Remko PGM30E Operating instructions
Remko PGM 30 is a powerful mobile gas heater designed for fast and efficient heating of well-ventilated spaces. It boasts a continuously adjustable heating capacity and a ventilation function for air circulation without heating. The safety features include a thermoelectric flame monitoring system, a safety pilot, and a hose break protection device. With its sturdy construction and easy-to-use controls, the Remko PGM 30 is an ideal heating solution for construction sites, workshops, greenhouses, and other large, airy areas.
Hirdetés
Hirdetés
Propane – Heater
REMKO PGM 30
REMKO PGM 60
Operation
Technology
Spare Parts
Edition GB– L07 REMKO – strong as a bear.
Operating instructions
Make sure to read these instructions carefully before starting/using the unit!
Our guarantee will become void when the unit supplied by us is used and installed for inadequate purposes, or maintained incorrectly, etc., or if it is changed without our prior consent.
Mobile
Propane heaters
2
Contents P age
Safety hints 3
General hints 3
Starting 4
Putting out of service 5
Important hints 5
Maintenance 5-6
Block diagram 6
Contents Page
Technical data 6
Action in the case of faults 7
Drawing PGM 30 8
List of spare parts PGM 30 9
Drawing PGM 60 10
List of spare parts PGM 60 11
G
Always keep these operating instructions near or on the device!
G
Safety Hints
When using this unit make sure always to observe the applicable building and fire protection regulations as well as the rules of the trade cooperative association. l The unit may be operated only by those persons who have been instructed accordingly. l The unit is to be installed and operated in such a way as to ensure that the employees are not endangered by waste gases and radiation heat and that no fire can break out. l The unit may only be installed and operated in rooms, when the air rate fed to the unit is sufficient for combustion. l Make sure to install mobile liquid gas reservoir on a solid ground and in a vertical position. l Liquid gas reservoir may never be used in a lying position while the unit is operating (gas leakage in the liquid phase). l The unit may be operated only in well aerated rooms.
Persons may not stay permanently in the room where the unit has been installed. Relevant prohibition signs are to be fastened to the entrances. l The unit is to be installed and operated on a solid non combustible ground. l It is to be ensured that no combustible objects/ materials can be sucked in. l The unit may not be installed or operated in inflammable and explosive surroundings. l A safety zone of 1.5 m around the unit and a minimum distance of 3 m at the unit’s exhaust opening are to be observed, even regarding non combustible objects. l The unit’s exhaust opening may not be reduced or equipped with hoses or pipings. l Make sure not to introduce foreign matters into the unit. l The air suction lattice is always to be kept free from dirt and loose objects. l Make sure not to expose the unit to direct water jets. l All electric cables outside the unit are to be protected from damage (e.g. caused by animals, etc.). l Make sure to cut off the gas supply and to pull the mains plug out of the mains socket when maintenance and repairs are carried out. l Safety devices may be neither overbridged nor blocked.
General Hints
² The unit may be operated only by those persons who have been instructed regarding the unit’s operation and the handling of liquid gas.
² When using the unit make sure always to observe the guiding principles of the countries and states concerned.
² The unit may only be operated in rooms when
– the air rate fed to the unit is sufficient for com-
bustion and
– the rooms are well ventilated and deventilated
and
– the percentage of the substances which are
injurious to health in the breathed in air has
no inadmissible concentration.
A good and natural ventilation and deventilation is given if e.g. the room volume in m³ corresponds to at least 30 times the nominal heat load in kW of all the units being operated in the room, and if a natural air exchange through doors and windows is ensured, or if there are permanently open ventilation possibilities for ingoing and outgoing air near the ceiling and the floor, of which the size in m² corresponds to at least 0.003 times the nominal heat load in kW of all the units being operated in the room.
² A uniform unit connection pressure of 1.5 bar (1500 mbar) of the category I 3B/P is necessary for all the countries of the European Community.
The connection pressure may not fall below or
exceed the required value.
² Make sure to use exclusively components, such as gas hose, pressure controller and hose security devices (protection against breakage) or safety devices against gas leakage, that have been tested and are suitable for the intended purpose. The pressure controllers must have a firmly regulated initial pressure of 1500 mbar and are to be equipped with a security device against hose breakage.
² Hose pipes are to be protected generally against chemical, thermal and mechanical damage.
² The persons charged with the operation of the unit have to check it prior to starting work to make sure that there are no visible defects. If there are defects which affect the unit’s operational reliability, its operation is to be stopped!
² The unit may be only maintained by trained persons and only original spare parts may be used.
² If the unit has been switched off by the temperature limiter due to overheating, the reason for the fault has to be detected and eliminated.
3
Starting
Make sure to charge a person with the operation of the unit and with the supervision of the reservoirs and of the bottle stock who has been instructed sufficiently regarding the handlings concerned.
Make sure to draw the operators‘ attention to possible dangers during the handling of liquid gas.
G
A constant unit connection pressure of 1.5 bar
(1500 mbar) must be ensured, also during continuous operation.
Heating Operation
Put the operating switch into position
"O" (= Off) and plug the mains into an appropriate mains socket with fault current safety switch (230V/1~ 50 Hz)
Put the operating switch into "I" position
(= heating operation)
The supply air fan starts.
Connect pressure controller to the gas bottle(s).
G
Attention – left-handed thread!
Press down pin of thermoelectric gas valve (safety pilot).
Open bottle valve(s).
When gas is taken out of several gas bottles simultaneously, all the valves have to be opened.
Press release button of the hose security device (protection against breakage) valve(s). after having opened
This has also to be done after each replacement of bottles. the
After approx. 2 or 3 sec. the piezo igniter is to be actuated (possibly several times) with the pin still held down, until a formation of flames has occured.
After the formation of flames still hold down the pin for approx. 10 seconds, until the thermoelectric flame monitoring has started.
Do not release the pin before this.
If the flame is extinguished after the pin has been released, repeat the ignition procedure after having waited for approx. 1 minute. Then keep the pin pressed down a little longer.
After the installation and connection of the units all the gas bearing connections have to be checked with soap solution, leakage detecting spray etc. to make sure that they are tight.
Do not use open flames!
Important Installation Hint
When installing or removing the gas hose make sure to exert a counterpressure on the gas connection nipple of the unit using an open-end spanner SW 19 and observing the left-handed thread.
1.
2.
1) Unscrew gas hose
Turn union nut clockwise
2) Fasten gas hose
Turn union nut anti-clockwise
This procedure also refers to all further gas components, such as pressure controller, hose security device (protection against breakage), etc.
Setting/Regulating the Heating Capacity
Set desired heating capacity by means of the continuously adjustable “power regulation”.
The setting can also be continuously adjusted when the unit is operating.
Ventilation
Turn to the left: i n c r e a s e d h e a t i n g c a p a c i t y
Turn to the right: r e d u c e d h e a t i n g c a p a c i t y
Put the operating switch into position "II".
In this position only the supply air fan runs and the unit can be used for air circulation.
Heating is not possible!
4
G
Install only in well ventilated rooms, not in rooms which people will be using for longer periods!
G
Putting out of Service
Close all the bottle valves.
Let flame burn out.
The fan should still run for a few seconds to exhaust the accumulated heat.
1
2
- remove protective cap (1)
- press key (2)
- refit protective cap (1)
Put operating switch into “0” position (= off) and unplug mains plug from the mains socket.
“RESETTING” is not possible before the sensor has cooled down below approx. 90 °C.
You will find a detailed chart for the fault elimination in chapter “Action in the case of faults”.
Important Hints
Assembly of Multi-bottle Set
To avoid intensive icing of the gas bottle during a longer operation of the unit, we recommend that you use a bottle battery consisting of at least 3 bottles. All bottle valves must be open to ensure regular gas supply! hose-break protection pressure controller high pressure hose 0.4 m
T-connection gas hose to unit
Important!
Make sure to place gas reservoir only laterally behind the unit! Never heat up or defrost gas reservoir through the unit’s hot air current ( danger of explosion!
).
Never use gas reservoir in a lying position when the unit is operating (gas leakage in the liquid phase).
The safety temperature limiter (STB) interrupts gas supply in the case of overheating and the unit is locked on the electric side. Any unit function is switched off.
When the safety temperature limiter has released, the reason for the fault is to be detected and to be eliminated first. Unlocking is carried out when the protective cap has been unscrewed by pressing the key “STB-
RESET“.
Maintenance
Depending on the operation conditions the units are to be tested by an expert when necessary, but at least regularly every two years, to ensure their safe operation.
The test result is to be recorded in a test certificate which is to be safely kept until the next test so that it can be presented to the authorized persons for control purposes at any time.
The persons charged with the operation of the units have to check the units before starting work to detect obvious defects on the operating and safety elements and to make sure that the safety devices have not been removed.
If any faults are stated the supervisor is to be informed.
If the faults affect the unit’s operational reliability, operation is to be stopped! l Regular maintenance and care, at least after each heating period is the basic condition for a long service life and a faultless operation of the unit. l Make sure to keep the unit free from dust and other deposits and to clean it only with a dry or humid cloth
(do not use water jet). l Do not use sharp or solvent-containing cleaning agents. l Check the suction opening for combustion air as well as the injector fitted behind it and the gas nozzle regularly to make sure that they are not dirty. l Clean gas burner and gas nozzle regularly. l Clean baffle plate regularly. l Check suction and blowing out lattice regularly to see whether it is dirty and clean it, when necessary.
G When the unit is being maintained, set or repaired, the gas supply has to be cut off and the mains plug has to be unplugged from the mains socket!
G
Setting and maintenance work is to be carried out only by authorized specialists!
G
Clean gas supply line thoroughly before starting the unit for the first time!
G
5
6
Removal and Cleaning of the Gas Burner
l Remove blow-off protective grid and outside casing, as well as the inspection cover at the lower side of the unit. l Loosen clamping screw of the nozzle holding device. l Remove iginition cable from ignition electrode
(Take care of cap nut and lock washer). l Screw capillary tube off the safety pilot. l Release clamping screw of electrode holder and remove ignition electrode and thermocouple. l Loosen 4 fastening screws of the burner and take burner out of unit. l Clean burner using a steel brush and compressed air and assemble in reverse order. l Set ignition electrode and thermocouple according to the following instructions. l Assemble all the parts thoroughly in reverse order. l Control the functions of the complete unit and carry out a tightness check for all gas-bearing connections using soap solution and leakage detection spray, respectively. l Intensive yellowish flames indicate that the fresh air supply is probably insufficient and that there is some dirt inside the unit, respectively.
Block Diagram
KL – Terminal strip
M – Fan motor
MV – Electric solenoid
STB – Safety temperature limiter
S – Operating switch
C ignition electrode
A
B thermocouple
Technical Data:
Series PGM 30 PGM 60
Nominal heat output kW 26 55
Heating capacity kW 10-26 25-55
Air output m³/h 800 1.450
Fuel/type of gas liquified gas Kat. I
3
Gas pressure bar 1,5 1,5
Gas consuption kg/h 0,78-2,0 1,95-4,27
Electrical connection 1~ V 230 230
Frequency Hz 50 50
Power consumption kW 0,07 0,11
Fuse-protection (requ.) A 10 10
Kind of protection IP 44 IP 44
Sound pressure level L pA
1m 1) dB(A) 56-69 62-72
Weight (without access.) kg 12 20
Length mm 450 650
Width mm 260 320
Hight mm 410 510
1) Noise measuring DIN 45635 - 01- KL 3
Setting Hints:
Size A = distance from ignition electrode tip to burner
Size B = distance from ignition electrode tip to burner
Size C = distance from thermocouple tip to burner
Type A B C
PGM 30 3 20 15
PGM 60 3 35 15 approx. dimensions in mm
Any operation/handling which does not correspond to that indicated in these instructions is prohibited, otherwise we will not be responsible and the guarantee will become void.
The orderer or the customer must have properly filled out the
“guarantee certificate” which is enclosed with every REM-
KO automatic heater and must have returned it to REMKO
GMBH & Co. KG within a timely acceptable period based on the sale and commissioning, to be entitled to possible guarantee claims regarding faulty material.
Action in the case of faults
trouble:
– unit doesn’t start
– unit stops during operation
– fan blows, but gas supply is blocked
resp. no ignition
– flame goes out after having released the pin of
thermoelectric gas valve
– gas supply is blocked, resp. flame goes out
– fuel consumption is too high
– unit can’t be shut down
– heating capacity drops during continuous operation
1 – 2 – 3 – 4 – 7
2 – 4 – 7 – 12 – 13
4 – 5 – 8 – 9 – 12
8 – 10 – 11
4 – 6 – 7 –10 – 11 – 12 – 13
12 – 15
3 – 14
13 cause:
1. no electrical connection
2. fan motor is overcharged
(fan blows irregularly or is blocked)
3. operating switch defect cause:
4. no gas pressure on solenoid valve
5. no ignition spark
6. air-suction grille impurified
7. unit is shut down by safety thermostat (STB)
8. safety pilot does not open (resp. does not lock) remedy:
plug the mains into an appropriate mains socket (230V/1~ 50Hz)
check fan motor, fan blade and clutch plate and replace if necessary.
close gas supply, unplug the mains and replace defect operating switch
check gas supply
check contents of gas cylinders
check gas hose(s) for damage
release hose break protection resp. replace it
set ignition electrode
check ignition cable
check porcelain insulation of ignition electrode
clean air-suction grille
check air-suction and blow-out grille and clean if necessary
check fresh air supply
release safety thermostat (STB - Reset)
replace safety pilot
9. piezo igniter defect
10. thermocouple is not getting warm enough
replace piezo igniter
check position of thermocouple and adjust according to setting hints
11. loose or impurified connection between safety pilot and termocouple
check connection and clean if necessary
12. pressure controller defect or false pressure controller mounted resp. hose break protection is blocked
mount original pressure controller
release hose break protection resp. replace it
13 gas cylinder(s) iced over due to low temperatures and too high gastaking
14. solenoid valve does not open
replace empty gas cylinder(s) and connect 2-3 cylinders using multi cylinder set (EDV-No. 1014050)
close gas supply
let flame burn out
put operating switch in position „0” and unplug the mains
replace solenoid valve
15. leak gas hose(s) find leakage by foam forming mediums eleminate leakage
Make sure that the gas supply has been closed and the mains plug has been taken out of the mains socket before carrying out any work regarding the unit!
Setting and maintenance is to be carried out by authorized experts only!
7
Drawing PGM 30
8
We reserve the right to make modifications in dimensions and construction in the interests of technical progress.
List of spare parts PGM 30
Fig.-No. Description EDV-Nr.
5
6
7
8
1
2
3
4 transport handle outside casing combustion chamber end plate, front blow out protection grille safety thermostat with sensitive element inspection cover terminal strip, 6er
9 thermocouple
10 ignition cable
11 ignition electrode
12 angled screw coupling 1/8"x6mm
13 gas nozzle
14 gas pipe Z/D
15 gas pipe M/R
16 piezo igniter
17 gas regulator
18 tube fitting M10x1
19 gas pipe R/Z
20 angled coupling 1/8"x6mm
21 thermoelectic gas valve
23 GE - coupling 1/4"x6mm
24 solenoid valve
25 gas connection nipple 3/8" lks.
26 control knob, cpl.
27 operating switch, cpl.
28 traction relief
29 connecting cable with plug
30 end plate, rear
31 fan motor
32 clutch plate B 6 Ø
32 clutch plate B 7 Ø
33 fan blade
34 clutch disc
35 gas burner
36 protection socket
37 retaining bracket not shown: pressure controller with hose-break protection
2 running metres gas hose
2 running metres gas hose (HD for building sites)
5 running metres gas hose (HD for building sites)
10 running metres gas hose (HD for building sites) multi-cylinder set (2 - 3 cylinders)
T - connection for multi-cylinder set nylon seal for T - connection
HD - gas hose 0,4m for multi-cylinder set
W h e n o r d e r i n g s p a r e p a r t s i t i s n e c e s s a r y t o i n d i c a t e
E D V - N o . a n d m a c h i n e n o . ( s e e d a t a p l a t e ) !
1101411
1101409
1101451
1101468
1101169
1101396
1101376
1101134
1101192
1101188
1101267
1101320
1101415
1108049
1108455
1108014
1101392
1101375
1101417
1101304
1101395
1101142
1101405
1101384
1101382
1101383
1101197
1101385
1101366
1101164
1101283
1101180
1101316
1101159
1101452
1101441
1101364
1101470
1101419
1101174
1108410
1108411
1014050
1101177
1101178
1101179
9
Drawing PGM 60
10
We reserve the right to make modifications in dimensions and construction in the interests of technical progress.
List of spare parts PGM 60
Fig.-No. Description EDV-Nr.
15
16
17
18
19
20
21
8
9
10
11
12
13
14
1
2
3
4
5
6
7
22
23
24
26
27
28
29
30
31
32
33
34
35 transport handle outside casing insulation combustion chamber gas burner blow out protection grille gas nozzle gas pipe Z/D angled screw coupling 1/8“x6mm ignition electrode ignition cable thermocouple support bracket, front base inspection cover gas pipe R/Z angled coupling 1/8"x6mm thermoelectic gas valve
GE - coupling 1/8"x6mm gas regulator tube fitting M10x1 gas pipe M/R support bracket, rear safety thermostat with sensitive element
GE - coupling 1/4"x6mm solenoid valve piezo igniter gas connection nipple 3/8" lks. control knob, cpl. traction relief operating switch, cpl. terminal strip, 6er protection socket connecting cable with plug
41 clutch disc not shown: pressure controller with hose-break protection
2 running metres gas hose
2 running metres gas hose (HD for building sites)
5 running metres gas hose (HD for building sites)
10 running metres gas hose (HD for building sites)
36
37
38
39
40 air suction grille fan motor clutch plate B 8 ø fan blade retaining bracket multi-cylinder set (2 - 3 cylinders)
T - connection for multi-cylinder set nylon seal for T - connection
HD - gas hose 0,4m for multi-cylinder set
W h e n o r d e r i n g s p a r e p a r t s i t i s n e c e s s a r y t o i n d i c a t e
1101142
1101420
1101421
1101422
1101423
1101424
1101426
1101458
1101316
1101280
1101283
1101164
1101427
1101428
1101469
1101459
1101468
1101169
1101359
1101412
1101409
1101441
1101249
1101197
1101396
1101376
1101364
1101134
1101192
1101267
1101188
1101366
1101304
1101320
1101432
1101254
1101255
1101150
1101395
1101375
1101470
1101419
1101174
1108410
1108411
1014050
1101177
1101178
1101179
E D V - N o . a n d m a c h i n e n o . ( s e e d a t a p l a t e ) !
11
REMKO GmbH & Co. KG
Klima- und Wärmetechnik
D-32791 Lage
•
Im Seelenkamp 12
D-32777 Lage
•
Postfach 1827
Telefon (0 52 32) 606 - 0
Telefax (0 52 32) 606260
Letöltés
Hirdetés