Mondawe MOSL020-10BN Manual 5-Spray Patterns Pressure Balanced Shower Faucets Set installation Guide

Add to My manuals
3 Pages

advertisement

Mondawe MOSL020-10BN Manual 5-Spray Patterns Pressure Balanced Shower Faucets Set installation Guide | Manualzz

1

.

Notifications Before Installation

1.

When you open the product packaging, please check the product and accessories at first. If there is any discrepancy, please contact the company or our distributor immediately.

2.

The hot and cold water supply pipe of the faucet must be properly connected. When facing the front of the shower set, the hot water supply is on the left and cold water supply is on the right. Incorrect connection will cause permanent damage to the cartridge.

3.

If the accessories to be changed without affecting the use, we will not make a prior notice.

4.

The impurities in the water supply pipe must be cleared before installation to avoid blockage.

5.

The water pressure of the shower head is 0.05MPa (including cold water and hot water pressure).

Applicable water temperature range: 4°C - 90°C.

2

.

Preparation before installation

1.Please read the installation manual carefully before installation .

2.Installation work must be performed by a professional installer.

3.Installation tool :

3. Accessories List

12

13

14

11

10

2

8

9

4

5

6

7

10

11

12

7

8

9

13

14

Item No.

1

4

5

2

3

6

Packing List

Product Name

Body Valve

Valve Holder

Valve Panel

Diverter Handle

Handle Lever

Hose Connector

Shower Hose

Handhelder

Handle Shower

Shower Head

Shower Arm

Teflon

Screw Set

Allen Key

1

QTY

1 Pcs

1 Pcs

1 Pcs

1 Pcs

1 Pcs

1 Pcs

1 Pcs

1 Pcs

1 Pcs

1 Pcs

1 Pcs

1 Bag

1 Pack

1 Pcs

3

4 .

Technical drawing of product

Unit: inch

1/2-14NPT

16"

°

3

0

1

Φ8.8"

6 、 Pipe connection

1 、 Please drill the holes on the wall for the main body embedded part, hot and cold water inlet pipes as well as shower arm connection pipes according to the basic product dimension drawing as below.

2 、 Please make hot and cold water inlet pipe, the mixed water outlet pipe connect with control valve,and tighten with the wrench

Φ

7

.1

"

1.8"~2.4"

2-1/2-14NPT

2-1/2-14NPT

1/2-14NPT

5 .

T echnical drawing of drilling size

1 、 The size of the embedded box that needs to be drilled

is 5.3"*6.7".

5.3"

2 、 The depth of the embedded box is 1.8"-2.4". It's better to drill the depth of 1.8"for blank wall.

Mixer water

Hot water

Mixer water cold water wall

1.8"-2"

≤ 2.4"

Tile surface

7 、

Water testing and sealing testing

1 、 After the pipe connection is completed, open the protective panel and cover, and then open the cartridge, flush the pipeline; then close the cartridge to check the pressure resistance and sealing performance of the pipeline, make sure there are no leakage.

2 、 Block each outlet pipe with a stopper then open the cartridge to check if the pipe joint is wellsealed and the pipe condition under pressure to ensure no leakage.

Testing Purpose: Flush the impurities and sludge in the pipeline

to avoid clogging and affect the effluent functions.

8 、 The procedure of sealing the wall

Use a parallel ruler to measure the flatness of the embedded box casing and the vertical wall surface. If the wall surface is not flat, it should be patched to ensure the embedded box casing and vertical wall angle meets at nearly ideal angle of 90, then lay the tile decoration.

Tile surface wall outside the wall

≥ 0.6"

9 、

Installation of control valve

1 、 Take off the protective panel and cover

2 、 The decorative panel and the handle are connected to the control valve as shown below sequence.

10 、 Shower sets installation

Make connection of shower head, shower arm and wall water pipe. Use teflon to prevent leakage.

11 、 Handle shower installation

Install the handheld as picture shown.

According to the figure below, please correctly adjust the direction of water separator handle

Top shower outlet water

Handle shower outlet water

advertisement

Related manuals

Download PDF

advertisement