual Quality Experience Application Overview, page 1-5
Cisco VDS Internet Streamer Overview
The Cisco Videoscape Distribution Suite Internet Streamer (VDS-IS) is a distributed network of CDEs running Content Delivery Applications (CDAs) that collaborate with each other to deliver multiformat content to a variety of client devices. The client devices supported are personal computers and
Wi-Fi-enabled mobile devices.
The VDS-IS supports a variety of functions to accelerate the distribution of content within the content delivery network. The VDS-IS offers an end-to-end solution for service providers to ingest and stream entertainment-grade content to subscribers.
The VDS-IS functionality can be separated into four areas:
•
•
•
•
Ingest
Distribution
Delivery
Management
Each CDE in the VDS-IS contributes to one or more of these functions as determined by the CDAs
running on it. Table 1-1 describes the relationship between the CDA names and the Internet Streaming
Content Delivery System Manager (CDSM) device names.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
1-1
Chapter 1 Overview of the Content Delivery Engines
Cisco VDS Internet Streamer Overview
Table 1-1 CDA Mapping to Functionality and IS CDSM
CDA Name Functionality
Internet Streamer (+ Content Acquirer) Ingest, distribution, and delivery
Service Router
Internet Streaming Content Delivery
System Manager
Redirection of client requests for delivery
Management
CDSM Device
Name
Service Engine (SE)
Service Router (SR)
CDSM
The Service Engine can function as a Content Acquirer and Internet Streamer, or just as an Internet
Streamer.
shows the major elements of a VDS-IS network. The content delivery services determine how content flows from ingest to distribution within the VDS-IS, and to the client devices. A delivery service is a configuration defined by using the CDSM and consists of configuration parameters that dictate how content is ingested and distributed, and what content is delivered to the client devices. Some of the primary delivery service definition parameters are as follows:
• Origin server
•
•
Service routing domain name
Service Engines participating in the delivery service
• Service Engine designated as the Content Acquirer
The Content Acquirer is active on only one Service Engine in each delivery service.
1-2
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 1 Overview of the Content Delivery Engines
Cisco VDS-TV Overview
High-Level View of the Cisco VDS Internet Streamer Figure 1-1 metadata
Asset
Management
System
Content provider content
Origin servers content
Policy Servers
(QoS and conditional access)
Service Engine
Internet Streamer
GigE Service Engine
Internet Streamer
GigE
GigE GigE
Access point
Service Engine
Content Acquirer
GigE management
Switched network
Switched network Access point
CDSM
GigE Service Engine
Internet Streamer
GigE management
GigE
CMTS
CMTS
CMTS
RF
RF
RF
GigE
HFC
Service Router
DNS servers
Modem
Access point
Cisco VDS-TV Overview
The Cisco Videoscape Distribution Suite for Television (VDS-TV) is a distributed network of CDEs running CDAs that collaborate with each other to deliver personalized entertainment and interactive media to subscribers.
The VDS-TV has a variety of functions to accelerate the distribution and delivery of content. The
VDS-TV interoperates with electronic program guides (EPGs), set-top boxes (STBs), and back office applications, offering an end-to-end solution for video delivery systems.
The Cisco VDS-TV functionality can be separated into four areas:
• Ingest
•
•
•
Storage
Streaming
Management
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
1-3
Chapter 1 Overview of the Content Delivery Engines
Cisco VDS-TV Overview
Each CDE in the VDS-TV contributes to one or more of these functions as determined by the CDAs running on it.
describes the relationship between the CDA names and the TV Content Delivery
System Manager (CDSM) device names.
Table 1-2 CDA Mapping to Functionality and TV CDSM
CDA Name
Vault
TV Streamer
TV PlayOut
TV MediaX Suite
Functionality
Ingest and storage
CDSM Device
Name
Vault
Content caching, personalization, and streaming to STBs Streamer
Streamer Multicast or unicast streaming of conventionally scheduled or looped content
Aids content ingest workflow and scheduling tasks for both asset-based and real-time content
Management
CDSM
CDSM TV Content
Delivery System
Manager
Caching Node
Recorder
Content distribution
Cloud DVR ingest, recording, and storage
Caching Node
Recorder
illustrates how a VDS-TV network can be deployed. A business management system (BMS), commonly called a back office, enables service providers to deploy on-demand services by using Video on Demand (VoD) servers, networks, billing systems’ and other system components. The asset management system (AMS) manages the content on headend and node servers, while the BMS handles functions related to pitching and catching. Sometimes there is some overlap of functionality between the
BMS and the AMS.
Figure 1-2 High-Level System View of VDS-TV
Asset
Management
System
Business
Management
System
Metadata
Raw
Data
Content
Provider
Vault Array
Management
Management
Switched
Network
CDSM
VVIM
Switched
Network
Switched
Network
Management
Caching Nodes
The Cisco VDS-TV solution has four major elements:
Streamer Array
RF Devices
RF
Set-top Box
HFC
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
1-4
Chapter 1 Overview of the Content Delivery Engines
Cisco CDA Visual Quality Experience Application Overview
•
•
•
•
A Vault Array consisting of one or more Vault servers. The Vault Array is responsible for ingest and reliable storage of VoD content. The number of Vault servers in the Vault Array is driven by the amount of content that the system offers and the degree of redundancy.
One or more Streamer Arrays, each consisting of one or more Streamer servers. The Streamer Array is responsible for personalizing and streaming content in response to user requests. The number of
Streamer servers and Streamer Arrays is determined by the number of streams deployed and by the topology that best suits your individual network and redundancy requirements.
One or more Cache Arrays, consisting of one or more Caching Nodes are optional. The Caching
Nodes provide more flexibility in designing a multi-tiered Virtual Video Infrastructure by acting as a content cache tier between the Vaults and the Streamers. The Caching Nodes facilitate content distribution and reduce distribution traffic from the network backbone.
A CDSM server. The Content Delivery System Manager is used to manage the Streamer, Vault and
Cache servers, collect event logs, and provide reporting tools.
Note In smaller systems, the Integrated Streamer-Vault (ISV) configuration can be used, where the Vault and
Streamer functionalities exist on a single CDE.
Cisco CDA Visual Quality Experience Application Overview
Cisco CDA Visual Quality Experience (VQE) Application offers service providers a set of technologies and products associated with the delivery of Internet Protocol television (IPTV) video services. VQE is designed to improve the quality of IPTV services and viewing experiences of the subscriber. VQE is part of a Cisco end-to-end solution that builds video awareness into the network infrastructure. VQE technology is intended for wireline operators who offer managed broadcast (multicast) IPTV services using xDSL.
IPTV subscribers expect high video quality. Because many subscribers are migrating from existing analog or digital cable services, their quality expectation has already been set.
VQE addresses the issue of video quality from both a network infrastructure and a video technology perspective. VQE provides the linkage to optimize video delivery over next-generation carrier networks.
Based on industry standards, including Real-Time Transport Protocol (RTP) and RTP Control Protocol
(RTCP), Cisco VQE provides these functions to help in delivering entertainment-grade services to subscribers:
Unicast Retransmission —Optimized, selective retransmission of dropped IPTV packets caused by noisy DSL lines or errors in the home network caused by poor-quality wiring. The set-top box (STB) receiver, the VQE Client (VQE-C), sends non-acknowledgement (NACK) packets to the VQE-S to request retransmission of the lost packets.
Forward Error Correction (FEC) —Extra information is sent along with the video data at the application layer. The additional information is used by the VQE-C on the STB to detect and correct lost packets.
Rapid Channel Change (RCC) —When the subscriber requests a channel change, the VQE-C on the
STB sends the VQE-S a request for the IPTV packets of the new channel. The VQE-S sends the VQE-C an optimized unicast burst of IPTV packets and other channel information for the new channel from the cached video data of the VQE-S. This greatly reduces the time needed to display the new channel.
IPTV Packet Loss Monitoring —Facilities such as VQE-S RTCP Exporter help operators measure, baseline, and pinpoint problem areas of the video infrastructure, including transmission lines and home networks.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
1-5
Chapter 1 Overview of the Content Delivery Engines
Cisco CDA Visual Quality Experience Application Overview
SHE
The two error-repair options, Unicast Retransmission and Forward Error Correction (FEC), can be used separately or together for Hybrid Error Repair. Each repair function has its own advantages and limitations. Whether Unicast Retransmission or FEC or both are used, the subscriber does not detect the error repair and no video artifact results.
shows the location of the major network and VQE components in the service-provider network and in the customer premises equipment (CPE) of the subscriber.
VQE Major Components Figure 1-3
VHO VSO/CO CO Customer premises
VQE Server on CDE250
VQE Client on Cisco STB
IPTV (RTP) multicast streams
Encoders
Unicast transmissions to VQE Clients
Metro network
N-PE router PE-AGG router
DSLAM
VQE Client on third-party STB
VQE operates on errors in this part of network
If FEC is used for error repair, an SMPTE 2022-compatible FEC stream generator, such as the Cisco
Digital Content Manager (DCM), is required. The FEC stream generator, shown in
, is often located in the headend and sends application-layer FEC packets. RTP encapsulation is a prerequisite for
FEC.
The FEC stream generator, which is connected to the real-time encoders, subscribes to video channels from the headend and encodes FEC for each channel. It is responsible for originating FEC packets associated with individual channels and with primary multicast streams. For each FEC-enabled channel, a primary media stream and two encoded FEC streams are sent over multicast addresses (see
Figure 1-4 FEC Stream Generator
Primary media stream
FEC stream generator
FEC 1 stream
FEC 2 stream
1-6
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 1 Overview of the Content Delivery Engines
OMD Overview
VQE Major Software Components
The two major VQE software components that implement Unicast Retransmission, FEC, RCC, and IPTV
Packet Loss Monitoring are:
VQE-C —Software embedded in the CPE of the subscriber-typically an STB. The VQE-C provides the
CPE interface to the VQE Server (VQE-S) to support Unicast Retransmission, RCC, and IPTV Packet
Loss Monitoring statistics. The VQE-C receives the primary media data packets and, if FEC is enabled, one or two streams with FEC packets. When the VQE-C software detects packet loss on a channel that is configured for FEC and Unicast Retransmission, the following occurs:
If there are packet losses in the primary media stream, the VQE-C first tries to repair the lost packets using the FEC streams. If some packet losses cannot be corrected by FEC, the VQE-C requests a Unicast
Retransmission of the missing packets from the VQE-S.
VQE-S —Software that runs on a Linux-based CDE250 and CDE280 appliance located in the intelligent edge of the service provider’s network. For Unicast Retransmission and RCC, the VQE-S caches primary video packets from an encoder or other headend device.
For Unicast Retransmission, working with the VQE-C, the VQE-S monitors the subscriber’s reception of video packets and uses its cached video data to service Unicast Retransmission requests from the
VQE-C on the STB.
For RCC, when the subscriber requests a channel change, the VQE-C on the STB sends a request for a new channel to the VQE-S. To service the RCC request, the VQE-S sends the VQE-C a unicast burst of video packets from its cached video data for the channel and also sends some MPEG priming information to facilitate immediate decoding. With both Unicast Retransmission and FEC, the missing packets are resequenced by the STB without interruption.
OMD Overview
For details about the Open Media Distribution (OMD), see Cisco Open Media Distribution Data Sheet
Hardware Features
The following CDEs are used with Cisco VDS-IS:
•
•
CDE205
CDE220 (see
for models)
•
•
CDE250 (see
for models)
CDE280
The following CDEs are used with VDS-TV:
• CDE220
•
•
•
•
•
CDE250 (see
for models)
CDE280
CDE420
CDE460
CDE475
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
1-7
Hardware Features
Chapter 1 Overview of the Content Delivery Engines
The CDE250 model 2S5, 2S6, 2S8, 2S9, and 2S10 are used with both VDS-IS and VDS-TV.
The CDE250 model 2V0 is used with VQE.
The CDE280 model is used with VQE
The following CDE is used only for OMD:
• CDE285
shows the CDE205 and CDE220,
shows the CDE250,
CDE420, and CDE460.
Figure 1-5 CDE205 and CDE220
Figure 1-6 CDE250
1-8
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 1 Overview of the Content Delivery Engines
Figure 1-7 CDE420 and CDE460
Hardware Features
1
To view the CDE285-S, see Cisco UCS C240 M4 High-Density Rack Server (Small Form Factor Disk
Drive Model).
To view the CDE285-L, see Cisco UCS C240 M4 High-Density Rack Server (Large Form Factor Disk
Drive Model).
Figure 1-8 is the rear view of the CDE205 and CDE220 showing the location of the power supplies,
connectors and slots.
Figure 1-8 CDE205 and CDE220 Rear View
2
1 2 3 4 5 6 7
8 7 6 5 4 3
1 Power connectors (the CDE205 only has one) 5 Parallel port (not supported)
2 PCI expansion slots
3 Interfaces (eth0 on left; eth1 on right)
4 VGA interface
6
7
8
Serial console interface
USB ports
Mouse and keyboard connectors
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
1-9
1
Chapter 1 Overview of the Content Delivery Engines
Hardware Features
1
is the rear view of the CDE250 showing the location of the power supplies, connectors and slots.
Figure 1-9 CDE250 Rear View
8 11 12 13 16 17 20
21
7 6 5 4 3 2 1
2 3 4 5 6
1 Power connectors
2 Keyboard
3 Mouse
4 Com port
5 VGA interface
6 USB port 0
7 USB port 1
8 IPMI Dedicated LAN (X8DAH+-F only)
9 USB port 2
10 USB port 3
11 USB port 4
1.
Slots are shown in descending order (left to right).
7 9 10 14 15 18 19
12 USB port 5
13 GigabitEthernet 1/1 = eth1 [on left]
14 GigabitEthernet 1/0 = eth0 [on right]
15 Side Surround
16 Back Surround
17 CE/LFE
18 Microphone In
19 Front
20 Line In
21 PCI Expansion Slots
1
1.
1-10
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 1 Overview of the Content Delivery Engines
Hardware Features
slots.
Figure 1-10 CDE280 Rear View
1
2
TenGigabit Ethernet Port
TenGigabit Ethernet Port
3 Power Supplies
4 USB Ports
5
Gbps dedicated management port
6 Serial connector (RJ-45)
7 Two embedded (on the motherboard) Intel i350 GbE Ethernet controller ports
(GigabitEthernet 1/0 = eth0 [on left] and
GigabitEthernet 1/1 =eth1 [on right])
8 VGA video port (DB-15 connector)
9 Rear Unit Identification button/LED
10
Grounding-lug holes (for DC power supplies)
Figure 1-11 is the rear view of the CDE-S and CDE285-L, showing the location of the power supplies,
connectors and slots.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
1-11
Hardware Features
Figure 1-11 CDE285 Rear View
Chapter 1 Overview of the Content Delivery Engines
1
2
3
4
5
TenGigabit Ethernet Port
TenGigabit Ethernet Port
6
7
Power Supplies
USB Ports
8
9
Gbps dedicated management port 10
Serial connector (RJ-45)
Two embedded (on the motherboard) Intel i350
GbE Ethernet controller ports
(GigabitEthernet 1/0 = eth0 [on left] and
GigabitEthernet 1/1 =eth1 [on right])
VGA video port (DB-15 connector)
Rear Unit Identification button/LED
Grounding-lug holes (for DC power supplies)
1-12
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 1 Overview of the Content Delivery Engines
Hardware Features
slots.
CDE420 Rear View
1
Figure 1-12
2
3
1 2 3 4 5 6 7
9 8 7 6 5
1 Power connectors
2 Fans
3 PCI expansion slots
4 Interfaces (eth0 on left; eth1 on right)
5 VGA Interface
4
6 Parallel port (not supported)
7 Serial console interface
8 USB ports
9 Mouse and keyboard connectors
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
1-13
Hardware Features
Chapter 1 Overview of the Content Delivery Engines
is the rear view of the CDE460 showing the location of the power supplies, connectors and slots.
Figure 1-13
1
CDE460 Rear View
2 3 4 5 6 7 8
15
14 13 12 11 10 9
1 Power connectors
2 Fans
3 Serial port
4 IPMI port
5 USB port
9
13
Mouse and keyboard connector
10 1 Gigabit Ethernet management port (eth1)
11 1 Gigabit Ethernet management port (eth0)
12 USB port
USB port
6 1 Gigabit Ethernet management port (eth2) 14 USB port
7 1 Gigabit Ethernet management port (eth3) 15 12 storage drives
8 PCI expansion slots
1-14
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 1 Overview of the Content Delivery Engines
Hardware Features
CDE Configurations
Table 1-3
provides a list of all the CDE configurations and provides their part identifiers (PID), VDS applications in which they are used, and a storage bundle designator defining the set of drives inserted into the chassis slots.
CDE Configurations
Product Name and Part Identifier
CDE205-2-500TX-K9
CDE220-K9, CB-32-12A1T-2QTX
CDE220-K9, CB-32-12A1T-4DSX
CDE220-K9, CB-16-4S73-1QTX
CDE220-K9, CB-16-4S73-2DSX
CDE220-K9, CB-32-12S73-3QTX
CDE220-K9, CB-32-12S73-4DSX
CDE220-K9, CB-16-6A1T-1QTX
CDE220-K9, CB-16-6A1T-2DSX
CDE220-K9, CB-16-12A500-2QTX
CDE220-K9, CB-16-12A500-4DSX
CDE220-K9, CB-16-4F160-1QTX
CDE220-K9, CB-16-4F160-2DSX
CDE220-K9, CB-32-12F160-3QTX
CDE220-K9, CB-32-12F160-4DSX
CDE220-K9, CB-32-12FI160-3QTX
CDE220-K9, CB-32-12FI160-4DSX
CDE250-K9, CB-48-HVY-2WPL-SB-24S1T
CDE250-K9, CB-48-HVY-2WPL-SB-24S600
CDE250-K9, CB-48-XVR-2WPL-SB-16A500
CDE250-K9, CB-48-HVY-2WPL-SB-12F160
CDE250-K9, CB-48-HVY-2WPL-SB-24F160
CDE250-K9, CB-48-HVY-2WPL-SB-24F300
CDE250-K9, CB-48-HVY-2WPL-SB-12F600
CDE250-K9, CB-48-HVY-2WPL-SB-24F600
CDE250-K9, CB-48-HVY-2WPL-SB-24F960
CDE250-K9, CB-48-XVR-2WPL-SB-1F200
CDE280-K9, SB-CDE280-2S5
CDE280-K9, SB-CDE280-2S10
CDE280-K9, SB-CDE280-2S21
CDE280-K9, SB-CDE280-2H1
CDE280-K9, SB-CDE280-2H13
CDE250
CDE250
CDE250
CDE250
CDE250
CDE250
CDE250
CDE250
CDE250
CDE250
CDE280
CDE280
CDE280
CDE280
CDE280
CDE220
CDE220
CDE220
CDE220
CDE220
CDE220
CDE220
CDE220
Base PID
CDE205
CDE220
CDE220
CDE220
CDE220
CDE220
CDE220
CDE220
CDE220
IS
IS
IS
TV
VQE
IS
IS
TV
TV
IS
TV/IS
TV/IS
TV/IS
TV/IS
TV/IS
TV
TV
IS
IS
IS
IS
TV
TV
TV
TV
TV
TV
VDS Application Storage Bundle
IS —
TV
TV
TV
TV
2A-C
2A-F
2C1-C
2C1-F
2C2-C
2C2-F
2D1-C
2D1-F
2G2-C
2G2-F
2S1-C
2S1-F
2S3-C
2S3-F
2S3I-C
2S3I-F
2S11
2V0
2S5
2S10
2S21
2H1
2H13
2A4
2G3
2M0
2S5
2S6
2S8
2S9
2S10
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
1-15
Chapter 1 Overview of the Content Delivery Engines
Hardware Features
Table 1-3 CDE Configurations (continued)
Product Name and Part Identifier
CDE205-2-500TX-K9
CDE220-K9, CB-32-12A1T-2QTX
CDE220-K9, CB-32-12A1T-4DSX
CDE220-K9, CB-16-4S73-1QTX
CDE220-K9, CB-16-4S73-2DSX
CDE280-K9, SB-CDE280-2H26
CDE280-K9, SB-CDE280-2U1
CDE280-K9, SB-CDE280-2U2
CDE280-K9, SB-CDE280-2U3
CDE280-K9, SB-CDE280-2V0
CDE280-K9, SB-CDE280-2U4
CDE285-S, SB-CDE285-2S10
CDE285-S, SB-CDE285-2H26
CDE285-S, SB-CDE285-2H40
CDE285-L, SB-CDE285-2H90
CDE420-K9, CB-32-24A1T-2QTX
CDE420-K9, CB-32-24A1T-2QSX
CDE420-K9, CB-32-24S450-3QTX
CDE420-K9, CB-32-24S450-3QSX
CDE460-K9, CB-128-HVY-2WPL-SB-36S3T
CDE460-K9, CB-128-HVY-2WPL-SB-36S3T
CDE475-K9,CB-128GB-4X10GE-SB-368T
Base PID
CDE205
CDE220
CDE220
CDE220
CDE220
CDE280
CDE280
CDE280
CDE280
CDE280
CDE280
CDE285-S
CDE285-S
CDE285-S
CDE285-L
CDE420
CDE420
CDE420
CDE420
CDE460
CDE460
CDE475
TV
TV
TV
TV
TV
OMD
OMD
TV
TV
VDS Application Storage Bundle
IS —
TV
TV
2A-C
2A-F
TV
TV
IS
TV
TV
TV
VQE
TV
OMD
OMD
2C1-C
2C1-F
2H26
2U1
2U2
2U3
2V0
2U4
2S10
2H26
2H40
2H90
4A-C
4A-F
4G-C
4G-F
4R1
4R3
4A1
CDE205 Hardware Overview
The CDE205 ships with the following components installed:
•
•
1 motherboard with 2 Gigabit Ethernet ports
1 Quad Core Intel Xeon (Harpertown L5410) CPU @ 2.33 GHz
•
•
•
•
•
•
4 x 2-GB RAM modules (8 GB total)
1 hot-swappable power supply
1 x 8-GB CF + IDE interposer
1 SAS disk controller inserted into slot 1
3 x 500-GB SATA drives mounted to bay expanders designed to slide into the front of the chassis
9 empty bay expanders (not labeled)
Note Bay expanders with mounted disks have stickers labeling the drive numbers from 0 to 2.
1-16
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 1 Overview of the Content Delivery Engines
Hardware Features
shows the supported CDE205 configuration.
Table 1-4 Supported CDE205 Configuration
CDE PID Drives RAM Product Name
Hardware
Support First
Introduced
CDE205 CDE205-2-500TX-K9 3 500-GB SATA 8 GB Entry-level IS streamer,
CDS IS Manager, Service
Router, Content Acquirer, or Proximity Engine
VDS-IS 3.0
Ports
2 Gigabit
Ethernet ports
CDE220 Hardware Overview
The CDE220 ships with the following components installed:
•
•
2 Quad Core Intel Xeon (Harpertown L5410) CPUs @ 2.33GHz
Onboard Gigabit Ethernet NIC (see
for NIC information for the various CDE220 models)
•
•
•
•
2 hot-swappable power supplies
1 x 8-GB CF + IDE adapter physically attached as IDE primary master
1 SAS disk controller inserted into slot 1 (except the CDE220 2G2-F)
1 SAS disk controller inserted into slot 4
•
•
SAS or SATA drives mounted internally (see
Table 1-5 for specific drive information for the various
CDE220 models)
2S3I copper and fiber models also have 2 internal 64GB SSD drives
shows the supported CDE220 configurations.
Table 1-5 Supported CDE220 Configurations
CDE PID Drives RAM Product Name
Hardware
Support
First
Introduced NIC
CDE220 2A-C CB-32-12A1T-2QTX 12 1-TB SATA 32 GB Dense TV Vault CDS-TV 3.0 2 Quad (8 GE) Copper
CDE220 2A-F CB-32-12A1T-4DSX 12 1-TB SATA 32 GB Dense TV Vault CDS-TV 3.0 4 Dual (8 GE) Fiber
CDE220 2C1-C CB-16-4S73-1QTX 4 73-GB SAS 16 GB Entry-level TV
Streamer
CDS-TV 3.0 1 Quad (4 GE) Copper
CDS-TV 3.0 2 Dual (4 GE) Fiber CDE220 2C1-F CB-16-4S73-2DSX 4 73-GB SAS 16 GB Entry-level TV
Streamer
CDE220 2C2-C CB-32-12S73-3QTX 12 73-GB SAS 32 GB Dense TV
Streamer
CDE220 2C2-F CB-32-12S73-4DSX 12 73-GB SAS 32 GB Dense TV
Streamer
CDS-TV 3.0 3 Quad (12 GE)
Copper
CDS-TV 3.0 4 Dual (8 GE) Fiber
CDE220 2D1-C CB-16-6A1T-1QTX
CDE220 2D1-F CB-16-6A1T-2DSX
6 1-TB SATA 16 GB Entry-level ISV VDS-IS 3.0
1 Quad (4 GE) Copper
6 1-TB SATA 16 GB Entry-level ISV VDS-IS 3.0
2 Dual (4 GE) Fiber
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
1-17
Chapter 1 Overview of the Content Delivery Engines
Hardware Features
Table 1-5 Supported CDE220 Configurations (continued)
CDE PID Drives
CDE220 2G2-C CB-16-12A500-2QTX 12 500-GB
SATA
RAM Product Name
16 GB Dense IS
Streamer,
Service Router, or Content
Acquirer
CDE220 2G2-F CB-16-12A500-4DSX 12 500-GB
SATA
16 GB Dense IS
Streamer
Service Router, or Content
Acquirer
CDE220 2S1-C
1
CB-16-4F160-1QTX 4 160-GB SSD 16 GB Entry-level TV
Streamer
CDE220 2S1-F
CDE220 2S3-C
1
1
CB-16-4F160-2DSX 4 160-GB SSD 16 GB Entry-level TV
Streamer
CB-32-12F160-3QTX 12 160-GB
SSD
32 GB Dense TV
Streamer
CDE220 2S3-F
1
CDE220 2S3I-C
1
CB-32-12F160-4DSX 12 160-GB
SSD
CB-32-12FI160-3QTX 12 160-GB
SSD
CDE220 2S3I-F
1
CB-32-12FI160-4DSX 12 160-GB
SSD
32 GB Dense TV
Streamer
32 GB Dense IS
Streamer
32 GB Dense IS
Streamer
1.
Featuring Flash Solid State Drive (SSD) technology.
Hardware
Support
First
Introduced NIC
VDS-IS 3.0
2 Quad (8 GE) Copper
VDS-IS 3.0
4 Dual (8 GE) Fiber
CDS-TV 3.0 1 Quad (4 GE) Copper
CDS-TV 3.0 2 Dual (4 GE) Fiber
CDS-TV 3.0 3 Quad (12 GE)
Copper
CDS-TV 3.0 4 Dual (8 GE) Fiber
VDS-IS 3.0
3 Quad (12 GE)
Copper
VDS-IS 3.0
4 Dual (8 GE) Fiber
CDE250 Hardware Overview
The CDE250 ships with the following components installed:
• 2 Quad Core Intel Xeon (Westmere) CPUs @ 2.4GHz
•
•
4 Onboard Gigabit Ethernet NICs (see Table 1-6 for NIC information for the various CDE250
models)
2 x Dual 10GE NIC ports in slots 2 and 6, and 10GE Ports support Copper and Fiber SFP Media
Modules
•
•
•
•
2 hot-swappable power supplies
1 x 8-GB CF + IDE adapter physically attached as IDE primary master
3 external SAS disk controllers located in slots 1, 3, and 4
1 internal MegaRAID SAS disk controller located in slot 5
• Storage drives mounted internally (see
for specific drive information for the various
CDE250 models)
Table 1-6 shows the supported CDE250 configurations.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
1-18
Chapter 1 Overview of the Content Delivery Engines
Hardware Features
Table 1-6 Supported CDE250 Configurations
CDE
CDE250
2A4
CDE250
2A2
CDE250
2G3
CDE250
2M0
PID
CB-48-HVY-2WPL
+ SB-24S1T
CB-48-HVY-2WPL
+ SB-24S1T
CB-48-HVY-2WPL
+ SB-24S600
CB-48-XVR-2WPL
+ SB-16A500
CDE250 2S5 CB-48-HVY-2WPL
+ SB-12F160
CDE250 2S6 CB-48-HVY-2WPL
+ SB-24F160
CDE250 2S8 CB-48-HVY-2WPL
+ SB-24F300
CDE250 2S9 CB-48-HVY-2WPL
+ SB-12F600
Drives
24 1 TB 2.5
SAS Drives
12 1 TB 2.5
SAS Drives
RAM
48GB
Product Name
48 GB Super Dense TV
Vault Server
Super Dense TV
Vault Server
Hardware
Support
First
Introduced NIC
CDS-TV 3.0
4 (10GE) Ports, Copper or Fiber by removable
SFP Module
4 (1GE) Copper Ports
CDS-TV 3.5
4 (10GE) Ports, Copper or Fiber by removable
SFP Module
4 (1GE) Copper Ports
CDS-TV 3.0
4 (10GE) Ports, Copper or Fiber by removable
SFP Module
24 600-GB 2.5
SAS Drives
48 GB Super Dense TV
Streamer or
Caching Server
1
16 500GB
SATA HDD
12 160-GB 2.5
Flash SSD
4 (1GE) Copper Ports
48 GB Dense IS Streamer VDS-IS 3.0
2 Dual (10GE) Ports,
Copper or Fiber by removable SFP Module
1 Quad (4GE) Copper
Port
48 GB Dense TV Streamer
Dense IS Streamer
CDS-TV 3.0
VDS-IS 3.2.1
4 (10GE) Ports, Copper or Fiber by removable
SFP Module
4 (1GE) Copper Ports
24 160-GB 2.5
Flash SSD
48 GB Very Dense TV and
IS Streamer
CDS-TV 3.0
VDS-IS 3.0
4 (10GE) Ports, Copper or Fiber by removable
SFP Module
24 300-GB 2.5
Flash SSD
12 600-GB 2.5
Flash SSD
48 GB Very Dense TV and
IS Flash Streamer
48 GB Very Dense TV and
IS Flash Streamer
CDS-TV 3.0
VDS-IS 3.0
CDS-TV 3.0
VDS-IS 3.0
4 (1GE) Copper Ports
4 (10GE) Ports, Copper or Fiber by removable
SFP Module
4 (1GE) Copper Ports
4 (10GE) Ports, Copper or Fiber by removable
SFP Module
4 (1GE) Copper Ports
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
1-19
Chapter 1 Overview of the Content Delivery Engines
Hardware Features
Table 1-6 Supported CDE250 Configurations (continued)
CDE
CDE250
2S10
CDE250
2V0
PID
CB-48-HVY-2WPL
+ SB-24F600
CB-48-XVR-2WPL
+ SB-1F200
Drives
24 600-GB 2.5
Flash SSD
RAM Product Name
48 GB Very Dense TV and
IS Flash Streamer
Hardware
Support
First
Introduced NIC
CDS-TV 3.0
VDS-IS 3.0
4 (10GE) Ports, Copper or Fiber by removable
SFP Module
1 200GB SSD 48 GB VQE Server VQE 3.0
4 (1GE) Copper Ports
2 Dual (10GE) Ports,
Copper or Fiber by removable SFP Module
1 Quad (4GE) Copper
Port
1.
Cache size is 10.8 TB.
CDE250 Connectivity
The CDE250 models have four 10-GE Interfaces. To achieve 40-GE maximize aggregate throughput, ensure 10-GE throughput is allocated for each interface.
Several 10-GE line card models are available that default to over subscription mode, for example:
• Cisco Catalyst 6500 Series 16-Port 10-Gigabit Ethernet Module, WS-X6716-10GE
(4:1 Oversubscription)
• Cisco Catalyst 6500 Series 8-Port 10-Gigabit Ethernet Module, WS-X6708-10GE
(2:1 Oversubscription)
Both of these line cards have 40-GE fabric that splits ports into four groups, resulting in each group having 10-GE throughput. These four groups have individual fabric and are not globally shared by all
16 ports within the line card. Do not connect four CDE interfaces to the same group to eliminate sharing the same 10-GE fabric. The total CDE’s aggregate bandwidth is limited to 10-GE if all four 10-GE ports are connected to the same group.
shows the port group mapping for a 4-port performance mode on the front panel of the
16-port 10-GE module, WS-X6716-10GE.
Figure 1-14 WS-X6716-10GE Port Group Mapping
4-Port Performance Mode
Port
Group
1
Port
Group
2
Port
Group
3
1-20
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Port
Group
4
Chapter 1 Overview of the Content Delivery Engines
Hardware Features
In order to get the maximum performance, connect the CDE250 4 10-GE ports to ports 1, 5, 9, and13 as shown in
.
The WS-X6708-10GE line card also comes with 40-GE fabric and four groups, but it has two ports per group. If you are using this line card, connect to the first port of each group, ports 1, 2, 5, and 6.
Note You may use different vendor’s switches or routers with the CDE250, refer to the vendor’s 10-GE line card specifications for connectivity information.
CDE280 Hardware Overview
Note •
•
•
The CDE280 engine is supported with the VDS-IS Software Applications.
The CDE280 engine is supported with the VDS-TV Software Applications.
The CDE280 is a fully optimized solution on the Cisco Unified Computing System TM (Cisco UCS®) server platform.
Table 1-7
The CDE280 ships with the following components installed:
•
•
2 Intel Xeon 3.20 GHz E5-2667 v3 series processor.
2 onboard copper Gigabit Ethernet ports.
•
•
2 hot-swappable redundant power supplies:
– AC power supplies (1200 W AC each).
– DC power supplies (930W -48V DC Common Power Supply).
6x16-GB RDIMM (RAM) 96GB.
•
•
4 Intel Dual Port 10 GbE Ethernet SFP+ Adapter cards.
Cisco 12G SAS Modular RAID controller card.
•
•
2G Raid Controller memory embedded.
2x 480 GB 2.5 inch SATA SSD (BOOT).
shows the supported CDE280 configurations.
Supported CDE280 Configurations
Drives
24 x 240 SSD
RAM Product Name
96GB VDS-IS
Hardware
Support
First
Introduced NIC
4.1.1
8 (10GE) Ports SFP+
CDE PID
CDE280-2S5 CDE280-K9 +
SB-CDE280-2S5
CDE280-2S10 CDE280-K9 +
SB-CDE280-2S10
CDE280-2S21 CDE280-K9 +
SB-CDE280-2S21
24 x 480 SSD
24 x 960 SSD
96GB
96GB
VDS-IS
VDS-IS
4.1.1
4.1.1
8 (10GE) Ports SFP+
8 (10GE) Ports SFP+
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
1-21
Chapter 1 Overview of the Content Delivery Engines
Hardware Features
Table 1-7
CDE
Supported CDE280 Configurations
PID
CDE280-2H1 CDE280-K9 +
SB-CDE280-2H1
CDE280-2H13 CDE280-K9 +
SB-CDE280-2H13
CDE280-2H26 CDE280-K9 +
SB-CDE280-2H26
CDE280-2U1 CDE280-K9
SB-CDE280-2U1
CDE280-2U2 CDE280-K9
SB-CDE280-2U2
CDE280-2U3 CDE280-K9
SB-CDE280-2U3
CDE280-2V0 CDE280-K9 +
SB-CDE280-2V0
CDE280-2U4 CDE280-K9
SB-CDE280-2U4
Drives
1 x 600 SAS
RAM Product Name
96GB VDS-IS
Hardware
Support
First
Introduced NIC
4.1.1
8 (10GE) Ports SFP+
24 x 600 SAS 96GB VDS-IS
24 x 1200 SAS 96GB VDS-IS
4.1.1
4.1.1
8 (10GE) Ports SFP+
8 (10GE) Ports SFP+
24 x 400 SAS
24 x 480 SATA
24 x 800 SAS
—
12 x 480 SATA
96GB
96GB
96GB
96GB
96GB
VDS-TV
VDS-TV
VDS-TV
VQE
VDS-TV
4.2.0
4.2.0
4.2.0
3.11
4.4.0
8(10GE)PORTS SFP+
8(10GE)PORTS SFP+
8(10GE)PORTS SFP+
8 (10GE) Ports SFP+
8(10GE)PORTS SFP+
CDE285 Hardware Overview
Note The CDE285 engine is supported only for the OMD Software Applications.
The CDE285 ships with the following components installed:
•
•
2 Intel Xeon 3.20 GHz E5-2667 v4 series processor.
2 onboard copper Gigabit Ethernet ports.
•
•
•
2 hot-swappable redundant power supplies:
– AC power supplies (1200 W AC each).
– DC power supplies (930W -48V DC Common Power Supply).
For CDE285-S, 8x16GB RDIMM (RAM) 128GB.
For CDE285-L, 8x32GB RDIMM (RAM) 256GB.
Note For more details about the CDE285-S hardware overview, see Cisco UCS C240 M4 High-Density Rack
Server (Small Form Factor Disk Drive Model).
Note For more details about the CDE285-L hardware overview, see Cisco UCS C240 M4 High-Density Rack
Server (Large Form Factor Disk Drive Model)
1-22
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 1 Overview of the Content Delivery Engines
Hardware Features
Table 1-8 Supported CDE285 Configurations
CDE PID
CDE285-2S10 CDE285-S +
SB-CDE285-2S10
Drives
24 x 480 SSD
SB-CDE285-2H26
CDE285-2H40 CDE285-S +
SB-CDE285-2H40
CDE285-2H90 CDE285-L +
SB-CDE285-2H90
24 x 1.2TB SAS
24 x 1.8TB SAS
12 x 8TB SAS
RAM
128GB
128GB
128GB
256GB
Product
Name
OMD
OMD
OMD
OMD
NIC
8 (10GE) Ports SFP+
8 (10GE) Ports SFP+
8 (10GE) Ports SFP+
8 (10GE) Ports SFP+
CDE420 Hardware Overview
The CDE420 ships with the following components installed:
•
•
2 Quad Core Intel Xeon (Harpertown L5410) CPUs @ 2.33 GHz
2 onboard copper Gigabit Ethernet NICs, 4-GB CF each (on 420 4A-C and 4A-F models)
•
•
•
•
3 onboard copper Gigabit Ethernet NICs, 4-GB CF each (on 420 4G-C and 4G-F models)
2 hot-swappable power supplies
32-GB RAM
1 8-GB CF + IDE adapter physically attached as IDE primary master
•
•
•
•
•
1 4-port Gigabit Ethernet adapter inserted into the third slot from the right (looking from rear)
1 SAS disk controller inserted into the far-right slot (looking from rear)
1 SAS disk controller inserted into the second slot from the right (looking from rear)
24 I-TB 3.5-inch SATA drives mounted to bay expanders designed to slide into the front of the
CDE420 chassis (on 420 4A-C and 420 4A-F models)
24 450-GB 3.5-inch SAS drives mounted to bay expanders designed to slide into the front of the
CDE420 chassis (on 420 4G-C and 4G-F models)
Note External drives and bay expanders are shipped separately and are not installed in the CDEs.
shows the supported CDE420 configurations.
Supported CDE420 Configurations Table 1-9
CDE PID Drives RAM Product Name
CDE420 4A-C CB-32-24A1T-2QTX 24 1-TB SATA 32 GB Vault
CDE420 4A-F CB-32-24A1T-2QSX 24 1-TB SATA 32 GB Vault
Hardware
Support
First
Introduced NIC
CDS-TV 3.0 2 Quad (8 GE) Copper
CDS-TV 3.0 2 Quad (8 GE) Fiber
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
1-23
Chapter 1 Overview of the Content Delivery Engines
Hardware Features
Table 1-9 Supported CDE420 Configurations
CDE PID Drives RAM Product Name
CDE420 4G-C CB-32-24S450-3QTX 24 450-GB SAS 32 GB Caching Server
1
CDE420 4G-F CB-32-24S450-3QSX 24 450-GB SAS 32 GB Caching Server
1
Hardware
Support
First
Introduced NIC
VDS-IS 3.0
3 Quad (12 GE) Copper
VDS-IS 3.0
3 Quad (12 GE) Fiber
1.
Cache size is 10.8 TB.
CDE460 Hardware Overview
The CDE460 ships with the following components installed:
•
•
2 Intel Sandy Bridge 2.3GB15M CPUs
4 onboard copper Gigabit Ethernet NICs
•
•
•
•
•
•
•
•
2 hot-swappable redundant power supplies, option of AC or DC
16 - 8-GB DIMM (RAM)
2 Intel 10G SFP+ dual-port Ethernet adapter cards
1 MegaRaid SAS internal disk controller inserted into the first slot from the right (looking from the rear)
1 SAS external disk controller inserted into the third slot from the right (looking from rear)
1 SAS integrated disk controller on the motherboard
36 3-TB 3.5-inch SAS drive is mounted to bay expanders designed to slide into the CDE460 chassis,
24 in the front of the chassis and 12 in the rear
36 4-TB SAS drive is mounted to bay expanders designed to slide into the CDE460 chassis, model used is 4R3
Note External drives and bay expanders are shipped separately and are not installed in the CDEs.
Table 1-10 shows the supported CDE460 configuration.
Supported CDE460 Configuration Table 1-10
CDE
CDE460
4R1
PID Drives RAM
Product
Name
CB-128-HVY-2WPL 36 3-TB SAS 128 GB Super Dense
TV Vault
Server
Hardware
Support First
Introduced
CDS-TV 3.5
NIC
4 (10GE) Ports, Copper or Fiber by removable
SFP
1-24
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 1 Overview of the Content Delivery Engines
Hardware Features
Table 1-10 Supported CDE460 Configuration
CDE PID
CDE460 CB-128-2WPL +
SB36S3T
Drives RAM
Product
Name
36 3-TB SATA 128 GB Recorder
CDE460-
4R3
CB-128-HVY-2WPL
+ SB-36S4T
4 TB Seagate
HDD
4 TB WD HDD
144GB Super Dense
TV Vault
Server
Hardware
Support First
Introduced
CDS-TV 3.0
CDS-TV 3.7.1
NIC
4 (10GE) Ports, Copper or Fiber by removable
SFP Module
4 (1GE) Copper Ports
4 (10GE) Ports, Copper or Fiber by removable
SFP
CDE475 Hardware Overview
The CDE475 ships with the following components installed:
• 2 CPUs (BDW-EP 8C/16T E5-2620V4 2.1G 20M 8GT 85W R3 2011 R0)
•
•
2onboard copper Gigabit Ethernet NICs
2 hot-swappable redundant power supplies, option of AC or DC
•
•
•
•
•
•
16 - 8-GB DIMM (RAM) (8GB DDR4-2666 1RX8 ECC RDIMM)
2 STD Dual-port 10G Ethernet with SFP+ W/ CDR
2 SAS-3, GEN-3 RAID cards [It supports 12Gb and R0,1,5,6,10,50 and 60]
2 Micron 5100 PRO 2.5" drives, 240GB,SATA,6Gb/s,3D NAND,7mm1.5DWPD
36 8-TB 3.5-inch SAS drive is mounted to bay expanders designed to slide into the CDE475 chassis,
24 in the front of the chassis and 12 in the rear
Note External drives and bay expanders are shipped separately and are not installed in the CDEs.
Table 1-11
CDE
CDE475
4A1
PID
shows the supported CDE475 configuration.
Supported CDE475 Configuration
CDE475-K9+SB-368T
Drives
36 8-TBSAS
RAM
Product
Name
Hardware
Support
First
Introduced NIC
128 GB Super Dense
TV Vault
Server
VDS-TV
4.10
4 (10GE) Ports, Copper or
Fiber by removable SFP
Module
2 (1GE) Copper Ports
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
1-25
Chapter 1 Overview of the Content Delivery Engines
Hardware Features
CDE Storage Drives and Expansion Cards
The following sections show the location of the storage drives for each CDE model, and list their PCI expansion cards. When looking at the rear of the CDE (see
), the PCI slot locations are numbered from left to right.
Note Storage drive slots that are not numbered in the following illustrations are empty and have blank faceplates affixed.
CDE205
is a front view of the CDE205 showing the location of the storage drives. The CDE205 has no expansion cards.
Figure 1-15 CDE205 Drives disk2 disk1 disk0
RESET
CDE220 2A-C
is a front view of the CDE220 2A (copper and fiber models) showing the location of the
numbers (see
to see the location of the PCI expansion slots).
Figure 1-16 disk3 disk2 disk1
CDE220 2A-C/F Drives disk6 disk5 disk4
RESET disk9 disk8 disk7 disk12 disk11 disk10
Table 1-12
3
4
5
1
2
PCI Expansion
Slot Number
CDE220 2A-C PCI Expansion Cards
Expansion Card
—
NIC—quad copper
NIC—quad copper
—
—
Interface Name
(top to bottom)
— eth6 eth7 eth8 eth9 eth2 eth3 eth4 eth5
—
—
1-26
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 1 Overview of the Content Delivery Engines
Table 1-12
6
7
PCI Expansion
Slot Number
CDE220 2A-C PCI Expansion Cards
Expansion Card
—
—
CDE220 2A-F
Interface Name
(top to bottom)
—
—
Hardware Features
Figure 1-16 is a front view of the CDE220 2A fiber and copper models showing the location of the
storage drives.
lists the CDE220 2A-F PCI expansion cards and their corresponding PCI slot numbers (see
to see the location of the PCI expansion slots).
Table 1-13
4
5
6
7
1
2
3
PCI Expansion
Slot Number
CDE220 2A-F PCI Expansion Cards
Expansion Card
—
NIC—dual fiber
NIC—dual fiber
NIC—dual fiber
NIC—dual fiber
—
Interface Name
(top to bottom)
— eth4 eth5 eth2 eth3
— eth6 eth7 eth8 eth9
—
CDE220 2C1-C
Figure 1-17 is a front view of the CDE220 2C1 (copper and fiber models) showing the location of the
storage drives.
lists the CDE220 2C1-C PCI expansion cards and their corresponding PCI slot numbers (see
Figure 1-8 to see the location of the PCI expansion slots).
Figure 1-17 CDE220 2C1-F/C Drives disk3 disk2 disk1
RESET disk4
Table 1-14
1
2
PCI Expansion
Slot Number
CDE220 2C1-C PCI Expansion Cards
Expansion Card
—
NIC—quad copper
Interface Name
(top to bottom)
— eth2 eth3 eth4 eth5
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
1-27
Chapter 1 Overview of the Content Delivery Engines
Hardware Features
Table 1-14
5
6
77
3
4
PCI Expansion
Slot Number
CDE220 2C1-C PCI Expansion Cards
Expansion Card
—
—
—
—
—
—
—
—
Interface Name
(top to bottom)
—
—
CDE220 2C1-F
is a front view of the CDE220 2C1 (copper and fiber models) showing the location of the storage drives.
Table 1-15 lists the CDE220 2C1-F PCI expansion cards and their corresponding PCI slot
numbers (see
to see the location of the PCI expansion slots).
Table 1-15
5
6
7
1
2
3
4
PCI Expansion
Slot Number
CDE220 2C1-F PCI Expansion Cards
Expansion Card
—
NIC—dual fiber
NIC—dual fiber
—
—
—
—
—
—
—
Interface Name
(top to bottom)
— eth4 eth5 eth2 eth3
—
CDE220 2C2-C
is a front view of the CDE220 2C2 fiber and copper models showing the location of the storage drives.
Table 1-16 lists the CDE220 2C2-C PCI expansion cards and their corresponding PCI slot
numbers (see
to see the location of the PCI expansion slots).
Figure 1-18 disk3 disk2 disk1
RESET
CDE220 2C2-F/C Drives disk6 disk5 disk4 disk9 disk8 disk7 disk12 disk11 disk10
1-28
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 1 Overview of the Content Delivery Engines
Hardware Features
Table 1-16
4
5
6
7
1
2
3
PCI Expansion
Slot Number
CDE220 2C2-C PCI Expansion Cards
Expansion Card
—
NIC—quad copper
NIC—quad copper
—
NIC—quad copper
—
—
Interface Name
(top to bottom)
— eth6 eth7 eth8 eth9 eth2 eth3 eth4 eth5
— eth10 eth11 eth12 eth13
—
—
CDE220 2C2-F
Figure 1-18 is a front view of the CDE220 2C2 (copper and fiber models) showing the location of the
numbers (see
Figure 1-8 to see the location of the PCI expansion slots).
Table 1-17
5
6
7
1
2
3
4
PCI Expansion
Slot Number
CDE220 2C2-F PCI Expansion Cards
Expansion Card
—
NIC—dual fiber
NIC—dual fiber
—
NIC—dual fiber
NIC—dual fiber
—
Interface Name
(top to bottom)
— eth4 eth5 eth2 eth3
— eth6 eth7 eth8 eth9
—
CDE220 2D1-C
Figure 1-19 is a front view of the CDE220 2D1 (copper and fiber models) showing the location of the
storage drives.
lists the CDE220 2D1-C PCI expansion cards and their corresponding PCI slot numbers (see
Figure 1-8 to see the location of the PCI expansion slots).
Figure 1-19 CDE220 2D1-F/C Drives disk6 disk5 disk4
RESET disk3 disk2 disk1
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
1-29
Chapter 1 Overview of the Content Delivery Engines
Hardware Features
Table 1-18
4
5
6
7
1
2
3
PCI Expansion
Slot Number
CDE220 2D1-C PCI Expansion Cards
Expansion Card
—
NIC—quad copper
—
—
—
—
—
Interface Name
(top to bottom)
—
—
—
—
— eth2 eth3 eth4 eth5
—
CDE220 2D1-F
is a front view of the CDE220 2D1 (copper and fiber models) showing the location of the storage drives.
Table 1-19 lists the CDE220 2D1-F PCI expansion cards and their corresponding PCI slot
numbers (see
to see the location of the PCI expansion slots).
Table 1-19 CDE220 2D1-F PCI Expansion Cards
5
6
7
1
2
3
4
PCI Expansion
Slot Number
Expansion Card
—
NIC—dual fiber
NIC—dual fiber
—
—
—
—
—
—
—
Interface Name
(top to bottom)
— eth4 eth5 eth2 eth3
—
CDE220 2G2-C
is a front view of the CDE220 2G2 (copper and fiber models) showing the location of the storage drives.
Table 1-20 and Table 1-21 list the CDE220 2G2-C PCI expansion cards and their
corresponding PCI slot numbers (see Figure 1-8
to see the location of the PCI expansion slots).
Figure 1-20 disk2 disk1 disk0
CDE220 2G2-F/C Drives disk5 disk4 disk3 disk8 disk7 disk6
RESET disk11 disk10 disk9
1-30
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 1 Overview of the Content Delivery Engines
Hardware Features
lists the PCI expansion card and slot numbering for CDE 2G2-C models. This configuration can be used with Internet Streamer Release 2.4.x software and later.
Table 1-20
3
4
5
6
7
1
2
PCI Expansion
Slot Number
CDE220 2G2-C PCI Expansion Cards for Release 2.4.x and Later
Expansion Card
—
NIC—quad copper
NIC—quad copper
—
—
—
—
Interface Name
(top to bottom)
—
7/0 8/0 9/0 10/0
3/0 4/0 5/0 6/0
—
—
—
—
Some early systems shipped with the PCI expansion card listed in
. This configuration can be used with all versions of Internet Streamer Release 2.4.x to 3.x software.
Table 1-21
4
5
6
7
1
2
3
PCI Expansion
Slot Number
CDE220 2G2-C PCI Expansion Cards for Release 2.4x to 3.x
Expansion Card
—
—
NIC—quad copper
—
NIC—quad copper
—
—
Interface Name
(top to bottom)
—
—
3/0 4/0 5/0 6/0
—
7/0 8/0 9/0 10/0
—
—
CDE220 2G2-F
Figure 1-20 is a front view of the CDE220 2G2 (copper and fiber models) showing the location of the
storage drives.
lists the CDE220 2G2-F PCI expansion cards and their corresponding PCI slot numbers (see
to see the location of the PCI expansion slots).
Table 1-22
1
2
PCI Expansion
Slot Number
3
CDE220 2G2-F PCI Expansion Cards
Expansion Card
—
NIC—dual fiber
NIC—dual fiber
Interface Name
(top to bottom)
—
5/0 6/0
3/0 4/0
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
1-31
Chapter 1 Overview of the Content Delivery Engines
Hardware Features
Table 1-22
6
7
4
5
PCI Expansion
Slot Number
CDE220 2G2-F PCI Expansion Cards
Expansion Card
—
NIC—dual fiber
NIC—dual fiber
—
Interface Name
(top to bottom)
—
7/0 8/0
9/0 10/0
—
CDE220 2S1-C
is a front view of the CDE220 2S1 (copper and fiber models) showing the location of the storage drives.
Table 1-23 lists the CDE220 2S1-C PCI expansion cards and their corresponding PCI slot
numbers (see
to see the location of the PCI expansion slots).
Figure 1-21 disk3 disk2 disk1
RESET
CDE220 2S1-F/C Drives disk4
Table 1-23
4
5
6
7
1
2
3
PCI Expansion
Slot Number
CDE220 2S1-C Expansion Cards
Expansion Card
—
NIC—quad copper
—
—
—
—
—
Interface Name
(top to bottom)
—
—
—
—
— eth2 eth3 eth4 eth5
—
CDE220 2S1-F
is a front view of the CDE220 2S1 (copper and fiber models) showing the location of the storage drives.
lists the CDE220 2S1-F PCI expansion cards and their corresponding PCI slot numbers (see
to see the location of the PCI expansion slots).
1-32
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 1 Overview of the Content Delivery Engines
Hardware Features
Table 1-24
4
5
6
7
1
2
3
PCI Expansion
Slot Number
CDE220 2S1-F Expansion Cards
Expansion Card
—
NIC—dual fiber
NIC—dual fiber
—
—
—
—
Interface Name
(top to bottom)
—
—
—
—
— eth4 eth5 eth2 eth3
CDE220 2S3-C
numbers (see
Figure 1-8 to see the location of the PCI expansion slots).
Figure 1-22 disk3 disk2 disk1
CDE220 2S3-F/C Drives disk6 disk5 disk4 disk9 disk8 disk7
RESET disk12 disk11 disk10
Table 1-25
4
5
6
7
1
2
3
PCI Expansion
Slot Number
CDE220 2S3-C Expansion Cards
Expansion Card
—
NIC—quad copper
NIC—quad copper
—
NIC—quad copper
—
—
Interface Name
(top to bottom)
— eth6 eth7 eth8 eth9 eth2 eth3 eth4 eth5
— eth10 eth11 eth12 eth13
—
—
CDE220 2S3-F
Figure 1-22 is a front view of the CDE220 2S3 (copper and fiber models) showing the location of the
storage drives.
Table 1-26 lists the CDE220 2S3-F PCI expansion cards and their corresponding PCI slot
numbers (see
to see the location of the PCI expansion slots).
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
1-33
Chapter 1 Overview of the Content Delivery Engines
Hardware Features
Table 1-26
4
5
6
7
1
2
3
PCI Expansion
Slot Number
CDE220 2S3-F Expansion Cards
Expansion Card
—
NIC—dual fiber
NIC—dual fiber
—
NIC—dual fiber
NIC—dual fiber
—
Interface Name
(top to bottom)
— eth4 eth5 eth2 eth3
— eth6 eth7 eth8 eth9
—
CDE220 2S3I-C
is a front view of the CDE220 2S3I (copper and fiber models) showing the location of the storage drives.
Table 1-27 lists the CDE220 2S3I-C PCI expansion cards and their corresponding PCI
to see the location of the PCI expansion slots).
Figure 1-23 disk2 disk1 disk0
CDE220 2S3I-F/C Drives disk5 disk4 disk3 disk8 disk7 disk6
RESET disk11 disk10 disk9
Table 1-27
4
5
6
7
1
2
3
PCI Expansion
Slot Number
CDE220 2S3I-C Expansion Cards
Expansion Card
—
NIC—quad copper
NIC—quad copper
—
NIC—quad copper
—
—
Interface Name
(top to bottom)
—
7/0 8/0 9/0 10/0
3/0 4/0 5/0 6/0
—
11/0 12/0 13/0 14/0
—
—
CDE220 2S3I-F
is a front view of the CDE220 2S3I (copper and fiber models) showing the location of the storage drives.
Table 1-28 lists the CDE220 2S3I-F PCI expansion cards and their corresponding PCI
to see the location of the PCI expansion slots).
1-34
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 1 Overview of the Content Delivery Engines
Hardware Features
Table 1-28
4
5
6
7
1
2
3
PCI Expansion
Slot Number
CDE220 2S3I-F Expansion Cards
Expansion Card
—
NIC—dual fiber
NIC—dual fiber
—
NIC—dual fiber
NIC—dual fiber
—
Interface Name
(top to bottom)
—
5/0 6/0
3/0 4/0
—
7/0 8/0
9/0 10/0
—
CDE250 2A4
Figure 1-24 is a front view of the CDE250 2A4 showing the location of the storage drives. Table 1-29
lists the CDE250 2A4 PCI expansion cards and their corresponding PCI slot numbers (see
see the location of the PCI expansion slots).
Figure 1-24 CDE250 2A4 Drives
RESET 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Table 1-29
5
6
7
1
2
3
4
PCI Expansion
Slot Number
CDE250 2A4 PCI Expansion Cards
Expansion Card
—
NIC—dual (10GE) fiber
—
—
—
NIC—dual (10GE) fiber
NIC—quad copper
Interface Name
(top to bottom)
— eth6 eth7
—
—
— eth8 eth9 eth2 eth3 eth4 eth5
CDE250 2A2
Figure 1-25 is a front view of the CDE250 2A2 showing the location of the storage drives. Table 1-30
lists the CDE250 2A2 PCI expansion cards and their corresponding PCI slot numbers (see
see the location of the PCI expansion slots).
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
1-35
Chapter 1 Overview of the Content Delivery Engines
Hardware Features
Figure 1-25 CDE250 2A2Drives
RESET 1 2 3 4 5 6 7 8 9 10 11 12
Table 1-30
4
5
6
7
1
2
3
PCI Expansion
Slot Number
CDE250 2A2 PCI Expansion Cards
Expansion Card
—
NIC—dual (10GE) fiber
—
—
—
NIC—dual (10GE) fiber
NIC—quad copper
Interface Name
(top to bottom)
— eth6 eth7
—
—
— eth8 eth9 eth2 eth3 eth4 eth5
CDE250 2G3
Figure 1-26 is a front view of the CDE250 2G3 showing the location of the storage drives. Table 1-31
lists the CDE250 2G3 PCI expansion cards and their corresponding PCI slot numbers (see
to see the location of the PCI expansion slots).
Figure 1-26 CDE250 2G3 Drives
RESET 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Table 1-31
4
5
6
7
1
2
3
PCI Expansion
Slot Number
CDE250 2G3 PCI Expansion Cards
Expansion Card
—
NIC—dual (10GE) fiber
—
—
—
NIC—dual (10GE) fiber
NIC—quad copper
Interface Name
(top to bottom)
— eth6 eth7
—
—
— eth8 eth9 eth2 eth3 eth4 eth5
1-36
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 1 Overview of the Content Delivery Engines
Hardware Features
CDE250 2M0
Figure 1-27 is a front view of the CDE250 2M0 showing the location of the storage drives. Table 1-32
lists the CDE250 2M0 PCI expansion cards and their corresponding PCI slot numbers (see
to see the location of the PCI expansion slots).
Figure 1-27 CDE250 2M0 Drives
RESET 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Table 1-32
5
6
7
1
2
3
4
PCI Expansion
Slot Number
CDE250 2M0 PCI Expansion Cards
Expansion Card
—
NIC—dual (10GE) fiber
—
—
—
NIC—dual (10GE) fiber
NIC—quad copper
Interface Name
(top to bottom)
—
1/0 2/0
—
—
—
3/0 4/0
3/0 4/0 5/0 6/0
CDE250 2S5
is a front view of the CDE250 2S5 showing the location of the storage drives. Table 1-33
lists the CDE250 2S5 PCI expansion cards and their corresponding PCI slot numbers (see
to see the location of the PCI expansion slots).
Note If this CDE is in an IS system, the storage drive numbering is from 0 to 25.
Figure 1-28 CDE250 2S5 Drives
RESET 1 2 3 4 5 6 7 8 9 10 11 12
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
1-37
Chapter 1 Overview of the Content Delivery Engines
Hardware Features
Table 1-33
4
5
6
7
1
2
3
PCI Expansion
Slot Number
CDE250 2S5 PCI Expansion Cards
Expansion Card
—
NIC—dual (10GE) fiber
—
—
—
NIC—dual (10GE) fiber
NIC—quad copper
VDS-IS Interface
Name
(top to bottom)
—
1/0 2/0
—
—
—
3/0 4/0
3/0 4/0 5/0 6/0
VDS-TV Interface
Name
(top to bottom)
— eth6 eth7
—
—
— eth8 eth9 eth2 eth3 eth4 eth5
CDE250 2S6
is a front view of the CDE250 2S6 showing the location of the storage drives.
lists the CDE250 2S6 PCI expansion cards and their corresponding PCI slot numbers (see
see the location of the PCI expansion slots).
Note If this CDE is in an IS system, the storage drive numbering is from 0 to 25.
Figure 1-29 CDE250 2S6 Drives
RESET 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Table 1-34
4
5
6
7
1
2
3
PCI Expansion
Slot Number
CDE250 2S6 PCI Expansion Cards
Expansion Card
—
NIC—dual (10GE) fiber
—
—
—
NIC—dual (10GE) fiber
NIC—quad copper
VDS-IS Interface
Name
(top to bottom)
—
1/0 2/0
—
—
—
3/0 4/0
3/0 4/0 5/0 6/0
VDS-TV Interface
Name
(top to bottom)
— eth6 eth7
—
—
— eth8 eth9 eth2 eth3 eth4 eth5
1-38
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 1 Overview of the Content Delivery Engines
Hardware Features
CDE250 2S8
Figure 1-30 is a front view of the CDE250 2S8 showing the location of the storage drives. Table 1-35
lists the CDE250 2S8 PCI expansion cards and their corresponding PCI slot numbers (see
to see the location of the PCI expansion slots).
Note If this CDE is in an IS system, the storage drive numbering is from 0 to 25.
Figure 1-30 CDE250 2S8 Drives
RESET 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Table 1-35
3
4
1
2
5
6
7
PCI Expansion
Slot Number
CDE250 2S8 PCI Expansion Cards
Expansion Card
—
NIC—dual (10GE) fiber
—
—
—
NIC—dual (10GE) fiber
NIC—quad copper
VDS-IS Interface
Name
(top to bottom)
—
1/0 2/0
—
—
—
3/0 4/0
3/0 4/0 5/0 6/0
VDS-TV Interface
Name
(top to bottom)
— eth6 eth7
—
—
— eth8 eth9 eth2 eth3 eth4 eth5
CDE250 2S9
is a front view of the CDE250 2S9 showing the location of the storage drives. Table 1-36
lists the CDE250 2S9 PCI expansion cards and their corresponding PCI slot numbers (see
to see the location of the PCI expansion slots).
Note If this CDE is in an IS system, the storage drive numbering is from 0 to 12.
Figure 1-31 CDE250 2S9 Drives
RESET 1 2 3 4 5 6 7 8 9 10 11 12
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
1-39
Chapter 1 Overview of the Content Delivery Engines
Hardware Features
Table 1-36
4
5
6
7
1
2
3
PCI Expansion
Slot Number
CDE250 2S9 PCI Expansion Cards
Expansion Card
—
NIC—dual (10GE) fiber
—
—
—
NIC—dual (10GE) fiber
NIC—quad copper
VDS-IS Interface
Name
(top to bottom)
—
1/0 2/0
—
—
—
3/0 4/0
3/0 4/0 5/0 6/0
VDS-TV Interface
Name
(top to bottom)
— eth6 eth7
—
—
— eth8 eth9 eth2 eth3 eth4 eth5
CDE250 2S10
is a front view of the CDE250 2S10 showing the location of the storage drives.
lists the CDE250 2S10 PCI expansion cards and their corresponding PCI slot numbers (see
to see the location of the PCI expansion slots).
Note If this CDE is in an IS system, the storage drive numbering is from 0 to 25.
Figure 1-32 CDE250 2S10 Drives
RESET 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Table 1-37
4
5
6
7
1
2
3
PCI Expansion
Slot Number
CDE250 2S10 PCI Expansion Cards
Expansion Card
—
NIC—dual (10GE) fiber
—
—
—
NIC—dual (10GE) fiber
NIC—quad copper
VDS-IS Interface
Name
(top to bottom)
—
1/0 2/0
—
—
—
3/0 4/0
3/0 4/0 5/0 6/0
VDS-TV Interface
Name
(top to bottom)
— eth6 eth7
—
—
— eth8 eth9 eth2 eth3 eth4 eth5
1-40
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 1 Overview of the Content Delivery Engines
Hardware Features
CDE250 2V0
The CDE250 2V0 supports the VQE Server and VQE Tools applications. It does not contain MegaRaid, and has a single external drive, unlike other CDE250 models.
drive and the remaining drive slots are empty.
lists the CDE250 2V0 PCI expansion cards and their corresponding PCI slot numbers (see
Figure 1-9 to see the location of the PCI expansion slots).
Figure 1-33 CDE250 2V0 Drives
CDE280
RESET 1
Table 1-38
3
4
5
6
7
1
2
PCI Expansion
Slot Number
CDE250 2V0 PCI Expansion Cards
Expansion Card
—
NIC—dual (10GE) fiber
—
—
—
NIC—dual (10GE) fiber
NIC—quad copper
Interface Name
(bottom to top)
— eth8 eth9
—
—
— eth6 eth7 eth2 eth3 eth4 eth5
For the procedure on installing VQE software on the CDE250 2V0, see the “Installing VQE Release 3.6
Software” section of the Release Notes for Cisco CDA Visual Quality Experience Application, Release
3.6
.
Figure 1-34 is a front view of the 24 drive CDE280 showing the location of the storage drive.
lists the CDE280 expansion cards and their corresponding PCI slot numbers (see
to see the location of the PCI expansion slots).
Figure 1-34 CDE280 Drives
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
1-41
Chapter 1 Overview of the Content Delivery Engines
Hardware Features
Table 1-39 CDE280 PCI Expansion Cards
3
4
PCI
Expansion
Slot Number
1
Expansion Card
1
VDS-IS Interface Name
2
5
NIC—dual (10GE) fiber TenGigabitEthernet 1/0 = eth2[Left] and
TenGigabitEthernet 1/1 = eth3 [Right]
NIC—dual (10GE) fiber TenGigabitEthernet 2/0 = eth4[Left] and
TenGigabitEthernet 2/1 = eth5[Right]
Blank
NIC—dual (10GE) fiber TenGigabitEthernet 3/0 = eth6[Left] and
TenGigabitEthernet 3/1 = eth7[Right]
NIC—dual (10GE) fiber TenGigabitEthernet 4/0 = eth8[Left] and
TenGigabitEthernet 4/1 = eth9[Right]
Blank
Component VDS-IS Interface Name
6
Embedded
Ethernet Port on the motherboard
(Labelled on back)
M
1
2
CIMC Ethernet port
Intel i350 GbE Ethernet
Intel i350 GbE Ethernet
CIMC Management
GigabitEthernet 1/0 = eth0
GigabitEthernet 1/1 = eth1
1.
These mappings are valid only when the CIMC NIC mode is dedicated (default setting)
CDE285-S
is the front view of the 24 drive CDE285-S shows the location of the storage drive.
Table 1-40 lists the CDE285-S expansion cards and their corresponding PCI slot numbers (see
in the Cisco UCS C240 M4 High-Density Rack Server (Small Form Factor Disk Drive
Model) for locating the PCI expansion slots).
Figure 1-35 CDE285-S Drives
1-42
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 1 Overview of the Content Delivery Engines
Table 1-40
4
5
6
1
2
3
PCI Expansion
Slot Number
CDE285-S Expansion Cards
CDE285-L
Expansion Card
NIC—dual (10GE) fiber
NIC—dual (10GE) fiber
Blank
NIC—dual (10GE) fiber
NIC—dual (10GE) fiber
Blank
Hardware Features
Figure 1-36 is the front view of the 12 drive CDE285-L, shows the location of the storage drive.
lists the CDE285-L expansion cards and their corresponding PCI slot numbers (see
Cisco UCS C240 M4 High-Density Rack Server (Large Form Factor Disk Drive
Model) for locating the PCI expansion slots).
Figure 1-36 CDE285-L Drives
Table 1-41
4
5
6
1
2
3
PCI Expansion
Slot Number
CDE285-L Expansion Cards
Expansion Card
NIC—dual (10GE) fiber
NIC—dual (10GE) fiber
Blank
NIC—dual (10GE) fiber
NIC—dual (10GE) fiber
Blank
For the procedure on installing OMD software on the CDE285, see Cisco UCS C240 M4 Server
Installation and Service Guide.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
1-43
Chapter 1 Overview of the Content Delivery Engines
Hardware Features
CDE420 4A-C
is a front view of the CDE420 showing the location of the storage drives. Note that some
CDE configurations do not have 24 drives. Table 1-42 lists the CDE420 4A-C PCI expansion cards and
their corresponding PCI slot numbers (see
to see the location of the PCI expansion slots).
Figure 1-37
RESET disk6 disk5 disk4 disk3 disk2 disk1
CDE420 Drives (all models) disk12 disk11 disk10 disk9 disk8 disk7 disk18 disk17 disk16 disk15 disk14 disk13 disk24 disk23 disk22 disk21 disk20 disk19
Table 1-42
3
4
1
2
5
6
7
PCI Expansion
Slot Number
CDE420 4A-C Expansion Cards
Expansion Card
—
NIC—quad copper
NIC—quad copper
—
—
—
—
Interface Name
(top to bottom)
— eth6 eth7 eth8 eth9 eth2 eth3 eth4 eth5
—
—
—
—
CDE420 4A-F
is a front view of the CDE420 (all models) showing the location of the storage drives.
Table 1-43 lists the CDE420 4A-F PCI expansion cards and their corresponding PCI slot numbers (see
to see the location of the PCI expansion slots).
Table 1-43 CDE420 4A-F PCI Expansion Cards
5
6
7
1
2
3
4
PCI Expansion
Slot Number
Expansion Card
—
NIC—dual fiber
NIC—dual fiber
—
—
—
—
—
—
—
Interface Name
(top to bottom)
— eth6 eth7 eth2 eth3
—
1-44
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 1 Overview of the Content Delivery Engines
Hardware Features
CDE420 4G-C
Figure 1-37 is a front view of the CDE420 (all models) showing the location of the storage drives.
lists the CDE420 4G-C PCI expansion cards and their corresponding PCI slot numbers (see
Figure 1-12 to see the location of the PCI expansion slots).
Table 1-44
5
6
7
1
2
3
4
PCI Expansion
Slot Number
CDE420 4G-C PCI Expansion Cards
Expansion Card
—
NIC—quad copper
NIC—quad copper
—
NIC—quad copper
—
—
Interface Name
(top to bottom)
— eth6 eth7 eth8 eth9 eth2 eth3 eth4 eth5
— eth10 eth11 eth12 eth13
—
—
CDE420 4G-F
Figure 1-37 is a front view of the CDE420 (all models) showing the location of the storage drives.
lists the CDE420 4G-F PCI expansion cards and their corresponding PCI slot numbers (see
Figure 1-12 to see the location of the PCI expansion slots).
Table 1-45
3
4
5
6
7
1
2
PCI Expansion
Slot Number
CDE420 4G-F PCI Expansion Cards
Expansion Card
—
NIC—dual fiber
NIC—dual fiber
—
NIC—dual fiber
—
—
Interface Name
(top to bottom)
— eth6 eth7 eth2 eth3
— eth10 eth11
—
—
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
1-45
Chapter 1 Overview of the Content Delivery Engines
Hardware Features
CDE460
is a front view of the CDE460 showing the location of 24 of the storage drives, and
is a rear view of the CDE460 showing the location of the remaining 12 storage drives.
Table 1-46 lists the CDE460 PCI expansion cards and their corresponding PCI slot numbers.
Figure 1-38
RESET disk6 disk5 disk4 disk3 disk2 disk1
CDE460 Front Drives disk12 disk11 disk10 disk9 disk8 disk7 disk18 disk17 disk16 disk15 disk14 disk13 disk24 disk23 disk22 disk21 disk20 disk19
Figure 1-39 CDE460 Rear Drives disk27 disk26 disk25 disk30 disk29 disk28 disk33 disk32 disk31
2
3
6
7
4
5
Table 1-46
PCI Expansion
Slot Number
1
CDE460 Expansion Cards
Expansion Card
SAS Controller LSI SAS2
9261-8i (Internal)
—
SAS Controller
AOC-S2308L-L8E LSI 2308
(External)
NIC—dual fiber
NIC—dual fiber
—
—
Interface Name
(top to bottom)
—
—
— disk36 disk35 disk34 eth6 eth7 eth2 eth3
—
—
1-46
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 1 Overview of the Content Delivery Engines
Hardware Features
CDE460-4R1
Figure 1-38 is a front view of the CDE460-4R1 showing the location of 24 of the storage drives, and
lists the CDE460-4R1 PCI expansion cards and their corresponding PCI slot numbers.
Figure 1-40
RESET disk6 disk5 disk4 disk3 disk2 disk1
CDE460-4R1 Front Drives disk12 disk11 disk10 disk9 disk8 disk7 disk18 disk17 disk16 disk15 disk14 disk13 disk24 disk23 disk22 disk21 disk20 disk19
Figure 1-41 CDE460-4R1 Rear Drives disk27 disk26 disk25 disk30 disk29 disk28 disk33 disk32 disk31
2
3
6
7
4
5
Table 1-47
PCI Expansion
Slot Number
1
CDE460-4R1 Expansion Cards
Expansion Card
SAS Controller LSI SAS2
9261-8i (Internal)
—
SAS Controller
AOC-S2308L-L8E LSI 2308
(External)
NIC—dual fiber
NIC—dual fiber
—
—
Interface Name
(top to bottom)
—
—
— disk36 disk35 disk34 eth6 eth7 eth2 eth3
—
—
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
1-47
Chapter 1 Overview of the Content Delivery Engines
Hardware Features
CDE460-4R3
is a front view of the CDE460-4R3 showing the location of 24 of the storage drives, and
is a rear view of the CDE460-4R3 showing the location of the remaining 12 storage drives.
Table 1-48 lists the CDE460-4R3 PCI expansion cards and their corresponding PCI slot numbers.
Figure 1-42
RESET disk6 disk5 disk4 disk3 disk2 disk1
CDE460-4R3 Front Drives disk12 disk11 disk10 disk9 disk8 disk7 disk18 disk17 disk16 disk15 disk14 disk13 disk24 disk23 disk22 disk21 disk20 disk19
Figure 1-43 CDE460-4R3 Rear Drives disk27 disk26 disk25 disk30 disk29 disk28 disk33 disk32 disk31 disk36 disk35 disk34
2
3
6
7
4
5
Table 1-48
PCI Expansion
Slot Number
1
CDE460-4R3 Expansion Cards
Expansion Card
SAS Controller LSI SAS2 9261-8i
(Internal)
—
SAS Controller AOC-S2308L-L8E LSI
2308 (External)
NIC—dual fiber
NIC—dual fiber
—
—
Interface Name
(top to bottom)
—
—
— eth6 eth7 eth2 eth3
—
—
1-48
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 1 Overview of the Content Delivery Engines
CDE475
Hardware Features
Figure 1-44 is a front view of the CDE475 showing the location of 24 of the storage drives, and
Figure 1-43 is a rear view of the CDE475 showing the location of the remaining 12 storage drives.
lists the CDE475 PCI expansion cards and their corresponding PCI slot numbers.
Figure 1-44 CDE475 Front Drives
RESET disk6 disk5 disk4 disk3 disk2 disk1 disk12 disk11 disk10 disk9 disk8 disk7 disk18 disk17 disk16 disk15 disk14 disk13 disk24 disk23 disk22 disk21 disk20 disk19
Figure 1-45 CDE475 Rear Drives
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
1-49
Chapter 1 Overview of the Content Delivery Engines
Hardware Features
5
6
3
4
Table 1-49
PCI Expansion
Slot Number
1
CDE475 Expansion Cards
Expansion Card
2
7
AOC-S3108L-H8IR (3108 SAS
MegaRaid controller)
AOC-S3108L-H8IR (3108 SAS
MegaRaid controller)
—
—
—
AOC-STGN-I2S-O-P (10GbE – Dual port)
AOC-STGN-I2S-O-P (10GbE – Dual port)
Interface Name
(top to bottom)
—
—
—
—
— eth2 eth3 eth4 eth5
Front Panel Control Buttons and LEDs
Several LEDs on the front control panel continuously provide information on the overall system status.
There are two buttons on the front control panel of the CDE220 and the CDE420—a reset button and an on/off switch.
shows the location of the CDE205, CDE220, and CDE250 front panel control buttons and
LEDs.
Figure 1-46 CDE205, CDE220, and CDE250 Front View Control Buttons and LEDs
RESET
RESET
1-50
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 1 Overview of the Content Delivery Engines
Hardware Features
Front Panel Control Panel Buttons
The Reset button and power button are located on the front, for the following CDEs:
• CDE205
•
•
CDE220
CDE250
•
•
CDE420
CDE460
Power —The main power switch is used to apply or remove power from the power supply to the CDE. Turning off system power with this button removes the main power but keeps standby power supplied to the system. Therefore, you must unplug the system before servicing it.
RESET —The Reset button is used to reboot the system.
Cell Zone
Front Panel LEDs
The control panel located on the front of the CDE chassis has six LEDs. These LEDs provide critical information related to different parts of the system.
Power Failure —When this LED flashes, it indicates a power failure in the power supply.
!
Overheat/Fan Fail —When this LED flashes, it indicates a fan failure. When continuously on (not flashing), it indicates an overheat condition, which may be caused by cables obstructing the airflow in the system or the ambient room temperature being too warm. Check the routing of the cables and make sure that all fans are present and operating normally. You should make sure that the chassis covers are installed. Finally, verify that the heatsinks are installed properly. This LED will remain flashing or on as long as the overheat condition exists.
NIC1 —Indicates network activity on GLAN1 when flashing.
1
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
1-51
Hardware Features
Chapter 1 Overview of the Content Delivery Engines
2
NIC2 —Indicates network activity on GLAN2 when flashing.
Power —Indicates power is being supplied to the system’s power supply units. This
LED should be illuminated when the system is operating.
HD —Indicates IDE channel activity on SAS or SATA drive or DVD-ROM drive activity when flashing.
3
4
5
6
7
8
9
shows the location of the CDE280 front panel control buttons and LEDs.
the LED states.
Figure 1-47 CDE280 Front View Control Buttons and LEDs
1 2
1
2
3
4
5
Hard drive fault LED (on each drive tray) 6
Hard drive activity LED (on each drive tray)
7
Power button/power status LED
Unit Identification button/LED
System status LED
8
9
Fan status LED
Temperature status LED
Power supply status LED
Network link activity LED
1-52
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 1 Overview of the Content Delivery Engines
Hardware Features
Table 1-50 CDE280 Front Panel LEDs, Definitions of States
1 Hard drive fault
2
3
4
5
6
Hard drive activity
Power button/LED
Unit Identification
System status
Fan status •
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Off—The hard drive is operating properly.
Amber—Drive fault detected.
Amber, blinking—The device is rebuilding.
Amber, blinking with one-second interval—Drive locate function activated.
Off—There is no hard drive in the hard drive tray (no access, no fault).
Green—The hard drive is ready.
Green, blinking—The hard drive is reading or writing data.
Off—There is no AC power to the server.
Amber—The server is in standby power mode. Power is supplied only to the Cisco IMC and some motherboard functions.
Green—The server is in main power mode. Power is supplied to all server components.
Off—The unit identification function is not in use.
Blue—The unit identification function is activated.
Green—The server is running in a normal operating condition.
Green, blinking—The server is performing system initialization and memory check.
Amber, steady—The server is in a degraded operational state. For example:
–
–
Power supply redundancy is lost.
CPUs are mismatched.
–
–
At least one CPU is faulty.
At least one DIMM is faulty.
– At least one drive in a RAID configuration failed.
Amber, blinking—The server is in a critical fault state.
For example:
–
–
Boot failed.
Fatal CPU and/or bus error is detected.
– Server is in an over-temperature condition.
Green—All fan modules are operating properly.
Amber, steady—One or more fan modules breached the critical threshold.
Amber, blinking—One or more fan modules breached the non-recoverable threshold.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
1-53
Hardware Features
Chapter 1 Overview of the Content Delivery Engines
Table 1-50
7
CDE280 Front Panel LEDs, Definitions of States (continued)
Temperature status
8
9
Power supply status
Network link activity
•
•
•
•
•
•
•
•
•
Green—The server is operating at normal temperature.
Amber, steady—One or more temperature sensors breached the critical threshold.
Amber, blinking—One or more temperature sensors breached the non-recoverable threshold.
Green—All power supplies are operating normally.
Amber, steady—One or more power supplies are in a degraded operational state.
Amber, blinking—One or more power supplies are in a critical fault state.
Off—The Ethernet link is idle.
Green—One or more Ethernet LOM ports are link-active, but there is no activity.
Green, blinking—One or more Ethernet LOM ports are link-active, with activity.
For more information on message and errors see, Cisco Internet Streamer CDS Alarms and Error
Messages Guide.
For details about the front panel control buttons and LEDs of the CDE285-S and CDE285-L, see Cisco
UCS C240 M4 Server Installation and Service Guide.
shows the location of the CDE420, and CDE460 front panel control buttons and LEDs.
Figure 1-48 CDE420, and CDE460 Front View Control Buttons and LEDs
RESET
RESET
1-54
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 1 Overview of the Content Delivery Engines
Hardware Features
Rear Panels LEDs and Buttons
shows the CDE280 rear panel LEDs and buttons. Table 1-51 defines the LED states.
Figure 1-49 CDE280 Rear Panel LEDs and Buttons
1 Power supply fault LED
2 Power supply AC status LED
4 1-Gb Ethernet dedicated management link speed LED
5 1-Gb Ethernet dedicated management link status LED
6 1-Gb Ethernet link speed LED
7 1-Gb Ethernet link status LED
8 Unit Identification button/LED
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
1-55
Hardware Features
Chapter 1 Overview of the Content Delivery Engines
Table 1-51 CDE280 Rear Panel LEDs, Definition of States
LED Name
1 Power supply fault
This is a summary; for advanced power supply LED information, see
.
2 Power supply status
This is a summary; for advanced power supply LED information, see
.
4
5
6
7
8
1-Gb Ethernet dedicated management link speed
1-Gb Ethernet dedicated management link status
1-Gb Ethernet link speed
1-Gb Ethernet link status
Unit Identification
State
• Off—The power supply is operating normally.
•
•
Amber, blinking—An event warning threshold has been reached, but the power supply continues to operate.
Amber, solid—A critical fault threshold has been reached, causing the power supply to shut down (for example, a fan failure or an over-temperature condition).
AC power supplies:
•
•
Off—There is no AC power to the power supply.
Green, blinking—AC power OK; DC output not enabled.
• Green, solid—AC power OK; DC outputs OK.
DC power supplies:
•
•
•
•
Off—There is no DC power to the power supply.
Green, blinking—DC power OK; DC output not enabled.
Green, solid—DC power OK; DC outputs OK.
Off—Link speed is 10 Mbps.
•
•
•
•
•
•
•
•
•
•
•
•
•
Amber—Link speed is 100 Mbps.
Green—Link speed is 1 Gbps.
Off—No Link is present.
Green—Link is active.
Green, blinking—Traffic is present on the active link.
Off—Link speed is 10 Mbps.
Amber—Link speed is 100 Mbps.
Green—Link speed is 1 Gbps.
Off—No link is present.
Green—Link is active.
Green, blinking—Traffic is present on the active link.
Off—The unit identification function is not in use.
Blue—The unit identification function is activated.
this combination.
1-56
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 1 Overview of the Content Delivery Engines
Hardware Features
Table 1-52 CDE280 Rear Power Supply LED States
•
•
•
•
•
•
•
•
•
•
Green PSU Status
LED State
•
•
•
•
Solid on
Blinking
Off
Off
Amber PSU Fault
LED State
•
•
•
•
Off
Off
Off
On
Blinking
Blinking
Blinking
Blinking
Solid on
Blinking
Blinking
Solid on
Solid on
Blinking
•
•
•
•
•
•
•
•
•
•
Solid on
Solid on
Solid on
Solid on
Solid on
Solid on
Solid on
Blinking
Blinking
Off
Event
12V main on (main power mode)
12Vmain off (standby power mode)
No AC power input (all PSUs present)
No AC power input (redundant supply active)
12V over-voltage protection (OVP)
12V under-voltage protection (UVP)
12V over-current protection (OCP)
12V short-circuit protection (SCP)
PSU fan fault/Lock (before OTP)
PSU fan fault/Lock (after OTP)
Over-temperature protection (OTP)
OTP warning
OCP warning
12V main off (CR slave PSU is in sleep mode)
For details about the rear panel control buttons and LEDs of the CDE285-S and CDE285-L, see Cisco
UCS C240 M4 Server Installation and Service Guide.
Storage Drive LEDs
Each SAS or SATA storage drive has two LEDs:
•
•
Blue —Each storage drive has a blue LED. For SATA drives, the LED is off when there is no I/O activity. For SAS drives, the LED is on with no I/O activity. I/O activity is represented by a blinking blue LED.
Red —The red LED indicates an SAS or SATA drive failure. If one of the drives fails, you are notified by the system management software.
Input/Output Ports and Connectors
The CDEs support the following I/O connectors on the rear of the CDE:
• Ethernet connector
•
•
Serial connector
Video and audio connectors (on optional adapter)
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
1-57
Chapter 1 Overview of the Content Delivery Engines
Hardware Features
Note The CDE280, CDE285-S and CDE285-L engine supports the CIMC (Cisco Integrated
Management Controller).
Caution Once the product installation is complete, all I/O cables, except those installed in the Ethernet ports, must be disconnected from the CDE to maintain EMC compliance. Any other cable connections are temporary and are used only to initialize the system. All PS/2 keyboard, PS/2 mouse, USB interface, serial console interface, and VGA interface cables must be disconnected from the front and rear I/O ports of the CDE.
shows the location of the CDE rear panel ports and connectors.
1-58
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
C H A P T E R
2
Preparing to Install the Content Delivery
Engines
This chapter contains site requirements and important safety information you should know before working with the Cisco Content Delivery Engines (CDEs). Use the guidelines in this chapter to ensure your own personal safety and to help protect your CDE from potential damage.
•
•
Storage Drive Cautions, page 2-3
•
•
Note •
•
See Regulatory Compliance and Safety Information for the Cisco Content Delivery Engines document that came with your CDE before you begin the installation.
See Regulatory Compliance and Safety Information for Cisco UCS C-Series, Cisco C880 Series, and
C-Series-Based Appliances.
Site Requirements
This section provides site requirements for the CDEs. You should verify the site power prior to installing the CDEs.
Preventing Electrostatic Discharge Damage
The CDEs have no user-serviceable parts inside their chassis. The only field-replaceable units are the
AC and DC power supplies and storage drives.
Electrostatic discharge (ESD) damage, which can occur when drives, electronic cards, or components are improperly handled, results in complete or intermittent failures. Follow these advisories to prevent damage from ESD:
• Always use an ESD wrist or ankle strap and ensure that it makes good skin contact.
• Connect the equipment end of the strap to a bare metal, unpainted chassis surface.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
2-1
Site Requirements
Chapter 2 Preparing to Install the Content Delivery Engines
•
•
•
•
When removing or installing a component, use any available handles, ejector levers, or captive installation screws. These devices prevent accidental removal, provide proper grounding for the system, and help to ensure that bus connectors are properly seated.
When unpacking a static-sensitive component from its shipping carton, do not remove the component from the antistatic packing material until you are ready to install the component in your system. Just before unwrapping the antistatic packaging, be sure to discharge static electricity from your body.
When transporting a sensitive component, first place it in an antistatic container or packaging.
Handle all sensitive components in a static-safe area. If possible, use antistatic floor pads and workbench pads.
Caution For safety, periodically check the resistance value of the antistatic strap. The measurement should be between 1 and 10 megohms (Mohm).
Environmental and Physical Specifications
The CDEs are tested to the environmental specifications indicated in
. All testing is performed per procedures defined in Bellcore GR-63-CORE NEBS Physical Protection and Bellcore
GR-1089-CORE EMC and Electrical Safety—Generic Criteria for Network Telecommunications
Equipment .
The CDE280 Engine should comply with CE Markings per directives 2004/108/EC and 2006/95/EC. For more information on the CDE280 specifications, see
“CDE280 Specifications” section on page A-3 .
For information on the CDE285 specifications, see Cisco UCS C240 M4 Server Installation and Service
Guide.
Table 2-1 Environmental Specifications Summary
Environment Specification
Temperature, operating
Temperature, nonoperating
32 to 122°F (0 to 50°C)
CDE280: 41 to 95°F (5 to 35°C)
Derate the maximum temperature by 1°C per every 305 meters of altitude above sea level.
–104°F to 158°F (–40°C to 70°C)
Altitude
Humidity, nonoperating
CDE280: –40 to 149°F (–40 to 65°C)
196 to 13,123 ft. (60 to 4000 m)
CDE280: 0 to 10,000 feet
5 to 95%, noncondensing at temperatures of 23°C (73°F) to 40°C
(104°F)
CDE280: 10 to 90%, noncondensing.
Table 2-2 provides the physical dimensions of the CDEs.
2-2
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 2 Preparing to Install the Content Delivery Engines
Table 2-2 Physical Dimensions
Height:
CDE205,CDE220, and CDE250
CDE420, and CDE460
CDE280
3.50 inches (8.90 cm)
7.00 inches (17.8 cm)
3.43 inches (8.70 cm)
CDE285
Width:
CDE205, CDE220, and CDE250
3.4 inches (8.70 cm)
17.50 inches (44.45 cm)
CDE420 and CDE460
CDE280
17.25 inches (43.82 cm)
19.0 inches (48.26 cm)
CDE285
Depth:
CDE205, CDE220 and CDE250
CDE420, CDE460
19.0 inches (48.26 cm)
28.5 inches (72.39 cm)
26.5 inches (67.30 cm)
CDE280
CDE285
Front clearance
Side clearance
Rear clearance
29.0 inches (73.70 cm)
29.0 inches (73.70 cm)
2.0 inches (5.1 cm)
1.0 inches (2.5 cm)
3.6 inches (9.2 cm)
Storage Drive Cautions
Storage Drive Cautions
Storage drives are complex electromechanical systems that are quite delicate. They are subject to permanent damage from relatively low levels of both mechanical and electrical shock. Review the following cautions to prevent damage while handling and installing a drive.
Caution Dropping an drive from as high as 10 mm (less than half an inch) onto a hard surface can create up to
900 g of force, exceeding the shock specifications of most storage drives.
Caution Do not strike the drive unit with another object or drive unit.
Caution Do not stack drive units on top of each other unless they are properly secured in a rack or chassis intended for stacking.
Caution Do not stand drive units on their edge. They may fall over.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
2-3
Chapter 2 Preparing to Install the Content Delivery Engines
Safety Warnings
Caution If the drive PC card is exposed in the drive unit, avoid touching the PC card. If you must touch the PC card, take ESD precautions (such as using an ESD mat and wrist strap).
Caution If the SATA or SAS connector pins are exposed, avoid touching them. If you must touch them, take ESD precautions (such as using an ESD mat and wrist strap).
Caution Drive units should not be moved or transported while the power is on and the disk drive is spinning.
Caution Drive units should normally only be installed or removed from a system with the system power off
(preferably the system should be unplugged).
Caution “Hot plugging” a drive unit, either inserting or removing, should only be done with a fully stopped drive
(the heads are parked and the disk is stationary). Exercise extreme care during this operation to avoid shocking the other drives in the system.
Safety Warnings
These warnings are translated into several languages in the Regulatory Compliance and Safety
Information for the Cisco Content Delivery Engines document.
The Cisco Compliance label can be found on the CDE chassis in the following locations:
Chassis bottom: CDE220, CDE420
Chassis top: CDE250, CDE280, CDE460
Warning Before working on a chassis or working near power supplies, unplug the power cord on AC units; disconnect the power at the circuit breaker on DC units. Statement 12
Warning Before working on equipment that is connected to power lines, remove jewelry (including rings, necklaces, and watches). Metal objects will heat up when connected to power and ground and can cause serious burns or weld the metal object to the terminals. Statement 43
Warning For Nordic countries (Norway, Finland, Sweden and Denmark) this system must be installed in a Restricted Access Location, where the voltage of the main ground connection of all equipment is the same (equipotential earth) and the system is connected to a grounded electrical outlet.
Statement 328
2-4
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 2 Preparing to Install the Content Delivery Engines
Safety Warnings
Warning Do not work on the system or connect or disconnect cables during periods of lightning activity.
Statement 1001
Warning Read the installation instructions before connecting the system to the power source. Statement
1004
Warning This product relies on the building’s installation for short-circuit (overcurrent) protection.
Ensure that the protective device is rated not greater than 30 A. Statement 1005
Warning To prevent bodily injury when mounting or servicing this unit in a rack, you must take special precautions to ensure that the system remains stable. The following guidelines are provided to ensure your safety:
• This unit should be mounted at the bottom of the rack if it is the only unit in the rack.
• When mounting this unit in a partially filled rack, load the rack from the bottom to the top with the heaviest component at the bottom of the rack.
• If the rack is provided with stabilizing devices, install the stabilizers before mounting or servicing the unit in the rack. Statement 1006
Warning This unit is intended for installation in restricted access areas. A restricted access area can be accessed only through the use of a special tool, lock and key, or other means of security.
Statement 1017
Warning Take care when connecting units to the supply circuit so that wiring is not overloaded.
Statement 1018
Warning The plug-socket combination must be accessible at all times, because it serves as the main disconnecting device. Statement 1019
Warning To avoid electric shock, do not connect safety extra-low voltage (SELV) circuits to telephone-network voltage (TNV) circuits. LAN ports contain SELV circuits, and WAN ports contain TNV circuits. Some LAN and WAN ports both use RJ-45 connectors. Use caution when connecting cables. Statement 1021
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
2-5
Chapter 2 Preparing to Install the Content Delivery Engines
Safety Warnings
Warning This equipment must be grounded. Never defeat the ground conductor or operate the equipment in the absence of a suitably installed ground conductor. Contact the appropriate electrical inspection authority or an electrician if you are uncertain that suitable grounding is available.
Statement 1024
Warning Class 1 LED product. Statement 1027
Warning This unit might have more than one power supply connection. All connections must be removed to de-energize the unit. Statement 1028
Warning Blank faceplates and cover panels serve three important functions: they prevent exposure to hazardous voltages and currents inside the chassis; they contain electromagnetic interference
(EMI) that might disrupt other equipment; and they direct the flow of cooling air through the chassis. Do not operate the system unless all cards, faceplates, front covers, and rear covers are in place. Statement 1029
Warning Only trained and qualified personnel should be allowed to install, replace, or service this equipment. Statement 1030
Warning To prevent personal injury or damage to the chassis, never attempt to lift or tilt the chassis using the handles on modules (such as power supplies, fans, or cards); these types of handles are not designed to support the weight of the unit. Statement 1032
Warning Ultimate disposal of this product should be handled according to all national laws and regulations. Statement 1040
Warning This product requires short-circuit (overcurrent) protection, to be provided as part of the building installation. Install only in accordance with national and local wiring regulations.
Statement 1045
Warning Invisible laser radiation may be emitted from disconnected fibers or connectors. Do not stare into beams or view directly with optical instruments. Statement 1051
Warning Installation of the equipment must comply with local and national electrical codes. Statement
1074
2-6
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 2 Preparing to Install the Content Delivery Engines
Safety Warnings
Warning The covers are an integral part of the safety design of the product. Do not operate the unit without the covers installed. Statement 1077
Warning This product is not intended to be directly connected to the Cable Distribution System.
Additional regulatory compliance and legal requirements may apply for direct connection to the
Cable Distribution System. This product may connect to the Cable Distribution System ONLY through a device that is approved for direct connection. Statement 1078
Warning Hazardous voltage or energy may be present on power terminals. Always replace cover when terminals are not in service. Be sure uninsulated conductors are not accessible when cover is in place. Statement 1086
Warning Avoid using or servicing any equipment that has outdoor connections during an electrical storm.
There may be a risk of electric shock from lightning. Statement 1088
Warning Main Land China Only
Only use at altitude 2000M or lower area.
Only use in non-tropical locations. Use in air conditioned room when in tropical locations.
AC Power Option Warnings
These warnings apply only to CDEs with the AC power option.
Warning The device is designed to work with TN power systems. Statement 19
Warning Connect the device to a grounded power outlet. Statement 25
DC Power Option Warnings
These warnings apply only to CDEs with the DC power option.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
2-7
Chapter 2 Preparing to Install the Content Delivery Engines
Safety Guidelines
Warning When stranded wiring is required, use approved wiring terminations, such as closed-loop or spade-type with upturned lugs. These terminations should be the appropriate size for the wires and should clamp both the insulation and conductor. Statement 1002
Warning Before performing any procedures, ensure that power is removed from the DC circuit.
Statement
1003
Warning A readily accessible two-poled disconnect device must be incorporated in the fixed wiring.
Statement 1022
Warning Use copper conductors only. Statement 1025
Warning When installing or replacing the unit, the ground connection must always be made first and disconnected last. Statement 1046
Safety Guidelines
To reduce the risk of bodily injury, electrical shock, fire, and damage to the equipment, observe the following precautions:
• Observe and follow service markings. Do not service any Cisco product except as explained in your system documentation. Opening or removing covers that are marked with the triangular symbol with a lightning bolt may expose you to electrical shock. Components inside these compartments should be serviced only by an authorized service technician.
• If any of the following conditions occurs, unplug the product from the electrical outlet and replace the part or contact your authorized service provider:
– Power cable or plug is damaged.
•
•
•
•
•
–
–
Object has fallen into the product.
Product has been exposed to water.
–
–
Product has been dropped or damaged.
Product does not operate correctly when you follow the operating instructions.
Keep your system components away from radiators and heat sources. Also, do not block cooling vents.
Do not spill food or liquids on your system components, and never operate the product in a wet environment.
Do not push any objects into the openings of your system components. Doing so can cause fire or electric shock by shorting out interior components.
Use the product only with other equipment approved by Cisco.
Allow the product to cool before removing covers or touching internal components.
2-8
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 2 Preparing to Install the Content Delivery Engines
Safety Guidelines
•
•
•
•
•
•
•
•
Use the correct external power source. Operate the product only from the type of power source indicated on the electrical ratings label. If you are not sure of the type of power source required, consult your service representative or local power company.
Use only approved power cables. If you have not been provided with a power cable for your system or for any AC-powered option intended for your system, purchase a power cable that is approved for use in your country. The power cable must be rated for the product and for the voltage and current marked on the electrical ratings label of the product. The voltage and current rating of the cable should be greater than the ratings marked on the product.
To help prevent electric shock, plug the system components and peripheral power cables into properly grounded electrical outlets. These cables are equipped with three-prong plugs to help ensure proper grounding. Do not use adapter plugs or remove the grounding prong from a cable.
Observe power strip ratings. Make sure that the total ampere rating of all products plugged into the power strip does not exceed 80 percent of the power strip ampere ratings limit.
Do not use appliance or voltage converters or kits sold for appliances with your product.
To help protect your system components from sudden, transient increases and decreases in electrical power, use a surge suppressor, line conditioner, or uninterruptible power supply (UPS).
Position cables and power cords carefully; route cables and the power cord and plug so that they cannot be stepped on or tripped over. Be sure that nothing rests on your system components’ cables or power cord.
Do not modify power cables or plugs. Consult a licensed electrician or your power company for site modifications. Always follow your local or national wiring rules.
Emissions Disclaimer
This is an Federal Communications Commission (FCC) Class A device.
Intended Uses
This product was evaluated as Information Technology Equipment (ITE), which may be installed in central offices, telecommunication centers, network telecommunication facilities, offices, schools, computer rooms, and similar commercial type locations where the National Electric Code (NEC) applies. The suitability of this product for other product categories and environments (medical, industrial, telecommunications, residential, alarm systems, test equipment, and so on), other than an ITE application, may require further evaluation.
Caution Although CDEs accept both AC and DC power modules, the system does not allow mixing of AC and
DC power modules in one system.
If AC Power Supplies Are Installed
Source AC power disconnect: The AC power cord is considered the source disconnect for the CDE and must be readily accessible when installed. If the individual CDE power cords are not readily accessible for disconnection, you must install an AC power disconnect for the entire rack unit. This main disconnect must be readily accessible, and it must be labeled as controlling power to the entire rack, not just to the
CDEs.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
2-9
Safety Guidelines
Chapter 2 Preparing to Install the Content Delivery Engines
Grounding the rack installation— If the CDE power cord is plugged into an AC outlet that is part of the rack, you must provide proper grounding for the rack itself. When the CDE power cord is plugged into a wall AC outlet, the safety ground conductor in the power cord provides proper grounding only for the
CDE. Take precaution when the CDE power cord is plugged into an AC outlet that is part of the rack.
You must make sure that proper grounding on the rack power outlet is provided or provide proper grounding for the rack itself.
Note When installing the CDEs, use the provided AC power cords.
Supplemental Grounding Connection
A supplemental ground connection is provided on the CDEs in case it is intended for installation in a rack and connection to a Common Bonding Network (CBN) as defined by NEBS GR-1089. To ground the CDE to the rack when rack-mounted, connect an additional grounding conductor to the CDE by using the separate listed closed two-hole crimp lug having 5/8-inch pitch. It is recommended that the grounding conductor wire be number 12 to number 10 AWG, with green insulation, rated minimum167°F (75°C), low smoke fume (LSF) and flame retardant. The ground connections should be tightened to a torque of 6 to 8 in-lb.
Use a grounding conductor to ground a CDE205, CDE220 or CDE280. The grounding conductor consists of the following parts:
•
•
•
•
2 hex head screws
2 round head screws
2 flat washers
2 tooth lock washers
• 1 grounding tab
Perform the following steps to install the grounding conductor to the CDE205, CDE220 or CDE280:
Step 1
Step 2
Screw the two round head screws along with the tooth lock washer to the side of the ground tab.
Place the hook side of the grounding tab to the rear mesh of the chassis and secure it using the two hex head screws with the flat washers (see
). The top of the ground tab should be even with the rear I/O shield.
Figure 2-1 CDE220 Rear View
1
1 Grounding tab
2-10
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 2 Preparing to Install the Content Delivery Engines
Safety Guidelines
The CDE280 grounding conductor consists of two screws that are mounted on the rear of the chassis (see
Figure 2-2 CDE280 Rear View
1 Grounding-lug holes
For information about the CDE285 grounding connections, see Cisco UCS C240 M4 Server Installation and Service Guide.
For the CDE420 grounding conductor consists of two screws that are mounted on the rear of the chassis
).
Figure 2-3 CDE420 Rear View
1
1 Grounding screws
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
2-11
Safety Guidelines
Chapter 2 Preparing to Install the Content Delivery Engines
Overcurrent protection: The CDE is designed for an AC line voltage source with up to 20 A of overcurrent protection per cord feed. If the power system for the equipment rack is installed on a branch circuit with more than 20 A of protection, you must provide supplemental protection for the CDE. The overall current rating of a configured CDE is less than 6 A.
If DC Power Supplies Are Installed
Connection with a DC source should only be performed by trained service personnel. The CDE with DC input is to be installed in a Restricted Access Location in accordance with articles 110-16, 110-17, and
110-18 of the National Electric Code, ANSI/NFPA 70. The DC source must be electrically isolated by double or reinforced insulation from any hazardous AC source. The DC source must be capable of providing up to 900 watts of continuous power per feed pair.
Caution Do not apply AC power to DC power modules.
As a general rule, take precautions when preparing DC power cables for connection to the CDE. Make sure to strip the power conductor insulation so that when installed, no external bare copper is accessible at the terminal block. The torque required for the DC input terminal block connection on the power supplies is 5 to 7 in-lb. Take precautions when connecting the polarity. The DC power input terminals are marked as –48 V and RTN. The –48 V terminal is for the Negative (source DC –48 V or –60 V) and the RTN is for the Positive (source DC return). After power cables have been installed, be careful to avoid strain on the power connection. It is recommended that strain relief be provided as appropriate.
For example, route the power cables in the rack and secure the cables with nylon tie wraps.
Source DC power disconnect— You are responsible for installing a properly rated DC power disconnect for the CDE system. This source disconnect must be readily accessible, and it must be labeled as controlling power to the CDE. The circuit breaker of a centralized DC power system may be used as a disconnect device when easily accessible and should be rated no more than 30 A.
Grounding the CDE— The ground connection must be made first and prior to powering the equipment .
Each power module is provided with a ground connection using the 5-mm screw. The connection is to use a closed-loop lug and the screw is to be tightened to a torque of 6 to 8 in-lb. It is recommended that the ground wire be number 12 to number 10 AWG, with green/yellow insulation, rated minimum 167°F
(75°C), low smoke fume (LSF) and flame retardant.
A supplemental ground connection is provided on the CDE in case it is intended for installation with an isolated DC return (DC-I) and is to be installed in a Common Bonding Network (CBN) per NEBS
GR-1089. To reliably ground the CDE to the rack when rack-mounted, connect an additional grounding conductor to the CDE using the separate listed closed two-hole crimp lug having 5/8-inch pitch. It is recommended that the grounding conductor wire be number 12 to number 10 AWG, with green insulation, rated minimum 75°C (167°F), low smoke fume (LSF), and flame retardant. The ground connections should be tightened with a torque of 6 to 8 in-lb. The metal pin of each module near the input power connector is to be connected to a protective earthing conductor during final system assembly.
Overcurrent protection— Overcurrent protection circuit breakers must be provided as part of each host equipment rack and must be incorporated in the field wiring between the DC source and the CDE. The branch circuit protection should be connected to a 30 A UL listed circuit breaker (or suitably certified for the country used), rated minimum 75 VDC, and copper wire conductors, sized for 24 A current
(12 AWG).
2-12
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 2 Preparing to Install the Content Delivery Engines
Safety Guidelines
Temperature and Ventilation
The ambient temperature in which the CDE operates must not exceed the range established for each CDE type as defined in
Appendix A, “Technical Specifications” . Extreme fluctuations in temperature can
cause a variety of problems in your CDE.
To maintain proper cooling, the equipment rack must provide sufficient airflow to the front of the CDE.
The rack selected and the ventilation provided must be suitable to the environment in which the CDE will be used. The rack must include ventilation sufficient to exhaust the rate heat load of each CDE server
in Appendix A, “Technical Specifications” ).
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
2-13
Safety Guidelines
Chapter 2 Preparing to Install the Content Delivery Engines
2-14
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
C H A P T E R
3
Installing the Content Delivery Engines
This chapter provides the necessary information to properly install the Cisco Content Delivery Engines.
•
Tools and Parts Required, page 3-1
•
•
•
Inspecting for Damage, page 3-2
Tools and Parts Required
You need the following tools and parts to install the CDEs:
• CDE205, CDE220, CDE280, CDE420, and CDE460
•
•
Antistatic mat
Properly grounded ESD-preventive device
•
•
•
1/4-inch flat-blade screwdriver
3/16-inch flat-blade screwdriver
Number 2 Phillips screwdriver
Unpacking the Box
Each Cisco CDE is securely packaged in a shipping box. The cards and power supplies ship installed in the CDEs.
Caution Proper ESD protection is required whenever you handle Cisco equipment. Installation and maintenance personnel should be properly grounded through the use of grounding straps to eliminate the risk of ESD damage to the equipment. CDEs are subject to ESD damage whenever they are removed from the chassis.
To unpack the shipping container, follow these steps:
Step 1 Inspect the packing containers.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
3-1
Chapter 3 Installing the Content Delivery Engines
Inspecting for Damage
Caution If any damage or other signs of mishandling are evident, inform both the local freight carrier and Cisco before unpacking. Your freight carrier can provide you with the procedures necessary to file a claim for damages.
Step 2
Step 3
Step 4
Step 5
Step 6
Carefully open the box.
Remove all packing material.
Remove the chassis from the box.
Carefully open the additional boxes and remove the packing material and contents.
Open the accessory kits and boxes that contain the cables and so forth.
Caution Do not use a knife to open these boxes.
Tip Save the boxes and packing material should you need to return any components to Cisco.
Verify that your shipment is complete by making sure you received everything on your packing list, and then comparing the packing list to your order. If any items are missing or if you need additional information, contact Cisco Technical Support at the following
URL: http://www.cisco.com/cisco/web/support/index.html
.
Inspecting for Damage
After you verify that all of the equipment is included, carefully examine the CDEs, cards, power supplies, and cables for any damage resulting from shipping. If you suspect any damage from shipping, contact your local freight carrier for procedures on damage claims.
If you observe any physical defects in the items you ordered, contact your sales representative or Cisco
Technical Support.
Installing the CDEs
Installing the CDEs consists of the following tasks:
•
Reviewing Rack Installation Safety Guidelines, page 3-3
•
•
•
Preparing the CDEs for Rack Installation, page 3-3
Making Physical Connections, page 3-37
3-2
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 3 Installing the Content Delivery Engines
Installing the CDEs
Reviewing Rack Installation Safety Guidelines
Before installing the device in a rack, review the following guidelines:
• Equipment is to be installed by a trained service person.
•
•
Equipment is to be installed in a restricted access location.
Handles on the equipment are provided for positioning purpose only, not for lifting the chassis.
•
•
You should follow your own company guidelines and governing regulations for handling heavy equipment.
Two or more people are required to install the device in a rack.
•
•
•
•
•
•
•
•
Do not block any air vents; usually 6 inches (15 cm) of space provides proper airflow.
Plan the device installation starting from the bottom of the rack.
Install the heaviest device in the bottom of the rack.
Do not extend more than one device out of the rack at the same time.
Remove the rack doors and side panels to provide easier access during installation.
Connect the device to a properly grounded outlet.
Do not overload the power outlet when installing multiple devices in the rack.
Do not place any object weighing more than 110 lb (50 kg) on top of rack-mounted devices.
Preparing the CDEs for Rack Installation
The rack must be of the following type:
• A standard 19-in. (48.3-cm) wide, four-post EIA rack, with mounting posts that conform to English universal hole spacing, per section 1 of ANSI/EIA-310-D-1992.
•
•
The rack post holes can be square 0.38-inch (9.6 mm), round 0.28-inch (7.1 mm), #12-24 UNC, or
#10-32 UNC when you use the supplied slide rails.
The minimum vertical rack space per server must be two RUs, equal to 3.5 in. (88.9 mm).
Warning During this procedure, wear grounding wrist straps to avoid ESD damage to the card.
Do not directly touch the backplane with your hand or any metal tool, or you could shock yourself. Statement 94
Replacing External Storage Drives
Caution The CDE205 and CDE220 2G2 models are not hot-swappable, you must power down the CDEs before you replace the disks.
The storage drive names, except fot the Internet Streamer models (CDE205, CDE220 2G2, and CDE200
2S3I), are located in the /proc/cds/cdd/disks directory.
On the CDE250, a red LED is included on a drive to visually locate a device and to identify the state of the device. For devices that have failed or that have been logically removed, the visual indication is also accompanied by an audible alarm.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
3-3
Chapter 3 Installing the Content Delivery Engines
Installing the CDEs
Table 3-1 describes the visual and audible alarm indicators.
Table 3-1 CDE250 Device Indicators
Device State
Located Device
Red LED Visual Indicator
Fast blink—Red LED is displayed every
1/2 seconds.
Logically Removed Device Slow blink—Red LED is displayed every two seconds.
Failed Device Solid on—Red LED is on.
Audible Alarm
None.
Audible when red LED is on.
Continuous.
To locate a device on a CDE250 or identify its state, enter the following command on the Linux console: echo O1 > /proc/cds/cdd/disks/ < device_name>
For example, to identify the location of csd10, enter the following command: echo 0x1 > /proc/cds/cdd/disks/csd10
Reenter the command to remove the visual indicator and audible alarm from the chassis.
On all other CDEs, to see the name of a failed drive, look at the Linux console or the /var/log/messages log file. If the system reports that a storage drive has failed and was abandoned by the system, this device can simply be removed. However, if you are replacing or upgrading a storage drive that has not failed, it is still active and you must first enter the following command on the Linux console at user root: echo csd12> /proc/cds/cdd/remove_device
A few moments later the message “Disk device 12 has been removed from the file system” appears on the console and you can now remove the storage drive from the CDE. Once you insert the new storage drive, you must first enter the following command on the Linux console at user root: echo csd12> /proc/cds/cdd/make_well
A few moments later the message “Found disk device 12” appears on the console.
Perform the following steps to remove a storage drive tray from the chassis:
Step 1
Step 2
Press the release tab on the storage drive tray. This extends the storage drive bay handle (see
Use the handle to pull the storage drive out of the chassis.
Note The illustrations show SATA drives. The procedure for installing SSD drives is identical.
Note
CDE250 storage drives are oriented vertically (see Figure 1-9
), but the removal procedure is the same.
3-4
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 3 Installing the Content Delivery Engines
Figure 3-1 Removing a Storage Drive
Installing the CDEs
1
2
1 Storage drive tray 2 Release tab
The storage drives are mounted in storage drive trays to simplify their installation and removal from the chassis (see
Figure 3-2 ). These trays also help promote proper airflow for the drive bays.
Note If you need to replace a storage drive, be sure to keep the existing storage drive tray, because spare storage drives do not ship with storage drive trays.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
3-5
Installing the CDEs
Figure 3-2 Storage Drive Tray
Chapter 3 Installing the Content Delivery Engines
Step 3 Remove the two screws securing the dummy drive to the drive tray and remove the dummy drive. Place the storage drive tray on a flat surface (see
Figure 3-3 Removing a Storage Drive
Step 4 Slide the storage drive into the storage drive tray with the printed-circuit side facing down (see
).
3-6
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 3 Installing the Content Delivery Engines
Figure 3-4 Installing a Storage Drive into the Storage Drive Tray
2
2
Installing the CDEs
1
1 Storage drive tray 2 Storage drive
Step 5
Step 6
Step 7
Carefully align the mounting holes in both the drive tray and the storage drive.
Secure the storage drive to the tray using six screws (see
).
Replace the drive tray into the chassis. Make sure to close the drive tray handle to lock the drive tray into place (see
).
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
3-7
Installing the CDEs
Figure 3-5 Installing a Storage Drive in the CDE
Chapter 3 Installing the Content Delivery Engines
Replacing a CDE280 Drive
Tip You do not have to shut down or power off the server to replace SAS/SATA hard drives or solid state drives (SSDs) because they are hot-swappable in system level. To activate the new drives in software level, see the Cisco Internet Streamer CDS Software Configuration Guide .
Step 1
Step 2
Remove the drive that you are replacing or remove a blank drive tray from an empty bay: a.
b.
Press the release button on the face of the drive tray. See
Grasp and open the ejector lever and then pull the drive tray out of the slot.
c.
If you are replacing an existing drive, remove the four drive-tray screws that secure the drive to the tray and then lift the drive out of the tray.
Install a new drive: a.
b.
c.
Place a new drive in the empty drive tray and replace the four drive-tray screws.
With the ejector lever on the drive tray open, insert the drive tray into the empty drive bay.
Push the tray into the slot until it touches the backplane, and then close the ejector lever to lock the drive in place.
3-8
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 3 Installing the Content Delivery Engines
Figure 3-6 Replacing CDE280 Drives
Installing the CDEs
1 2
3
3
1 Release button
2 Ejector lever
3
3
3 Drive tray securing screws (four)
—
Replacing a Power Supply
The CDE chassis has a 900-watt, high-efficiency redundant power supply. This power supply is auto-switching capable. This feature enables it to sense and operate automatically at a 100—V to
240—V input voltage.
Note If the chassis includes a redundant power supply (two power supplies), you can leave the CDE running and remove only one power supply. If the CDE has only one power supply, you must power down the
CDE by performing a graceful system shutdown, and then unplugging the power cord.
Perform the following steps to replace the power supply:
Step 1 Turn off the AC/DC power source that is providing power for the failed power supply. Before proceeding, the failed power supply status LED must indicate that power to this power supply is off. See
Figure 3-7 for the location of the status LED.
• If the status LED is off, it indicates no power to all power supplies.
•
•
•
If the status LED is amber, it indicates the CDE is off but there is still power going to the power supply.
If the status LED is green, it indicates that the power supply is operating.
For the 1+1 configuration, if both power supplies are plugged in but only one power supply has source power applied, then the one without the power will have an amber LED lit and an audible alarm will sound.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
3-9
Chapter 3 Installing the Content Delivery Engines
Installing the CDEs
Warning Before performing any of the following procedures, ensure that power is removed from the
AC/DC circuit. Statement 1003
Step 2 Remove all cabling from the power supply. When removing a AC/DC power supply, you must also remove the positive and negative nodes (see
).
Figure 3-7
5
Rear View of the DC Power Supply
1
2
-48V
RTN
DC power source
-48V
RTN
4
3
1 -48V
3 Grounding screws
5 Status LED
2 RTN
4 Grounding wire
Note For additional information on DC power supplies, see the
“If DC Power Supplies Are Installed” section on page 12 .
Note The CDE220 has an additional grounding bracket for grounding both AC and DC power supplies. See the
“Supplemental Grounding Connection” section on page 2-10
for instructions on installing this bracket.
Step 3 Push the release tab on the back of the power supply (see
Figure 3-8 for a CDE205, CDE220 and
for a CDE420).
3-10
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 3 Installing the Content Delivery Engines
Figure 3-8 Power Supply Release Tab on a CDE205, and CDE220,
Installing the CDEs
1
2
1 Power supply
Figure 3-9
2
Power Supply Release Tab on a CDE420
Release tab
1
2
1 Power supply 2 Release tab
Step 4 Pull the power supply out using the handle on the front of the power supply (see
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
3-11
Installing the CDEs
Figure 3-10 Removing a Power Supply from a CDE420
Chapter 3 Installing the Content Delivery Engines
Step 5
Step 6
Replace the power supply with the same model.
Slide the new power supply into the power bay and gently push it until you hear a click.
Note When installing a DC power supply, you must also connect the positive node to the RTN connection and negative node to the -48V connection (see
Step 7 Verify that the new power supply is operational.
Replacing a CDE280 Power Supply
Step 1
Step 2
Remove the power supply that you are replacing or a blank panel from an empty bay: a.
Perform one of the following actions:
– If your server has only one power supply, shut down and power off the server.
b.
c.
– If your server has two power supplies, you do not have to shut down the server.
Remove the power cord from the power supply that you are replacing.
For a DC power supply, release the electrical connector block from the power supply by pushing the orange plastic button on the top of the connector inward toward the power supply. Pull the connector block from the power supply.
Grasp the power supply handle while pinching the green release lever towards the handle.
d.
Pull the power supply out of the bay.
Install a new power supply: a.
b.
Grasp the power supply handle and insert the new power supply into the empty bay.
Push the power supply into the bay until the release lever locks.
c.
Connect the power cord to the new power supply.
For a DC power supply, push the electrical connector block into the power supply.
3-12
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 3 Installing the Content Delivery Engines
Installing the CDEs d.
If you shut down the server, press the Power button to return the server to main power mode.
Device Connection Test in a VDS-TV Environment
It is important to ensure after shipment and drive insertion that all drives are discovered and enumerate properly. After the equipment is installed and the software is properly configured, perform the following test to ensure that the storage drives are properly enumerated.
For VDS-TV Version 3.4.1 or higher, execute ccdm -C on . This action causes the red LED of each drive to turn on, starting with the first drive and progressing to the last drive. After the last drive LED is illuminated, the LEDs turn off, starting with the first and progressing to the last. This pattern continues until the test is turned off by entering ccdm -C off .
For VDS-TV versions prior to Version 3.4.1, this test can be performed by echoing 1 to the
/proc/cds/cdd/identify_dev proc file. for example: echo 1 > /proc/cds/cdd/identify_dev
The test pattern repeats until a 0 is echoed to the proc file.
This test has no effect on normal device operations. We do not recommended, however, that this test be performed while a device currently has its red LED lit because it indicates a status requiring attention
(for example, device error, device logically removed), and the status LED will go off if the connection test is started.
Installing SFPs
SFPs do not come preinstalled, and you must manually insert them into the Ethernet ports.
Note The SFPs are hot swappable on all CDE250s for VQE.
Perform the following steps to install an SFP:
Step 1
Step 2
Step 3
Step 4
Power off the system.
Insert the Intel SFP into the desired 10 Gigabit Ethernet port making sure it is fully seated.
Connect the appropriate cables to the SFP.
Reboot the system, the interface should be visible.
Note On the VDS-IS system, if you insert or remove any of the SFPs, then the system must be rebooted for this change to take effect in the CLI.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
3-13
Chapter 3 Installing the Content Delivery Engines
Installing the CDEs
Rail Kits
First generation CDEs originally shipped with the Rev. A rail kit. This kit required screws to mount the rails to the rack. Replacement CDEs and CDEs shipped with Cisco TV CDS Release 2.4 software or later come with the Rev. B quick release rail kit in short rail or long rail sizes. The dimensions of the rails are as follows:
• Rev. B long rails range from 26.5 to 36.4 inches.
•
•
Rev. B short rails range from 19 to 26 inches.
Rev. A rails only come range from 27 to 34 inches.
Note Retain your original inner rails in case the unit is returned by an RMA.
To install a CDE in a rack using the Rev. A rail kit, see
Installing a CDE205, CDE220, in the Rack Using a Rev. A Rail Kit, page 3-14 or
Installing a CDE420 in the Rack Using a Rev. A Rail Kit, page 3-19 .
To install a CDE in a rack using the Rev. B rail kit, see
Installing a CDE205, CDE220, CDE420, and
CDE460 in the Rack Using a Rev. B Rail Kit, page 3-24
.
To install a CDE in a rack using the rail kit, see
Installing a CDE205, CDE220, CDE420, and CDE460 in the Rack Using a Rev. B Rail Kit, page 3-24
.
Note The slide rails supplied by Cisco Systems for the CDE280 engine does not require tools for installation if you install them in a rack that has square 0.38-inch (9.6 mm), round 0.28-inch (7.1 mm), or #12-24
UNC threaded holes.
Installing a CDE205, CDE220, in the Rack Using a Rev. A Rail Kit
This section provides information on installing the CDE205, CDE220, chassis into a rack using the Rev.
A rail kit. There are a variety of racks on the market, which may mean that the assembly procedures will differ slightly. You should also see the installation instructions that came with the rack you are using.
Note This rail will fit a rack between 26 inches and 33.5 inches in depth.
Identifying the Rev. A Inner Rack Rails
The chassis package includes two rack-rail assemblies in the rack-mounting kit. Each assembly consists of two sections: an inner fixed chassis rail that secures directly to the CDE chassis and an outer fixed rack-rail that secures directly to the rack itself (see
3-14
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 3 Installing the Content Delivery Engines
Figure 3-11 Identifying the Inner Rack Rails
1
Installing the CDEs
2
4 2
1 Inner rail extensions
3 Inner rails
3
2 Rail locking tabs
4 CDE
Locking Tabs
Both chassis rails have a locking tab that locks the CDE into place when it is installed and pushed fully into the rack. These tabs also lock the CDE in place when it is fully extended from the rack. This prevents the CDE from coming completely out of the rack when you pull it out for servicing.
Inner Rail Extension
The inner rails are preattached and do not interfere with normal use of the chassis if you decide not to use a rack. Attach the inner rail extensions to stabilize the chassis within the rack. If you are not using a rack, you do not have to install the inner rail extensions.
Installing the Rev. A Inner Rails
Perform the following steps to install the inner rails:
Step 1 Place the inner rack extensions on the side of the chassis, aligning the hooks of the chassis with the rail extension holes. Make sure the extension faces outward just like the preattached inner rail (see
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
3-15
Installing the CDEs
Figure 3-12 Installing the Inner Rails
Chapter 3 Installing the Content Delivery Engines
Step 2
Step 3
Step 4
Slide the extension toward the front of the chassis.
Secure the chassis with screws.
Repeat
for the other inner rail extension.
Installing the Rev. A Outer Rails to the Rack
Outer rails attach to the rack and hold the CDE in place. The outer rails for the CDE205, CDE220, chassis extend between 30 inches and 33 inches.
Perform the following steps to install the outer rails to the rack:
Step 1 Attach the short bracket to the outside of the long bracket. You must align the pins with the slides. Also, both bracket ends must face the same direction (see
).
3-16
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 3 Installing the Content Delivery Engines
Figure 3-13 Assembling the Outer Rails
3
2
4
Installing the CDEs
1
1 Long bracket end
3 Pins
2 Slides
4 Short bracket end
Step 2
Step 3
Step 4
Adjust both the short and long brackets to the proper distance so that the rail fits snugly into the rack.
Secure the long bracket to the front side of the outer rail with two M5 screws and the short bracket to the rear side of the outer rail with three M5 screws (see
).
through
Step 3 for the other outer rail.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
3-17
Installing the CDEs
Figure 3-14 Installing the Outer Rails to the Rack
Chapter 3 Installing the Content Delivery Engines
1
2
1
FRO
NT
1 M5 screws 2 Outer rails
Installing the Chassis into a Rack
Perform the following steps to install the CDE420, and CDE460 chassis into the rack:
Step 1
Step 2
Step 3
Step 4
Confirm that the chassis includes the inner rails and rail extensions. Also, confirm that the outer rails are installed on the rack (see
Align chassis rails with the front of the rack rails.
Slide the chassis rails into the rack rails, keeping the pressure even on both sides (you may have to depress the locking tabs when inserting the chassis rails). When the CDE has been pushed completely into the rack, you should hear the locking tabs click.
(Optional) Insert and tighten the thumbscrews that hold the front of the CDE to the rack.
3-18
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 3 Installing the Content Delivery Engines
Figure 3-15 Installing the Chassis in the Rack
Installing the CDEs
3
2
1
1 Locking tabs
3 Rack rails
2 Chassis rails
Installing a CDE285
For details about installing the CDE285 chassis into a rack, see Cisco UCS C240 M4 Server Installation and Service Guide .
Replacing CDE285
For details about replacing the CDE285, see Cisco UCS C240 M4 Server Installation and Service Guide.
Installing a CDE420 in the Rack Using a Rev. A Rail Kit
This section provides information on installing the CDE420 chassis into a rack with the Rev. A rails kit.
There are a variety of racks on the market, which may mean that the assembly procedure will differ slightly. You should also refer to the installation instructions that came with the rack you are using.
Note This rail will fit a rack between 26 inches and 33.5 inches in depth.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
3-19
Chapter 3 Installing the Content Delivery Engines
Installing the CDEs
Identifying the Rev. A Inner Rails
The chassis package includes a rack-rail assembly in the rack-mounting kit. Each assembly consists of an inner rail that secures to the chassis and an outer rail that is attached directly to the rack (see
).
Figure 3-16 Identifying the Rev. A Inner Rails
1
2
1 Inner rail assemblies 2 CDE
Installing the Rev. A Inner Rails
Perform the following steps to install the inner rails:
Step 1
Step 2
Step 3
Step 4
Place the inner rails on the side of the chassis, aligning the hooks of the chassis with the inner rail holes.
Make sure the rail faces outward so that it will fit with the rack-mounting bracket (see
Slide the rail toward the front of the chassis.
Secure the chassis with four screws.
Repeat
for the other inner rail.
3-20
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 3 Installing the Content Delivery Engines
Figure 3-17 Installing the Inner Rails
2
Installing the CDEs
1
2 Inner rails 1 Chassis hooks
Installing the Rev. A Outer Rails to the Rack
Outer rails attach to the rack and hold the CDE in place. The outer rails for the CDE205, CDE220, chassis extend between 30 inches and 33 inches.
Perform the following steps to install the outer rails to the rack:
Step 1 Attach the short bracket to the outside of the long bracket. You must align the pins with the slides. Also, both bracket ends must face the same direction (see
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
3-21
Installing the CDEs
Figure 3-18 Assembling the Outer Rails
3
Chapter 3 Installing the Content Delivery Engines
4
2
1
1 Long bracket end
3 Pins
2 Slides
4 Short bracket end
Step 2
Step 3
Step 4
Adjust both the short and long brackets to the proper distance so that the rail fits snugly into the rack.
Secure the long bracket to the front side of the outer rail with two M5 screws and the short bracket to the rear side of the outer rail with three M5 screws (see
Repeat
for the other outer rail.
3-22
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 3 Installing the Content Delivery Engines
Figure 3-19 Attaching the Outer Rails to the Rack
1
Installing the CDEs
2
1
FRO
NT
1 M5 screws 2 Outer rails
Installing the Chassis into a Rack
Perform the following steps to install the CDE420, and CDE460 chassis in the rack:
Step 1
Step 2
Step 3
Step 4
Confirm that the chassis includes the inner rails and rail extensions. Also, confirm that the outer rails are installed on the rack (see
Align the chassis rails with the front of the rack rails.
Slide the chassis rails into the rack rails, keeping the pressure even on both sides (you may have to depress the locking tabs when inserting the chassis rails). When the CDE has been pushed completely into the rack, you should hear the locking tabs click.
(Optional) Insert and tighten the thumbscrews that hold the front of the CDE to the rack.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
3-23
Installing the CDEs
Figure 3-20 Installing the Chassis in the Rack
Chapter 3 Installing the Content Delivery Engines
2
1 Chassis rails
1
FRO
NT
2 Rack rails
Installing a CDE205, CDE220, CDE420, and CDE460 in the Rack Using a Rev. B Rail Kit
Note the following before beginning the installation procedure:
• The Rev. B rail kit must be used in its entirety. Remove all previous Rev. A rail kit components from the rack completely before you install the new rails. Do not mix and match any components from
Rev. A and Rev. B rail kits.
•
•
The Rev. B rail kit comes in two sizes. The long range rail kit ships with all CDEs and the short range rail kit can be ordered from Cisco.
Depending on rack depth, if the accompanying (long) rail kit is too long for the rack, obtain the shorter rail kit from Cisco if not already supplied (Cisco p/n CDE3-RCK-EIA19=).
Installing the Rev. B Inner Rails
Step 1 Pull the inner rail out of the outer rail until it is fully extended.
3-24
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 3 Installing the Content Delivery Engines
Figure 3-21 Identifying the Rev. B Rails
3
2
Installing the CDEs
1
1 Inner rail assembly
3 Outer rail assembly
2 Middle rail assembly
Step 2 Press the locking tab down to release the inner rail and remove it from the rail assembly.
Figure 3-22 Releasing the Rev. B Inner Rails
Step 3 Place the inner rails on the side of the chassis, aligning the hooks of the chassis with the inner rail so that it snaps securely. Make sure that the rail faces outward so that it fits with the rack-mounting bracket
(see arrow number 1).
Slide the inner rail forward until it clicks into the locked position (see arrow number 2).
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
3-25
Installing the CDEs
Figure 3-23
3
Attaching the Rev. B Rails to the CDE
2
1
Chapter 3 Installing the Content Delivery Engines
2
1
2
1 CDE
3 Screws
2 Rail assemblies
Step 4
Step 5
Secure the inner rails with screws (optional).
Press the locking tab and push the middle rail back into the outer rail.
3
3-26
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 3 Installing the Content Delivery Engines
Figure 3-24 Locking the Rev. B Rails
1
Installing the CDEs
2
3
1 Outer rail assembly
3 Locking tab
2 Middle rail assembly
Step 6 Hang the hooks of the rails on the rack holes and press down so they are completely seated. If necessary, secure the rails with screws.
Attaching the Rev. B Rack Rails to the Rack Figure 3-25
1
2
3
1
2
1 Rack
3 Screws
2 Rail hooks
Step 7
to mount the four ends, extending the rails as necessary.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
3-27
Installing the CDEs
Figure 3-26 Extending the Rev. B Rails
2
1
Chapter 3 Installing the Content Delivery Engines
1 Outer rail assembly 2 Middle rail assembly
Step 8 Pull the middle rail out of the front of the outer rail and make sure the ball bearing shuttle is locked at the front of the middle rail. Align the inner rail with the middle rail and then push evenly on both sides of the chassis until it clicks into the fully extended position.
3-28
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 3 Installing the Content Delivery Engines
Figure 3-27 Attaching the Inner Rails to the Middle and Outer Rails
Installing the CDEs
4
3
2
1
1 Outer rail assembly
3 Middle rail assembly
2 Inner rail assembly
4 Ball bearing shuttle
Step 9
Step 10
Depress the locking tabs on both sides of the chassis simultaneously and push the chassis all the way into the rear of the rack.
If additional security is required, secure the chassis handles to the front of the rack with two screws
(optional).
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
3-29
Installing the CDEs
Figure 3-28 Securing the CDE in the Rack
1
2
Chapter 3 Installing the Content Delivery Engines
2
1 Rack 2 Screws
Installing a CDE280 in the Rack Using a Rail Kit
This chapter describes how to install the server, and it includes the following sections:
•
•
•
Unpacking and Inspecting the Server, page 3-31
Preparing for Server Installation, page 3-31
Installing the Server In a Rack, page 3-33
Note Before you install, operate, or service a server, review the Regulatory Compliance and Safety
Information for the Cisco Content Delivery Engines for important safety information.
Warning IMPORTANT SAFETY INSTRUCTIONS
This warning symbol means danger. You are in a situation that could cause bodily injury. Before you work on any equipment, be aware of the hazards involved with electrical circuitry and be familiar with standard practices for preventing accidents. Use the statement number provided at the end of each warning to locate its translation in the translated safety warnings that accompanied this device.
Statement 1071
3-30
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 3 Installing the Content Delivery Engines
Unpacking and Inspecting the Server
Unpacking and Inspecting the Server
Caution When handling internal server components, wear an ESD strap and handle modules by the carrier edges only.
Tip Keep the shipping container in case the server requires shipping in the future.
Note The chassis is thoroughly inspected before shipment. If any damage occurred during transportation or any items are missing, contact your customer service representative immediately.
Step 1
Step 2
Step 3
Remove the server from its cardboard container and save all packaging material.
Compare the shipment to the equipment list provided by your customer service representative. Verify that you have all items.
Check for damage and report any discrepancies or damage to your customer service representative. Have the following information ready:
• Invoice number of shipper (see the packing slip)
•
•
•
Model and serial number of the damaged unit
Description of damage
Effect of damage on the installation
Preparing for Server Installation
This section provides information about preparing for server installation, and it includes the following topics:
•
Installation Guidelines, page 3-31
•
•
•
Equipment Requirements, page 3-33
Slide Rail Adjustment Range, page 3-33
Installation Guidelines
Warning To prevent the system from overheating, do not operate it in an area that exceeds the maximum recommended ambient temperature of: 35° C (95° F).
Statement 1047
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
3-31
Chapter 3 Installing the Content Delivery Engines
Preparing for Server Installation
Warning The plug-socket combination must be accessible at all times, because it serves as the main disconnecting device.
Statement 1019
Warning This product relies on the building’s installation for short-circuit (overcurrent) protection.
Ensure that the protective device is rated not greater than: 250 V, 15 A.
Statement 1005
Warning Installation of the equipment must comply with local and national electrical codes.
Statement 1074
Caution To ensure proper airflow it is necessary to rack the servers using rail kits. Physically placing the units on top of one another or “stacking” without the use of the rail kits blocks the air vents on top of the servers, which could result in overheating, higher fan speeds, and higher power consumption. We recommend that you mount your servers on rail kits when you are installing them into the rack because these rails provide the minimal spacing required between the servers. No additional spacing between the servers is required when you mount the units using rail kits.
Caution Avoid UPS types that use ferroresonant technology. These UPS types can become unstable with systems such as the Cisco UCS, which can have substantial current draw fluctuations from fluctuating data traffic patterns.
When you are installing a server, use the following guidelines:
• Plan your site configuration and prepare the site before installing the server. See the Cisco UCS Site
Preparation Guide for the recommended site planning tasks.
•
•
Ensure that there is adequate space around the server to allow for servicing the server and for adequate airflow. The airflow in this server is from front to back.
Ensure that the air-conditioning meets the thermal requirements listed in the
.
•
•
Ensure that the cabinet or rack meets the requirements listed in the
“Rack Requirements” section on page 3-32 .
Ensure that the site power meets the power requirements listed in the
CDE280 Specifications, page A-3
. If available, you can use an uninterruptible power supply (UPS) to protect against power failures.
Rack Requirements
This section provides the requirements for the standard open racks.
The rack must be of the following type:
• A standard 19-in. (48.3-cm) wide, four-post EIA rack, with mounting posts that conform to English universal hole spacing, per section 1 of ANSI/EIA-310-D-1992.
3-32
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 3 Installing the Content Delivery Engines
Installing the Server In a Rack
•
•
The rack post holes can be square 0.38-inch (9.6 mm), round 0.28-inch (7.1 mm), #12-24 UNC, or
#10-32 UNC when you use the supplied slide rails.
The minimum vertical rack space per server must be two RUs, equal to 3.5 in. (88.9 mm).
Equipment Requirements
The slide rails supplied by Cisco Systems for this server do not require tools for installation if you install them in a rack that has square 0.38-inch (9.6 mm), round 0.28-inch (7.1 mm), or #12-24 UNC threaded holes.
Slide Rail Adjustment Range
The slide rails for this server have an adjustment range of 26 to 36 inches (660 to 914 mm).
Installing the Server In a Rack
This section contains the following sections:
•
Installing the Slide Rails, page 3-33
•
•
Installing the Cable Management Arm (Optional), page 3-35
Reversing the Cable Management Arm (Optional), page 3-37
Installing the Slide Rails
This section describes how to install the server in a rack using the rack kits that are sold by Cisco.
Warning To prevent bodily injury when mounting or servicing this unit in a rack, you must take special precautions to ensure that the system remains stable. The following guidelines are provided to ensure your safety:
This unit should be mounted at the bottom of the rack if it is the only unit in the rack.
When mounting this unit in a partially filled rack, load the rack from the bottom to the top with the heaviest component at the bottom of the rack.
If the rack is provided with stabilizing devices, install the stabilizers before mounting or servicing the unit in the rack. Statement 1006
Step 1 Attach the inner rails to the sides of the server: a.
b.
c.
Align an inner rail with one side of the server so that the three keyed slots in the rail align with the
three pegs on the side of the server (see Figure 3-29
).
Set the keyed slots over the pegs, and then slide the rail toward the front to lock it in place on the pegs. The front slot has a metal clip that locks over the front peg.
Install the second inner rail to the opposite side of the server.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
3-33
Installing the Server In a Rack
Figure 3-29 Attaching Inner Rail to Side of Server
Chapter 3 Installing the Content Delivery Engines
1
1 Front of server
2
2 Locking clip on inner rail
Step 2 Open the front securing plate on both slide-rail assemblies. The front end of the slide-rail assembly has a spring-loaded securing plate that must be open before you can insert the mounting pegs into the
rack-post holes (see Figure 3-30
).
On the outside of the assembly, push the green arrow button toward the rear to open the securing plate.
Figure 3-30 Front Securing Mechanism, Inside of Front End
2
1
3-34
3
1 Front mounting pegs
2 Rack post
3 Securing plate shown pulled back to open position
Step 3 Install the slide rails into the rack: a.
Align one slide-rail assembly front end with the front rack-post holes that you want to use.
The slide rail front-end wraps around the outside of the rack post and the mounting pegs enter the rack-post holes from the outside-front (see
).
Note The rack post must be between the mounting pegs and the open securing plate.
b.
Push the mounting pegs into the rack-post holes from the outside-front.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 3 Installing the Content Delivery Engines
Installing the Server In a Rack
Step 4 c.
d.
Press the securing plate release button, marked “PUSH.” The spring-loaded securing plate closes to lock the pegs in place.
Adjust the slide-rail length, and then push the rear mounting pegs into the corresponding rear rack-post holes. The slide rail must be level front-to-rear.
The rear mounting pegs enter the rear rack-post holes from the inside of the rack post.
e.
f.
Attach the second slide-rail assembly to the opposite side of the rack. Ensure that the two slide-rail assemblies are at the same height with each other and are level front-to-back.
Pull the inner slide rails on each assembly out toward the rack front until they hit the internal stops and lock in place.
Insert the server into the slide rails:
Caution This server can weigh up to 67 pounds (59 kilograms) when fully loaded with components. We recommend that you use a minimum of two people or a mechanical lift when lifting the server.
Attempting this procedure alone could result in personal injury or equipment damage.
b.
c.
a.
Align the rear of the inner rails that are attached to the server sides with the front ends of the empty slide rails on the rack.
Push the inner rails into the slide rails on the rack until they stop at the internal stops.
Slide the release clip toward the rear on both inner rails ( Figure 3-31
), and then continue pushing the server into the rack until its front slam latches engage with the rack posts.
Figure 3-31 Inner Rail Release Clip
1
1 Inner rail release clip
2 Inner rail attached to server
2 3
3 Outer rail attached to rack post
Step 5 (Optional) Secure the server in the rack more permanently by using the two screws that are provided with the slide rails. Perform this step if you plan to move the rack with servers installed.
With the server fully pushed into the slide rails, open a hinged slam latch lever on the front of the server and insert the screw through the hole that is under the lever. The screw threads into the static part of the rail on the rack post and prevents the server from being pulled out. Repeat for the opposite slam latch.
Installing the Cable Management Arm (Optional)
Note The CMA is reversible left to right. To reverse the CMA, see
Reversing the Cable Management
before installation.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
3-35
Chapter 3 Installing the Content Delivery Engines
Installing the Server In a Rack
Step 1
Step 2
Step 3
Step 4
Step 5
With the server pushed fully into the rack, slide the CMA tab of the CMA arm that is farthest from the server onto the end of the stationary slide rail that is attached to the rack post (see
the tab over the end of the rail until it clicks and locks.
Slide the CMA tab that is closest to the server over the end of the inner rail that is attached to the server
(see
). Slide the tab over the end of the rail until it clicks and locks.
Pull out the width-adjustment slider that is at the opposite end of the CMA assembly until it matches the
width of your rack (see Figure 3-32
).
Slide the CMA tab that is at the end of the width-adjustment slider onto the end of the stationary slide rail that is attached to the rack post (see
). Slide the tab over the end of the rail until it clicks and locks.
Open the hinged flap at the top of each plastic cable guide and route your cables through the cable guides as desired.
Figure 3-32 Attaching the Cable Management Arm to the Rear of the Slide Rails
3
1
2
4
1 CMA tab on arm farthest from server and end of stationary outer slide rail
2 CMA tab on arm closest to the server and end of inner slide rail attached to server
3 CMA tab on width-adjustment slider and end of stationary outer slide rail
4 Rear of server
3-36
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 3 Installing the Content Delivery Engines
Installing the Server In a Rack
Reversing the Cable Management Arm (Optional)
Step 1
Step 2
Step 3
Rotate the entire CMA assembly 180 degrees. The plastic cable guides must remain pointing upward.
Flip the tabs at the end of each CMA arm so that they point toward the rear of the server.
Pivot the tab that is at the end of the width-adjustment slider. Depress and hold the metal button on the outside of the tab and pivot the tab 180 degrees so that it points toward the rear of the server.
Figure 3-33 Reversing the CMA
2 1
1 CMA tab on end of width-adjustment slider 2 Metal button for rotating
Making Physical Connections
After mounting the CDEs, continue the hardware setup by making the physical power and network connections.
Caution The unit is intended for indoor use and is provided with numerous standard USB and Ethernet ports. This product is not intended to be directly connected to the Telecommunication Network System. Additional regulatory compliance and legal requirements may apply for direct connection to the Telecommunication
Network System. This product may connect to the Telecommunication Network System only through a device that is approved for direct connection.
Caution Once the product installation is complete, all I/O cables, except those installed in the Ethernet ports, must be disconnected from the CDE to maintain EMC compliance. Any other cable connections are temporary and are used only to initialize the system. All PS/2 keyboard, PS/2 mouse, USB interface, serial console interface, and VGA interface cables must be disconnected from the CDE’s front and rear
I/O ports.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
3-37
Chapter 3 Installing the Content Delivery Engines
Installing the Server In a Rack
Connecting Power Cords
Redundant power connectors are located at the rear of the chassis as shown in
and
Figure 1-12 on page 1-13 . Power connections have the following properties:
• Chassis power inlets accept 120 VAC or 220 VAC or –48 VDC power supplies.
• The CDE205, CDE220chassis contain two VAC or VDC power ports contain three VAC or VDC power ports.
Caution Although CDEs accept both AC and DC power modules, the system does not allow mixing of AC and
DC power modules in one system.
Do not apply AC power to DC power modules.
Server Types
Both VDS-IS and VDS-TV consist of servers (CDEs) that are connected through Ethernet switches. The
Intel Xeon-based servers are populated with multiple high-capacity storage drives.
There are three distinct server types in VDS-IS:
• Content Delivery System Manager (CDSM)—CDE205
•
•
Service Engine (SE)—CDE205, CDE220, CDE250 or CDE280
Service Router (SR)—CDE205 or CDE220
Depending on your application, you may have multiple SEs and SRs. A network switch is employed to link multiple servers together within a larger network.
There are six distinct server types in VDS-TV:
•
•
Management Server (CDSM & VVIM)—CDE110
TV Streamer—CDE220 (models 2C1, 2C2, 2S3) and CDE250 (models 2S5, 2S6, 2S8, 2S9, 2S10,
2S11)
•
•
•
•
TV Vault—CDE420 (model 4A) and CDE250 (2A4)
TV Cache Node—CDE420 (model 4G) and CDE250 (2G3)
Integrated Streamer Vault (ISV) or Playout Server—CDE220 (model 2D1)
TV Recorder—CDE460 (model 4R1)
Depending on your application, you may have multiple Streamers and Vaults. A network switch is employed to link multiple servers together within a larger network.
Connecting Network Cables
Using the topology prescribed for the application, attach network cables to the network interfaces on the
CDEs at the maximum rated speed (see
).
Note If you are using a TenGigabit network interface, you must use the Intel Transceiver Twinax cable.
3-38
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 3 Installing the Content Delivery Engines
Installing the Server In a Rack
Note Once the CDEs are powered up, a Cisco technician will initially configure the CDEs to communicate properly. Further configuration is accomplished through the CDSM. See the Cisco Internet Streamer
CDS Software Configuration Guide for more information.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
3-39
Installing the Server In a Rack
Chapter 3 Installing the Content Delivery Engines
3-40
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
C H A P T E R
4
Installing the VDS Internet Streamer
Software and Initially Configuring a CDE
This chapter describes the initial installation of the Cisco VDS Internet Streamer Release 3.x, and 4.x software application suite, and the initial configuration of a CDE.
•
•
Launching a New CDE for the First Time, page 4-1
Re manufacturing a CDE, page 4-14
If you received a new CDE 205/220/250/420/460/475 go to the
“Launching a New CDE for the First
.
If you received a new CDE280, go to the
“Launching a CDE280 for the First Time” section on page 4-3 .
If you need to re manufacture a CDE for any reason, go to the
“Re manufacturing a CDE” section on page 4-14
, and then go to
“Launching a New CDE for the First Time” section on page 4-1
.
If you need to upgrade or downgrade the software version of a VDS-IS system running on a CDE, see the “ Software Upgrade ” section in the Cisco Internet Streamer CDS Software Configuration Guide .
Note For the procedure on installing VQE software on the CDE250 2V0, see the “Installing VQE Release 3.6
Software” section of the Release Notes for Cisco CDA Visual Quality Experience Application, Release
3.6
.
Launching a New CDE for the First Time
When you receive a new CDE, the VDS-IS software is preloaded and the initial configuration is complete. Perform the following steps to launch your VDS-IS for the first time:
To launch a CDE280 for the first time, see
“Launching a CDE280 for the First Time” section on page 4-3
.
Step 1
Step 2
Step 3
Connect the cables to the CDE (see the
“Making Physical Connections” section on page 3-37
).
Power up the CDE.
Connect a terminal server serial port to the console to run the setup utility.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
4-1
Launching a New CDE for the First Time
Chapter 4 Installing the VDS Internet Streamer Software and Initially Configuring a CDE
Note Release 2.6.1 and later releases of the Cisco VDS-IS (formerly CDS) software support both serial console connections and local monitor connections for the rescue CD. When you boot a
VDS-IS device from the rescue CD-ROM, you are prompted to select 0 for serial console or 1 for local monitor. Serial console is the default and if no entry is made, the serial console is used.
Step 4
Step 5
Enter the following commands to assign a primary interface:
CDE# configure
CDE(config)# primary-interface GigabitEthernet 1/0
The CDE must be configured with a primary interface. Any interface in the CDE can be configured as the primary interface.
Run the setup utility to configure the network settings and register the CDEs with the CDSM.
CDE# setup
CDE#
What is the mode of the device (SE/SR/CDSM) [SE]: SE
Is this SE going to be managed by a CDSM (Content Delivery System Manager) (y/n) [y]: y
Press the ESC key at any time to quit this session
Please choose an interface to configure from the following list:
1: GigabitEthernet 1/0
2: GigabitEthernet 2/0
3: GigabitEthernet 3/0
4: GigabitEthernet 4/0
5: GigabitEthernet 5/0
6: GigabitEthernet 6/0
7: GigabitEthernet 7/0
8: GigabitEthernet 8/0
9: GigabitEthernet 9/0
10: GigabitEthernet 10/0
Enter choice: 1
Please enter the IP address of this interface: XXX.XXX.XXX.XXX
Please enter the netmask of this interface: XXX.XXX.XXX.XXX
Please enter the default gateway: XX.X.X.X
Please enter the domain name server ip: XXX.XX.X.X
Please enter the domain name: cisco.com
Please enter the hostname: ST2-CDE220-2
Please enter CDSM (Content Delivery System Manager) IP or Host name: XXX.XXX.XXX.X
Press any key to continue
CDE# configure
CDE(config)# cms enable
This process initiates database services on the device that you just configured. If you want to configure a port channel, use the CLI. See Configuring a Port Channel in the Cisco Internet Streamer CDS
Software Configuration Guide .
Note Once the IP default gateway has been set, we recommend you ping the outside network to verify that it is reachable, and then verify that the CDSM is reachable.
Step 6 After you have run the setup utility on each SE or SR, they register with the CDSM. Save the configuration by entering the following command: copy running-config startup-config
4-2
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 4 Installing the VDS Internet Streamer Software and Initially Configuring a CDE
Launching a New CDE for the First Time
Launching a CDE280 for the First Time
For CDE280, you can use the CIMC to manage your device. To use the CIMC, you have to configure it.
This section describes the following tasks:
•
•
Configure the CIMC IP, page 4-3
Configure Remote Presence, page 4-5
•
•
•
Connect to the Console, page 4-7
Configure VDS-IS Software, page 4-7
Configure the CIMC IP
Note This section describes how to configure the CIMC. It is strongly recommended that you leave this connection as a permanent connection. There should be a permanent IP address and a cable permanently connected to switch/router associated with this connection. The CIMC will benefit monitoring, general troubleshooting and troubleshooting system alarms of this system.
Step 1 Attach an Ethernet cable to the Management port of the CDE280 and also attach a monitor to the CDE
280. The Management port is labeled M . See
to find the port.
Figure 4-1 Attaching the Ethernet Cable
Step 2
Step 3
Power on the server and press F8 when the CIMC configuration screen appears.
Configure the device with the options shown below: a.
b.
c.
Enter your IP, subnet mask and gateway addresses.
Press the Space Bar to apply the new IP configuration.
Press F10 to save the configuration and press <esc> to exit
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
4-3
Chapter 4 Installing the VDS Internet Streamer Software and Initially Configuring a CDE
Launching a New CDE for the First Time
Figure 4-2 Configuring the CIMC IP
Note When configuring CIMC, pay close attention to the 'NIC Mode' and 'NIC Redundancy' settings. If these are set incorrectly, CIMC configures itself to use network ports other than the dedicated CIMC port causing issues.
We recommend that you set the NIC mode to Dedicated and the NIC redundancy to None .
Step 4
Step 5
Step 6
Ping the IP address associated with the CIMC port.
After verifying the CIMC interface is reachable, verify that the CIMC Web Interface is available by pointing your Web-browser to its IP address: https://<CIMC IP>
Enter admin as the username and the default password as password .
4-4
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 4 Installing the VDS Internet Streamer Software and Initially Configuring a CDE
Figure 4-3 CIMC Main Webpage
Launching a New CDE for the First Time
Configure Remote Presence
Step 7
To get access to the serial port of CDE280, you have to configure the settings:
Select Remote Presence from the left pane: a.
b.
Select Virtual KVM and check the Enabled check box.
Set Max Sessions to 4.
c.
d.
Set Remote Port to 2068.
Click Save Changes .
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
4-5
Chapter 4 Installing the VDS Internet Streamer Software and Initially Configuring a CDE
Launching a New CDE for the First Time
Figure 4-4 Configuring Remote Presence - Virtual KVM
Step 8 Select Virtual Media: a.
b.
Check the Enabled check box.
Click Save Changes .
Figure 4-5 Configuring Remote Presence - Virtual Media
4-6
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 4 Installing the VDS Internet Streamer Software and Initially Configuring a CDE
Step 9 Select Serial Over LAN: a.
b.
Check the Enabled check box.
Select the Baud Rate value of 115.2kbps.
c.
d.
Select com port com0.
Click Save changes .
Figure 4-6 Configuring Remote Presence - Serial Over LAN
Launching a New CDE for the First Time
Connect to the Console
Step 10 Enter the IP address of the server with admin as the username and then the password (same as CIMC login webpage, default password as password ):
You have to use a ssh client or a ssh terminal software to access CIMC IP address.
user1$ ssh -l admin 10.140.104.17
[email protected]'s password: XXXXX
C240-FCH1852V20Y#
Step 11 Enter the following command:
C240-FCH1852V20Y# connect host
Configure VDS-IS Software
Step 12 Enter the following commands to assign a primary interface:
CDE# configure
CDE(config)# primary-interface GigabitEthernet 1/0
Step 13
The CDE must be configured with a primary interface. Any interface in the CDE can be configured as the primary interface.
Run the setup utility to configure the network settings and register the CDEs with the CDSM.
Here is the current profile of this device
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
4-7
Chapter 4 Installing the VDS Internet Streamer Software and Initially Configuring a CDE
Launching a New CDE for the First Time
Device Mode : SE
CDN device : Yes
Do you want to change this (y/n) [n]: n
Is this SE going to be managed by a
CDSM (Content Delivery System Manager) (y/n) [y]: y
Please choose an interface to configure from the following list:
1: GigabitEthernet 1/0
2: GigabitEthernet 1/1
3: TenGigabitEthernet 1/0
4: TenGigabitEthernet 1/1
5: TenGigabitEthernet 2/0
6: TenGigabitEthernet 2/1
7: TenGigabitEthernet 3/0
8: TenGigabitEthernet 3/1
9: TenGigabitEthernet 4/0
10: TenGigabitEthernet 4/1
Enter choice: 1
Please enter the IP address of this interface: XXX.XXX.XXX.XXX
Please enter the netmask of this interface: XXX.XXX.XXX.XXX
Please enter the default gateway: XX.X.X.X
Please enter the domain name server ip: XXX.XX.X.X
Please enter the domain name: cisco.com
Please enter the hostname: ST2-CDE280-2
Please enter CDSM (Content Delivery System Manager) IP or Host name: XXX.XXX.XXX.X
…
CDE# configure CDE(config)
This process initiates database services on the device that you just configured. If you want to configure a port channel, use the CLI. See Configuring a Port Channel in the Cisco Internet Streamer CDS
Software Configuration Guide .
Note Once the IP default gateway has been set, we recommend you ping the outside network to verify that it is reachable, and then verify that the CDSM is reachable.
Step 14 After you have run the setup utility on each SE or SR, they register with the CDSM. Save the configuration by entering the following command: copy running-config startup-config
Configuring SNMP
SNMP
CDE280 Engine supports Simple Network Management Protocol (SNMP) for viewing server configuration, status, sending fault and alert information by SNMP traps. However, configuring SNMP is optional.
Configuring SNMP Properties
Before You Begin
You must log in as a user with admin privileges to perform this task.
4-8
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 4 Installing the VDS Internet Streamer Software and Initially Configuring a CDE
Launching a New CDE for the First Time
Procedure
Step 1
Step 2
Step 3
Step 4
Step 5
Log into CIMC GUI.
For more information on setting up the CIMC, and logging on to the CIMC, see the
Launching a CDE280 for the First Time
.
In the Navigation pane, click the Admin tab.
On the Admin tab, click Communications Services .
In the Communications Services pane, click the SNMP tab.
In the SNMP Properties area, update the following properties:
Table 4-1 Fields to be updated to configure SNMP
Name
SNMP Enabled check box
SNMP Port field
Access Community String
SNMP Community Access
field
drop-down list
Description
Whether this server sends SNMP traps to the designated host.
Note After you check this check box, you need to click Save Changes before you can configure SNMP users or traps.
The port on which Cisco IMC SNMP agent runs.
Enter an SNMP port number within the range 1 to
65535. The default port number is 161.
Note The port numbers that are reserved for system calls, such as
22,23,80,123,443,623,389,636,3268,326
9 and 2068, cannot be used as an SNMP port.
The default SNMP v1 or v2c community name
Cisco IMC includes on any SNMP get operations.
Enter a string up to 18 characters.
This can be one of the following:
– Disabled — This option blocks access to the information in the inventory tables.
Note
–
–
Limited — This option provides partial access to read the information in the inventory tables.
Full — This option provides full access to read the information in the inventory tables.
This is only for SNMP v2c users.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
4-9
Chapter 4 Installing the VDS Internet Streamer Software and Initially Configuring a CDE
Launching a New CDE for the First Time
Table 4-1 Fields to be updated to configure SNMP
Name
Trap Community String field
System Contact field
System Location field
Description
The name of the SNMP community group used for sending SNMP trap to other devices.
Enter a string up to 18 characters.
Note This is only for SNMP v2c users.
The system contact person responsible for the
SNMP implementation.
Enter a string up to 64 characters, such as an email address or a name and telephone number.
The location of the host on which the SNMP agent
(server) runs.
Enter a string up to 64 characters.
Step 6 Click Save Changes .
What to do next
Configure SNMP trap settings as described in
Configuring SNMP Trap Settings
.
Configuring SNMP Trap Settings
Before You Begin
You must log in as a user with admin privileges to perform this task.
Procedure
Step 1
Step 2
Step 3
Step 4
Step 5
In the Navigation pane, click the Admin tab.
On the Admin tab, click Communications Services .
In the Communications Services pane, click the SNMP tab.
Click on Trap Destinations tab.
In the Trap Destinations area, you can perform one of the following:
•
•
Select an existing user from the table and click Modify .
Click Add to create a new user.
Note If the fields are not highlighted, select Enabled .
Step 6 In the Trap Details dialog box, complete the following fields:
4-10
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 4 Installing the VDS Internet Streamer Software and Initially Configuring a CDE
Launching a New CDE for the First Time
Table 4-2
Name
ID field
Enabled
Version
check box
drop-down list
Trap Type
User
Port
Fields to be updated in the Trap Details dialog box
radio button
drop-down list
Trap Destination Address
Description
The trap destination ID. This value cannot be modified.
If checked, then this trap is active on the server.
The SNMP version and model used for the trap.
This can be one of the following:
•
•
V2
V3
The type of trap to send. This can be one of the following:
•
•
Trap : If this option is chosen, the trap will be sent to the destination but you do not receive any notifications.
Inform : You can choose this option only for
V2 users. If chosen, you will receive a notification when a trap is received at the destination.
The drop-down list displays all available users, select a user from the list.
Address to which the SNMP trap information is sent. You can set an IPv4 or IPv6 address or a domain name as the trap destination.
The port the server uses to communicate with the trap destination.
Enter a trap destination port number within the range 1 to 65535.
Step 7
Step 8
Click Save Changes .
If you want to delete a trap destination, select the row and click Delete .
Click OK in the delete confirmation prompt.
Sending a Test SNMP Trap Message
Before You Begin
You must log in as a user with admin privileges to perform this task.
Procedure
Step 1
Step 2
Step 3
In the Navigation pane, click the Admin tab.
On the Admin tab, click Communications Services .
Click the SNMP tab, and then click on the Trap Destinations tab.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
4-11
Chapter 4 Installing the VDS Internet Streamer Software and Initially Configuring a CDE
Launching a New CDE for the First Time
Step 4
Step 5
In the Trap Destinations area, select the row of the desired SNMP trap destination.
Click Send SNMP Test Trap .
An SNMP test trap message is sent to the trap destination.
Note The trap must be configured and enabled in order to send a test message.
Managing SNMPv3 Users
Before You Begin, check the following
• You must log in as a user with admin privileges to perform this task.
• SNMP must be enabled.
Procedure
Step 1
Step 2
Step 3
Step 4
In the Navigation pane, click the Admin tab.
On the Admin tab, click Communications Services .
In the Communications Services pane, click the SNMP tab.
In the SNMPV3 Users area, update the following properties:
Table 4-3
Name
Add button
SNMPV3 Users Properties
Modify button
Delete button
ID column
Name column
Auth Type column
Privacy Type column
Step 5 Click Save Changes .
Description
Click an available row in the table then click this button to add a new SNMP user.
Select the user you want to change in the table then click this button to modify the selected
SNMP user.
Select the user you want to delete in the table then click this button to delete the selected SNMP user.
The system-assigned identifier for the SNMP user.
The SNMP user name.
The user authentication type.
The user privacy type.
Configuring SNMPv3 Users
Before You Begin, check the following:
• You must log in as a user with admin privileges to perform this task.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
4-12
Chapter 4 Installing the VDS Internet Streamer Software and Initially Configuring a CDE
Launching a New CDE for the First Time
• SNMP must be enabled.
Procedure
Step 1
Step 2
Step 3
Step 4
Step 5
In the Navigation pane, click the Admin tab.
On the Admin tab, click Communications Services .
In the Communications Services pane, click the SNMP tab.
In the Users area, perform one of the following actions:
•
•
Select an existing user from the table and click Modify .
Select a row in the Users area and click Add to create a new user.
In the SNMP User Details dialog box, update the following properties:
Table 4-4
Name
ID field
Name field
Security Level
Auth Type
SNMP User Details that need to be updated
drop-down list
radio button
Auth Password field
Confirm Auth Password field
Description
The unique identifier for the user. This field cannot be changed.
The SNMP username.
Enter between 1 and 31 characters or spaces.
Note Cisco IMC automatically trims leading or trailing spaces.
The security level for this user. This can be one of the following:
•
• no auth, no priv —The user does not require an authorization or privacy password. auth, no priv —The user requires an authorization password but not a privacy password. If you select this option, Cisco
IMC enables the Auth fields described below.
• auth, priv —The user requires both an authorization password and a privacy password. If you select this option, Cisco
IMC enables the Auth and Privacy fields.
The authorization type. This can be one of the following:
• MD5
• SHA
The authorization password for this SNMP user.
Enter between 8 and 64 characters or spaces.
Note Cisco IMC automatically trims leading or trailing spaces.
The authorization password again for confirmation purposes.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
4-13
Chapter 4 Installing the VDS Internet Streamer Software and Initially Configuring a CDE
Re manufacturing a CDE
Table 4-4 SNMP User Details that need to be updated
Name
Privacy Type radio button
Privacy Password field
Confirm Privacy Password field
Description
The privacy type. This can be one of the following:
•
•
DES
AES
The privacy password for this SNMP user.
Enter between 8 and 64 characters or spaces.
Note Cisco IMC automatically trims leading or trailing spaces.
The authorization password again for confirmation purposes.
Step 6
Step 7
Click Save Changes .
If you want to delete a user, select the user and click Delete .
Click OK in the delete confirmation prompt.
Re manufacturing a CDE
If your CDE205, CDE220, CDE280 or CDE250 has failed and is no longer booting up or functioning properly, you must perform a full remanufacturing of the CDE.
Before You Begin
You need the following to re manufacture a CDE:
• Either a CDE205, CDE220, CDE250, or CDE280:
– CDE205 chassis with 3 500-GB SATA drives (labeled 0 to 3), and 9 empty chassis drive bay expanders (not labeled).
–
–
CDE220 chassis (drives vary by CDE model, see
for a list of models and drives).
CDE250 chassis (drives vary by CDE model, see
for a list of models and drives).
•
•
– CDE280 chassis (drives vary by CDE model, see
for a list of models and drives).
External USB DVD-ROM drive or CD-ROM drive
Internal IDE CompactFlash (CF) drive (preinstalled)
Note The CDE280 Engine does not require the CF drive.
4-14
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 4 Installing the VDS Internet Streamer Software and Initially Configuring a CDE
• Terminal server connection with the following parameters:
–
–
–
9600 baud
8 bits
No parity
Re manufacturing a CDE
Note Release 2.6.1 and later releases of the Cisco VDS-IS (formerly Internet Streamer CDS) software support both serial console connections and local monitor connections for the rescue CD. When you boot a CDS device from the rescue CD-ROM, you are prompted to select 0 for serial console or 1 for local monitor. Serial console is the default and if no entry is made, the serial console is used.
• Internet Streamer rescue image CD.
Note For a CDE280 Engine, you can also use rescue image iso.
•
•
VQE image CD (if installing VQE software on the CDE250 2V0). For the procedure, see the
“Installing VQE Release 3.11 Software” section of the Release Notes for Cisco CDA Visual Quality
Experience Application, Release 3.11
.
Console connection
Note For CDE280, you don't need to connect console port physically
Note On the CDE, use the USB port to connect the external USB DVD-ROM drive. Use the external USB
DVD-ROM drive for all procedures that require a DVD-ROM drive. After the initial installation, remove the external USB DVD-ROM drive. The internal IDE CF drive becomes the boot drive for subsequent operations.
Installing a CDE
Perform the following steps to boot a CDE:
If you received a new CDE280, go to the
“Re-manufacturing and Installing CDE280” section on page 4-17
.
Note This example uses the CDE250. The procedure for installing the other CDEs in this guide is the same; however, there may be slight variations in the output.
Step 1
Step 2
Step 3
Step 4
Ensure that the CDE is powered off.
Attach the USB DVD-ROM drive to any available USB port at the rear of the CDE (see
).
Attach a power cord and keyboard to the CDE, and attach a terminal server to the CDE serial port and
ensure the serial communications are properly configured (see Figure 1-8 on page 1-9
).
Insert the VDS Internet Streamer rescue image CD in the DVD-ROM drive.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
4-15
Chapter 4 Installing the VDS Internet Streamer Software and Initially Configuring a CDE
Re manufacturing a CDE
The system boots from the image on the CD. This requires a terminal server to be connected to the serial
for terminal server settings).
Note Boot and installation output is directed to the terminal server console and cannot be viewed from a monitor.
Step 5
Step 6
Step 7
Step 8
Power on the external USB DVD-ROM drive.
Power on the CDE.
Once the CD starts booting, it displays a spinning “|” symbol for approximately five minutes. Allow the booting to proceed and monitor the sequence from a remote terminal provided by the terminal server.
The Installer main menu is displayed at the conclusion of the boot sequence; you should see a menu similar to this:
Welcome to the Cisco CDS-IS installer! |
| With this installer, you can configure your hardware |
| and install CDS-IS software on it. The installer can also be |
| used to modify an existing hardware configuration
<Output truncated>
System type : CDE250-2S6
Software status : Successfully installed
1. Configure Hardware
2. Install all software
3. Exit
Choice:
From the Installer Main Menu, choose Option 2 to install the software on the CDE and clear the unnecessary data. You should see a display similar to this:
Choosing this option will delete all software and data on your system
Do u wish to continue? [Y/N]
Enter Y and to confirm the installation. You should see a display similar to this:
Invoking unmount-all-filesystems
Invoking whack-all-drives
Erasing disks
Invoking megaraid.sh
[WARNING] Provisioning disk00 as a new CDNFS drive
[WARNING] Provisioning disk01 as a new CDNFS drive
[WARNING] Provisioning disk02 as a new CDNFS drive
<Output truncated>
Installing system image to flash
Installing static mapping files to /boot
Generating platform.conf
Invoking ruby_upgrade apply
Installing application components...[ap] [di] [jr] [li] [me] [pe] [to] [un] [vm]
Running post-install hooks...
Syncing filesystems...
/ruby/bin/install-to-sw: DONE.
Successfully installed product image.
4-16
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 4 Installing the VDS Internet Streamer Software and Initially Configuring a CDE
------------------------------------------------------------------
Re manufacturing a CDE
System type : CDE250-2S6
Software status : Successfully installed
Step 9
1. Configure Hardware
2. Install all software
3. Exit
The SE reboots after selecting the option “exit”
Un-mount the ISO file: From the Virtual Media tab, deselect map CD/DVD . You should see a display similar to this: unmounting /swstore... done unmounting /sw... done unmounting /state... done unmounting /local/local1... done unmounting /disk23-01... done unmounting /disk22-01... done unmounting /disk21-01... done unmounting /disk20-01... done unmounting /disk19-01... done unmounting /disk18-01... done unmounting /disk17-01... done
Step 10 Eject the CD from the DVD-ROM drive, disconnect the DVD-ROM drive from the CDE.
Re-manufacturing and Installing CDE280
To install the CDE280 with the help of CIMC, follow these steps:
Note For more information on setting up the CIMC, and logging on to the CIMC, see the
“Launching a CDE280 for the First Time” section on page 4-3
Step 1 Configure the BIOS boot order: a.
Navigate to the BIOS section of the CIMC Web Interface, and click Configure Boot Order .
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
4-17
Re manufacturing a CDE
Figure 4-7
Chapter 4 Installing the VDS Internet Streamer Software and Initially Configuring a CDE
Configuring Boot Order b.
Select the Add virtual media , and then select KVM mapped DVD .
Figure 4-8 Adding Virtual Media c.
Click the Add device and then Save Changes .
4-18
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 4 Installing the VDS Internet Streamer Software and Initially Configuring a CDE
Re manufacturing a CDE
Step 2 Mount a virtual ISO: a.
Navigate to the Summary section of the CIMC and click the Launch KVM Console to launch the console.
Figure 4-9 Launching KVM Console
Note You may be prompted several times, before you get to the KVM console. b.
In the prompt KVM console, from the Virtual Media tab, select Activate Virtual Devices .
Figure 4-10 Activating Virtual Devices c.
From the Virtual Media tab, select the Map CD/DVD .
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
4-19
Re manufacturing a CDE
Figure 4-11
Chapter 4 Installing the VDS Internet Streamer Software and Initially Configuring a CDE
Mapping CD/DVD d.
From the Drive/Image File drop down list, select the iso image.
Figure 4-12 Selecting ISO image
Step 3 e.
Click Map Device .
Reboot the server:
From the Power tab, select Power Cycle Systems (cold boot) to reboot the server.
Figure 4-13 Rebooting the Server
Step 4 Install the VDS-IS Software for CDE280: a.
Connect to the serial console of CDE280:
– Enter the IP address of the server with admin as the username and the password previously set:
4-20
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 4 Installing the VDS Internet Streamer Software and Initially Configuring a CDE
Re manufacturing a CDE
Step 5 user1$ ssh -l admin 10.140.104.17 [email protected]'s password: XXXXX
C240-FCH1852V20Y#
– Enter the following command:
C240-FCH1852V20Y# connect host
Power on the CDE.
Once the CD starts booting, it displays a spinning “|” symbol for approximately five minutes. Allow the booting to proceed and monitor the sequence from a remote terminal provided by the terminal server.
The Installer main menu is displayed at the conclusion of the boot sequence; you should see a menu similar to this:
Welcome to the Cisco CDS-IS installer! |
| With this installer, you can configure your hardware |
| and install CDS-IS software on it. The installer can also be |
| used to modify an existing hardware configuration
<Output truncated>
System type : CDE280-2S5
Software status : Successfully installed
1. Configure Hardware
2. Install all software
3. Exit
Choice:
Note This may take approximately 10 to 20 minutes.
Step 6
Step 7
From the Installer Main Menu, choose Option 2 to install the software on the CDE and clear the unnecessary data. You should see a display similar to this:
Choosing this option will delete all software and data on your system
Do u wish to continue? [Y/N]
Enter Y and to confirm the installation. You should see a display similar to this:
Invoking unmount-all-filesystems
Invoking whack-all-drives
Erasing disks
Invoking megaraid.sh
[WARNING] Provisioning disk00 as a new CDNFS drive
[WARNING] Provisioning disk01 as a new CDNFS drive
[WARNING] Provisioning disk02 as a new CDNFS drive
<Output truncated>
Installing system image to flash
Installing static mapping files to /boot
Generating platform.conf
Invoking ruby_upgrade apply
Installing application components...[ap] [di] [jr] [li] [me] [pe] [to] [un] [vm]
Running post-install hooks...
Syncing filesystems...
/ruby/bin/install-to-sw: DONE.
Successfully installed product image.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
4-21
Re manufacturing a CDE
Chapter 4 Installing the VDS Internet Streamer Software and Initially Configuring a CDE
------------------------------------------------------------------
System type : CDE280-2S5
Software status : Successfully installed
Step 8
1. Configure Hardware
2. Install all software
3. Exit
From the Installer Main Menu, choose Option 3 to exit the installer. You should see a display similar to this: unmounting /swstore... done unmounting /sw... done unmounting /state... done unmounting /local/local1... done unmounting /disk23-01... done unmounting /disk22-01... done unmounting /disk21-01... done unmounting /disk20-01... done unmounting /disk19-01... done unmounting /disk18-01... done unmounting /disk17-01... done
Note There may be slight variations in the output.
Step 9 Un-mount the ISO file:
From the Virtual Media tab, select Activate Virtual Devices .
Figure 4-14 Activating Virtual Devices
Note When you select Activate Virtual Devices , the system prompts whether you want to unmount the iso file or not.
Step 10 From the Power tab, select Power Cycle Systems (cold boot) to reboot the server.
4-22
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 4 Installing the VDS Internet Streamer Software and Initially Configuring a CDE
Figure 4-15 Rebooting the Server
Re manufacturing a CDE
Step 11 Follow
to
from the
“Connect to the Console” section on page 4-7
and
VDS-IS Software” section on page 4-7
.
CDE280 Model Migration
CDE280 has 6 sub-prototypes and VDS-IS supports CDE280 prototype migration between those 6 sub-prototypes. This section will explain how to change a CDE280 sub-prototype to another CDE280 sub-prototype.
Note Configuration on CDE280 box will be reserved with only model change to new one after this process.
In addition to that, the external disk will be formatted and no caches contents will be preserved.
The main difference between the 6 sub-prototypes is the drives.
lists the internal and external drives of each CDE280 sub-prototype.
Table 4-5 Internal and External Drives of the CDE280 Sub-prototype
CDE280 Variation
2H1
2H13
2H26
2S5
2S10
2S21
Internal Drives
480G SSD x 2
480G SSD x 2
480G SSD x 2
480G SSD x 2
480G SSD x 2
480G SSD x 2
External Drives
600G HDD x 1
600G HDD x 24
1200G HDD x 24
240G SSD x 24
480G SSD x 24
960G SSD x 24
For example, to migrate from CDE280-2S5 to CDE280-2S10, do the following:
Step 1
Step 2
Step 3
Step 4
Switch off the device by clicking the Power button on the front panel of the device.
Pull out all the external drives (24 x 240G SSD) of the device.
Push the 24 x 480G SSD drives into the device as the CDE280-2S10 should have the 24 x 480G SSD the external drive only.
Power on the device.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
4-23
Chapter 4 Installing the VDS Internet Streamer Software and Initially Configuring a CDE
Re manufacturing a CDE
Step 5 Log into VDS-IS, and run the following command:
#model CDE280-2S10
This command will reload the device automatically.
#model CDE280-2S10
Updating the model will reload the system and erase CDNFS volumes.
Please make sure the system is offline.
Proceed with model update? (y/n) y
%SE-DISK-0-200047: Stopping all services (this may take several minutes) ...
INIT: Switching to runlevel: 4
INIT: Sending processes configured via /etc/inittab the TERM signal
INIT: Sending processes configured via /etc/inittab the KILL signal
Recoverying CDNFS volumes...
CDNFS recovery complete unmounting /swstore... done unmounting /sw... done unmounting /state... done unmounting /local/local1... done unmounting /boot... done stopping MD device md5...mdadm: stopped /dev/md5
done stopping MD device md4...mdadm: stopped /dev/md4
done stopping MD device md3...mdadm: stopped /dev/md3
done stopping MD device md2...mdadm: stopped /dev/md2
done rebooting now...
Restarting system.
4-24
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 4 Installing the VDS Internet Streamer Software and Initially Configuring a CDE
Re manufacturing a CDE
Step 6 After the reload, run the following command to set up the drives.
#disk policy apply
#
The device changes to CDE280-2S10. To check the device that you are currently working on, run the following command:
#show inventory
The system displays the following:
PID: CDE280-2S10 VID: 01 SN: FCH1834V3AU
Replacing CDE280 chassis
CDE280 has 6 sub-prototypes, and the spare lite CDE280 chassis can be manufactured into anyone of them. This section will explain how to manufacture a spare lite CDE280 chassis into a CDE280 sub-prototype.
Requirement
• A CDE280 spare lite chassis
• Corresponding drives
lists the CDE280 sub-prototype and its external drives
Table 4-6 CDE280 sun-prototype and its external drives
CDE280 Variation
2H1
2H13
2H26
2S5
2S10
2S21
External Drives
600G HDD x 1
600G HDD x 24
1200G HDD x 24
240G SSD x 24
480G SSD x 24
960G SSD X 24
After this process, drives loses its data.
For example, to manufacture a spare lite CDE280 chassis into CDE280-2S5, do the following:
Step 1
Step 2
Step 3
Configure the CIMC and remote presence.
For more information, see
Push 24 x 240G drives into the front panel of the chassis.
According to the previous table, CDE280-2S5 should have 24 x 240G drives.
Power on the device.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
4-25
Chapter 4 Installing the VDS Internet Streamer Software and Initially Configuring a CDE
Re manufacturing a CDE
Step 4
Step 5
Connect to the console.
For more information, see
.
Log into VDS-IS, and run following command.
#model CDE280-2S5
This command will reload the device automatically.
#model CDE280-2S5
Updating the model will reload the system and erase CDNFS volumes.
Please make sure the system is offline.
Proceed with model update? (y/n) y
%SE-DISK-0-200047: Stopping all services (this may take several minutes) ...
INIT: Switching to runlevel: 4
INIT: Sending processes configured via /etc/inittab the TERM signal
INIT: Sending processes configured via /etc/inittab the KILL signal
Recoverying CDNFS volumes...
CDNFS recovery complete unmounting /swstore... done unmounting /sw... done unmounting /state... done unmounting /local/local1... done unmounting /boot... done stopping MD device md5...mdadm: stopped /dev/md5
done stopping MD device md4...mdadm: stopped /dev/md4
done stopping MD device md3...mdadm: stopped /dev/md3
done stopping MD device md2...mdadm: stopped /dev/md2
done rebooting now...
Restarting system.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
4-26
Chapter 4 Installing the VDS Internet Streamer Software and Initially Configuring a CDE
Re manufacturing a CDE
Step 6 After the reload, run the command "disk policy apply" to set up the drives.
#disk policy apply
#
The device changes to CDE280-2S5. To check the device that you are currently working on, run the following command:
#show inventory
The system displays the following:
PID: CDE280-2S5 VID: 01 SN: FCH1834V3AU
Installing the VDS-IS Software
Note For a CDE280 Engine, you do not have to refer this section.
Perform the following steps to install the software:
Step 1 Launch the Installer. You will see something like this:
Welcome to the installer. The installer will enable installation of a new software image onto your system, or recover a previous image in the event that the hardware was changed.
Step 2
MODEL: CDE205
FLASH: found, directory validated
COOKIE: valid
IMAGE: DEVELOPMENT[vcn-build2:/auto/vcn-u1/carlowan/refact-dev-1/spcdn
FLASHDEV: /dev/hda
Installer Main Menu:
1. Configure Network
2. Manufacture flash
3. Install flash cookie
4. Install flash image from network
5. Install flash image from cdrom
6. Install flash image from disk
7. Wipe out disks and install .bin image
8. Exit (and reboot)
9. Force manufacturing flash
Choice [0]:
Manufacture the IDE compact flash drive by selecting Option 2 . This makes the IDE compact flash drive bootable. Enter Y to confirm the process.
Note This step is not necessary if the IDE compact flash drive has been previously manufactured. The system produces an error; ignore the error and proceed.
Step 3 At the Installer Main Menu, choose Option 9 to force the manufacturing flash. You should see something like this:
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
4-27
Chapter 4 Installing the VDS Internet Streamer Software and Initially Configuring a CDE
Re manufacturing a CDE
Step 4
Step 5
WARNING! This will erase everything on flash [n]: y
Read 4275200 byte rescue image file
................................. done.
Flash manufactured successfully.
UUID is: 53D19F64-D663-A017-8922-003048C377F2
Serial Number is last 10 of UUID: 3048C377F2
Date= '09/22/08'
Cookie installed successfully.
MODEL: CDE205
FLASH: found, directory validated
COOKIE: valid
IMAGE: NONE
FLASHDEV: /dev/hda
Installer Main Menu:
1. Configure Network
2. Manufacture flash
3. Install flash cookie
4. Install flash image from network
5. Install flash image from cdrom
6. Install flash image from disk
7. Wipe out disks and install .bin image
8. Exit (and reboot)
9. Force manufacturing flash
Choice [0]:
Choose Option 5 to install the flash image from the CD-ROM drive. You should see something like this:
Please select an image from the following list:
1. CDS23.sysimg
2. Return to Main Menu
Image [1]:
Choose Sub-option 1 to select an image and enter Y when prompted to confirm and proceed with the flash write. You should see something like this:
Installing CDS23.sysimg
Read 34243584 byte image file
Existing version in flash: NONE
New version to install: 2.3.1.2
Proceed with flash write? [y]:
..........................................................................................
.................................................................................... done.
Image was successfully written to flash.
MODEL: CDE205
FLASH: found, directory validated
COOKIE: valid
IMAGE: 2.3.1.2
FLASHDEV: /dev/hda
Installer Main Menu:
1. Configure Network
2. Manufacture flash
3. Install flash cookie
4. Install flash image from network
5. Install flash image from cdrom
6. Install flash image from disk
7. Wipe out disks and install .bin image
8. Exit (and reboot)
4-28
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 4 Installing the VDS Internet Streamer Software and Initially Configuring a CDE
Re manufacturing a CDE
Step 6
9. Force manufacturing flash
Choice [0]:
Enter full URL of .bin image to install.
ftp://[user:pass@]ip_addr/path/to/file
http://[user:pass@]ip_addr/path/to/file
file:/local/path/to/to/file
URL for .bin image [file:/cdrom/images/CDS23.bin]:
Continue? This will wipe out all disks! [n]: y
Erasing disks
Disk drive not supported. (type 5 host 3 chan 0 id 8 lun 0)
Unsupported disk hardware.
diskman: fread flash disk config rc=0
Creating SYSTEM and SYSFS volumes on [disk00]
Creating SYSTEM and SYSFS volumes on [disk01]
New drive [disk02] detected: allocating to CDNFS volume.
Reading and installing image, it may take a few minutes, please wait...
remote size / mtime: 253105823 / 1221548342 cookie_check: Skip supported platform check for Model:CDE205
Reclaiming unused flash safe state sectors ... Done.
######################################################################################
######################################################################################
#####################################################################
253105823 bytes transferred in 81.5 seconds (2.96 MBps)
Installing phase3 bootloader...
Installing system image to flash: done.
cat: /etc/PERSONALITY: No such file or directory
Installing application components...[ap] [di] [jr] [li] [me] [pe] [to] [un]
Running post-install hooks...
Syncing filesystems...
/ruby/bin/install-to-sw: DONE.
Successfully installed product image.
MODEL: CDE205
FLASH: found, directory validated
COOKIE: valid
IMAGE: 2.3.1.2
FLASHDEV: /dev/hda
Installer Main Menu:
1. Configure Network
2. Manufacture flash
3. Install flash cookie
4. Install flash image from network
5. Install flash image from cdrom
6. Install flash image from disk
7. Wipe out disks and install .bin image
8. Exit (and reboot)
9. Force manufacturing flash
Choice [0]:
Eject the CD from the CD-ROM drive, disconnect the CD-ROM drive from the CDE, and choose Option
8 to exit and reboot. Press Y and Enter to confirm the reboot request.
The system boots from the IDE compact flash drive with the data installed from the CD. All prior data is removed and the original system remains unaffected.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
4-29
Re manufacturing a CDE
Chapter 4 Installing the VDS Internet Streamer Software and Initially Configuring a CDE
Caution Be sure to disconnect the CD-ROM drive before rebooting the system or the system will not boot with the normal image.
Verifying the CDSM
Perform the following steps to verify that the remanufactured device is operational from CDSM:
Step 1 Launch a web browser and enter the IP address of the CDSM using the following format: https://<CDSM_IP_address>:8443/
The CDSM Login page appears (see
).
Figure 4-16 CDSM Login Page
Step 2 Enter admin as the username and default as the password, then click Login .
4-30
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 4 Installing the VDS Internet Streamer Software and Initially Configuring a CDE
The CDSM Main menu appears (see
).
Figure 4-17 CDSM Main Menu
Re manufacturing a CDE
Step 3 From the CDSM Main menu, select the Devices tab. A list of all your registered Service Engines and
Service Routers appears (see
Figure 4-18 ). These devices appear as “inactive” and you must activate
them using the Device Activation page. See the “ Activating a Service Engine ” section in the Cisco
Internet Streamer CDS 3.0 Software Configuration Guide .
Figure 4-18 Devices Page
Step 4
Step 5
Verify that the devices you configured for your VDS network are listed.
If a device is not listed, restart the CMS for that device by using either the console or a Telnet connection and enter the following commands in global configuration mode:
CDE(config)# no cms enable
CDE(config)# cms enable
The installation is now complete. See the Cisco Internet Streamer CDS Software Configuration Guide for information on configuring and using the VDS-IS. See the
“Related Documentation” section on page xii
.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
4-31
Re manufacturing a CDE
Chapter 4 Installing the VDS Internet Streamer Software and Initially Configuring a CDE
BIOS Settings
Note For BIOS upgrade, see
This appendix contains the following sections:, page F-1
.
You do not need to edit the BIOS for any reason when installing or re manufacturing a CDE205,
CDE220, CDE250, or CDE280. If you have made changes to any of the BIOS screens, you need to return them to their default configuration. The original BIOS screens are shown in
.
For the CDE280 BIOS Settings, see
.
Figure 4-19 Main BIOS Screen
4-32
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 4 Installing the VDS Internet Streamer Software and Initially Configuring a CDE
Figure 4-20 Main BIOS Screen, IDE Channel 0 Master
Re manufacturing a CDE
Figure 4-21 Advanced BIOS Screen, Console Redirection
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
4-33
Re manufacturing a CDE
Figure 4-22
Chapter 4 Installing the VDS Internet Streamer Software and Initially Configuring a CDE
Advanced BIOS Screen, Boot Features
Figure 4-23 Boot BIOS Screen
CDE280 BIOS and CIMC Settings
Table 4-7 describes the CDE280 BIOS and CIMC Settings:
Table 4-7
Settings
CDE280 BIOS and CIMC Settings
Adopter Setting
Lockdown Versions
4-34
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 4 Installing the VDS Internet Streamer Software and Initially Configuring a CDE
Table 4-7
SW Passsword
CIMC Settings
CDE280 BIOS and CIMC Settings (continued)
Container Image
BIOS_version
CIMC_version
RAID Setting
SW PIDs
Top Level PID
CDE280-K9
CDE280-LITE-K9=
SW Login Name
SW Installation Procedure
Server Power-Restore-policy
Fan Policy
C240M4.2.0.9a
2.0(9c)
CDA-U-VDSMU-4.1
CDA-U-VDSMU-4.3
Selectable License PID Combinations
NONE
NONE admin default power-off balanced
.0.120120151913
Software RAID of two internal boot SSD dedicated none
Network NIC Mode
NIC Redundancy
SOL (Serial Over LAN)
Enabled
Baud-rate
BIOS Boot-Order Setting
Boot-order
BIOS Main
TPM Support
BIOS Advanced Settings
Processos Configuration
Intel(R) Hyper-Threading
Techno:
Number of Cores Enabled
Execute Disable:
Intel(R) VT:
Intel(R) VT-d:
Intel(R) VT-d Coherency
Support:
Interrupt Remapping
PassThrough DMA
All enabled enabled enabled disabled enabled disabled yes
115200
Shipping Order
HDD Slot 9:INTEL SSDSC2BB480G4 (hdd)
Shipping Order disabled enabled
Re manufacturing a CDE
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
4-35
Chapter 4 Installing the VDS Internet Streamer Software and Initially Configuring a CDE
Re manufacturing a CDE
Table 4-7 CDE280 BIOS and CIMC Settings (continued)
Intel(R) VT-d ATS Support:
CPU Performance:
Hardware Prefetcher:
Adjacent Cache Line
Prefetcher: enabled enterprise enabled enabled
DCU Streamer Prefetch:
DCU IP Prefetcher:
Direct Cache Access Support: enabled
Power Technology: energe efficient
Enhanced Intel Speedstep(R)
Tec:
Intel(R) Turbo Boost
Technology: enabled enabled enabled enabled
Processor Power state C6:
Processor Power state C1
Enhanc:
P-STATE Coordination:
Energy Performance: enabled enabled
HW ALL balaned performance
Workload Configuration
Extended APIC
Server ME configuration
Altitude
MCTP Bus Owner balanced
XAPIC
80000000
0
Memory Configuration
Select Memory RAS: maximum performance
NUMA: enabled
Channel Interleaving: auto
Rank Interleaving:
Patrol Scrub:
Demand Scrub: auto enabled enabled
QPI Configuration
QPI Link Frequency Select:
Snoop Mode
USB Configuration
Legacy USB Support:
Port 60/64 Emulation: auto
Home Snoop enabled enabled
4-36
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 4 Installing the VDS Internet Streamer Software and Initially Configuring a CDE
Table 4-7 CDE280 BIOS and CIMC Settings (continued) disabled XHCI Mode
PCI Configuration
MMIO above 4GB:
VGA Priority
SR-IOV Support
Serial Configuration
Out-of-Band Management
Console Redirection:
Terminal Type:
Bits per second:
Flow Control
Putty KeyPad: enabled
OnBoard
Enable disabled
COM 0
VT100
115200
None
ESCN
Redirection After BIOS POST: always enable
LOM and PCIe slot Configuration
PCI ROM CLP disabled
PCH SATA Mode:
All Onboard LOM Ports:
LOM Port 0 OptionROM:
LOM Port 1 OptionROM:
AHCI enabled enabled enabled
All PCIe Slots OptionROM:
PCIe Slot:1 OptionROM:
PCIe Slot:2 OptionROM:
PCIe Slot:3 OptionROM: enabled enabled enabled disabled
PCIe Slot:4 OptionROM:
PCIe Slot:5 OptionROM: enabled enabled
PCIe Slot:6 OptionROM: enabled
PCIe Slot:MLOM OptionROM: enabled
PCIe Slot:HBA OptionROM: enabled
PCIe Slot:N1 OptionROM: enabled
PCIe Slot:N2 OptionROM:
SIO Configuration enabled
Serial Port 1:
Use this deviceGSIO011
Possible
Serial Port 2:
Use this deviceGSIO011 enabled
Use Automatic Settings enabled
Re manufacturing a CDE
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
4-37
Chapter 4 Installing the VDS Internet Streamer Software and Initially Configuring a CDE
Re manufacturing a CDE
Table 4-7 CDE280 BIOS and CIMC Settings (continued)
Possible
Server Management wait for BMC
Clear System Event Log
FRB-2 Timer
OS Watchdog Timer
Use Automatic Settings
Disabled
No
Enabled
Disabled
OS Watchdog Timer Timeout 10 mins
OS Watchdog Timer Policy Reset
4-38
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
C H A P T E R
5
Installing the VDS-TV Software and Initially
Configuring a CDE
For detailed information on VDS-TV Installation, see Cisco VDS-TV Installation and Upgrade Guide,
Release 4.10.
Hardware/Platform specific performance numbers for
VDS-TV
provides the information on the Hardware or platform specific perfomance numbers for
VDS-TV.
Table 5-1 VDS-TV Hardware Models
Hardware Models
CDE110
UCS220M4
CDE420
Device Type
CDSM/VVIM
CDSM/VVIM
Vault
CDE420
CDE220
CGW
Streamer
Performance Numbers
Transactions/Sec of PlayoutHistory: 200
Transactions/Sec of PlayoutHistory: 1000
Ingest:
Max parallel: 10(RTSP), 21(ISA)
Throughput: (1Gig Ingest link)
Approx 780Mbps
Max Fills: Approx 5.75Gbps
Max Streams (Fill Receive): 950 (Tput:
3.5Gbps)
Max Streams (Fill Transfer): 2500 (Tput:
9.4Gbps)
Max Streams (Cache Miss): 950 (Tput:
3.5Gbps)
Max Streams (Cache Hit): 2500 (Tput: 9.4Gbps)
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
39
Chapter 5 Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Table 5-1 VDS-TV Hardware Models
Hardware Models
CDE460-4R1
Device Type
Vault
CDE460-4R3
CDE475-4A1
CDE250-2A4
CDE250-2A2
Vault
Vault
Vault
Vault
Performance Numbers
Ingest:
Max parallel: 10(RTSP), 21(ISA)
Throughput: (1Gig Ingest link)
Approx 900Mbps (RTSP)
Approx 930Mbps (ISA)
Max Fills: Approx 20Gbps
Ingest:
Max parallel: 10(RTSP), 21(ISA)
Throughput: (1Gig Ingest link)
Approx 900Mbps (RTSP)
Approx 930Mbps (ISA)
Throughput: (10 Gig Ingest link)
Approx 4800Mbps (ISA)
Max Fills: Approx 25Gbps
Ingest:
Max parallel: 10(RTSP), 42(ISA)
Throughput: (1Gig Ingest link)
Approx 944Mbps (RTSP)
Approx 925Mbps (ISA)
Throughput: (10 Gig Ingest link)
Approx 5210Mbps (ISA)
Max Fills: Approx 26Gbps (ISA and RTSP)
Ingest:
Max parallel: 10(RTSP), 21(ISA)
Throughput: (1Gig Ingest link)
Approx 780Mbps
Mirroring: Approx 8Gbps
Max Fills: Approx 13Gbps
Ingest:
Max parallel: 10(RTSP), 21(ISA)
Throughput: (1Gig Ingest link)
Approx 780Mbps
Mirroring: Approx 6.5Gbps
Max Fills: Approx 7Gbps
40
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter
Table 5-1 VDS-TV Hardware Models
Hardware Models
CDE250-2S6
Device Type
Streamer
CDE250-2S9
CDE250-2S10
CDE280-2U1
CDE280-2U2
CDE280-2U3
CDE280-2U3
CDE280-2U4
Streamer
Streamer
Streamer
Streamer
Streamer
CGW
Streamer
Performance Numbers
Max Streams (Cache Miss): 2000 (Tput:
7.5Gbps)
Max Streams (Cache Hit): 10000 (Tput:
37.5Gbps)
Max Streams (Cache Miss): 2000 (Tput:
7.5Gbps)
Max Streams (Cache Hit): 10000 (Tput:
37.5Gbps)
Max Streams (Cache Miss): 2300 (Tput:
8.6Gbps)
Max Streams (Cache Hit): 10000 (Tput:
37.5Gbps)
Max Streams (Cache Miss): 3600 (Tput:
13.5Gbps)
Max Streams (Cache Hit): 7998 (Tput: 30Gbps)
Max Streams (Cache Miss): 3645 (Tput:
13.6Gbps)
Max Streams (Cache Hit): 9997 (Tput:
37.4Gbps)
Max Streams (Cache Miss): 4245 (Tput:
15.9Gbps)
Max Streams (Cache Hit): 11999 (Tput:
45.0Gbps)
Max Streams (Cache Miss): 2800 (Tput:
10.5Gbps)
Max Streams (Cache Hit): 9900 (Tput:
37.1Gbps)
Max Streams (Cache Miss): 3600 (Tput:
13.5Gbps)
Max Streams (Cache Hit): 6499 (Tput:
24.3Gbps)
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
41
Chapter 5 Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
42
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
C H A P T E R
6
Installing the VQE and Initially Configuring a
CDE
This chapter describes the initial installation of the Cisco VQE software application suite, and the initial configuration of a CDE.
•
•
Launching a New CDE250 for the First Time, page 6-1
Re-manufacturing a CDE, page 6-2
If you receive a new CDE250 go to the
“Launching a New CDE250 for the First Time” section on page 6-1
.
If you receive a new CDE280 go to the
“Launching a New CDE280 for the First Time” section on page 6-1
section on page.
If you need to re-manufacture a CDE for any reason, see the
“Re-manufacturing a CDE” section on page 6-2
.
Launching a New CDE250 for the First Time
To launch a CDE250 for the first time, see “VQE Software Installation Types” section in the Release Notes for Cisco CDA Visual Quality Experience Application Release 3.11
.
Launching a New CDE280 for the First Time
For CDE280, you can use the CIMC to manage your device. To use the CIMC, you have to configure it.
This section describes the following tasks:
•
Configure the CIMC IP, page 6-1
•
Configure Remote Presence, page 6-2
•
•
•
Connect to the Console, page 6-2
Configure VQE Software, page 6-2
Configure the CIMC IP
To configure CIMC IP, see
“Configure the CIMC IP” section on page 4-3 .
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
6-1
Chapter 6 Installing the VQE and Initially Configuring a CDE
Re-Manufacturing a CDE
Configure Remote Presence
To configure remote presence, see
“Configure Remote Presence” section on page 4-5 .
Connect to the Console
To connect to the console, see
“Connect to the Console” section on page 4-7
Configure VQE Software
To configure VQE software, see “Installing VQE Release 3.11 Software” section in the Release Notes for Cisco CDA Visual Quality Experience Application Release 3.11
Configuring SNMP
To configure SNMP, see
“Configuring SNMP” section on page 4-8 .
Re-manufacturing a CDE
If your CDE250 and CDE280 has failed and is no longer booting up or functioning properly, you must perform a full re-manufacturing of the CDE. The general re-manufacturing process is as follows:
•
•
•
•
•
Re-Manufacturing and Installing CDE280, page 6-3
Installing the VQE Software, page 6-6
Before You Begin
You need the following to re-manufacture a CDE:
• Either a CDE250, or CDE280:
– CDE250 chassis (drives vary by CDE model, see
for a list of models and drives).
•
– CDE280 chassis (drives vary by CDE model, see
for a list of models and drives).
External USB DVD-ROM drive or CD-ROM drive
Note The CDE280 Engine does not require the CF drive.
•
•
Internal IDE Compact Flash (CF) drive (preinstalled)
Terminal server connection with the following parameters:
– 9600 baud
6-2
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 6 Installing the VQE and Initially Configuring a CDE
Re-manufacturing a CDE
•
•
– 8 bits
– No parity
VQE image CD (if installing VQE software on the CDE250 2V0). For the procedure, see the
“Installing VQE Release 3.11 Software” section in the Release Notes for Cisco CDA Visual Quality
Experience Application, Release 3.11.
Console connection
Installing a CDE
To install a CDE, do the following:
Step 1
Step 2
Step 3
Step 4
Step 5
Step 6
Ensure that the CDE is powered off.
Attach the USB DVD-ROM drive to any available USB port at the rear of the CDE (see
).
Attach a power cord and keyboard to the CDE, and attach a terminal server to the CDE serial port and
ensure the serial communications are properly configured (see Figure 1-9 on page 1-10
).
Insert the VQE installation image CD in the DVD-ROM drive.
The system boots from the image on the CD. This requires a terminal server to be connected to the serial port of the CDE. All communication is done through the serial port (see the
“Before You Begin” section on page 6-2
for terminal server settings).
Power on the external USB DVD-ROM drive.
To start the booting process, see “ISO Clean Installation” section in the Release Notes for Cisco CDA
Visual Quality Experience Application, Release 3.11
.
Figure 6-1 ISO Clean Installation
Re-Manufacturing and Installing CDE280
To install the CDE280 with the help of CIMC, do the following:
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
6-3
Chapter 6 Installing the VQE and Initially Configuring a CDE
Re-Manufacturing a CDE
Note For more information on setting up the CIMC, and logging on to the CIMC, see the
“Launching a CDE280 for the First Time” section on page 4-3
Step 1 Configure the BIOS boot order: a.
Navigate to the BIOS section of the CIMC Web Interface, and click Configure Boot Order , see
Caution Ensure that the DVD image is unloaded or unmounted after the first reboot following the installation.
This boot order change is permanent. To change the boot order temporarily, see “ ISO Clean Installation” section in the Release Notes for Cisco CDA Visual Quality Experience Application, Release 3.11
Step 2 b.
c.
Select the Add virtual media , and then select KVM mapped DVD , see
Click the Add device and then Save Changes .
Mount a virtual ISO: a.
Navigate to the Summary section of the CIMC and click the Launch KVM Console to launch the console, see
Note You may be prompted several times, before you get to the KVM console. b.
In the prompt KVM console, from the Virtual Media tab, select Activate Virtual Devices
Figure 6-2 Activating Virtual Devices c.
From the Virtual Media tab, select the Map CD or DVD .
6-4
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 6 Installing the VQE and Initially Configuring a CDE
Figure 6-3 Mapping CD or DVD
Re-manufacturing a CDE d.
From the Drive/Image File drop down list, select the iso image.
Figure 6-4 Selecting ISO Images
Step 3 e.
Click Map Device .
Reboot the server:
From the Power tab, select Power Cycle Systems (cold boot) to reboot the server.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
6-5
Re-Manufacturing a CDE
Figure 6-5 Rebooting the Server
Chapter 6 Installing the VQE and Initially Configuring a CDE
Step 4
Step 5
Step 6
Install the VQE Software for CDE280: a.
Connect to the serial console of CDE280:
– Enter the IP address of the server with admin as the username and the password previously set.
– user1$ ssh -l admin 10.140.104.17 [email protected]'s password: XXXXX
C240-FCH1852V20Y#
Enter the following command:
C240-FCH1852V20Y# connect host
Power on the CDE.
Once the CD starts booting, it displays a spinning “|” symbol for approximately five minutes. Allow the booting to proceed and monitor the sequence from a remote terminal provided by the terminal server.
The Installer main menu is displayed at the conclusion of the boot sequence; you should see a menu similar to this:
Un-mount the ISO file:
From the Virtual Media tab, select Activate Virtual Devices .
Note When you select Activate Virtual Devices , the system prompts whether you want to unmount the iso file or not.
Step 7
Step 8
From the Power tab, select Power Cycle Systems (cold boot) to reboot the server.
To connect to the Console, see
“Connect to the Console” section on page 4-7 and
.
Installing the VQE Software
To install the VQE software, see Installing VQE Release 3.11 Software” section in the Release Notes for
Cisco CDA Visual Quality Experience Application Release 3.11.
6-6
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 6 Installing the VQE and Initially Configuring a CDE
BIOS Settings
For BIOS setting, see
“BIOS Settings” section on page 4-32.
Re-manufacturing a CDE
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
6-7
Re-Manufacturing a CDE
Chapter 6 Installing the VQE and Initially Configuring a CDE
6-8
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Technical Specifications
A P P E N D I X
A
This appendix provides the technical specifications and management information for the CDE205,
CDE220, CDE280, CDE285, CDE420, CDE460, and CDE475.
This appendix contains the following sections:
•
•
•
•
CDE205 Specifications, page A-1
CDE220 Specifications, page A-2
CDE280 Specifications, page A-3
CDE285 Specifications, page A-4
•
•
•
•
•
•
CDE420 Specifications, page A-5
CDE460 Specifications, page A-6
CDE475 Specifications, page A-7
CDE205 Specifications
Table A-1 lists the technical specifications and management information for the CDE205.
Table A-1 CDE205 Specifications
Rack Units
Power
AC Power Rating
DC Power Rating
AC Electrical Input
2
100 to 240 VAC or –48 VDC single power supply; optional redundant power supply available
800 W peak
710 W peak
•
•
AC input voltage low range—Minimum: 100 VAC,
Maximum:127 VAC
AC input voltage high range—Minimum: 200 VAC,
Maximum: 240 VAC
See the
“If AC Power Supplies Are Installed” section on page 2-9
.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
A-1
Appendix A Technical Specifications
CDE220 Specifications
Table A-1 CDE205 Specifications
Rack Units
DC Electrical Input
2
DC input voltage range: –36VDC to –75VDC
DC Connector Type
Power Connector Cables
Molex
Wire cable gauge 8 AWG
Operating Relative Humidity 8 to 90% (noncondensing)
Nonoperating Relative
Humidity
Operating Temperature
Nonoperating Temperature
Operating Altitude
Dimensions (H x W x D)
See the “If DC Power Supplies Are Installed” section on page 2-12 .
5 to 95% (noncondensing) at temperatures of 73°F to 104°F (23°C to 40°C)
50° to 95°F (10 to 35°C)
–104° to 158°F (–40°to 70°C)
0 to 4000 m
3.5 x 17.2 x 25.5 in. (8.9 x 43.7 x 64.8 cm)
Weight (fully configured)
Approvals: Safety
Approvals: EMC
52 lb (23.58 kg)
UL/CSA 60950-1
FCC Part 15 (CFR 47) Class A
CDE220 Specifications
lists the technical specifications and management information for the CDE220.
Table A-2 CDE220 Specifications
Rack Units
Power
Power Rating
DC Power Rating
AC Electrical Input
2
100 to 240 VAC or –48 VDC redundant power supplies included in all models
800 W peak
710 W peak
• AC input voltage low range—Minimum: 100 VAC,
Maximum: 127 VAC
DC Electrical Input
• AC input voltage high range—Minimum: 200 VAC,
Maximum: 240 VAC
See the
“If AC Power Supplies Are Installed” section on page 2-9 .
DC input voltage range: –36VDC to –75VDC
DC Connector Type
Power Connector Cables
See the “If DC Power Supplies Are Installed” section on page 2-12 .
Molex
Wire cable gauge 8 AWG
Operating Relative Humidity 8 to 90% (non-condensing)
Nonoperating Relative
Humidity
5 to 95% (non-condensing) at temperatures of 73°F to 104°F (23°C to 40°C)
A-2
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Appendix A Technical Specifications
Table A-2
Rack Units
CDE220 Specifications
Operating Temperature
Nonoperating Temperature
Operating Altitude
Dimensions (H x W x D)
Weight (fully configured)
Approvals: Safety
Approvals: EMC
2
50 to 95°F (10 to 35°C)
–104 to 158°F (–40 to 70°C)
0 to 4000 m
3.5 x 17.2 x 25.5 in. (8.9 x 43.7 x 64.8 cm)
52 lb (23.58 kg)
UL/CSA 60950-1
FCC Part 15 (CFR 47) Class A
CDE280 Specifications
CDE280 Specifications
Table A-3 lists the technical specifications and management information for the CDE280.
Table A-3 CDE280 Specifications
Rack Units
Power
Power Rating
DC Power Rating
AC Electrical Input
Operating Temperature
Nonoperating Temperature
Operating Altitude
Dimensions (H x W x D)
W x D (Including handles)
Weight (fully configured)
Front Clearance
2
90 to 264 VAC (self-ranging, 180 to 264 VAC nominal)
1200 W peak
930W peak
11 Amps maximum at 100 VAC
DC Electrical Input
7 Amps maximum at 208 VAC
–48 to –60 VDC nominal
Nonoperating Relative
Humidity
(self-ranging, –40 to –72 VDC)
DC Connector Type
Power Connector Cables
Amphenol
Wire cable gauge 12 AWG
Operating Relative Humidity 10 to 90%, non-condensing at 82° F (28° C)
5 to 93% at 82° F (28° C)
41 to 95°F (5 to 35°C)
Derate the maximum temperature by 1°C per every 305 meters of altitude above sea level.
–40 to 149°F (–40 to 65°C)
(when the server is in storage or is transported)
0 to 10,000 feet
3.43 x 17.65 x 29.0 in. (8.7 x 44.8 x 73.80 cm)
18.96 x 30.18 in. (48.2 x 76.6 cm)
62.7 lb. (28.4 Kg)
3 in. (76 mm)
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
A-3
Appendix A Technical Specifications
CDE285 Specifications
Table A-3
Rack Units
Side Clearance
Rear Clearance
CDE280 Specifications
Safety
EMC - Emissions
EMC - Immunity
2
1 in. (25 mm)
6 in. (152 mm)
UL 60950-1 Second Edition
CAN/CSA-C22.2 No. 60950-1 Second Edition
EN 60950-1 Second Edition
IEC 60950-1 Second Edition
AS/NZS 60950-1
GB4943 2001
47CFR Part 15 (CFR 47) Class A
AS/NZS CISPR22 Class A
CISPR22 Class A
EN55022 Class A
ICES003 Class A
VCCI Class A
EN61000-3-2
EN61000-3-3
KN22 Class A
CNS13438 Class A
EN55024
CISPR24
EN300386
KN24
CDE285 Specifications
For the technical specifications and management information for CDE285, see Cisco UCS C240 M4
Server Installation and Service Guide.
A-4
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Appendix A Technical Specifications
CDE420 Specifications
CDE420 Specifications
Table A-4 lists the technical specifications and management information for the CDE420.
Table A-4 CDE420 Specifications
Rack Units
Power
AC Power Rating
DC Power Rating
AC Electrical Input
4
100 to 240 VAC or –48 VDC redundant power supplies included in all models
950 W peak
710 W peak
• AC input voltage low range—Minimum: 100 VAC,
Maximum: 127 VAC
DC Electrical Input
• AC input voltage high range—Minimum: 200 VAC,
Maximum: 240 VAC
See the
“If AC Power Supplies Are Installed” section on page 2-9
.
DC input voltage range: –48 VDC to –60 VDC
See also the
“If DC Power Supplies Are Installed” section on page 2-12
.
DC Connector Type
Power Connector Cables
Operating Relative Humidity 8 to 90% (non-condensing)
Nonoperating Relative
Humidity
5 to 95% (non-condensing) at temperatures of 73°F to 104°F (23°C to 40°C)
Operating Temperature
Nonoperating Temperature
50 to 95°F (10 to 35°C)
–104 to 158°F (–40 to 70°C)
Operating Altitude
Molex
Wire cable gauge 8 AWG
Dimensions (H x W x D)
Weight (fully configured)
Approvals: Safety
Approvals: EMC
0 to 4000 m
7.0 x 17.2 x 26 in. (17.8 x 43.7 x 66.0 cm)
96 lb (43.54 kg)
UL/CSA 60950-1
FCC Part 15 (CFR 47) Class A
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
A-5
Appendix A Technical Specifications
CDE460 Specifications
CDE460 Specifications
lists the technical specifications and management information for the CDE460.
Table A-5 CDE460 Specifications
Rack Units
Power
AC Power Rating
DC Power Rating
AC Electrical Input
4
100 to 240 VAC or –48 VDC redundant power supplies included in all models
1280 W peak
1010 W peak
• AC input voltage low range—Minimum: 100 VAC,
Maximum: 127 VAC
DC Electrical Input
• AC input voltage high range—Minimum: 200 VAC,
Maximum: 240 VAC
See the
“If AC Power Supplies Are Installed” section on page 2-9 .
DC input voltage range: –48 VDC to –60 VDC
See also the
“If DC Power Supplies Are Installed” section on page 2-12 .
DC Connector Type
Power Connector Cables
Operating Relative Humidity 8 to 90% (non-condensing)
Nonoperating Relative
Humidity
5 to 95% (non-condensing) at temperatures of 73°F to 104°F (23°C to 40°C)
Operating Temperature
Nonoperating Temperature
50 to 95°F (10 to 35°C)
–104 to 158°F (–40 to 70°C)
Operating Altitude
Molex
Wire cable gauge 10 AWG
Dimensions (H x W x D)
Weight (fully configured)
Approvals: Safety
Approvals: EMC
0 to 3028 m
7.0 x 17.2 x 26 in. (17.8 x 43.7 x 66.0 cm)
122 lb (55.39 kg)
UL 60950-1, CSA C22.2
FCC Part 15, Industry Canada ICES-003 issue 4, VCCI,
EN55022:2010, CISPR 22:2008, AS/NZS, EN 55024:2010, CISPR
24:2010
A-6
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Appendix A Technical Specifications
CDE475 Specifications
CDE475 Specifications
Table A-6 lists the technical specifications and management information for the CDE475.
Table A-6 CDE475 Specifications
Rack Units
Power
AC Power Rating
DC Power Rating
AC Electrical Input
4
100 to 240 VAC or –48 VDC redundant power supplies included in all models
1280 W peak
1000 W peak
• AC input voltage low range—Minimum: 100 VAC,
Maximum: 127 VAC
DC Electrical Input
• AC input voltage high range—Minimum: 200 VAC,
Maximum: 240 VAC
See the
“If AC Power Supplies Are Installed” section on page 2-9
.
DC input voltage range: –48 VDC to –60 VDC
See also the
“If DC Power Supplies Are Installed” section on page 2-12
.
DC Connector Type
Power Connector Cables
Operating Relative Humidity 8 to 90% (non-condensing)
Nonoperating Relative
Humidity
5 to 95% (non-condensing) at temperatures of 73°F to 104°F (23°C to 40°C)
Operating Temperature
Nonoperating Temperature
50 to 95°F (10 to 35°C)
–104 to 158°F (–40 to 70°C)
Operating Altitude
Dimensions (H x W x D)
Weight (fully configured)
Molex
Wire cable gauge 10 AWG
0 to 3028 m
7.0 x 17.2 x 26 in. (17.8 x 43.7 x 66.0 cm)
122 lb (55.39 kg)
CDE Management
Table A-7 lists the management for all CDE models.
Table A-7
Data Rate
Ports
Input Cables
CDE Management
2 Gbps maximum
Console port: DB-9 RS-232
10/100/1000 Mbps Ethernet interface: RJ-45 (management)
Note The CDE280 Engine has one RS-232 serial port (RJ-45 connector)
Console port: DB-9 female serial cable
Ethernet interface: RJ-45 Category 5E or higher cable
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
A-7
Appendix A Technical Specifications
CDE Heat Rate Load
CDE Heat Rate Load
provides the heat rate load for rack ventilation for each CDE.
Table A-8
Platform
CDE205
CDE220 2A
CDE220 2C1
CDE220 2C2
CDE220 2D1
CDE220 2G2
CDE250 2G3
CDE250 2M0
CDE220 2S1
CDE220 2S3
CDE250 2S5
CDE250 2S6
CDE250 2S8
CDE250 2S9
CDE250 2S10
CDE250 2S10
CDE250 2V0
CDE280 2S5
CDE280 2S10
CDE280 2S21
CDE280 2H1
CDE280 2H13
CDE280 2H26
CDE420 4A
CDE420 4G
CDE460 4R1
CDE Heat Rate Load
Typical Power (Watts)
450
450
450
450
600
385
510
450
300
665
435
635
475
550
600
520
404
603
634
450
450
540
514
875
980
973 (for DC)
Typical Heat
Dissipation
(BTU /Hr)
2047
1325
1750
1550
1550
1535
1535
1535
1025
2275
1500
2175
1625
1885
2052
1535
1535
1843
1754
1774
1379
2058
2163
3000
3350
3318 (for DC)
A-8
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
A P P E N D I X
B
Connector Pin Assignments
This appendix lists the connector pin assignments for the Cisco Content Delivery Engines.
•
Serial Console-Interface Connector Pin Assignments, page B-1
•
•
Ethernet Connector Pin Assignments, page B-3
Cable Pin Assignments, page B-6
Serial Console-Interface Connector Pin Assignments
The serial console-interface connector is a 9-pin, RS-232 D-type, DTE connector. A null modem cable
is required to connect a workstation running the Linux or Windows operating system. Table B-1
lists the pin assignments for the serial console interface-connector.
Table B-1 RS-232 Connector Pin Assignments
Description
Data carrier detect; input
Receive data; input
Transmit data; output
Data terminal ready; output
Interface signal ground
Data set ready; input
Ready to send; output
Clear to send; input
Ring indicator; input
8
9
6
7
2
3
4
5
Pin
1
In
Out
In
In
I/O
In
In
Out
Out
—
Signal Name
DCD
RXD
TXD
DTR
GND
DSR
RTS
CTS
RI
Table B-2 RJ-45 Connector Pin Assignments
Description
Request to Send; input
Data Terminal Ready; output
Transmit data; output
Pin
1
2
3
I/O
In
Out
Out
Signal Name
RTS
DTR
TXD
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
B-1
Appendix B Connector Pin Assignments
Serial Console-Interface Connector Pin Assignments
Table B-2 RJ-45 Connector Pin Assignments (continued)
Description
Interface signal ground
Interface signal ground
Receive Data; input
Ready to send; output
Data Set Ready; input
Clear to Send; input
Pin
4
5
6
7
8
9
I/O
—
—
In
Out
In
In
Signal Name
GND
GND
RXD
RTS
DSR
CTS
Serial Port Connector
The CDEs have one standard serial port connector located on the back of the device.
Note The CDE280 Engine uses a KVM console or CIMC virtual console. For more information on the KVM console, see the
“KVM Console” section on page B-3
Figure B-1 shows the pin number assignments for the 9-pin, male D-shell serial port connector on the
back of the device. These pin number assignments conform to the industry standard for RS-232 communications.
Figure B-1
1
Serial Port Connector
5
6 9
provides the RJ-45-to-DB-9 pinout information for the interconnections between the terminal server and a CDE.
Table B-3 RJ-45 Connector to DB-9 Pinout
Signal Name/
Function
TXD
RXD
DSR
GND
DTR
RTS
CTS
GND
1
8
4
3
2
5
7
RJ-45 Pin
6
RJ-45
Yellow
Black
Orange
Green
Brown
Blue
Slate/Grey
Red
DB-9 Pin
2
3
4
5
6
7
8
—
Signal Name/
Function
RXD
TXD
DTR
GND
DSR
CTS
RTS
GND
B-2
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Appendix B Connector Pin Assignments
Table B-3 RJ-45 Connector to DB-9 Pinout
Signal Name/
Function
—
—
RJ-45 Pin
—
—
RJ-45
White
Purple
DB-9 Pin
—
—
Ethernet Connector Pin Assignments
Signal Name/
Function
—
—
KVM Console
The KVM cable provides a connection into the server, providing a DB9 serial connector, a VGA connector for a monitor, and dual USB 2.0 ports for a keyboard and mouse. With this cable, you can create a direct connection to the operating system and the BIOS running on the server.
Figure B-2 KVM Console
4
2 3
1
1 Connector (to server front panel)
2 DB-9 serial connector
3
4
VGA connector (for a monitor)
Two-port USB 2.0 connector (for a mouse and keyboard)
Ethernet Connector Pin Assignments
The Ethernet connector is an 8-pin, modular RJ-45 connector.
list the
Ethernet connector pin assignments.
Table B-4 Ethernet Connector Pin Assignments for T568A
3
4
RJ-45
Pin
1
2
Wire Color
(T568A)
White/Green
Green
White/Orange
Blue
Wire Diagram
(T568A)
10BASE-T
100BASE-T
Transmit+
Transmit–
Receive+
Unused
1000BASE-T
Signal
BI_DA+
BI_DA–
BI_DB+
BI_DC+
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
B-3
Ethernet Connector Pin Assignments
Table B-4
6
7
8
RJ-45
Pin
5
Ethernet Connector Pin Assignments for T568A
Wire Color
(T568A)
White/Blue
Orange
White/Brown
Brown
Wire Diagram
(T568A)
10BASE-T
100BASE-T
Unused
Receive–
Unused
Unused
Appendix B Connector Pin Assignments
1000BASE-T
Signal
BI_DC–
BI_DB–
BI_DD+
BI_DD–
Table B-5
5
6
3
4
7
8
RJ-45
Pin
1
2
Ethernet Connector Pin Assignments for T568B
Wire Color
(T568B)
White/Orange
Orange
Wire Diagram
(T568B)
White/Green
Blue
White/Blue
Green
White/Brown
Brown
10BASE-T
100BASE-T
Transmit+
Transmit–
Receive+
Unused
Unused
Receive–
Unused
Unused
1000BASE-T
Signal
BI_DA+
BI_DA–
BI_DB+
BI_DC+
BI_DC–
BI_DB–
BI_DD+
BI_DD–
B-4
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Appendix B Connector Pin Assignments
Table B-6 RJ-45 Crossover Cable Pin Assignments for T568B
7
8
5
6
3
4
RJ-45 Pin
End 1
1
2
Wire Color
White/Orange
Orange
White/Green
Blue
White/Blue
Green
White/Brown
Brown
Diagram End 1
4
5
8
2
1
7
RJ-45 Pin End 2
3
6
Fiber Connector Type
Ethernet Port Connector
The CDEs come with an integrated dual-port Ethernet controller. This controller provides an interface for connecting to 10-Mbps, 100-Mbps, or 1000-Mbps networks; it provides full-duplex (FDX) capability, which enables simultaneous transmission and reception of data on the Ethernet LAN.
To access the Ethernet port, connect a Category 3, 4, or 5 unshielded twisted-pair (UTP) cable to the
RJ-45 connector on the back of the device.
Note The 100BASE-TX/1000BASE-TX Ethernet standard requires that the cabling in the network be
Category 5 or higher.
shows the pin number assignments for the Ethernet RJ-45 port.
Figure B-3 RJ-45 Ethernet Port Connector
Activity LED
(green)
Speed LED
(green)
8 1
Fiber Connector Type
The fiber connector type used to connect to the SE dual-fiber NIC cards is the GLC-SX-MM.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
B-5
Appendix B Connector Pin Assignments
Cable Pin Assignments
Note If you are using a TenGigabit network interface, you must use the Intel Transceiver Twinax cable.
Cable Pin Assignments
Figure B-6 show the pin assignments for the cable connection for an RS-232 null
modem, RJ-45 straight-through cable, and RJ-45 crossover cable, respectively .
.
Figure B-4 Pin Assignments for RS-232 Null Modem
TXD
R X D
G N D
3
4
5
6
1
2
7
8
9
DB-9 (Female)
End view
5 1
9 6
Figure B-5 Pin Assignments and Wiring for an RJ-45 Straight-Through Cable
4
5
6
7
8
1
2
3
White/Orange
Orange
White/Green
Blue
White/Blue
Green
White/Brown
Brown
3
4
5
6
1
2
7
8
9
TO HOST
COMPUTER
DB-9 (Female)
End view
5 1
9 6
4
5
6
7
8
1
2
3
B-6
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Appendix B Connector Pin Assignments
Figure B-6 Pin Assignments and Wiring for an RJ-45 Crossover Cable
3
4
5
6
1
2
7
8
White/Orange
Orange
White/Green
Blue
White/Blue
Green
White/Brown
Brown
Cable Pin Assignments
3
4
5
6
1
2
7
8
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
B-7
Cable Pin Assignments
Appendix B Connector Pin Assignments
B-8
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
A P P E N D I X
C
Power Cord Specifications
This appendix provides supported power cable specifications.
This appendix contains the following sections:
•
Supported Power Cords and Plugs, page C-1
Supported Power Cords and Plugs
Each power supply has a separate power cord. Standard power cords or jumper power cords are available for connection to the server. The jumper power cords, for use in racks, are available as an optional alternative to the standard power cords.
Note Only the approved power cords or jumper power cords provided with the server are supported.
Table C-1 lists the power cords for the server power supplies.
Table C-1 Supported Power Cords for the Server
Length
Feet
8.2
Meters
2.5
Description
SFS-250V-10A-AR
Power Cord, 250 VAC 10 A IRAM 2073 Plug
Argentina
CAB-9K10A-AU
250 VAC 10 A 3112 Plug,
Australia
SFS-250V-10A-CN
Power Cord, 250 VAC 10 A GB 2009 Plug
China
CAB-9K10A-EU
Power Cord, 250 VAC 10 A M 2511 Plug
Europe
SFS-250V-10A-ID
Power Cord, 250 VAC 16A EL-208 Plug
South Africa, United Arab Emirates, India
8.2
8.2
8.2
8.2
2.5
2.5
2.5
2.5
Power Cord
Reference
Illustration
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
C-1
Appendix C Power Cord Specifications
Supported Power Cords and Plugs
Table C-1 Supported Power Cords for the Server (continued)
Length
Description
SFS-250V-10A-IS
Power Cord, 250 VAC 10 A SI32 Plug
Israel
CAB-9K10A-IT
Power Cord, 250 VAC 10 A CEI 23-16 Plug
Italy
CAB-9K10A-SW
Power Cord, 250 VAC 10 A MP232 Plug
Switzerland
CAB-9K10A-UK
Power Cord, 250 VAC 10 A BS1363 Plug (13 A fuse)
United Kingdom
CAB-AC-250V/13A
Power Cord, 250 VAC 13 A IEC60320 Plug
North America
CAB-N5K6A-NA
Power Cord, 250 VAC 13 A NEMA 6-15 Plug,
North America
CAB-9K12A-NA
Power cord, 125 VAC, 13 A, NEMA 5-15 Plug
North America
CAB-C13-CBN
Cabinet Jumper Power Cord, 250 VAC 10 A,
C13-C14 Connectors
CAB-C13-C14-2M
Cabinet Jumper Power Cord, 250 VAC 10 A,
C13-C14 Connectors
CAB-C13-C14-AC
Cabinet Jumper Power Cord, 250 VAC 10 A,
C13-C14 Connectors
CAB-JPN-3PIN
Power Cord 3PIN Japan
CAB-AC-L620-C13
AC Power Cord, NEMA L6-20 - C13
CAB-250V-10A-CN
AC Power Cord - 250V, 10A - PRC
CAB-250V-10A-BR
Power Cord - 250V, 10A - Brazil
Feet
8.2
8.2
8.2
8.2
6.6
8.2
8.2
2.2
6.6
9.8
7.9
6.5
8.2
7
Meters
2.5
2.5
2.5
2.5
2.0
2.5
2.5
0.68
2.0
3.0
2.4
2.0
2.5
2.1
Power Cord
Reference
Illustration
C-2
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Appendix C Power Cord Specifications
Supported Power Cords and Plugs
AC Power Cord Illustrations
This section includes the AC power cord illustrations. See
through
.
Figure C-1 SFS-250V-10A-AR
2500 mm
Plug:
EL 219
(IRAM 2073)
Cordset rating: 10 A, 250/500 V MAX
Length: 8.2 ft
Connector:
EL 701
(IEC60320/C13)
Figure C-2 CAB-9K10A-AU
Plug:
EL 206
A.S. 3112-2000)
Cordset rating: 10 A, 250 V/500V
Length: 2500mm
Connector:
EL 701C
(IEC 60320/C15)
Figure C-3 SFS-250V-10A-CN
Plug:
EL 218
(CCEE GB2009)
Cordset rating 10A, 250V
(2500 mm)
Connector:
EL 701
(IEC60320/C13)
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
C-3
Appendix C Power Cord Specifications
Supported Power Cords and Plugs
Figure C-4 CAB-9K10A-EU
Plug:
M2511
Figure C-5 SFS-250V-10A-ID
Cordset rating: 10A/16 A, 250 V
Length: 8 ft 2 in. (2.5 m)
Connector:
VSCC15
Plug:
EL 208
Cordset rating 16A, 250V
(2500mm)
Connector:
EL 701
Figure C-6 SFS-250V-10A-IS
EL-212
16A
250V
Plug:
EL 212
(SI-32)
Cordset rating 10A, 250V/500V MAX
(2500 mm)
Connector:
EL 701B
(IEC60320/C13)
C-4
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Appendix C Power Cord Specifications
Figure C-7 CAB-9K10A-IT
Supported Power Cords and Plugs
Plug:
I/3G
(CEI 23-16)
Cordset rating: 10 A, 250 V
Length: 8 ft 2 in. (2.5 m)
Connector
C15M
(EN60320/C15 )
Figure C-8 CAB-9K10A-SW
Plug:
MP232-R
Cordset rating: 10 A, 250 V
Length: 8 ft. 2 in (2.5 m)
Connector:
IEC 60320 C15
Figure C-9 CAB-9K10A-UK
Plug:
EL 210
Cordset rating: 10 A, 250 V/500 V MAX
Length: 2500mm
Connector:
EL 701C
(EN 60320/C15)
(BS 1363A) 13 AMP fuse
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
C-5
Appendix C Power Cord Specifications
Supported Power Cords and Plugs
Figure C-10 CAB-AC-250V/13A
Plug:
EL312MoldedTwistlock
(NEMA L6-20)
Figure C-11 CAB-N5K6A-NA
Cordset rating 13A, 250V
(6.6 feet) (79±2m)
Connector:
EL 701
(IEC60320/C13)
Plug: NEMA 6-15P
Cordset rating: 10 A, 250 V
Length: 8.2 ft
Connector:
IEC60320/C13
Figure C-12 CAB-9K12A-NA
Cordset rating 13A, 125V
(8.2 feet) (2.5m)
Plug:
NEMA 5-15P
Connector:
IEC60320/C15
C-6
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Appendix C Power Cord Specifications
Figure C-13 CAB-C13-CBN, Jumper Power Cord (0.68 m)
Supported Power Cords and Plugs
Cordset rating 10A, 250V
(686mm)
Plug:
SS10A
Figure C-14 CAB-C13-C14-2M, Jumper Power Cord (2 m)
Connector:
HS10S
Cordset rating 10A, 250V
(2.0 m)
Plug:
SS10A
Figure C-15 CAB-C13-C14-AC, Jumper Power Cord (3 m)
Cordset rating 10A, 250V
(3.0 m)
Plug:
SS10A
Connector:
HS10S
Connector:
HS10S
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
C-7
Supported Power Cords and Plugs
Figure C-16 CAB-JPN-3PIN, Power Cord 3PIN, Japan
Appendix C Power Cord Specifications
Figure C-17 CAB-AC-L620-C13, AC Power Cord, NEMA L6-20 - C13 (2 m)
C-8
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Appendix C Power Cord Specifications
Figure C-18 CAB-250V-10A-CN, AC Power Cord
Supported Power Cords and Plugs
Figure C-19 CAB-250V-10A-BR
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
C-9
Supported Power Cords and Plugs
Appendix C Power Cord Specifications
C-10
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
A P P E N D I X
D
CDE280 and CDE285 Troubleshooting Tips
The Cisco Integrated Management Controller (CIMC) is the management service for the CDE280
Service Engine. CIMC runs within the server.
You can use a web-based GUI or SSH-based CLI to access, configure, administer, and monitor the server.
Almost all tasks can be performed in either interface. The results of tasks performed in one interface are automatically displayed in another.
This document provides some CIMC troubleshooting tips and common troubleshooting scenarios for
CDE280 Service Engine.
This appendix contains the following sections:
•
Troubleshooting Tips, page D-1
Note The troubleshooting tips for CDE285 is similar to CDE280. For the latest information on using the
CIMC for troubleshooting, see Cisco UCS C-Series Servers Integrated Management Controller CLI
Configuration Guide, Release 2.0
and Cisco UCS C-Series Servers Integrated Management Controller
GUI Configuration Guide, Release 2.0
.
Troubleshooting Tips
This session provides common troubleshooting tips on CDE280 service engine.
Obtaining Show Tech Support to TAC
Perform this task when requested by the Cisco Technical Assistance Center (TAC). This utility creates a summary report containing configuration information, logs, and diagnostic data that will help TAC in troubleshooting and resolving a technical issue.
This show tech support is available from GUI and CLI to tftp upload a tech support file for offline analysis.
To obtain show tech via GUI, do the following:
Step 1
Step 2
Step 3
In the Navigation pane, click the Admin tab.
From the Admin tab, click Utilities .
In the Actions area of the Utilities pane, click Export Technical Support Data .
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
D-1
Troubleshooting Tips
Figure D-1 Utilities
Appendix D CDE280 and CDE285 Troubleshooting Tips
Step 4
Step 5
In the Export Technical Support Data dialog box, complete these fields:
TFTP Server IP Address field - The IP address of the TFTP server on which the support data file should be stored.
Path and Filename field - The file name in which the support data should be stored on the server. When you enter this name, include the relative path for the file from the top of the TFTP tree to the desired location.
Click Export .
D-2
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Appendix D CDE280 and CDE285 Troubleshooting Tips
Figure D-2 Utilities - Export Technical Support Data
Troubleshooting Tips
To obtain show tech via CLI command, do the following:
Generate show techsupport then provide the generated report file to Cisco TAC.
SanDiego# scope cimc SanDiego /cimc # scope firmware log network tech-support
SanDiego /cimc # scope tech-support
SanDiego /cimc/tech-support # set tftp-ip 192.168.1.1 SanDiego /cimc/tech-support *# set path
\techsupport\showtech SanDiego /cimc/tech-support *#commit
SanDiego /cimc/tech-support *#start
Following are the explanations of some of the key fields within the showtech:
•
•
•
• var/ - Contains detailed logs, and status of all monitored services. It also contains services information files such as the configuration of SOL and IPMI sensor alarms.
var/log - This contains the rolling volatile log messages.
obfl/ - This contains the rolling non-volatile log messages.
met/ - Non-volatile configuration and SEL.
•
• tmp/ - The show techsupport text files, along with BIOS techsupport text files.
Text files in tmp - These contain all process, network, system, mezzanine, and bios state information.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
D-3
Appendix D CDE280 and CDE285 Troubleshooting Tips
Troubleshooting Tips
•
•
•
•
•
•
• mctool - Gets basic information on the State of the CIMC to USC management API.
network - See current network configuration and socket information.
obfl - Live obfl messages - Live /var/log/messages file alarms - What sensors are in alarm.
sensors - Current sensor readings from IPMI.
power - The current power state of the x86.
Display of System Event Log Events
To display the System Event Log (SEL) events, do the following:
Step 1
Step 2
Step 3
Step 4
Step 5
In the Navigation pane, click the Server tab.
From the Server tab, click System Event Log .
Review the following information for each system event in the log.
(Optional) From the Entries Per Page drop?down list, select the number of system events to display on each page.
(Optional) Click <Newer and Older> to move backward and forward through the pages of system events, or click <<Newest to move to the top of the list. By default, the newest system events are displayed at the top if the list. Cisco CIMC.
Figure D-3 System Event Log
Display of Sensor Readings
To display the sensor readings, do the following:
D-4
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Appendix D CDE280 and CDE285 Troubleshooting Tips
Step 1
Step 2
Step 3
In the Navigation pane, click the Server tab.
From the Server tab, click Sensors .
View various sensors by clicking the desired sensor.
Figure D-4 Sensors
Troubleshooting Tips
Display of CIMC Log
To display the CIMC log, do the following:
Step 1
Step 2
Step 3
In the Navigation pane, click the Admin tab.
From the Admin tab, click CIMC Log .
From the Entries Per Page drop?down list, select the number of CIMC events to display on each page.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
D-5
Troubleshooting Tips
Figure D-5 CIMC Log
Appendix D CDE280 and CDE285 Troubleshooting Tips
Common Troubleshooting Scenarios
Power-On Related
If there is no Standby Power to UCS C250 M1 Extended-Memory Rack-Mount Server, do the following:
Step 1
Step 2
Check that the AC power cord is ok.
Failure in Power Supply Unit.
If the Server Host does not power up, do the following:
Step 1
Step 2
Step 3
Check front I/O board connection.
Check Power Sequencer fault LEDs.
Power Supply unit failure (PS Failure LED blinking).
If the Server powers on with no video, do the following:
Step 1
Step 2
Step 3
Check that the front I/O dongle is properly seated.
Check the front I/O cable connection to Motherboard.
Memory subsystem failure.
D-6
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Appendix D CDE280 and CDE285 Troubleshooting Tips
Troubleshooting Tips
Common Troubleshooting Scenarios Host Does not Boot
If the host does not boots up, do the following:
Step 1
Step 2
Step 3
Step 4
Step 5
Step 6
Step 7
Step 8
Verify front I/O dongle is seated correctly.
Check Front I/O cable connection.
Reseat/Replace Dimm(s).
Verify BIOS is not corrupt.
Verify host power rails are good.
Check CPU sockets for bent pins.
Verify Powerok signals are ok.
Verify Resets are good.
Common Troubleshooting Scenarios - BMC
BMC booted. Look for Blade health LED to come on which indicates that the BMC has started.
Step 1
Step 2
Step 3
Step 4
Check that the Standby power rails are ok.
Check that the BMC bios is not corrupt.
Check that the BMC clock is ok.
Check that standby power is ok and resets are valid.
If the BMC Ethernet cannot communicate, do the following:
Step 1 Check the flex cable connections to Mother Board and Rear I/O.
Accessing CIMC on CDE280 Service Engine
For CDE280, you can use the CIMC to manage your device. However, you have to configure the CIMC.
To configure the CIMCIP, do the following:
Step 1 Attach an Ethernet cable to the Management port of the CDE280 or CDE285. The Management port is labeled “ M ”.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
D-7
Troubleshooting Tips
Figure D-6 Attaching the Ethernet Cable
Appendix D CDE280 and CDE285 Troubleshooting Tips
Step 2
Step 3
Power on the server and press F8 when the CIMC configuration screen appears.
Configure the device with the options shown below:
•
•
Enter your IP, subnet mask and gateway addresses.
Press the Space Bar to apply the new IP configuration.
Figure D-7 Configuring the CIMCIP
D-8
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Appendix D CDE280 and CDE285 Troubleshooting Tips
Troubleshooting Tips
Note When configuring CIMC, pay close attention to the 'NIC Mode' and 'NIC Redundancy' settings. If these are set incorrectly, CIMC configures itself to use network ports other than the dedicated CIMC port causing issues.
Step 4
Step 5
Step 6
Ping the IP address associated with the CIMC port.
After verifying the CIMC interface is reachable; verify that the CIMC Web Interface is available by pointing your Web-browser to its IP address: https://< CIMC IP >
Enter admin as the username and the default password as password .
Figure D-8 CIMC Main Webpage
Connecting to the console
To connect to the console, do the following:
Step 1 Enter the IP address of the server with admin as the username and then the password (same as CIMC login web page):
SE1$ ssh -l admin
10.140.104.17 [email protected]'s password: XXXXX C240-
FCH1852V20Y#
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
D-9
Troubleshooting Tips
Step 2 Enter the following command:
C240-FCH1852V20Y# connect host
Appendix D CDE280 and CDE285 Troubleshooting Tips
D-10
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
A P P E N D I X
E
Configuring VDS-IS CDE280 Disks
Before you begin ensure that you have installed Java Version 6.45 in your machine.
Once the new disks are inserted to the CDE-280, the physical status of the new disks will be in Just a
Bunch of Disks (JBOD) state and the virtual status will be blank. To update the physical drive and virtual drive statuses for the disks, you can follow one of the two methods:
•
•
Changing the Disk Status Using KVM Console
Changing Drive Status Using CIMC Console
Changing the Disk Status Using KVM Console
To change the physical drive status of the new disks from JBOD to Online and to update the virtual drive status, perform the following steps:
Step 1
Step 2
Step 3
Step 4
Step 5
Step 6
Step 7
Step 8
Log into the UCS Management controller.
Click the Server tab.
Choose Summary > Launch KVM Console to launch the Console.
The KVM Console triggers the Java Application which is already installed in the PC and the Opening viewer popup window appears.
In the Opening viewer popup window, select the Open with drop-down list, choose Java(TM) Web
Start Launcher
Click OK.
The Warning – Security popup window appears.
Click Continue in the Warning – Security popup window.
From the KVM Console, choose Power > Power Cycle Systems (cold boot).
Press Ctrl-R key combination to run the MegaRAID Configuration Utility, if the message as show in
Figure E-1 appears in the KVM Console.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
E-1
Changing the Disk Status Using KVM Console
Figure E-1 MegaRAID Configuration Utility
Appendix E Configuring VDS-IS CDE280 Disks
Step 9 On successful completion, the MegaRAID configuration utility is loaded and the Virtual Drive
Management window displays the No Configuration Present message under Cisco 12G SAS Modular
Raid(Bus 0x04, Dev 0x00) . All the 24 new disks that are added are listed under Controller.
Figure E-2 Loading MegaRAID Configuration Utility
Step 10
Step 11
Select Cisco 12G SAS Modular Raid(Bus 0x04, Dev 0x00) and press F2 to change the disk status from
JBOD to Online.
Choose Make Unconfigured Good from the drop-down list and press Enter.
E-2
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Appendix E Configuring VDS-IS CDE280 Disks
Figure E-3 Make Unconfigured Good
Changing the Disk Status Using KVM Console
Step 12 Select all the JBOD disks to change the status to Unconfigured Good.
Note You can use the Space bar to select all the Disks in JBOD state.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
E-3
Changing the Disk Status Using KVM Console
Figure E-4 Selecting all the Disks
Appendix E Configuring VDS-IS CDE280 Disks
Step 13
Step 14
Select OK and press Enter.
On successful conversion, you can view all the disks displayed under Unconfigured Drives in the
Virtual Drive Management (VD Mgmt) window.
Press Ctrl-N key combination to go to Physical Drive Management (PD Mgmt) window.
You can view all the disks state as Unconfigured Good in the PD Management window.
E-4
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Appendix E Configuring VDS-IS CDE280 Disks
Figure E-5 Physical Drive Management
Changing the Disk Status Using KVM Console
Step 15 To verify the physical status of the disk, choose Storage > Cisco 12G SAS Modular Raid Controller
(SLOT-HBA) > Physical Drive Info from the CIMC Console.
You can view that the physical drive status is changed as Unconfigured Good.
Figure E-6 Physical Drive Info
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
E-5
Appendix E Configuring VDS-IS CDE280 Disks
Changing the Disk Status Using KVM Console
Step 16
Step 17
To modify the status of the Virtual Drive Info, from the KVM Console , select Cisco 12G SAS Modular
Raid(Bus 0x04, Dev 0x00) in the Virtual Drive Management window and press F2 .
Select Create Virtual Drive from the drop-down list and press Enter .
Figure E-7 Creating Virtual Device
Step 18 Select a single disk using Spacebar to create a Virtual Drive under the Virtual Drive Management window as shown in
, and .
E-6
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Appendix E Configuring VDS-IS CDE280 Disks
Figure E-8 Virtual Drive Management
Changing the Disk Status Using KVM Console
Step 19
Step 20
Select OK .
The confirmation popup window appears. Select OK and view the Virtual Drive created using the selected disk.
Repeat the procedure from step 16 to step 19 for creating virtual drives with the entire unconfigured drives.
On successful creation of the virtual drives for each disk you can view 24 Device Groups and 24 Virtual
Drives under the Controller information.
Figure E-9 Adding the Virtual Drives
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
E-7
Changing the Disk Status Using KVM Console
Appendix E Configuring VDS-IS CDE280 Disks
Step 21 To verify the status of the virtual drive status, choose Storage > Cisco 12G SAS Modular Raid
Controller (SLOT-HBA) > Virtual Drive Info.
The Virtual Drives area displays the following status:
•
•
•
Status—Optimal
Health—Good
RAID Level—RAID 0
Figure E-10 Virtual Drive Info Status
E-8
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Appendix E Configuring VDS-IS CDE280 Disks
Changing Drive Status Using CIMC Console
Changing Drive Status Using CIMC Console
To change the physical drive status of the new disks from JBOD to Online and to update the virtual drive status, perform the following steps:
Step 1
Step 2
Step 3
Launch the CIMC Console.
Choose Storage > Cisco 12G SAS Modular Raid Controller (SLOT-HBA) > Physical Drive Info .
To change the physical drive status, select the disks that are in JBOD state and click Set State as
Unconfigured Good radio button.
Figure E-11 Changing the Physical Drive Status
Step 4
A warning message is displayed. Click OK to change the status of the physical drive.
To verify the status of the physical drive, choose Storage > Cisco 12G SAS Modular Raid Controller
(SLOT-HBA) > Physical Drive Info from the CIMC Console .
You can view that the physical drive status is changed as Unconfigured Good.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
E-9
Changing Drive Status Using CIMC Console
Figure E-12 Status changed in Physical Drive Info
Appendix E Configuring VDS-IS CDE280 Disks
Step 5 Repeat the step 3 for all the Individual JBOD Disks till the status of all the disks are changed to
Unconfigured Good.
Figure E-13 Status of all Disks in Physical Drive Info
Step 6 Click the Controller Info tab and click the Create Virtual Drive from Unused Physical Drives radio button.
E-10
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Appendix E Configuring VDS-IS CDE280 Disks
Changing Drive Status Using CIMC Console
Figure E-14 Creating Virtual Drive from Unused Physical Drives
Step 7 Select the Disk to be added to the Device Group and click the >> .
Figure E-15 Selecting the Disk
Step 8 Click the Create Virtual Drive .
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
E-11
Appendix E Configuring VDS-IS CDE280 Disks
Changing Drive Status Using CIMC Console
Figure E-16 Creating Virtual Drive from Unused Physical Drives
Step 9 To verify the status of the disks for which the Device Group is created, choose Storage > Cisco 12G
SAS Modular Raid Controller (SLOT-HBA) > Physical Drive Info .
You can view the Physical Drive status is changed as Online.
Figure E-17 Verifying the Status of the Disks
E-12
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Appendix E Configuring VDS-IS CDE280 Disks
Changing Drive Status Using CIMC Console
Step 10 To verify the status of the Virtual Drive, choose Storage > Cisco 12G SAS Modular Raid Controller
(SLOT-HBA) > Virtual Drive Info .
The status of a single disk appears as follows:
• Status—Optimal
•
•
Health—Good
RAID Level—RAID 0
Figure E-18 Status of a Single disk in Virtual drive Info Page
Step 11 Repeat the procedure from step 6 to step 8 for all the disks that are marked as Unconfigured Good.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
E-13
Changing Drive Status Using CIMC Console
Figure E-19 Physical Drive Info Page
Appendix E Configuring VDS-IS CDE280 Disks
E-14
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
A P P E N D I X
F
VDS-IS and VQE CDE280 and CDE285
CIMC / BIOS Firmware
This appendix contains the following sections:
•
•
VDS-IS and VQE CDE 280 CIMC Firmware and BIOS Firmware Upgrade, page F-1
OMD CDE285 CIMC Firmware and BIOS Firmware Upgrade, page F-15
VDS-IS and VQE CDE 280 CIMC Firmware and BIOS
Firmware Upgrade
Before You Begin
You must ensure that you have successfully installed Java software version 6.45.
Procedure
Step 1
Step 2
Step 3
Log into the UCS Management controller.
Click the Admin tab and choose the Firmware Management to view the existing version of the CIMC
Firmware and the BIOS Firmware .
Click the Server tab.
To upgrade the firmware and BIOS, perform the following steps: a.
b.
c.
d.
e.
f.
g.
Choose Summary > Launch KVM Console to launch the Console.
In the Opening viewer popup window, select the Open with drop-down list, choose Java(TM) Web
Start Launcher and click OK .
Click Continue in the Warning – Security popup window.
From the KVM Console, choose Virtual Media > Activate Virtual Devices .
In the Unencrypted Virtual Media Session popup window select the Apply this session radio button.
Click Apply .
On successful activation of the virtual device, you can view a check mark before the Activate Virtual
Devices.
Choose Virtual Media > Map CD/DVD to map the ISO image.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
F-1
Appendix F VDS-IS and VQE CDE280 and CDE285 CIMC / BIOS Firmware
VDS-IS and VQE CDE 280 CIMC Firmware and BIOS Firmware Upgrade
Note You must ensure that you have already downloaded a ISO image before upgrading.
h.
i.
In the Virtual Media popup window, click Browse , and select the required ISO image.
Click Open .
Note If user upgrade the UCS CIMC and BIOS to 3.0 Version and try for VDSIS ISO to rescue or manufacturing the CDE 280 device which will fail with import/export utility. To avoid this failure, the user needs to run and enable Power Characterization in the UCS.
F-2
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Appendix F VDS-IS and VQE CDE280 and CDE285 CIMC / BIOS Firmware
VDS-IS and VQE CDE 280 CIMC Firmware and BIOS Firmware Upgrade
Figure F-1 Selecting ISO Image j.
Click Map Device .
You can view a check mark before the ISO File Mapped to CD/DVD in the KVM Console .
Figure F-2 Mapping Device
Step 4 Reboot the server: a.
Choose Power > Power Cycle Systems (cold boot) to reboot the server.
b.
c.
Click Yes to continue to execute a server control action. Device gets restarted automatically.
Press F6 for the Boot Menu Options as shown in
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
F-3
Appendix F VDS-IS and VQE CDE280 and CDE285 CIMC / BIOS Firmware
VDS-IS and VQE CDE 280 CIMC Firmware and BIOS Firmware Upgrade
Boot Menu Options
Figure F-3 Boot Menu Options
You can view the Entering Boot Selection Menu as shown in
.
Figure F-4 Entering Boot Selection Menu
F-4
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Appendix F VDS-IS and VQE CDE280 and CDE285 CIMC / BIOS Firmware
VDS-IS and VQE CDE 280 CIMC Firmware and BIOS Firmware Upgrade
Step 5 Choose Cisco vKVM-Mapped vDVD1.22
option from the Please select boot device popup window by navigating using the down arrow key.
Figure F-5 Selecting Boot Device
On successful selection, ISO image will be loaded and the Cisco UCS Host Upgrade Utility will be loaded after some time as shown in
.
Figure F-6 Loading Cisco ISO Image
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
F-5
Appendix F VDS-IS and VQE CDE280 and CDE285 CIMC / BIOS Firmware
VDS-IS and VQE CDE 280 CIMC Firmware and BIOS Firmware Upgrade
Note The upgrade may take approximately 10 to 20 minutes.
Cisco UCS Host Upgrade Utility launches with the latest version.
Figure F-7 Cisco UCS Host Upgrade Utility
Step 6
Step 7
Step 8
Click I Agree in the End User License Agreement.
Click Update , after you select the required components.
Click Update All , if you want to update all the components.
F-6
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Appendix F VDS-IS and VQE CDE280 and CDE285 CIMC / BIOS Firmware
VDS-IS and VQE CDE 280 CIMC Firmware and BIOS Firmware Upgrade
Figure F-8 Updating Components
Step 9 Click Yes in the confirmation popup window, to update firmware on all the components.
Figure F-9 Updating Firmware for the components
Step 10
Step 11
Click Yes to proceed with the firmware update.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
F-7
Appendix F VDS-IS and VQE CDE280 and CDE285 CIMC / BIOS Firmware
VDS-IS and VQE CDE 280 CIMC Firmware and BIOS Firmware Upgrade
Figure F-10 Updating Firmware
On successful firmware update, the status changes to the following:
•
•
SCHEDULED—Schedules the process for the selected components
IN PROGRESS —Displays the progress of the scheduled process
•
•
SKIPPED—Skips the process if both the versions are same
PASS—Process gets passed once the component is successfully updated.
F-8
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Appendix F VDS-IS and VQE CDE280 and CDE285 CIMC / BIOS Firmware
VDS-IS and VQE CDE 280 CIMC Firmware and BIOS Firmware Upgrade
Figure F-11 Scheduled Status for the Selected Components
Figure F-12 Status of the Selected Components
Step 12 Click Exit after all the components are updated.
Click Yes on the confirmation popup window to exit.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
F-9
Appendix F VDS-IS and VQE CDE280 and CDE285 CIMC / BIOS Firmware
VDS-IS and VQE CDE 280 CIMC Firmware and BIOS Firmware Upgrade
Figure F-13 Exit the Firmware Update
Step 13
Step 14
Choose Virtual Media > ISO file mapped to CD/DVD , to unmap the ISO file mapped to CD/DVD.
Click Yes to unmap the drive request.
Figure F-14 Unmap the Drive Request
Step 15
Step 16
Choose Power > Power Cycle Systems (cold boot) to reboot the server.
After Rebooting the server, log into the UCS Management controller.
Click the Admin tab and choose the Firmware Management to view the updated current version of the
Cisco IMC Firmware and the BIOS Firmware .
F-10
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Appendix F VDS-IS and VQE CDE280 and CDE285 CIMC / BIOS Firmware
VDS-IS and VQE CDE 280 CIMC Firmware and BIOS Firmware Upgrade
Figure F-15 Upgraded to Latest UCS Firmware and BIOS
VDS-IS and VQE CDE280 CIMC Firmware and BIOS Firmware
Downgrade
Step 1
Step 2
Log into the Cisco UCS Management controller. After you upgrade the CIMC and BIOS Firmware to higher version, the previous version will become the backup version.
Choose Admin > Firmware Management > Activate BIOS Firmware .
Note You will receive an error message as displayed in
. Click OK.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
F-11
Appendix F VDS-IS and VQE CDE280 and CDE285 CIMC / BIOS Firmware
VDS-IS and VQE CDE 280 CIMC Firmware and BIOS Firmware Upgrade
Figure F-16 Power Off the Server
Step 3
To Power Off the server, follow the steps: a.
b.
Click the
Click icon to Power Off the Server, and
Activate BIOS firmware to activate the BIOS Firmware.
Select the Firmware version to downgrade and Click Activate Firmware .
Note By default, the backup version of the firmware image remains selected in the popup window.
F-12
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Appendix F VDS-IS and VQE CDE280 and CDE285 CIMC / BIOS Firmware
VDS-IS and VQE CDE 280 CIMC Firmware and BIOS Firmware Upgrade
Figure F-17 Activating BIOS firmware
Step 4 While you perform a refresh, BIOS Firmware status changes to Write Host Flash.
On successful completion of downgrade, the backup version becomes the running version.
Figure F-18 Downgrading BIOS Firmware
Step 5 Click Activate Cisco IMC Firmware to load the Backup CIMC Firmware.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
F-13
Appendix F VDS-IS and VQE CDE280 and CDE285 CIMC / BIOS Firmware
VDS-IS and VQE CDE 280 CIMC Firmware and BIOS Firmware Upgrade
Note By default, the backup version of the CIMC Firmware remains selected in the popup window.
Step 6 Click Activate Firmware .
Figure F-19 Activating Cisco IMC Firmware
Note The Cisco IMC is restarted and is not reachable. You must enter the new URL in the browser location bar if the IP address or the HTTP ports have changed.
On successful completion, the backup versions of CIMC Firmware and BIOS Firmware becomes the running versions.
F-14
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Appendix F VDS-IS and VQE CDE280 and CDE285 CIMC / BIOS Firmware
OMD CDE285 CIMC Firmware and BIOS Firmware Upgrade
Figure F-20 Downgraded to previous version of CIMC Firmware
OMD CDE285 CIMC Firmware and BIOS Firmware Upgrade
For CDE285 CIMC and BIOS firmware upgrade, see Cisco UCS C240 M4 Server Installation and
Service Guide.
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
F-15
OMD CDE285 CIMC Firmware and BIOS Firmware Upgrade
Appendix F VDS-IS and VQE CDE280 and CDE285 CIMC / BIOS Firmware
F-16
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Download
Advertisement
Key features
Supports multiple video formats, including MPEG-DASH, HLS, and Smooth Streaming
Adaptive bitrate streaming for optimal video quality on any device
Content caching for fast and reliable video delivery
Powerful hardware for high-performance video processing
Comprehensive software suite for video management and control
Easy to deploy and manage
Modular design for scalability and flexibility
Frequently asked questions
The Cisco Content Delivery Engine 475 offers a number of benefits, including improved video quality, reduced buffering, and increased scalability. It also provides a comprehensive suite of features to optimize video delivery, making it an ideal solution for video service providers looking to improve the quality and reach of their video content.
The Cisco Content Delivery Engine 475 supports a wide range of video formats, including MPEG-DASH, HLS, and Smooth Streaming.
Yes, the Cisco Content Delivery Engine 475 can be used to deliver both live and on-demand video.