إعلان
إعلان
...Innovative liquid vaporizing and gas mixing solutions ZIMMER Dry Electric Vaporizer Operations & Maintenance Manual 151 S. Michigan Street, Seattle, Washington, USA 98108 Tel: +1 206-789-5410 Fax: 206-789-5414 Web: www.algas-sdi.com FILE: MANUAL PN 54399 REV 3-10-2021 ZIMMER ELECTRIC VAPORIZER.doc Briana 2021.03.1 6 16:32:45 -07'00' 1 DISCLAIMER and COPYRIGHT DISCLAIMER Read this Operations and Maintenance Manual before operating the ZIMMER! Algas-SDI International, LLC shall not be liable for technical and/or editorial errors or omissions in this manual. Algas-SDI makes no warranties, express or implied, including the implied warranties of merchantability and fitness for a particular purpose with respect to this manual. In no event shall Algas-SDI be liable for any special or consequential damages including, but not limited to, loss of production time or loss of profits. Product names used in this manual are for the manufacturer or supplier identification only and may be trademarks, or registered trademarks, of these companies. In accordance with the manufacturer’s policy of continual product improvement, Algas-SDI reserves the right to use alternate manufacturer’s components as vendor availability dictates. For further information please contact Algas-SDI. COPYRIGHT Copyright 2021 by Algas-SDI International, LLC Seattle, Washington, USA 98108 All rights reserved. No part of this manual may be reproduced or copied in any form or by any means, photographic, electronic, or mechanical without the prior express written consent from AlgasSDI International, LLC. PATENTS For patent information go to: www.algas-sdi.com/patents 2 WARRANTY and CONTACT INFORMATION WARRANTY REGISTRATION Fill out the Warranty Registration information on the last page of this manual. Refer to the nameplate on the vaporizer to fill out the product registration. Then make a photocopy and mail to the address shown at the bottom, or scan and email alternatively. WARRANTY Algas-SDI International, LLC (ASDI) warrants that the equipment is free from defects in materials and workmanship under normal use and service. ASDI agrees to repair or replace, at its option, without charge F.O.B. factory, any part which has proven defective to the satisfaction of ASDI within one (1) year from the date of the original installation or with 18 months from the date of shipment, whichever is earlier. Equipment, which in the opinion of ASDI, has been damaged in shipment or by improper installation or operation, or has been abused or tampered with in any way, will not be accepted for return under warranty. ASDI will not accept back charges for work performed by others upon or in conjunction with ASDI equipment unless prior authorization is given by means of an ASDI purchase order. ASDI will not be liable by reason of shutdown, non-operation or increased expense of operation of other equipment, or any other loss or damage of any nature, whether direct or consequential, arising from any cause whatsoever. ASDI makes NO other warranty of any kind, whatsoever expressed or implied; and all warranties of merchantability and fitness for a particular purpose are hereby disclaimed by ASDI and excluded from these terms of sale. No person has any authority to bind ASDI to any representation or warranty other than this warranty. ASDI CONTACT INFORMATION If you have questions or need help with your equipment, or want information on other products, contact your distributor or Algas-SDI at: Telephone: +1.206.789.5410 Facsimile: +1.206.789.5414 E-mail: [email protected] Internet: www.algas-sdi.com 3 TECHNICAL SPECIFICATIONS Pressure Relief Valve Set point: Heat Exchanger: 17.24 barg (250 psig) MAWP: 17.24 barg @ 149 ºC (250 psig @ 300 ºF) MDMT: -29 ºC @ 17.24 barg (-20 ºF @ 250 psig) Hydrostatic Test Pressure: 25.86 barg (375 psig) PED: SEP (Sound Engineering Practice) for models Z25 - Z50 Category I for models Z100 - Z150 Electrical: Voltage: 100 – 277 VAC 1PH (All models) Voltage: 240 – 480 VAC 3PH Wye (Z100 and Z150 only) Frequency: 50/60Hz Circuit breaker: See Electrical Specifications in the Appendix Ambient temperature rating: -4 ºF to +122 ºF (-20 ºC to +50 ºC) Hazardous Area Rating: 2460 II 2 G DEMKO 19 ATEX 2083X II 2 G Ex db IIA T3 Gb IECEx UL 19.0034X Ex db IIA T3 Gb LPG VAPORIZER FOR HAZARDOUS LOCATIONS 2PA5 Class I, Division 1, Group D, T3 Enclosure Rating: Type 4 (shell not required) Fasteners: M10 x 50 mm CLASS 8.8, Min. Yield strength 640 MPa Seal-off: ¾” Male NPT Thread 4 TABLE of CONTENTS 1. 2. INTRODUCTION 7 Description/Overview 7 How the Vaporizer Works 7 Basic Features 8 Model Selection 9 Propane version (P valve) 9 Propane version (P valve) – Table 1 9 LPG version (L valve) 9 LPG version (L valve) – Table 2 9 50/50 version (S valve) 10 50/50 version (S valve) – Table 3 10 Available Options 10 INSTALLATION 12 Preparing the Site 13 Materials you may need for Installation 13 Mounting the ZIMMER 14 Piping 15 Relief valve 16 Filtaire 17 Installing Multiple Vaporizers 17 Common Piping Problems 17 Electrical Service 18 Wire length chart (#4 AWG – 21.1 mm2) 19 Wire length chart (#6 AWG – 13.3 mm ) 19 Wire length chart (#8 AWG – 8.36 mm2) 20 Wire length chart (#10 AWG – 5.26 mm2) 20 OPERATION 21 Putting Your Vaporizer into Service 21 Shutting Down the System 22 MAINTENANCE 23 General 23 2 3. 4. 5 Servicing your ZIMMER 24 TROUBLESHOOTING 25 Possible problems 25 Inlet valve does not open – Tree #1 25 Inlet valve closes during operation – Tree #2 26 6. REPLACEMENT PARTS 27 7. FREQUENTLY ASKED QUESTIONS 28 8. APPENDIX 32 5. ELECTRICAL SPECIFICATIONS TABLE ZIMMER 25/40/50 1PH EQUIPMENT DRAWING ZIMMER 100/150 3PH EQUIPMENT DRAWING ZIMMER 25/40/50 WIRING SCHEMATIC ZIMMER 100/150 WIRING SCHEMATIC ZIMMER SINGLE UNIT HORIZONTAL INSTALLATION DRAWING ZIMMER MULTI UNIT HORIZONTAL INSTALLATION DRAWING ZIMMER SINGLE UNIT VERTICAL INSTALLATION DRAWING ZIMMER WALL MOUNTING DETAIL DRAWING ZIMMER DRAIN KIT INSTALLATION DRAWING Warranty Registration - Refer to the nameplate on the vaporizer to fill out the product registration. Then photocopy and mail to address shown. 6 1 INTRODUCTION Description / Overview Your new ZIMMER is a dry-electric LPG or Propane vaporizer that adds energy to vaporize liquid fuel when the amount of energy available from the natural environment is insufficient for vaporization. A primary benefit of this device is that it allows greater capacities from smaller amounts of stored LPG. Often code restrictions limit the number and size of cylinders which can be stored next to a building or in a small space. The ZIMMER overcomes this problem and can be supplied by as few as one cylinder or tank of any size, or as many as can be manifolded together according to local codes. All ZIMMER vaporizers are manufactured under a certified ISO 9001 quality system. The inlet control valve and heat exchanger have been proof tested to 1600 psig (110 bar). How the Vaporizer Works 1 2 3 CROSS OVER ELECTRICAL CONDUIT 4 6 5 CROSS OVER 7 7 Ref. 1 – Liquid LPG enters the inlet valve where the inlet valve screen prevents debris from entering. Ref. 2 – Liquid flows through the inlet valve where it is controlled by a metal-to-metal seat and ball. The infinite seating positions of the ball provide long life. Ref. 3 – As liquid passes through the tubes, the energy is transferred, causing the liquid to boil. Tubes provide a secure pressure boundary and exceptional heat transfer. Ref. 4 – Energy drawn from the heat sink is replenished by selfregulating heaters without the need for switches, temperature sensors, relays, or other controls. The heaters cannot overheat by nature of their design and they consume only as much energy as is needed for vaporization. Ref. 5 – Power is supplied to the heaters by a wide range of voltages through a factory-mounted explosion-proof seal. Ref. 6 – As LPG vapor exits the vaporizer, it heats or cools the temperature-sensitive bulb, providing feedback to the inlet valve. Ref. 7 – The inlet valve receives feedback from the temperaturesensitive bulb and combines it with pressure feedback to ensure only superheated LPG vapor (superheat is the amount of temperature above the dew point) leaves the vaporizer. The valve modulates the inlet flow to control the process. In the event of a power failure, the vaporizer will continue to operate until all available energy has been used. If the power comes back on before all the energy has been used, the heat process served by the LPG should remain engaged. Otherwise, the inlet valve will close as the heat stored in the heat exchanger is transferred to the passing fluid. When the power comes back on, the vaporizer will automatically re-energize and begin operation. Basic Features The heaters are self-temperature-regulating and therefore do not have (or need) an external temperature sensor. The heat generating material in the heaters also acts as a high-temperature limit by breaking down if it reaches its critical point. Because of its unique design features, the ZIMMER can be operated on power supplies ranging from 100 - 480 volts (480 VAC Wye connection or 277VAC per phase to neutral) depending on the model. When operated at 110V, the maximum continuous capacity rating is reduced by 25%. 8 Model Selection The ZIMMER is available in three versions – One propane Model (e.g. Z40P) and two LPG models (e.g. Z40L and Z40S). The difference between the L, P and the S models are the inlet valves. The inlet valve operates on the thermodynamic properties of the specific gas (either LPG or commercial propane). The valve expects to see the vapor exit the vaporizer at 8 °C (15 °F) warmer than the boiling point of the respective gas. The unique function of the valve is that it senses both pressure and temperature to truly predict the boiling point. The valve is clearly marked with a sticker indicating whether it is to be used with LPG (70/30), Propane or 50/50 (LPG). Propane version (e.g. Z40P) – See Table 1 • Use with 85% or greater commercial Propane. • Never use propane which exceeds 15% Butane. Table 1 - Propane version 100% Butane 15% Butane 0% Butane Never use in this range Full capacity 0% Propane 85% Propane 100% Propane LPG version (e.g. Z40L) – See Table 2 • Full capacity is based on LPG containing 60-80% Butane. • Never use LPG which contains more than 80% Butane. • Using the LPG version with LPG containing more than 4060% Propane will decrease the capacity of the vaporizer. *Especially in warmer environments. Table 2 - LPG version 100% Butane 80% Butane 60% Butane 40% Butane 0% Butane Never use in this range Full capacity *Reduced capacity Never use in this range 0% Propane 20% Propane 40% Propane 60% Propane 100% Propane 9 50/50 version (e.g. Z40S) – See Table 3 • Full capacity is based on LPG containing 40-60% Butane. • Never use LPG which contains more than 60% Butane. • Using the 50/50 version with LPG containing more than 60% Propane will decrease the capacity of the vaporizer. *Especially in warmer environments. Table 3 - 50/50 version 100% Butane 60% Butane 40% Butane 0% Butane Never use in this range Full capacity *Reduced capacity 0% Propane 40% Propane 60% Propane 100% Propane Available Options Your ZIMMER vaporizer may be equipped with one or several factory options. All options can be integrated into the ZIMMER vaporizer and are designed to enhance convenience to the end user. Ask for the following items from your local Algas-SDI dealer: Models Z25, Z40 and Z50 Algas-SDI P/N: 80887 Tank Mount Kit for mounting ZIMMER to any horizontal tank up to 48” (1,250 mm) diameter. Algas-SDI P/N: 80888 (includes Kit P/N: 80890) Piping Kit for use with Tank Mount Kit Algas-SDI P/N: 80885 Wall Mount kit Algas-SDI P/N: 80892 Strainer with 40 mesh and piping kit Algas-SDI P/N: 80890 Outlet regulator/gauge kit with Fluorocarbon elastomer for high temperature gas Algas-SDI P/N: 82288 FILT-EZE - Vapor filter for filtering out heavier hydrocarbons Algas-SDI P/N: 80895 Seal off and terminal box kit Div 1 or 80896 Seal off and terminal box kit Ex. Algas-SDI P/N: 40835 Mobile application end cap latch kit Algas-SDI P/N: 80770 Drain kit for easy removal of heavy ends Algas-SDI P/N: 82288 FILT-EZE - Vapor filter for filtering out heavier hydrocarbons or P/N 20536-ASME Filtaire F4 10 Algas-SDI P/N: 80770 Drain Valve kit Models Z100 and Z150 Algas-SDI P/N: 80771 Free standing kit, floor mount Algas-SDI P/N: 81633 Wall Mount kit Algas-SDI P/N: 81634 Strainer and piping kit Algas-SDI P/N: 81635 Regulator and gauge kit Algas-SDI P/N: P/N 20536-ASME Filtaire F4 - Vapor filter for filtering out heavier hydrocarbons Algas-SDI P/N: 54294 4-Pole 40AMP 3PH Circuit Breaker Algas-SDI P/N: 80770 Drain Valve kit 11 INSTALLATION 2 WARNING The equipment described in this manual is designed to operate with LP-gas, a flammable fuel under pressure. The nature of the application involves inherent hazards that could result in injury. Only a TRAINED and FULLY QUALIFIED person should service this equipment. NOTE Prior to installing your new ZIMMER, check all relevant codes and standards that apply in your local area to ensure compliance! CAUTION To prevent ignition of hazardous atmospheres: 1. 2. Any repairs internal to the flameproof enclosure must be made by the manufacturer or its authorized service center. Keep flameproof enclosure tight, torque to 40,6 Nm (30 ft. lbs.) while in service and disconnect power before installing or removing vaporizer from service. NOTE Installer must install a terminal box (connection facility). Metal Terminal Box (3/4”): Use a suitably certified metal terminal box (3/4”) for the area classification, ATEX or IECEx certified - for Europe; or Class I, Division 1, Group D (UL listed or equivalent) - for US and Canada. Electrical wiring must be rated for -20ºC (-4ºF) to 130°C (266°F). CAUTION Vaporizer may be hot during or after use. CAUTION To provide grounding, connect only metal electrical conduit or armored cable to the Metal Terminal Box. CAUTION Do not install vaporizer in corrosive environments or expose to corrosive chemicals. CAUTION If flameproof joint dimensions are required by the end user, please contact AlgasSDI. CAUTION Propane odor can fade. 12 Preparing the site When preparing your site, consider local setback limitations for your desired storage container(s). Also, consider points of ingress/egress and other openings into buildings, including any air intakes. The ZIMMER vaporizer is explosion-proof, which means that it can be mounted next to, on, or near the storage container(s). For portable applications, the ZIMMER (up to 50 kg/hr model) can be mounted on the storage container. Make sure the mount touches the vessel in as small an area as possible to avoid corrosion on the vessel surface. For stationary applications mount the ZIMMER on a wall or support near the container(s) or on the container (up to 50 kg/hr model) by using the tank mount kit. Materials you may need for installation ♦ Storage tank, or cylinder(s) with liquid withdrawal valve(s) also called “dip tube(s)”, are required. ♦ Excess flow valve(s). ♦ Manifold piping if using multiple cylinders. ♦ Inlet isolation valve with hydrostatic relief valve approved for liquid LP Gas service (included with Algas-SDI P/N 80892). ♦ Piping components including forged steel union or removable compression/flare fittings. ♦ SCH 80 pipe for liquid service, or approved tubing and fittings. ♦ Inlet strainer with No.40 mesh screen (in Algas-SDI P/N 80892) ♦ Outlet regulator with high temperature Fluorocarbon elastomer (Viton) seat, (Algas-SDI P/N 80890) (Outlet Range 0.21 – 2.10 bar [3-30 psig]). ♦ Outlet isolation valve approved for LP Gas vapor service (included with Algas-SDI P/N 80892). ♦ Wall mount kit up to model Z50. (Algas-SDI P/N 80885). ♦ Electrical disconnect switch (See Electrical Specifications in Appendix). ♦ Metal Terminal box use Algas-SDI P/N 80895 (Div 1) and P/N 80896 (Ex) for models up to 50kg/hr. ♦ Wire to connect your ZIMMER. Wire type will be determined by your specific voltage, current and wiring conditions. 13 Mounting the ZIMMER Z25/40/50 model shown Z100/150 model shown If mounted outdoors, the ZIMMER must be mounted horizontally or vertically on a vertical surface to maintain its enclosure rating. Use Algas-SDI Mounting Kit P/N 80885, or equivalent components, when mounting the ZIMMER to a concrete, masonry, or wood construction wall. For mounting options see Available Options. MOUNTING CHANNEL SLEEVE ANCHOR 3/8" WASHER 14 Piping CAUTION Teflon tape can clog orifices if not properly used. If a removed fitting has Teflon tape, make sure to clean all threads and remove all tape debris before re-installing. The ZIMMER is designed for feed-through operation. If you are using cylinders to store the LPG, you will need liquid withdrawal valves in each cylinder. It is best to use valves that have both vapor and liquid withdrawal ports – this allows you to use vapor when your load is small or when the temperature is high, and then use your vaporizer when the ambient conditions are insufficient. Typical Piping Installation – Dip Tube If you are using a tank to store the LPG, you will need to connect to the bottom of the tank or to a connection that has a “dip tube” extending into the tank for liquid withdrawal. ♦ Install an approved isolation valve at the outlet of the tank or use the existing tank valve. If you are using cylinders you should install an isolation valve after the cylinders have been manifolded together. The isolation valve should have a hydrostatic relief valve installed to protect the pipe section between the valves. ♦ After the isolation valve, install a ½” or ¾” NPT strainer with a size 40 or smaller mesh screen. ♦ Connect the strainer to the inlet of the ZIMMER using ½” or ¾” pipe, Schedule 80, depending on the model. NOTE Do not install a check valve between the ZIMMER and the tank or cylinders! Liquid must be able to back-flow if necessary. ♦ At the outlet of the ZIMMER install an isolation valve approved for LPG vapor service. 15 ♦ Next, install a pressure regulator with a high temperature Fluorocarbon elastomer (Viton) seat no more than 1 meter (3 feet) after the vaporizer outlet. Install this regulator as close to the outlet of the vaporizer as possible and always at a higher elevation than the vaporizer outlet to allow any condensed liquid to travel back to the vaporizer. Never install the regulator more than 1 meter (3 feet) from the vaporizer. If you are using PE pipe after the regulator, ensure that it is connected at a minimum 2 meters (6 feet) after the vaporizer. ♦ Install a pressure gauge in the regulator or at the regulator outlet. ♦ After the regulator, install a “drip-leg” in the piping or a vapor filter to collect any residue or heavy-ends from the LPG. The drip leg should terminate with a valve and a plug for draining. LPG liquid line size chart (Minimum Pipe Size) Capacity of units MMBtu (Kcal) 1.1 (288,792) 1.8 (446,069) 2.3 (557,584) 4.6 (1,155,168) 6,8 (1,722,690) Distance from storage to vaporizer - feet (meters) LBS (GPH) 55 25 (12.5) 88 40 (20) 110 50 (25) 220 100 (50) 352 150 (80) Kg 25 (8) ½” 50 (15) ½” 75 (23) ½” 100 (31) ½” 150 (36) ½” 200 (61) ¾” 300 (92) ¾” 400 (122) ¾” ½” ½” ½” ¾” ¾” 1” 1” 1” ½” ½” ½” ¾” ¾” 1” 1” 1” ½” ¾” ¾” ¾” 1” 1” 1” 1¼” ¾” ¾” 1” 1” 1” 1¼” 1¼” 1¼” (DN15) (DN15) (DN15) (DN15) (DN15) (DN20) (DN20) (DN20) (DN15) (DN15) (DN15) (DN20) (DN20) (DN25) (DN25) (DN25) (DN15) (DN15) (DN15) (DN20) (DN20) (DN25) (DN25) (DN25) (DN15) (DN20) (DN20) (DN20) (DN25) (DN25) (DN25) (DN32) (DN20) (DN20) (DN25) (DN25) (DN25) (DN32) (DN32) (DN32) Relief valve For horizontal installation, no modifications to the relief valve orientation are required. For vertical installation, ensure that the relief valve vent is piped in a vertical orientation. This may be achieved by using a pipe away adapter with a ½” NPT pipe nipple and ½” NPT F x F elbow, or by switching the LPG outlet adapter with the pressure relief valve to ensure the pressure relief valve vents upwards. Leak test new piping connections during commissioning. Note: When mounting vertically, always ensure that the LPG inlet and the outlet end of the vaporizer are on top. 16 Filtaire In areas where LPG quality is poor it may be necessary to install FILTAIRE or FILT-EZE Gas trap at the outlet of your vaporizer. ♦ For model Z150 use FILTAIRE model F4 P/N 20536-ASME. ♦ For model Z100 above 14ºF (-10ºC) ambient temperature (35 psig (2.4 bar) saturation pressure) use FILT-EZE P/N 82288. Below 14ºF (-10ºC), use FILTAIRE model F4 P/N 20536-ASME. ♦ For models Z25, Z40 and Z50 use FILT-EZE P/N 82288. Installing Multiple Vaporizers Multiple ZIMMER vaporizers can be manifolded together to increase the total system capacity. ♦ Manifold the inlets and outlets together using similar length piping runs. It is best to keep the piping as short as possible. ♦ Install an isolation valve at the inlet and outlet of each vaporizer. ♦ Install an appropriately sized regulator with Fluorocarbon elastomer (Viton) seat after the outlets have been manifolded together. For more than two vaporizers use one adequately sized regulator with a Fluorocarbon elastomer (Viton) seat. Common piping problems Problem: Frost or condensation on the liquid LPG piping. Cause: Vaporizer installed with undersized piping from storage container to vaporizer. Reason: Liquid LPG boils in the pipe before the vaporizer causing a reduction in vaporization capacity. Problem: Moisture or water droplets on the piping before the regulator. Frosting of the regulator. Cause: Outlet regulator installed too far from vaporizer or below vaporizer outlet. Reason: High pressure LPG vapor condenses between the vaporizer outlet and the regulator. Problem: Downstream component failure. Cause: Drip leg or filter is not installed or is too small. Reason: Oils or heavy ends collect in downstream regulators and other components. 17 Electrical Service The ZIMMER vaporizer is manufactured as an explosion proof device suitable for hazardous locations. Do not separate the heat exchanger to access the electrical enclosure – separating the enclosure will void warranty! ♦ When connecting the electrical service for the ZIMMER you will need a circuit breaker appropriate for the application. See Electrical Specifications in the Appendix. ♦ You will also need a disconnect switch located within sight of the vaporizer (refer to Electrical Specification in Appendix). ♦ Select the appropriate size conductors based on the current draw (refer to Electrical Specification in Appendix) and conductor run distance (see reference charts below). ♦ Install metal terminal box to the ¾” MNPT seal-off to make the wiring connections in accordance with the local electrical codes. Ensure the terminal box is connected to seal-off before vaporizer is mounted to wall. Metal Terminal Box (3/4”) for 50kg/hr and Smaller models Use a suitably certified metal terminal box for the area classification, ATEX or IECEx certified - for Europe; or Class I, Division 1, Group D (UL listed or equivalent) - for US and Canada. Electrical components must be rated for 130°C (266°F). (ASDI P/N 80895 (CLASS I DIV 1) OR 80896 (ATEX Ex d) Metal Terminal Box (1-1/4”) for 100kg/hr and 150kg/hr models Ex db IIA Gb or Ex eb IIA Gb, ATEX or IECEx certified - for Europe; or Class I, Division 1, Group D (UL listed or equivalent) - for US and Canada. Electrical components must be rated for 130°C (266°F). (KILLARK P/N GESLT-4 or equivalent) ♦ Do not separate vaporizer sections to access the wiring. Use conductor assembly provided. ♦ Connect the green conductor to ground. See appropriate wiring schematic in Appendix based on your desired installation. Do not pull on, twist, or bend the wires. CAUTION________________________________________ When installing the metal terminal box, use an open-end wrench to securely hold the factory provided seal-off to prevent twisting! ___________________________________________________ 18 Wire Length Chart [#4 AWG – 21.1 mm2] Wire Length Chart [#6 AWG – 13.3 mm2] 19 Wire Length Chart [#8 AWG – 8.36 mm2] Wire Length Chart [10 AWG – 5.26 mm2] 20 3 OPERATION WARNING The equipment described in this manual is designed to operate with LP-gas, a flammable fuel under pressure. The nature of the application involves inherent hazards that could result in injury. Only a TRAINED and FULLY QUALIFIED person should service this equipment. _____________________________________________________________ Putting your vaporizer into service After completing the piping work, leak test all connections with a soap solution and pressure from the tank or cylinders, or from a pressure tap and compressed air bottle. To initiate operation of the ZIMMER vaporizer, engage the electrical supply at the disconnect and open all valves in the liquid supply line to the vaporizer. Depending on the conditions, it could take up to 2-5 minutes for the vaporizer to be ready for full use, though around 1 minute is more typical. Open the isolation valve located at the outlet of the vaporizer. If starting the system for the first time, set the first stage regulator at the outlet of the vaporizer to 5 psig (0.35 barg) or at the desired pressure. This pressure should be kept as low as possible to reduce the risk of vapor re-liquification. The system should now be ready for use. The vaporizer is designed to be used continuously and can also idle for long periods of time when not in use. NOTE During the first few days of use it is a good practice to blow-down the drip leg and strainer to remove any debris which may be left over from installation. 21 Shutting down the system For overnight or short time periods: ♦ Because the ZIMMER uses only a small amount of electricity (e.g. approximately 300 - 600 watts in 1 PH operation for Z50) when there is no load, it is suitable to leave the power engaged even during periods of non-use. If desired, close the vaporizer outlet isolation valve when the vaporizer is not being used. For extended periods: ♦ Close the vaporizer outlet isolation valve. ♦ Open the disconnect switch to power off the vaporizer. ♦ Close the inlet valve or tank valve(s) only after the vaporizer has expanded the remaining gas and pushed it back toward the tank (approximately 5 minutes). Trapped liquid can expand when heated causing damage or possible rupture to pipes and components. Always install hydrostatic relief valves between isolation valves. 22 MAINTENANCE 4 CAUTION To prevent ignition of hazardous atmospheres, 1. Any repairs internal to the flameproof enclosure must be made by the manufacturer. 2. Keep flameproof enclosure tight, torque to 40.6 Nm (30 ft. lbs.) while in service and disconnect power before installing or removing vaporizer from service. GENERAL The ZIMMER vaporizer is designed for long-term trouble-free operation. Because of the nature of its use, and the severe duty it receives, it is important to provide scheduled maintenance. The maintenance schedule, type, and frequency provided in this manual is the minimum maintenance required for proper operation of the vaporizer. Ambient conditions surrounding the vaporizer installation and LPG quality may require a more frequent maintenance schedule. A list of REPLACEMENT PARTS is in Section 6 of this manual. Initial Installation & Operation Inspections: Component Inlet Strainer Electronic wiring and connections Heat exchanger and drip legs Required 30-60 days after initial installation Action Required Inspect strainer and remove accumulated debris. Note: if debris accumulation is heavy check every 3 - 6 months. Check junction/terminal box electrical connections. Inspect electrical connections for loose conductors and any indication of heat build-up or damage. Check all drip legs and vaporizer for heavy ends and oil build-up. If present, first ensure there are no sources of ignition within 25 feet (8 meters), then drain heavy ends. NOTE: In areas where LPG quality is poor it may be necessary for the drip legs and the heat exchanger to be checked for heavy ends more frequently (monthly or bimonthly depending on LPG quality). Once it is verified that no significant quantity of heavy ends is accumulating during vaporizer operation, this maintenance can be performed on an annual basis. 23 Servicing your ZIMMER ZIMMER vaporizers are designed to require very little maintenance. The amount and frequency of maintenance depends on the quality of the LPG. The main servicing points for the system are the drip leg or heavy ends trap, vaporizer gas passages, the inlet strainer, and the inlet valve screen. Annual Maintenance Requirements: Component Inlet strainer Inlet valve Relief Valve Electronic wiring and connections Heat exchanger & system drip legs Mounting bracket Action Required Remove plug and clean the screen. Replace screen if gaps or holes are present in the screen. If oils or contaminants are present, it may be necessary to use a cleaning solution to remove them. Check for accumulation of heavy ends. Remove the inlet valve, allow heavy ends to drain. Alternatively blow out the oils through the holes in the valve body. Do not disassemble the valve! Ensure thermal probe is sufficiently coated in thermal grease and pushed all the way into the thermowell. Recommend replacing the valve after 7 years in service. Visually check and replace if leaks are observed. Check for excessive corrosion and ensure the relief valve is covered with the appropriate rain cap to prevent rain and debris from entering the valve. Replace rain cap if damaged or missing. Relief valve should be replaced per the manufacturers’ recommended replacement schedule or if it relieves during normal operation. Visually inspect all connections for corrosion, loose conductors, heat build-up and/or charring. Tighten or replace if necessary. Check the system drip legs and vaporizer for heavy ends and oil build-ups. If present, first ensure there are no sources of ignition within 25 feet (8 meters), then drain heavy ends to a safe area. If necessary, the heat exchanger gas passages can be cleaned by removing end caps, plugs, and adapters. Use compressed air or a non-metallic brush to clean gas passages. Visually inspect plug, adapter and valve o-rings and always perform a leak test after reinstalling. When reinstalling plugs, torque to 44 ft-lbs (60 Nm). After cleaning ensure that the gas passage inserts are installed back in the same passages they were removed from! NOTE: In areas where LPG quality is poor it may be necessary for the drip legs and heat exchanger to be checked for heavy ends more frequently (monthly or bi-monthly depending on LPG quality). Visually inspect mounting brackets for cracks or damage. CAUTION – HOT! When servicing the vaporizer, always make sure the vaporizer has cooled prior to touching! 24 5 TROUBLESHOOTING The ZIMMER is a very simple device with few areas for problems to occur. The main areas of the vaporizer are the inlet valve and the heat exchanger. The heaters used are not ordinary wire filament resistance heating elements that are susceptible to burn-out. Possible problems TREE #1 INLET VALVE DOES NOT OPEN AFTER POWER IS APPLIED Is vaporizer warm? YES YES YES Replace actuator Is the capillary tube between bulb and actuator broken?* Is power applied? NO NO YES Apply power and wait 2 min. for valve to open NO If pump is used lower pump pressure YES Heater system not functioning. Contact ASDI YES *Note: May need to replace actuator with known functioning one to determine if broken. Input voltage OK? Heater system not functioning. Contact ASDI NO Is circuit breaker opening at power start? NO Fix wiring Are high inrush circuit protection devices used and sized properly? NO Change to high inrush circuit protection 25 TREE #2 INLET VALVE CLOSES DURING OPERATION Is vaporizer warm as outlet pressure drops? YES NO Measure current as pressure drops Is there frosting or water condensation on any of the inlet piping? YES YES Is current per table values? 1. Exceeding vaporizer capacity. Lower capacity or add additional vaporizers. 2. Thermal valve probe not pushed all the way in the thermowell. Check for probe insertion depth. YES NO Correct pressure losses in liquid piping Allow ZIMMER to completely cool for 5-6 hours. Apply power and measure current after 20 seconds. YES NO Debris on inlet screen? NO Clean inlet screen debris Check fuel composition meets valve limits Current per El. Specification table in Appendix? NO Heater system not functioning. Contact ASDI 26 6 REPLACEMENT PARTS Item Description ASDI P/N 50/50 LPG 70/30 LPG PROPANE Recommended replacement interval 1 Valve actuator replacement kit 40815 40816 40817 only required if damaged 2 Valve replacement kit 40946 40944 40945 only required if damaged 3 4 Replacement vaporizer gas passage plugs (includes o-rings) 3/4” Replacement vaporizer adapter fitting (on inlet, outlet and relief valve connection) 1” Replacement vaporizer adapter fitting (used on Z100 and Z150 outlet) 60564 N/A 60565 N/A 60898 N/A 8074-101 N/A 5 Relief valve UL/CE approved 6 End cap with magnets – front end 80041 N/A 7 End cap with magnets – back end 80042 N/A 27 FAQ’s 7 Q1: A1: What voltages can the ZIMMER operate on? The UL/CE listing is valid for any voltage between: 100 - 277 VAC, single phase for sizes up to 50 kg/hr. 100 - 277 VAC, single phase; or up to 480 VAC, three phase, 4 wire (wye) for 100 - 150 kg/hr sizes. Q2: A2: At which voltage are the capacities calculated at? Capacities are rated based on 220 VAC. Q3: What is the capacity rating based on? A3: The capacity is based on using a 220V power supply and with LPG having a maximum butane percentage allowed for specific valve Model Selection at an ambient temperature of 104 ºF (40 ºC) for models Z25, Z40 and Z50 and at an ambient temperature of 80ºF (27 ºC) for models Z100 and Z150. Q4: A4: Can the ZIMMER use any mixture of propane and or butane? There are three versions of the ZIMMER – one for commercial propane (e.g. Z40P), one for standard LPG 70% Butane/ 30% Propane (e.g. Z40L), and one for 50% Butane/ 50% Propane (e.g. Z40S). The ZIMMER is not designed for use with commercial butanes. • The P valve is designed to operate with a maximum of 15% Butane • The L valve is designed to operate with a maximum of 80% Butane and ideally with 60-80% Butane. Using less than 60% Butane will result in a reduced capacity. • The S valve is designed to operate with a maximum of 60% Butane and ideally with 40-60% Butane. Using less than 40% Butane will result in a reduced capacity. Specific vapor pressure curves are available upon request. Q5: What is the operating temperature? A5: The ZIMMER uses self-regulating heaters that are not fixed resistance. This means the ZIMMER does not have a fixed temperature setting. The ZIMMER will reach its peak temperature at idle, at which point it will consume the least amount of energy. As the flow rate increases, heat is drawn from the heaters by the LPG causing the resistance to decrease and allowing them to produce more energy. Q6: What is the pressure drop at maximum flow? A6: This depends on the tank pressure and ambient temperature. At 100 psig (6.9 bar) the pressure drop is about 1-2 psig (0.07 – 0.14 bar) for 50 kg/hr model or less flow. For the 100 kg/hr or 150 kg/hr models, pressure drop is about 6 psig (0.04 bar). If using 100 or 150 kg/hr models in cold climates below 0ºF (-18ºC), visit ASDI website or contact factory for additional information. 28 Q7: What prevents liquid from passing downstream? A7: The vapor temperature at the exit of the vaporizer, in combination with the LPG pressure exerts a specific force against a preset spring and ball assembly. As the temperature drops the resulting decrease in force on the spring causes the ball to modulate closed against the valve seat. The temperature and pressure curves are matched based on your specific Butane/Propane content. Q8: Can liquid pass downstream when the electricity fails? A8: No. Because the inlet control valve does not require electricity to operate, it is fail-safe. The valve operates as stated in A7 to ensure that no liquid passes downstream. Q9: Because there are no switches, what prevents the heaters from overheating? A9: The ZIMMER heaters are not traditional filament-type resistance heaters. Instead, the heaters are made from a special ceramic-like silicon material that cannot exceed a certain temperature. If the heaters are subjected to a higher temperature during use the molecular structure will degrade into an infinite resistance form yielding no heat output. Q10: Can I leave my ZIMMER on overnight while it is not in use? A10: Yes. Your ZIMMER is designed for continuous use. Additionally, the ZIMMER consumes very little energy while not in use (e.g. approximately 300 - 600 watts in 1 PH operation for 50 kg/hr model). Q11: If the power goes out for a brief period of time, will it shut down the gas supply to my burners or pilots? A11: Generally, no. For short power outages the ZIMMER will continue operating – even without power. Although no additional heat will be added, the heat exchanger’s aluminum body generally will have enough reserve energy to sustain a short power outage. When the power comes back on, the heatsink will be replenished. Since the inlet control valve does not require electricity for operation, its function is independent of the power supply. Q12: Does the ZIMMER have to be horizontally mounted on a wall? A12: Horizontal mounting is the preferred mounting, but vertical mounting is possible. If mounting vertically, local codes may require an elbow to be mounted between the ZIMMER and pressure relief valve to direct released LPG upward instead of outward or you may swap the inlet adapter with the relief valve to ensure relief valve points upward. If mounting vertically, always ensure the inlet and outlet are at the top. Q13: What is the recommended first-stage regulator? A13: Regulator must be sized adequately for flow and must have high temperature Fluorocarbon elastomer seat (Viton). If unable to acquire high temperature regulator in your area, Algas-SDI stocks a 5-20 psig (0.14 – 1.4 bar) high temperature regulator. Q14: Can the ZIMMER be used in an economy configuration like the XP vaporizers? A14: With Propane models, but at present an economy kit is not offered for the ZIMMER. Q15: What is the minimum temperature rating for the ZIMMER? A15: The UL/CE approval is valid for -4ºF (-20 ºC). Q16: Is the capacity de-rated at certain ambient conditions? A16: In general, no. In fact, the ZIMMER vaporizes more at lower temperatures. At extreme low temperatures and at extreme high temperatures, the 100 and 150 kg/hr capacities are derated somewhat. Contact factory for application related questions. 29 Q17: What is the "maximum current draw"* from the ZIMMER and under what conditions does this occur? A17: The maximum current occurs at the maximum capacity, the lowest temperature, and the lowest voltage. The maximum power output occurs at the same conditions, except additionally at the highest voltage. Please see electrical table in Appendix. * Maximum current draw is defined as anything after the first five seconds preceding a cold start. Q18: Can the ZIMMER be used with DC voltage? A18: Yes, the ZIMMER can be used with both AC and DC voltage. All respective Electrical specifications such as breaker type and sizing remain the same. Q19: What is the outer shell material, and is it “hot to the touch”? A19: The outer shell material is made from anodized aluminum. Under normal operating conditions, the shell should be safe to touch. However, in idle conditions and depending on your installation, it may be too hot to touch. Depending on your installation, you may want to consider mounting in a way to reduce risk of touching the vaporizer on idle. Q20: Are common spare parts the same as the first- generation ZIMMER? A20: The ZIMMER requires very few spare parts. Of those required, some are common between ZIMMER revisions however some are not. Most notably, the inlet valve is different between ZIMMER families and are ordered under separate part numbers. Q21: Why do I require special circuit breakers for ZIMMER vaporizers? A21: Because of the high initial current of the ZIMMER, Type D or TYPE J breakers are required. Please see electrical specifications in the Appendix. Q22: Can multiple ZIMMER vaporizers be installed together? If so, do they require balancing orifices? A22: Multiple ZIMMER vaporizers can be installed in parallel. Due to the self-balancing nature of the ZIMMER, no balancing orifices are required. Additionally, you can parallel install ZIMMER vaporizers of different sizes, again without the need for balancing orifices. Q23: Can first generation and second-generation ZIMMER vaporizers be used together? If so, do they require balancing orifices? A23: First and second-generation ZIMMER vaporizers can be installed together in parallel, again without the need for balancing orifices. Note: The system start-up time is based upon the first-generation ZIMMER. Q24: Can a propane version of the ZIMMER be converted to an LPG model? A24: Yes, with replacement of the inlet valve. If using the wrong valve, you may experience capacity de-rate or passing liquid. Contact the factory for the correct inlet valve for your application. Q25: What is the start-up time for the ZIMMER? A25: The ZIMMER is ready to flow LPG within one minute. 30 Q26: What is the recommended pipe-away method for the third-generation ZIMMER? A26: To pipe-away REGO 3129G used on the third-generation ZIMMER, use the REGO pipe-away adapter, ASDI P/N 8079-107. Q27: Is it possible to clean the new ZIMMER without removing from service? A27: Yes. The innovative design of the ZIMMER allows tubes to be cleaned in place, and for the inlet valve to be removed from service without disconnecting the remaining LPG connections or electrical connections. See Maintenance section. 31 8 Appendix ELECTRICAL SPECIFICATIONS Single phase wiring Z25 (25 kg/hr nominal)*** Voltage L1 to Neutral [V] Power [kW] * Current at rated capacity [A] * Breaker - D/J type [A] (125%) * 100 2.2 22.3 30 120 2.2 18.6 25 208 3.0 14.3 20 220 3.0 13.5 20 240 3.0 12.4 15 277 3.0 10.7 15 220 4.8 21.6 30 240 4.8 19.8 25 277 4.8 17.2 25 220 6.0 27.0 35 240 6.0 24.8 35 277 6.0 21.5 30 220 11.9 21.6 30 240 11.9 19.8 25 277 11.9 17.2 25 220 17.9 27.0 35 240 17.9 24.8 35 277 17.9 21.5 30 Z40 (40kg/hr nominal)*** Voltage L1 to Neutral [V] Power [kW] * Current at rated capacity [A] * Breaker - D/J type [A] (125%) * 100 3.6 35.7 45 120 3.6 29.8 40 208 4.8 22.9 30 Z50 (50 kg/hr nominal)*** Voltage L1 to Neutral [V] Power [kW] * Current at rated capacity [A] * Breaker - D/J type [A] (125%) * 100 4.5 44.6 60 120 4.5 37.2 50 208 6.0 28.6 40 Z100 (100 kg/hr nominal)**/*** Voltage L1, L2 or L3 to Neutral [V] Power [kW] * Current at rated capacity [A] * Breaker - D/J type [A] (125%) * 100 8.9 29.8 40 120 8.9 24.8 35 208 11.9 22.9 30 Z150 (150 kg/hr nominal)**/*** Voltage L1, L2 or L3 to Neutral [V] Power [kW] * Current at rated capacity [A] * Breaker - D/J type [A] (125%) * 100 13.4 44.6 60 120 13.4 37.2 50 208 17.9 28.6 40 Three phase wiring Z100 (100 kg/hr nominal)*** 4-Wire Wye Configuration (4 pole breaker) 3-Phase Delta Configuration (3 pole breaker) Three Phase Line to Line voltage [V] Voltage L1, L2 or L3 to Neutral [V] Power [kW] * Current at rated capacity [A] * Breaker - D/J type [A] (125%) * 173 100 8.9 29.8 40 415 240 11.9 19.8 25 480 277 11.9 17.2 25 100 100 8.9 51.5 65 120 120 8.9 42.9 55 208 208 11.9 39.6 50 220 220 11.9 37.5 50 240 240 11.9 34.4 45 277 277 11.9 29.8 40 Three Phase Line to Line voltage [V] Voltage L1, L2 or L3 to Neutral [V] Power [kW] * Current at rated capacity [A] * Breaker - D/J type [A] (125%) * Z150 (150 kg/hr nominal)*** 173 208 360 380 415 100 120 208 220 240 13.4 13.4 17.9 17.9 17.9 44.6 37.2 28.6 27.0 24.8 60 50 40 35 35 480 277 17.9 21.5 30 100 100 13.4 77.3 100 120 120 13.4 64.4 85 208 208 17.9 49.5 65 220 220 17.9 46.8 60 240 240 17.9 42.9 55 277 277 17.9 37.2 50 208 120 8.9 24.8 35 360 208 11.9 22.9 30 380 220 11.9 21.6 30 *Your exact conditions may result in differing power and current. **Requires three (3) single phase breakers, one for each leg (L1, L2, L3) ***25% capacity derate with 100-120V line to line voltage 32 END VIEW 2.7 69 VAPOR OUTLET 1/2"-14 FNPT 5.8 148 2.7 69 5.6 141 3.3 84 PRESSURE RELIEF VALVE W/PIPE AWAY OPTION NOTES: 1. ELECTRICAL: 120-277 VAC, 1PH, 50/60Hz 2. CONFORMS TO HAZARDOUS AREA RATING: 1. ATEX/IECEx Ex db IIA T3 Gb 2. UL CLASS I, DIV 1, GROUP D T3 3. ENCLOSURE : TYPE 4, HORIZONTAL OR VERTICAL MOUNT 4. RELIEF VALVE SET: 250 PSIG [17,24 BAR] 5. MAWP: 250 PSIG AT 300°F [17,24 BAR AT 149°C] MDMT: -20°F AT 250 PSIG [17,24 BAR AT -29°C] 6. WEIGHT: 50 LB [23 KG] 7. DIMENSIONS SHOWN IN INCHES [MM] 9.5 241 8.3 210 VAPOR OUTLET 1/2"-14 FNPT 3.3 83 BOTTOM VIEW LIQUID INLET 1/2"-14 FNPT 24" [610] LG. X 12 GA [3.3mm²] POWER WIRE FRONT VIEW 26.9 684 TOP VIEW 6.2 158 .X 0.10 .XX 0.030 .XXX 0.010 ANGLE 1 FRACTIONS 1/4" UNLESS OTHERWISE SPECIFIED TOLERANCES 3.3 83 4.2 108 1/29/2018 Dwg. # 0903-6001 AAS Job # Sht. No.: 1of 1 Rev.: B 1:8 AND NOTED Scale: Date: Approved By: Checked By: Drawn By: ASDI STD N/A ZIMMER 1PH, EQUIPMENT DRAWING Part # B END VIEW 151 S. Michigan St., Seattle, Washington. USA 98108 Tel: (206) 789-5410 Fax: (206) 789-5414 3/4"-14 MNPT ELECTRICAL CONNECTION POINT 67" 8 175 INTERPRET THIS DRAWING IN ACCORDANCE Title: WITH ANSI/ASME Y14.5-2009 THIS DRAWING IS PROPRIETARY AND CONFIDENTIAL AND SHALL NOT BE REPRODUCED OR USED IN ANY MANNER DETRIMENTAL TO ALGAS-SDI'S INTERESTS. Size: ALL RIGHTS RESERVED.© COPYRIGHT ALGAS-SDI DO NOT SCALE DRAWING THIRD ANGLE PROJECTION 13 5 " 8 346 9.5 241 8.3 210 END VIEW 3.3 83 VAPOR OUTLET 3/4"-14 FNPT 2.7 69 PRESSURE RELIEF VALVE W/PIPE AWAY OPTION 5.6 141 VAPOR OUTLET 3/4"-14 FNPT 5.8 148 2.7 69 3.3 84 LIQUID INLET 3/4"-14 FNPT NOTES: 1. ELECTRICAL: 1PH 110-277VAC, 3PH 4 WIRE WYE 240-480 VAC, 50/60Hz 2. CONFORMS TO HAZARDOUS AREA RATING: 1. IECEx/ATEX Ex db IIA T3 Gb 2. UL: CLASS I, DIV 1, GROUP D T3 3. ENCLOSURE: TYPE 4, HORIZONTAL OR VERTICAL MOUNT 4. RELIEF VALVE SET: 250 PSIG [17,24 BAR] 5. MAWP: 250PSIG AT 300°F [17,24 BARG AT 149°C] MDMT: -20°F [-29°C] AT 250 PSIG [17,24 BAR] WEIGHT: 170 LB [77 KG] DIMENSIONS SHOWN IN INCHES [MM] 6. 7. TOP VIEW 67.4 1712 54 1 " 8 1375 FRONT VIEW BOTTOM VIEW .X 0.10 .XX 0.030 .XXX 0.010 ANGLE 1 FRACTIONS 1/4" UNLESS OTHERWISE SPECIFIED TOLERANCES 24" [610] LG X 12 GA [3.3mm²] POWER WIRES THIRD ANGLE PROJECTION DO NOT SCALE DRAWING INTERPRET THIS DRAWING IN ACCORDANCE Title: WITH ANSI/ASME Y14.5-2009 THIS DRAWING IS PROPRIETARY AND CONFIDENTIAL AND SHALL NOT BE REPRODUCED OR USED IN ANY MANNER DETRIMENTAL TO ALGAS-SDI'S INTERESTS. Size: ALL RIGHTS RESERVED.© COPYRIGHT ALGAS-SDI 67" 8 175 3/4"-14 MNPT ELECTRICAL CONNECTION POINT 4.2 108 3.3 83 0903-6002 Job # Sht. No.: 6.2 158 AAS DN 1/31/2018 1of 1 Rev.: B 1:16 AND NOTED Scale: Date: Approved By: Checked By: Drawn By: END VIEW 151 S. Michigan St., Seattle, Washington. USA 98108 Tel: (206) 789-5410 Fax: (206) 789-5414 Dwg. # ASDI STD N/A ZIMMER 3PH, EQUIPMENT DRAWING Part # B 3 CONDUIT BOX BY OTHERS GRN/GREEN L1 NEUTRAL SEAL-OFF DO NOT TWIST NOTES: 1. FOR BREAKER SIZE, PLEASE REFERENCE THE ELECTRICAL SPECIFICATION IN THE OPERATIONS MANUAL. 2. L1 TO NEUTRAL VOLTAGE: 100VAC - 277VAC 3 FOR JUNCTION BOX SIZING PLEASE REFERENCE THE ELECTRICAL SERVICE SECTION OF THE MANUAL. ELECTRICAL SERVICE DISCONNECT BY OTHERS GROUND L1 NEUTRAL BREAKER TYPE "D" 1-PHASE WIRING SCHEMATIC .X 0.030 .XX 0.010 .XXX 0.005 ANGLE 1 FRACTIONS 1/16" UNLESS OTHERWISE SPECIFIED TOLERANCES INTERPRET THIS DRAWING IN ACCORDANCE Title: WITH ANSI/ASME Y14.5-2009 THIS DRAWING IS PROPRIETARY AND CONFIDENTIAL AND SHALL NOT BE REPRODUCED OR USED IN ANY MANNER DETRIMENTAL TO ALGAS-SDI'S INTERESTS. Size: ALL RIGHTS RESERVED.© COPYRIGHT ALGAS-SDI DO NOT SCALE DRAWING THIRD ANGLE PROJECTION INITIAL RELEASE A B 9/18/2018 Dwg. # 0903-7001 AAS ECN # Job # Sht. No.: 1of 1 Rev.: A 1:4 AND NOTED Scale: Date: Approved By: Checked By: Drawn By: AAS NAME ASDI STD N/A ZIMMER 25/40/50KG WIRING SCHEMATIC Part # 9/18/2018 DATE 151 S. Michigan St., Seattle, Washington. USA 98108 Tel: (206) 789-5410 Fax: (206) 789-5414 ZIMMER VAPORIZER DESCRIPTION REV. REVISIONS L3 L1 L2 GROUND 3-PHASE WIRING SCHEMATIC WYE CONFIGURATION ELECTRICAL SERVICE DISCONNECT BY OTHERS NEUTRAL BREAKER TYPE "D" 3 CONDUIT BOX BY OTHERS NOTE: 1. FOR BREAKER SIZE, PLEASE REFERENCE THE ELECTRICAL SPECIFICATION IN THE OPERATIONS MANUAL 2. L1, L2, L3 TO NEUTRAL VOLTAGE: 100VAC - 277VAC 3 FOR JUNCTION BOX SIZING PLEASE REFERENCE THE ELECTRICAL SERVICE SECTION OF THE MANUAL. SEAL-OFF DO NOT TWIST GRN/GREEN L1 L2 L3 N1 N2 N3 DESCRIPTION REVISIONS A REV. B C AAS AAS NAME 9/17/2018 BDZ DATE 10/21/2020 RWP 9/7/2018 2/15/2021 151 S. Michigan St., Seattle, Washington. USA 98108 Tel: (206) 789-5410 Fax: (206) 789-5414 N/A 0903-7002 Drawn By: AAS BDZ ECR/ECN Checked By: 9/7/2018 Approved By: Date: D 1:4 AND NOTED Scale: 1of 3 Rev.: ASDI STD Job # Sht. No.: ZIMMER 100/150KG WIRING SCHEMATIC, 3 PHASE, 4-WIRE (Wye) Dwg. # Part # ELIMINATED 1-PHASE, 1- BREAKER CONFIGURATION INITIAL RELEASE UPDATED WIRE NAMES ENLARGED IMAGE AND CENTERED ADDED SINGLE PHASE TRIPLE BREAKER SHT 3 FIXED SPELLING ERRORS IN NOTES ADDED PAGE 4 DETAILING 3-PHASE DELTA WIRING CONFIGURATION D TOLERANCES UNLESS OTHERWISE SPECIFIED .X 0.10 .XX 0.030 .XXX 0.010 ANGLE 1 FRACTIONS 1/4" B ZIMMER VAPORIZER THIRD ANGLE PROJECTION DO NOT SCALE DRAWING INTERPRET THIS DRAWING IN ACCORDANCE Title: WITH ANSI/ASME Y14.5-2009 THIS DRAWING IS PROPRIETARY AND CONFIDENTIAL AND SHALL NOT BE REPRODUCED OR USED IN ANY MANNER DETRIMENTAL TO ALGAS-SDI'S INTERESTS. Size: ALL RIGHTS RESERVED.© COPYRIGHT ALGAS-SDI 3 CONDUIT BOX BY OTHERS NEUTRAL L1 3X BREAKER TYPE "D" NOTE: 1. FOR BREAKER SIZING, PLEASE REFER TO ELECTRICAL SPECIFICATION IN THE OPERATING MANUAL. 2. L1 TO NEUTRAL VOLTAGE: 100VAC - 277 VAC 3 FOR JUNCTION BOX SIZING PLEASE REFERECNE THE ELECTRICAL SERVICE SECTION OF THE MANUAL. ELECTRICAL SERVICE DISCONNECT BY OTHERS GROUND L1 L1 1-PHASE WIRING SCHEMATIC TRIPLE-BREAKER N3 N2 N1 L3 L2 L1 GRN/GREEN B .X 0.1 .XX 0.03 .XXX 0.01 ANGLE 0 30' FRACTIONS 1/4" UNLESS OTHERWISE SPECIFIED TOLERANCES Title: INTERPRET THIS DRAWING IN ACCORDANCE WITH ANSI/ASME Y14.5-2009 THIS DRAWING SHALL NOT BE REPRODUCED OR USED IN ANY MANNER DETRIMENTAL TO ITS Size: INTERESTS. ALL RIGHTS RESERVED. © COPYRIGHT ALGAS-SDI DO NOT SCALE DRAWING THIRD ANGLE PROJECTION ZIMMER VAPORIZER SEAL-OFF DO NOT TWIST Dwg. # N/A 0903-7002 9/7/2018 AAS BDZ Sht. No.: 2of 3 Rev.: ASDI STD Job # D 1:4 AND NOTED Scale: ZIMMER 100/150KG WIRING SCHEMATIC 1-PHASE, 3 BREAKER Part # 151 S. Michigan St., Seattle, Washington. USA 98108 Tel: (206) 789-5410 Fax: (206) 789-5414 Date: Approved By: Checked By: Drawn By: L3 GROUND L1 L2 3-PHASE WIRING SCHEMATIC DELTA CONFIGURATION ELECTRICAL SERVICE DISCONNECT BY OTHERS BREAKER TYPE "D" 3 CONDUIT BOX BY OTHERS NOTE: 1. FOR BREAKER SIZING, PLEASE REFER TO ELECTRICAL SPECIFICATION IN THE OPERATING MANUAL. 2. L1, L2, L3 TO NEUTRAL VOLTAGE: 100VAC - 277 VAC 3 FOR JUNCTION BOX SIZING PLEASE REFERENCE THE ELECTRICAL SERVICE SECTION OF THE MANUAL. GRN/GREEN L1 L2 L3 N1 N2 N3 SEAL-OFF DO NOT TWIST TOLERANCES B .X 0.1 .XX 0.03 .XXX 0.01 ANGLE 0 30' FRACTIONS 1/4" UNLESS OTHERWISE SPECIFIED ZIMMER VAPORIZER THIRD ANGLE PROJECTION DO NOT SCALE DRAWING Title: INTERPRET THIS DRAWING IN ACCORDANCE WITH ANSI/ASME Y14.5-2009 THIS DRAWING SHALL NOT BE REPRODUCED OR USED IN ANY MANNER DETRIMENTAL TO ITS Size: INTERESTS. ALL RIGHTS RESERVED. © COPYRIGHT ALGAS-SDI N/A 151 S. Michigan St., Seattle, Washington. USA 98108 Tel: (206) 789-5410 Fax: (206) 789-5414 Part # 0903-7002 Drawn By: Checked By: AAS BDZ 9/7/2018 Approved By: Date: D 1:4 AND NOTED Scale: 3of 3 Rev.: ASDI STD Job # Sht. No.: ZIMMER 100/150KG WIRING SCHEMATIC 3-PHASE DELTA Dwg. # DRIP LEG W/SHUT OFF VALVE AND PLUG LPG OUT OUTLET REGULATOR WITH FLUORCARBON ELASTOMERS NO MINIMUM DISTANCE REQUIRED PSI ISOLATION VALVE WITH HYDROSTATIC RELIEF OPTIONAL BY-PASS OUTLET REGULATOR SET BELOW VAPORIZER OUTLET REGULATOR LPG IN PSI AAS NAME ECR/ECN LPG VAPOR OUT Part # 151 S. Michigan St., Seattle, Washington. USA 98108 Tel: (206) 789-5410 Fax: (206) 789-5414 1/15/2018 DN AAS Job # 1:8 AND NOTED Scale: Date: Approved By: Checked By: Drawn By: B Dwg. # 0903-8001 Sht. No.: 1of 1 Rev.: A N/A ASDI STD ZIMMER 1PH SINGLE UNIT INSTALLATION DRAWING .X 0.10 .XX 0.030 .XXX 0.010 ANGLE 1 FRACTIONS 1/4" UNLESS OTHERWISE SPECIFIED TOLERANCES INTERPRET THIS DRAWING IN ACCORDANCE Title: WITH ANSI/ASME Y14.5-2009 THIS DRAWING IS PROPRIETARY AND CONFIDENTIAL AND SHALL NOT BE REPRODUCED OR USED IN ANY MANNER DETRIMENTAL TO ALGAS-SDI'S INTERESTS. Size: ALL RIGHTS RESERVED.© COPYRIGHT ALGAS-SDI DO NOT SCALE DRAWING THIRD ANGLE PROJECTION NOTES: 1. FOLLOW ALL LOCAL CODES & REGULATION FOR INSTALLATION 2. LEAK TEST ALL CONNECTION AFTER INSTALLATION. 3. ADDITIONAL UNIONS MAY BE REQUIRED AND ARE RESPONSIBILITY OF THE CUSTOMER CABLE OR CONDUIT SUITABLE FOR LOCATION 3/4" CONDUIT BOX IF USING PE PIPING PLACE OUTLET VALVE 2 METERS (6'-7') AFTER VAPORIZER OUTLET. PE PIPING CAN BE USED FROM THIS POINT ON. 1/15/2018 DATE FACTORY INSTALLED EXPLOSION PROOFS SEAL INITIAL RELEASE A FILTAIRE GAS TRAP DESCRIPTION REV. REVISIONS OUTLET REGULATOR SET BELOW VAPORIZER OUTLET REGULATOR OPTIONAL BY-PASS ISOLATION VALVE WITH HYDROSTATIC RELIFE NO MINIMUM DISTANCE REQUIRED OUTLET REGULATOR WITH FLUORCARBON ELASTOMERS LPG OUT LPG IN DRIP LEG W/SHUT OFF VALVE AND PLUG DATE AAS NAME PSI DESCRIPTION 1/16/2018 REVISIONS REV. INITIAL RELEASE ECR/ECN 7 68" LPG VAPOR OUT FACTORY INSTALLED EXPLOSION PROOF SEALS CABLE OR CONDUIT SUITABLE FOR LOCATION 3/4" CONDUIT BOX FILTAIRE GAS TRAP IF USING PE PIPING PLACE OUTLET VALVE 2 METERS (6'-7') AFTER VAPORIZER OUTLET. PE PIPING CAN BE USED FROM THIS POINT ON A TOLERANCES UNLESS OTHERWISE SPECIFIED .X 0.10 .XX 0.030 .XXX 0.010 ANGLE 1 FRACTIONS 151 S. Michigan St., Seattle, Washington. USA 98108 Tel: (206) 789-5410 Fax: (206) 789-5414 Part # Dwg. # 0903-8002 Job # Sht. No.: AAS DN 1/16/2018 1of 1 Rev.: A 1:4 AND NOTED Scale: Date: Approved By: Checked By: Drawn By: NOTES: 1. FOLLOW ALL LOCAL CODES & REGULATIONS FOR INSTALLATION. 2. LEAK TEST ALL CONNECTION AFTER INSTALLATION. 3. ADDITIONAL UNIONS MAY BE REQUIRED AND ARE RESPONSIBILITY OF THE CUSTOMER THIRD ANGLE PROJECTION DO NOT SCALE DRAWING B 1/4" ASDI STD N/A ZIMMER 1PH MULTI-UNIT INSTALLATION DRAWING INTERPRET THIS DRAWING IN ACCORDANCE Title: WITH ANSI/ASME Y14.5-2009 THIS DRAWING IS PROPRIETARY AND CONFIDENTIAL AND SHALL NOT BE REPRODUCED OR USED IN ANY MANNER DETRIMENTAL TO ALGAS-SDI'S INTERESTS. Size: ALL RIGHTS RESERVED.© COPYRIGHT ALGAS-SDI PSI ISOLATION VALVE WITH HYDROSTATIC RELIEF OPTIONAL BY-PASS PSI NOTES: 1. FOLLOW ALL LOCAL CODES & REGULATIONS FOR INSTALLATION. 2. LEAK TEST ALL CONNECTIONS AFTER INSTALLATION. 3. ADDITIONAL UNIONS MAY BE REQUIRED AND ARE RESPONSIBILITY OF THE CUSTOMER. OUTLET REGULATOR SET BELOW VAPORIZER OUTLET REGULATOR DRIP LEG W/SHUT OFF VALVE AND PLUG OUTLET REGULATOR WITH FLUROCARBON ELASTOMERS LPG VAPOR OUT 1/29/2018 DN B Dwg. # 0903-8003 AAS Job # Sht. No.: 1of 1 Rev.: A 1:4 AND NOTED Scale: Date: Approved By: Checked By: Drawn By: LOCAL CODE MAY REQUIRE AN ELBOW TO PIPE PRESSURE RELIEF VALVE VERTICAL 151 S. Michigan St., Seattle, Washington. USA 98108 Tel: (206) 789-5410 Fax: (206) 789-5414 Part # AAS ECR/ECN ASDI STD N/A ZIMMER 1PH SINGLE UNIT, VERTICAL INSTALLTION .X 0.10 .XX 0.030 .XXX 0.010 ANGLE 1 FRACTIONS 1/4" UNLESS OTHERWISE SPECIFIED TOLERANCES INTERPRET THIS DRAWING IN ACCORDANCE Title: WITH ANSI/ASME Y14.5-2009 THIS DRAWING IS PROPRIETARY AND CONFIDENTIAL AND SHALL NOT BE REPRODUCED OR USED IN ANY MANNER DETRIMENTAL TO ALGAS-SDI'S INTERESTS. Size: ALL RIGHTS RESERVED.© COPYRIGHT ALGAS-SDI DO NOT SCALE DRAWING THIRD ANGLE PROJECTION CABLE OR CONDUIT SUITABLE FOR LOCATION 3/4" CONDUIT BOX FACTORY INSTALLED EXPLOSION PROOF SEAL LPG OUT FILTAIRE GAS TRAP 1/29/2018 INITIAL RELEASE NAME IF USING PE PIPING PLACE OUTLETVALVE 2 METERS (6'-7') AFTER VAPORIZER OUTLET PE PIPING CAN BE USED FROM THIS POINT ON DATE REVISIONS DESCRIPTION NO MINIMUM DISTANCE REQUIRED LPG IN A REV. PSI 3/8" WASHER LAG BOLT MOUNTING CHANNEL MOUNTING CHANNEL INSTALLATION FOR SOFT (WOOD) WALLS 3/8" WASHER SLEEVE ANCHOR MOUNTING CHANNEL MOUNTING CHANNEL INSTALLATION FOR CONCRETE WALLS 13 5 " 8 346 ANCHORING METHODS FOR RECOMMENDED MOUNTING KIT A.S.D.I PART NO 80885 NOTE: 1. DIMENSIONS SHOWN INCHES [MM] REV. INITIAL RELEASE DESCRIPTION 5/21/2018 DATE AAS NAME REVISIONS A TOLERANCES SQUARE WASHER MOUNTING CHANNEL 151 S. Michigan St., Seattle, Washington. USA 98108 Tel: (206) 789-5410 Fax: (206) 789-5414 Dwg. # DN AAS ECR/ECN Drawn By: Checked By: 5/21/2018 Approved By: Date: 1:8 AND NOTED Scale: Job # ASDI STD N/A ZIMMER ELECTRIC LP-GAS VAPORIZER MOUNTING DETAILS Sht. No.: Rev.: 0903-8004 1of 1 A Part # 1/2" X 1-1/4" FENDER WASHER PROVIDED WITH KIT MUST BE USED B .X 0.10 .XX 0.030 .XXX 0.010 ANGLE 1 FRACTIONS 1/4" UNLESS OTHERWISE SPECIFIED 3/8" MOUNTING STUD W/ SPRING LOCKING NUT 67" 8 175 THIRD ANGLE PROJECTION DO NOT SCALE DRAWING Title: INTERPRET THIS DRAWING IN ACCORDANCE WITH ANSI/ASME Y14.5-2009 THIS DRAWING SHALL NOT BE REPRODUCED OR USED IN ANY MANNER DETRIMENTAL TO ITS Size: INTERESTS. ALL RIGHTS RESERVED. © COPYRIGHT ALGAS-SDI BACK ENDCAP DRILL AT CENTER OF PROVIDED DIMPLES TO CREATE 1-1/4" HOLE B B .X 0.10 .XX 0.03 .XXX 0.01 ANGLE 1 FRACTIONS 1/4" UNLESS OTHERWISE SPECIFIED TOLERANCES Title: INTERPRET THIS DRAWING IN ACCORDANCE WITH ANSI/ASME Y14.5-2009 THIS DRAWING SHALL NOT BE REPRODUCED OR USED IN ANY MANNER DETRIMENTAL TO ITS Size: INTERESTS. ALL RIGHTS RESERVED. © COPYRIGHT ALGAS-SDI DO NOT SCALE DRAWING THIRD ANGLE PROJECTION Dwg. # Part # 5/23/2018 DN 0903-8005 AAS Job # Sht. No.: 1of 1 Rev.: A 1:4 AND NOTED Scale: Date: Approved By: Checked By: Drawn By: ASDI STD 80770 ZIMMER DRAIN KIT INSTALLATION 151 S. Michigan St., Seattle, Washington. USA 98108 Tel: (206) 789-5410 Fax: (206) 789-5414 DETAIL B SCALE 1 : 2 1/2" NPT PLUG M-F 1/2" NPT BALL VALVE 90° ELBOW 1/2" NIPPLE 5/8 ORB TO 1/2" NPT ADAPTER 32 Algas-SDI International, LLC 151 S. Michigan Street Seattle, Washington 98108 USA Ph.: 1.206.789.5410 Fax.: 1.206.789.5414 www.algas-sdi.com ">
/
تنزيل
مجرد تذكير ودي. يمكنك عرض المستند هنا. ولكن الأهم من ذلك، أن الذكاء الاصطناعي لدينا قد قرأه بالفعل. يمكنه شرح الأشياء المعقدة بعبارات بسيطة، والإجابة على أسئلتك بأي لغة، ومساعدتك في التنقل بسرعة حتى في أطول المستندات أو أكثرها تعقيدًا.
إعلان