APPLIED INFORMATION (AI) INTEGRATION INSTALL GUIDE
For all G Series systems
G Series
Solar Cabinet
G Series
AC Cabinet
89105_InstallGuide_TRA_G-Series-AI-Integration-Kit_RevB
Carmanah Technologies Corp. | 250 Bay St, Victoria, BC V9A 3K5, Canada | 1.250.380.0052 | [email protected] | carmanah.com
APPLIED INFORMATION (AI) INTEGRATION
INSTALL GUIDE
Table of Contents
Table of Contents .....................................................................................................................................................1
1.0 Warnings and Precautions ................................................................................................................................3
1.1
Warranty Disclaimer ...................................................................................................................................3
1.2
Standards ...................................................................................................................................................3
1.3
Safety and Usage Precautions ...................................................................................................................3
1.4
Applications ................................................................................................................................................4
2.0 System Components ..........................................................................................................................................5
3.0 Tools and Materials Required ...........................................................................................................................5
4.0 G Series Cabinet Installation .............................................................................................................................6
4.1
Antenna.......................................................................................................................................................6
4.2
Door Switch Kit (Optional) ..........................................................................................................................8
4.3
AI 500-070 Field Control Unit (FCU) ....................................................................................................... 10
4.4
Testing AI FCU ........................................................................................................................................ 12
Carmanah Technologies Corp. | 250 Bay St, Victoria, BC V9A 3K5, Canada | 1.250.380.0052 | [email protected] | carmanah.com
2
APPLIED INFORMATION (AI) INTEGRATION
INSTALL GUIDE
1.0 Warnings and Precautions
The following symbols indicate important safety warnings and precautions throughout this guide:
WARNING indicates that serious bodily harm or death may result from failure to adhere to the
precautions.
CAUTION indicates that damage to equipment may result if the instructions are not followed.
NOTE suggests optimal conditions and provides additional information.
1.1
Warranty Disclaimer
This manual will familiarize you with the features, operation standards, and installation of Carmanah’s G Series
Applied Information (AI) system. Failure to comply with the use, storage, maintenance, installation or placement
instructions detailed in this manual could void the warranty.
1.2
Standards
Perform all installation, wiring, grounding and maintenance in conformance with local building and electrical
codes. Adherence to the National Electrical Code (NEC) is mandatory to comply with any certification markings.
Non-adherence to code may void the warranty.
1.3
Safety and Usage Precautions
Batteries are shipped fully charged. Use extreme caution when handling the batteries as they can
generate hazardous short-circuit currents. Remove all jewelry (bracelets, metal-strap watches,
etc.) before entering the cabinet.
Solar panels produce DC electricity when exposed to light and can therefore produce an
electrical shock or burn. To render solar panels inoperative, remove them from sunlight or fully
cover their front surface with an opaque material.
Before lifting any heavy or bulky equipment, ensure the load is secured so moving parts do not
shift, and that it can be lifted as far as needed without back strain or loss of grip. Installation may
require more than one person.
Ensure the equipment is not powered during installation and wiring of the system.
Carmanah Technologies Corp. | 250 Bay St, Victoria, BC V9A 3K5, Canada | 1.250.380.0052 | [email protected] | carmanah.com
3
APPLIED INFORMATION (AI) INTEGRATION
INSTALL GUIDE
Recheck all completed wiring for proper polarity prior to energizing the system.
Changes or modifications to Carmanah equipment not expressly approved by Carmanah could
void both the user's authority to operate the equipment and the warranty.
Product can have sharp edges. Accidental movement of hinged components can cause injury.
1.4
Applications
For Carmanah R829-G and R247-G systems, the G Series AI Integration Kit allows for remote system monitoring,
scheduling and control. With Carmanah R820-G and SC315-G Rectangular Rapid Flashing Beacon (RRFB)
systems, the G Series AI Integration Kit allows remote system monitoring only.
Carmanah Technologies Corp. | 250 Bay St, Victoria, BC V9A 3K5, Canada | 1.250.380.0052 | [email protected] | carmanah.com
4
APPLIED INFORMATION (AI) INTEGRATION
INSTALL GUIDE
2.0 System Components
The G Series Applied Information (AI) Integration Kit consists of the following items:
1.
2.
3.
4.
5.
6.
7.
Harness, AI 16-pin to terminal block (1)
Door switch and harness, G Series cabinet (1)
Adapter, 90°, SMA male to SMA female (2)
Screw, security, pin-in hex, #10-32 x 0.5” (2)
Screw, machine, #8-32 x 3/8”, Phillips (4)
Screw, machine, #10-32 x 3/8”, Phillips (2)
Washer, flat, #10 (4)
8.
9.
10.
11.
12.
13.
14.
Washer, lock, #10 (2)
Standoff, #10-32 x 5/8”, female, aluminum (2)
Tie mount, push barb (2)
Cable tie, mounting base, ¾ x ¾” (3)
Cable tie, 4” (10)
Cable tie, 7”, #8 screw mount (1)
Install guide, AI Integration Kit, G Series (1)
3.0 Tools and Materials Required
The following tools and materials may be required to install the AI Integration Kit into your G Series system:
1.
2.
3.
4.
5.
6.
Drill and ½” drill bit
Deburring tool or similar
Crescent wrench
Side cutters
Multi-bit screwdriver
Electrical multimeter
Door Switch (optional):
1. Loctite 220 threadlocker or similar
2. ANSI #9 drill bit (0.196” diameter)
3. 5/32" tamper-resistant hex screwdriver bit
Carmanah Technologies Corp. | 250 Bay St, Victoria, BC V9A 3K5, Canada | 1.250.380.0052 | [email protected] | carmanah.com
5
APPLIED INFORMATION (AI) INTEGRATION
INSTALL GUIDE
4.0 G Series Cabinet Installation
4.1
Antenna
1. Remove power to the system. For AC-powered systems, turn off the circuit breaker in the cabinet and for
solar-powered systems remove the battery and solar fuses.
2. Use the indentation in the center of the cabinet to locate the tip of the drill bit. Drill a ½” hole on top of the
enclosure. Deburr hole and remove all aluminum chips.
Ensure the equipment is not powered during installation. Recheck all wiring prior to energizing
the system.
Ensure all metal chips are removed to prevent system damage caused by short circuits.
Ensure that no burrs are present that would prevent the antenna from making a good seal with
the top of the cabinet.
Carmanah Technologies Corp. | 250 Bay St, Victoria, BC V9A 3K5, Canada | 1.250.380.0052 | [email protected] | carmanah.com
6
APPLIED INFORMATION (AI) INTEGRATION
INSTALL GUIDE
3. Route antenna coax connector cables into enclosure hole and through plastic washer, lock washer, and
nut. Tighten nut securely using crescent wrench.
4. Install one cable tie base in the location noted below.
5. Route coax cables from antenna to cable tie mount and loop 1.5 times in a counter-clockwise direction.
Fasten coax to cable tie mount with one cable tie. Twist the cable so the connector ends exit to the righthand side.
Twist
Carmanah Technologies Corp. | 250 Bay St, Victoria, BC V9A 3K5, Canada | 1.250.380.0052 | [email protected] | carmanah.com
7
APPLIED INFORMATION (AI) INTEGRATION
INSTALL GUIDE
4.2
Door Switch Kit (Optional)
1. Use the indentation marks below to locate the drill holes.
2. Drill two 0.196” diameter holes as noted using a #9 ANSI drill bit.
3. Deburr the holes on the outside and inside to remove all aluminum chips.
Ensure all metal chips are removed to prevent system damage caused by short circuits.
Carmanah Technologies Corp. | 250 Bay St, Victoria, BC V9A 3K5, Canada | 1.250.380.0052 | [email protected] | carmanah.com
8
APPLIED INFORMATION (AI) INTEGRATION
INSTALL GUIDE
4. Apply Loctite 220 threadlocker to two standoffs.
5. Assemble standoffs to the inside of the cabinet using two security screws and two flat washers.
6. Fasten the long wire from door switch to slots with two cable ties. Leave loose/untrimmed for now.
7. Install door switch to the standoffs using two screws, two lock washers, and two flat washers.
8. Center switch front/rear in slots and tighten. No Loctite threadlocker is required for this step.
The terminal on the end of the long door switch wire gets installed into the Applied Information
(AI) harness connector in a later step.
9. Install ring terminal from door switch onto top Battery/DC Power RD + fuse holder terminal.
10. Install two cable tie bases as shown below. Fasten the long wire from door switch to the two cable tie
bases. Leave loose/untrimmed for now.
Carmanah Technologies Corp. | 250 Bay St, Victoria, BC V9A 3K5, Canada | 1.250.380.0052 | [email protected] | carmanah.com
9
APPLIED INFORMATION (AI) INTEGRATION
INSTALL GUIDE
11. Insert terminal from door switch harness into Position 2 of AI harness connector. Orient terminal same
way as other terminals present in connector. Tug to confirm it’s fully inserted. Cable ties will be tightened
and trimmed at the end of Section 4.3.
Connector terminal shown uncrimped. Crimp wings will be bent over wire strands.
4.3
AI 500-070 Field Control Unit (FCU)
1. Install two cable tie mounts. Press into ¼” holes.
2. Install the AI harness wires to the terminals as follows:
a. Yellow → PV+ (over existing terminal)
b. Violet → INPT+
c.
Blue → OUT1
d. Red → DC+
e. Black → DC3. Secure yellow wire to mounts & location shown with three cable ties. Leave loose/untrimmed for now.
Carmanah Technologies Corp. | 250 Bay St, Victoria, BC V9A 3K5, Canada | 1.250.380.0052 | [email protected] | carmanah.com
10
APPLIED INFORMATION (AI) INTEGRATION
INSTALL GUIDE
4. Install green wire ring terminal from AI harness along with door ground ring terminal in the order shown
below.
5. Route ground wire down and fasten with screw mount cable tie. Remove existing cable tie if present and
add existing wires to new cable tie
6. Fasten harness wires using two cable ties. Include door switch wire if present.
7. Thread two 90° coax adapters onto antenna connectors. Orient as shown (facing upward when installed
into cabinet).
8. Fasten AI FCU into cabinet using four screws.
9. Thread coax adapters onto AI FCU connectors. Match GPS & LTE labels on antenna harness & AI FCU
(Cell closer to front, GPS closer to back).
10. Route the coax cables between the AI FCU and antenna neatly. Avoid sharp bends in the coax cable.
Keep coax cable away from sharp edges.
11. Mate 16-pin connector to AI FCU connector. With all cables installed, tighten and trim all cable ties.
4x
Clearance between
coax and box edge
Carmanah Technologies Corp. | 250 Bay St, Victoria, BC V9A 3K5, Canada | 1.250.380.0052 | [email protected] | carmanah.com
11
APPLIED INFORMATION (AI) INTEGRATION
INSTALL GUIDE
4.4
Testing AI FCU
1. Ensure AI serial number has been activated.
2. For SC315-G or R820 systems set toggle switch to “OFF”. In all other cases set to “AUTO”.
3. Ensure connector is properly mated on the bottom of the AI FCU.
4. Confirm correct wiring and power-up system by connecting the DC power (system fuses or switching on
breaker) and turning on the AI power switch.
5. On your PC, open a browser and navigate to the Glance website:
a. glance.appinfoinc.com
6. Log in using the credentials provided by AI or the distributor you purchased the equipment from.
7. On the upper left side of the browser, select the device name that matches the Device ID (the ID number
labelled on the AI FCU).
Ensure the equipment is not powering during installation. Recheck all wiring prior to energizing
the system.
Carmanah Technologies Corp. | 250 Bay St, Victoria, BC V9A 3K5, Canada | 1.250.380.0052 | [email protected] | carmanah.com
12
APPLIED INFORMATION (AI) INTEGRATION
INSTALL GUIDE
8. Ensure that the “Current Status” indicates “Online”.
9. Ensure “Current Device Status” is “OK”.
10. If the door switch sensor is installed, ensure that the “Cabinet Door” status reflects the current position of
the door. Open and close the door to change the switch state and confirm Glance reflects the change.
a. Door open = Open
b. Door closed = Closed
11. Contact Applied Information to arrange the firmware in the AI unit to be programmed correctly, if this
hasn’t already been done.
c.
Phone: 678.830.2170
d. Email: [email protected]
e. Web:
appinfoinc.com
If testing indoors where there is no GPS signal, this may result in a device status of “No GPS
Lock”.
R829 school zone application shown above.
Carmanah Technologies Corp. | 250 Bay St, Victoria, BC V9A 3K5, Canada | 1.250.380.0052 | [email protected] | carmanah.com
13
APPLIED INFORMATION (AI) INTEGRATION
INSTALL GUIDE
© 2021 Carmanah Technologies Corporation
Technical Support:
Email:
Toll Free:
Worldwide:
Fax:
Web:
[email protected]
1.877.722.8877 (US & Canada)
1.250.380.0052
1.250.380.0062
carmanah.com