Carrier 17EA, 17M, 17S Start-Up Instructions
PDF
Dokument
Annonce
Annonce
Contents List of Tables List of Figures Safety Guide Introduction General Job Data Required Initial Preparation General Machine Tightness Storage Tank Safety Devices Gear, Coupling and Drive Lubrication Purge Lubrication Machine Compressor Lubrication Flush Auxiliary Oil System Contents Lubricate Auxiliary Equipment Inspect Piping Inspect Field Wiring Check Turbine Operation Charge Machine with Water Check Level Controller Settings Charge Machine with Refrigerant Check Coupling Separation and Alignment Grouting Check Safety Control Settings Check Suction Damper Start-Up Procedure Compressor Oil Preparation Before Starting Machine Contents To Start Machine Purge Operation Check Running System Hot Alignment Check Doweling To Stop Machine Adjusting the Refrigerant Charge Adjusting Refrigerant Levels Pumpout Procedures General Pumpout Adjustments 5F Pumpout Procedures 6D Pumpout Procedures Instructing the Operator Contents List of Tables Table 1 — Test Pressures Table 2 — Storage Tank Relief Device Settings Table 3 — Level Controller Pressure Settings Table 4 — Refrigerant Pressure Corresponding to 32 F Saturation Temperature (Water) Table 5 — Thermal Purge Settings Table 6 — Motor-Driven Purge Settings Table 7 — Machine Operating Temperatures and Pressures Table 8 — Operating Checks of Machine Controls and Safety Devices Table 9 — Refrigerant Test Pressures Contents List of Figures Figure 1 — Flushing Filter Figure 2 — 17MA, PA and SA Size 30 and 40 Compressors (Typical) Figure 3 — Series 2500 Level Controller Figure 4 — Typical Oil Pressure Switch Figure 5 — Typical Load Limiting Control Assembly Figure 6 — Demand Limit Controller Figure 7 — Electro-Pneumatic Transducer Figure 8 — Automatic Suction Damper Figure 9 — Pumpout Unit (Typical Earlier Model 5F Unit) Figure 10 — Pumpout Unit Piping, 5F Unit without Vent Valve or Charging Connection (Earlier Model) Figure 11 — Pumpout Unit Piping, 5F Unit with Vent Valve and Charging Connection Figure 12 — 6D Pumpout Unit and Piping Schematic (Typical) ">
/
Download
Bare en venlig påmindelse. Du kan se dokumentet lige her. Men vigtigst af alt har vores AI allerede læst det. Den kan forklare komplekse ting i enkle vendinger, besvare dine spørgsmål på ethvert sprog og hjælpe dig med hurtigt at navigere selv de længste eller mest komplicerede dokumenter.
Annonce