© Panduit Corp. 2017
TX6A Shielded Modular Plug
T568B & T568A
Part Number: SPS6X88-C
INSTALLATION INSTRUCTIONS PN600A
T568B Wiring Scheme
(Cable end 2)
Divider
Load bar
(Cable end 1)
Plug housing with shield
Strain relief boot
Strain relief collar
Pin # 8
T568B BRN
7
BRN/
WHT
6 5
BLU/
GRN WHT
4 3
GRN/
BLU WHT
2 1
ORG/
ORG WHT
Specifications
• Cable jacket diameter maximum 0.300 in (7.6mm).
• Solid or stranded conductor maximum insulated diameter
0.047 in (1.2mm).
• Panduit recommends T568B wiring scheme for use with cable constructed with the brown pair opposing the orange pair.
• For use with F/UTP, U/FTP and S/FTP type cables, which meet the dimensional requirements. Cable must have drain wire or braid.
Load Bar
Conductor holes and contact slots
Pins
1
8
Conductor holes
Divider
Conductor slots and “V” channel
1
Thread on boot
2
Contact slots
and collar first!
(Cable ends 1 & 2)
90°
CWST
ORG
BLU
“V” channel
GRN
(Cable end 2)
BRN
Drain wire
GRN
(Cable end 1)
ORG
Drain wire
“V” channel
BLU BRN
“V” channel
Divider post
• Thread boot and collar onto cable.
• Remove 1.5" of the outer jacket using wire stripping tool
(CJAST).
• Cut foil flush with cable jacket. If cable is braided, form braid into a drain wire. Bend the drain wire back so it is against the cable jacket.
• Fan twisted pairs into respective quadrants. The brown pair should be opposite the orange pair.
• Cut spline flush to fanned pairs using wire snipping tool
(CWST).
• Align the conductor divider “V” channel with the green pair.
• Insert divider posts into the cable. If the cable has an internal spline, insert divider posts into the brown and orange quadrants of the spline.
3 • Arrange conductors to T568B wiring scheme while minimizing untwist.
• Seat conductors into proper divider slots while holding divider flush with cable jacket.
“V” channel
(Cable end 1) (Cable end 2)
For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 1 of 4
© Panduit Corp. 2017
4
INSTALLATION INSTRUCTIONS PN600A
• Straighten and align untwisted conductors using a circular motion while holding conductors in respective divider slots.
• Maintain grip of conductors in T568B wiring scheme.
• Trim conductors on an angle approximately 1.00" from divider leading edge.
Pin # 8
T568B BRN
7
BRN/
WHT
6 5 4 3 2 1
1.00"
(Cable end 1)
5
Verify load bar orientation
1
Pins
8
(Cable end 2)
1
Pins
8
(Cable end 1)
• Orient load bar with contact slots facing downward.
6 7
• Guide conductors into load bar holes while holding conductors in the divider.
• Slide load bar towards divider until flush.
• Ensure the divider/load bar is centered and perpendicular to the cable axis.
• Trim conductors flush with load bar face.
(Cable end 1)
8
9
1
Pin s
8
Dr a in wire
Coll a r ba r bs
(C ab le end 2)
1
Pin s
8
Coll a r l a tche s
S tr a in coll a r g u ide s
(C ab le end 1)
Coll a r locking t abs
Boot po s ition when us ing
C S PT
• Orient cable so the drain wire is facing up.
• Hold the load bar and divider stationary while sliding the strain relief collar forward until there is no gap between the collar and divider.
• Ensure the drain wire is routed through the strain collar guides.
• Confirm the cable jacket extends beyond the collar barbs.
• Align pin #1 of cable sub-assembly (cable, load bar, divider, and strain relief collar) with pin #1 of plug housing.
Plug housing
10 MPT5-8AS
• Grip the strain relief collar and insert cable sub-assembly into the plug housing. (Fig. 9)
• Push sub-assembly into housing until collar locking tabs engage the plug housing pocket. Although not required, TX6
PLUS Plug Assembly Tool (CSPT) is available to facilitate this step.
• Use tool MPT5-8AS to complete plug termination. (Fig. 10)
• Trim or press excess drain wire between the collar latches.
• Push up boot and engage with collar latches.
• Visually check plug. Assembly is complete.
For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 2 of 4
© Panduit Corp. 2017
INSTALLATION INSTRUCTIONS
T568A Wiring Scheme
(Cable end 2)
(Cable end 1)
Strain relief boot
Strain relief collar
Divider
Load bar
Plug housing with shield
PN600A
Pin # 8
T568A BRN
7
BRN/
WHT
6 5 4 3 2 1
Specifications
• Cable jacket diameter maximum 0.300 in (7.6mm).
• Solid or stranded conductor maximum insulated diameter
0.047 in (1.2mm).
• Panduit recommends T568A wiring scheme for use with cable constructed with the brown pair opposing the green pair.
• For use with F/UTP, U/FTP and S/FTP type cables, which meet the dimensional requirements. Cable must have drain wire or braid.
Load Bar
Conductor holes and contact slots
Pins
1
8
Conductor holes
Divider
Conductor slots and “V” channel
“V” channel
Contact slots
Divider post
1
Thread on boot and collar first!
(Cable ends 1 & 2)
90°
CWST
• Thread boot and collar onto cable.
• Remove 1.5" of the outer jacket from the cable end using wire stripping tool (CJAST).
• Cut foil flush with cable jacket end. If cable is braided, form into a drain wire. Bend the drain wire back so it is against the cable jacket.
• Fan twisted pairs into respective quadrants. The brown pair should be opposite the green pair.
• When a cable spline (X-shaped filler) is present, cut spline flush to fanned pairs using wire snipping tool (CWST).
2
GRN
BLU
“V” channel
ORG
(Cable end 2)
BRN
Drain wire
ORG
(Cable end 1)
GRN
Drain wire
“V” channel
BLU BRN
• The “V” channel should be aligned with the orange pair.
• Insert divider posts into the cable. If the cable has an internal spline, insert divider posts into the brown and green quadrants of the spline.
3 • Arrange conductors to T568A wiring scheme while minimizing untwist.
• Seat conductors into proper divider slots while holding divider flush with cable jacket.
“V” channel
(Cable end 1) (Cable end 2)
For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 3 of 4
© Panduit Corp. 2017
4
INSTALLATION INSTRUCTIONS PN600A
• Straighten and align untwisted conductors using a circular motion while holding conductors in respective divider slots.
• Maintain grip of conductors in T568A wiring scheme.
• Trim conductors on an angle approximately 1.00" from divider leading edge.
Pin # 8
T568A BRN
7
BRN/
WHT
6 5 4 3 2 1
1.00"
(Cable end 1)
5
Verify load bar orientation
1
Pins
8
(Cable end 2)
1
Pins
8
(Cable end 1)
6 7
• Orient load bar with contact slots facing downward.
• Guide conductors into load bar holes while holding conductors in the divider.
• Slide load bar towards divider until flush.
• Ensure the divider/load bar is centered and perpendicular to the cable axis.
• Trim conductors flush with load bar face.
(Cable end 1)
8
9
1
Pin s
8
Dr a in wire
Coll a r ba r bs
(C ab le end 2)
1
Pin s
8
Plug housing
S tr a in coll a r g u ide s
(C ab le end 1)
Boot po s ition when us ing
C S PT
Coll a r locking t abs
10
Coll a r l a tche s
MPT5-8AS
For Instructions in Local Languages and Technical Support: www.panduit.com/resources/install_maintain.asp
g p
• Hold the load bar and divider stationary while sliding the strain relief collar forward until there is no gap between the collar and divider.
• Ensure the drain wire is routed through the strain collar guides.
• Confirm the cable jacket extends beyond the collar barbs.
• Align pin #1 of cable sub-assembly (cable, load bar, divider, and strain relief collar) with pin #1 of plug housing.
• Grip the strain relief collar and insert cable sub-assembly into the plug housing. (Fig. 9)
• Push sub-assembly into housing until collar locking tabs engage the plug housing pocket. Although not required, TX6
PLUS Plug Assembly Tool (CSPT) is available to facilitate this step.
• Use tool MPT5-8AS to complete plug termination. (Fig. 10)
• Trim or press excess drain wire between the collar latches.
• Push up boot and engage with collar latches.
• Visually check plug. Assembly is complete.
www.panduit.com
Page 4 of 4
E-mail: [email protected]
Phone:
866-405-6654