Workrite Ergonomics Small, Mini Tower CPU Holder Installation Instructions
Workrite Ergonomics Small, Mini Tower CPU Holder
The Workrite Ergonomics Small, Mini Tower CPU Holder is a versatile and adjustable CPU holder designed to provide secure and convenient storage for your CPU under your desk. With its compact size and easy installation, it's an ideal solution for optimizing your workspace and improving ergonomics.
Key Features:
- Adjustable Height and Width: The CPU holder's adjustable height and width allow you to customize the fit to accommodate different CPU sizes and configurations.
- Secure Clamp: The clamp plate securely holds your CPU in place, preventing it from slipping or falling.
Reklama
Reklama
Line of Sight Small, Mini Tower CPU Holder Installation
Instructions: VE-CPU-SMALL
Parts Included
A
Small, Mini Tower CPU
Holder
Qty: 1
B
#8 ⅝" Phillips
Head Screws
Qty: 4
C
Foam Pads
Qty: 12
D
Template Page 6
Qty: 1
5/8"
#2 Drive
#8 Screw Size
0.164"
Required, Sold Separately
Line of Sight Workcenter
Tools Needed
#2 tip Phillips screwdriver or drill/driver
Drill with ⅛" drill bit
Note: CPU placement will depend on your over all room configuration, Switch locations, Grommet Power choices and in some instances, cable lengths. Consider all wiring objectives prior to installing CPU Holders.
Single User Workstations can be configured with the
CPU on either the left or right side of the Chassis. Dual
User Workstations can be configured left, right, inside or outside. Make sure you anticipate all cabling needs and install the CPU Holder(s) accordingly.
Single Left
Dual Outside
(preferred)
Dual Left
Single Right
Dual Right
Dual Inside
(avoid-may conflict with USB & switch)
1
Remove Track Stop then Track from CPU Holder
1.1 Press on the Track Stop tabs to bow the Track Stop so it can be removed from the Track.
CPU Width
1.1
Track
Track Stop
1.2
1.1
CPU Holder
Press Track Stop tabs
Tab
1 of 6 Line of Sight | (800) 463-7731 | los.workriteergo.com
2
Postion and Attach Track to Worksurface
2.1 Position the Track Template (D, page 6) on the underside of the worksurface where you would like the CPU
Holder to be installed. See the Template Positioning Guidelines on page 4.
2.2 Use a ⅛" drill bit to drill pilot holes at the four drill locations in the template. You may wish to mark your drill bit so you do not drill any more than ¾" deep and damage your worksurface.
Do not drill all the way through worksurface!
2.3 Attach at the four locations using four #8 × ⅝" Phillips Head Screws (B). If you use an electric screwdriver, be sure it is on the lowest torque setting to avoid stripping the holes in the top.
Mark drill!
F
>¾"
2.2
65 m m
128 m m
mm
× 15 eep
mm d
Pilot H ole
210 m m
No te:
"N ke ted one e thi
at 1
Pa int
scal ge mp e. S alog
bo late enu
245 mm
1.1
View from below worksurface
3
Apply Foam Pads to CPU Holder
Apply the eight Foam Pads (C) to the CPU Holder (A), placing four in the corners of the Base and four on the INSIDE of the Clamp.
B
Track
2.3
View from above worksurface
A
Four on INSIDE of Clamp
C Four on Base
CPU Width
4
Insert CPU Holder into Track & Install Track Stop
4.1 Insert the CPU Holder (A) assembly into the installed Track.
4.2 Install Track Stop into the end of the
Track.
4.1
A CPU Width
Track
Track Stop
4.2
2 of 6 Line of Sight | (800) 463-7731 | los.workriteergo.com
5
Adjust and Install CPU
5.1 Pull out the Height Adjustment Pin to adjust the CPU Base to the height of the CPU. The Height Adjustment Pin is captive and spring loaded, so simply release at the correct height and confirm mechanism is engaged and secure.
5.2 With the height set, turn the Width Adjustment Lever up
(counter-clockwise) to loosen.
5.3 Slide the CPU in between the Clamp Plate and CPU Holder and center on the Base.
5.4 Clamp the CPU in place by pressing on the Lever while closing.
The Clamp should hold the CPU securely.
5.5 Front to back and rotation on the
CPU can be performed by using the Knob or by simply moving the secure CPU.
Note: Position the CPU to access the ports for cabling in the next step.
CPU Width
5.3
5.1
Base
CPU Width
5.2
5.5
Knob
5.4
Apply pressure at top of clamp behind lever
Centered on Base
6
Route Cables– Guidelines
Note: Cabling and mounting of the CPU is a difficult process and unique to each situation. Use these guidelines as a reference, making sure to keep all cabling away from interfering with the Monitor Lift.
6.1 Remove the Front and Rear Panel from your Line of Sight Chassis for access to route the cables.
6.2 Route cables in the best direction using front
Chassis Grommet access for larger CPU's and over the top of the chassis for smaller CPU's.
6.2
Top of Chassis
6.3 Use the Wire Loom to route cables from the CPU to the Keyboard Tray for keyboard and mouse.
6.4 Route all power to the shared power area which may include installed Power Tracks or Power Bars.
6.5 Use the bottom Trough to bundle any excess cabling.
CPU
CPU Port locations will vary
CPU Power
6.6 Use the Desktop Grommets to route power and data to the desktop as needed.
6.7 Once routed, secure all cabling with P-Loops,
Cable Clips and Wire Ties provided with the
Chassis hardware.
6.2
Chassis
Grommet
Note: In some cases, extension cabels may be required.
3 of 6
Monitor Out &
Monitor Power
Keyboard
& Mouse
6.3
Wire
Loom
6.4
Shared Power
6.5
Bottom Trough
6.6
Desktop
Grommet
Power &
Data Out
Line of Sight | (800) 463-7731 | los.workriteergo.com
✓
Template Positioning Guidelines
Anticipate the needs for your complete installation and follow a "measure/place/repeat" methodology for consistency. Position the Track Template (next page) on the underside of the worksurface, exactly where you would like the CPU Holder to be installed.
A – for front to back track mounting:
Position the template flush or slightly under the front edge of the worksurface and parallel to the Top Bracket, keeping the distance from the side and front, consistent throughout the installation.
Note: Confirm as best as possible that a fully installed front-to-back CPU with all cabling will not interfere with the Top Bracket or Grommet and that cabling will be routed properly in Step 6. If the Track interferes with
Grommet, consider side-to-side mounting.
B - for side to side track mounting:
Position the template half the depth of the CPU and perpendicular to the front edge of the worksurface, keeping the distance from the side and front, consistent throughout the installation.
Note: Confirm as best as possible that a fully installed side-to-side CPU and all cabling will not interfere with the
Bracket or seated user and that cabling will be routed properly in Step 6. If the Track interferes with Top Bracket or seated User, consider front-to-back mounting.
Single Right Single Left
Grommet
Top Bracket
Flush or slightly under front edge
½ CPU
B
½ CPU
A B
Dual Outside (preferred)
B
B
Dual Right
A
A B
½ CPU
B
½ CPU
Dual Left
B
B A
B
B A
Dual Inside
B
B A
A B
B
A B
B
4 of 6
B A B
B
A A
B
(avoid-may conflict with USB & Switch)
Line of Sight | (800) 463-7731 | los.workriteergo.com
This page intentionally left blank.
5 of 6 Line of Sight | (800) 463-7731 | los.workriteergo.com
#1500399 Rev A
Stiahnuť
Reklama