Algas SDI TORREXX TX25 Operation & Maintenance Manual
पीडीएफ
दस्तावेज़
विज्ञापन
विज्ञापन
...Innovative liquid vaporizing and gas mixing solutions Vertical electric single core vaporizer Operations & Maintenance Manual 151 South Michigan Street, Seattle, Washington, USA 98108 Tel: +1-206-789-5410 Fax: +1-206-789-5414 Web: www.algas-sdi.com FILE: MANUAL PN 54629 TORREXX REV 11-2-21 Briana 2021.11.02 11:12:57 -07'00' WARNING Read the OPERATION MANUAL before operating this equipment. ■ NOTE: Algas-SDI reserves the right to use alternate manufacturers’ components as vendor delivery applicability dictates. Vendors have supplied literature contained in the Operation Manual. Please check to be sure supplied data matches your configuration. Contact Algas-SDI if any questions exist. ■ This equipment uses LPG - a flammable fuel handled under pressure. Inherent hazards exist and a thorough understanding of the equipment is required to allow safe operation and maintenance. ■ Allow only a TRAINED and FULLY QUALIFIED person to service this equipment. ■ Any time a component must be replaced use the same type, model, etc. DO NOT SUBSTITUTE! The consequence from such actions is unpredictable and may lead to dire consequences. When components are replaced with components not approved for use in our Nemko listed equipment, the Nemko listing becomes void for that unit. WARRANTY REGISTRATION A Warranty Registration Card is located on the last page of this manual. Fill it out and send a copy either by mail to the address shown at the bottom of the form or submit via email to [email protected]. WARRANTY, COPYRIGHTS AND APPROVALS WARRANTY Algas-SDI International, LLC (ASDI) warrants that the equipment is free of defects in materials and workmanship under normal use and service. ASDI agrees to repair or replace, at our option, without charge f.o.b. factory, any part which has proven defective to the satisfaction of Algas-SDI International, LLC within one (1) year from the date of the original installation or within 18 months from the date of shipment, whichever is earlier. Equipment, which in the opinion of ASDI, has been damaged by improper installation or operation, or has been abused or tampered with in any way, will not be accepted for return under warranty. Algas-SDI International, LLC will not accept back charges for work performed by others upon or in conjunction with ASDI equipment, unless prior authorization is given by means of an Algas-SDI International, LLC purchase order. Algas-SDI International, LLC will not be liable by reason of shutdown, non-operation or increased expense of operation of other equipment, or any other loss or damage of any nature, whether direct or consequential, arising from any cause whatsoever. Algas-SDI International, LLC makes NO other warranty of any kind, whatsoever expressed or implied; and all warranties of merchantability and fitness for a particular purpose are hereby disclaimed by Algas-SDI International, LLC and excluded from these terms of sale. No person has any authority to bind AlgasSDI International, LLC to any representation or warranty other than this warranty. COPYRIGHT Copyright 2021 by Algas-SDI International, LLC, Seattle, Washington 98108. All rights reserved. No part of this manual may be reproduced or copied in any form or by any means, photographic, electronic, or mechanical, without the prior express written consent from Algas-SDI International, LLC, Seattle, Washington, USA. APPROVALS SYMBOLS AND CONVENTIONS Special symbols are used to denote hazardous or important information. You should familiarize yourself with their meaning and take special notice of the indicated information. Please read the following explanations thoroughly. GENERAL WARNING OR CAUTION This symbol indicates hazards or unsafe practices, which can result in damage to the equipment or cause personal injury. Use care and follow the instructions given. FLAMMABLE GAS HAZARD This symbol indicates a potential hazard, which can result in severe personal injury or death. Use extreme care and follow the instructions given. ELECTRICAL DISCONNECT REQUIRED This symbol indicates a potentially dangerous situation, which can result in severe personal injury or death or damage to equipment. Use great care and follow the instructions given. ASDI CONTACT NUMBERS If you have questions, need help with your equipment, or want information on other products, contact Algas-SDI at: Telephone: +1.206.762.4537 Facsimile: +1.206.789.5414 Email: [email protected] Internet: http://www.algas-sdi.com TORREXX TABLE of CONTENTS 1. INTRODUCTION DESCRIPTION Figure 1 – TORREXX SSR Dimensional Drawing TORREXX VAPORIZER OPTIONS 1-1 1-2 1-3 2. MAJOR COMPONENTS DESCRIPTION 2-6 Figure 2 – Heating System 2-6 Figure 3 – Liquid Passage Prevention System 2-7 MAJOR COMPONENTS LIST Figure 4 – TORREXX SSR Major Components Drawing 2-8 2-8 3. INSTALLATION GENERAL 3-10 Figure 5 – Typical TORREXX Installation Drawing with Pump & Vapor Bypass 3-10 Figure 6 – Typical TORREXX Installation Drawing with Vapor Bypass & No Pump 3-11 Figure 7 – Typical TORREXX Installation Drawing with Economy Operation & Vapor Bypass 3-11 Figure 8 – Typical TORREXX Installation Drawing for Manifolding 2 Vaporizers 3-12 Figure 9 – Typical TORREXX Installation Drawing for Manifolding 3 Vaporizers 3-12 LIQUID LINE 3-13 LIQUID PUMP 3-13 VAPOR LINE 3-13 SAFETY RELIEF VALVE 3-14 ELECTRICAL SERVICE 3-14 GROUNDING 3-14 WIRE SIZE 3-15 Table 1 – Wire Length Chart (#4 AWG, 25 mm2) 3-16 Table 2 – Wire Length Chart (#6 AWG, 16 mm2) 3-16 Table 3 – Wire Length Chart (#8 AWG, 10 mm2) 3-17 Table 4 – Wire Length Chart (#10 AWG, 6 mm2) 3-17 Table 5 – Liquid Temperature vs. Tank Pressure Chart 3-18 Table 6 – LPG Liquid Line Sizing Chart (Minimum Pipe Size) 3-19 Table 7 – Equivalent Pipe Length of Various Valves and Fittings 3-19 TORREXX TABLE of CONTENTS - Continued 4. OPERATION GENERAL 4-20 OPERATING INSTRUCTIONS 4-20 STARTING THE VAPORIZER 4-20 STOPPING THE VAPORIZER 4-21 PURGING THE VAPORIZER 4-21 5. MAINTENANCE GENERAL 5-22 INITIAL INSTALLATION AND OPERATION INSPECTIONS 5-22 ANNUAL MAINTENANCE REQUIREMENTS 5-23 Liqui-SAFE VALVE – PERFORMANCE CHECK 5-24 Figure 10 – Steps to check Liqui-SAFE valve operation. Liqui-SAFE VALVE – SERVICE INSTRUCTIONS 5-24 5-25 Figure 11A – STEP 1 – Be sure the Liqui-SAFE valve is in the closed position as shown. 5-25 Figure 11B – STEP 2 – Unscrew reset button base and remove the spring. 5-25 Figure 11C – STEP 3 – Replace button post internal O-ring. 5-26 Figure 11D – Full hook O-ring tool 5-26 Figure 11E – STEP 4 – Unscrew valve latch body. 5-26 Figure 11F – STEP 5 – Replace valve body static O-ring. 5-27 Figure 11G – STEP 6 – Replace valve seat and valve stem base O-rings. 5-27 6. TROUBLESHOOTING TROUBLESHOOTING TREES 6-28 FULL LOAD VOLTAGE CHECK 6-34 Figure 12 – Full Load Voltage Check FULL LOAD CURRENT CHECK 6-34 6-35 Figure 13 – Full Load Current Check 6-35 TORREXX ELECTRIC VAPORIZER DATA SHEET 6-36 HEATER CORE RESISTANCE 6-37 Figure 14 – Heater Core Resistance Check SOLENOID VALVE LEAK TEST Figure 15 – Solenoid Valve Leak Test Components 6-37 6-38 6-38 TORREXX TABLE of CONTENTS - Continued SOLENOID VALVE ELECTRICAL TEST Figure 16 – Solenoid Valve Electrical Test 6-39 6-39 7. TORREXX OPTIONS ECONOMY OPERATION Figure 17 – TORREXX Economy Valve Installation TORREXX ECONOMY VALVE MAINTENANCE 7-40 7-40 7-41 Figure 18A – STEP 1 – Unscrew the inlet housing from the outlet housing. 7-41 Figure 18B – STEP 2 – Remove old O-rings and clean all piston surfaces. 7-41 Figure 18C – STEP 3 – Clean all O-ring contact surfaces and the bottom surface of the outlet housing. Apply excess lithium O-ring grease to inside of both housings. 7-42 Figure 18D – STEP 4 – Replace the three O-rings contained in the Economy Valve repair kit. Apply excess lithium O-ring grease to all O-rings. 7-42 Figure 18E – STEP 5 – Make sure that the pin hole is clear and the spring is undamaged. Carefully reassemble all the parts. Apply lubrication grease on the straight threads if necessary. The inlet housing MUST be screwed all the way down for the valve to accurately function at the set pressure. DO NOT apply sealant agent or Teflon tape on these threads. TX REMOTE BOX Figure 19 – Remote START/STOP Box 7-42 7-43 7-43 VALVE AND STRAINER PACKAGE 7-44 FILTAIRE CONTAMINANT SEPARATOR 7-44 Figure 20 – FILTAIRE Operation 7-44 APPENDIX A – TECHNICAL INFORMATION TORREXX LPG VAPORIZER DATA SHEETS (CE/NEMKO) TORREXX ELECTRIC VAPORIZER SPARE PARTS AND ACCESSORIES (CE/NEMKO) Figure 21 – TORREXX Electric Vaporizer Major Components and Accessories HEATER BUSSING DIAGRAMS EQUIPMENT DRAWINGS INSTALLATION DRAWINGS TORREXX WIRING SCHEMATIC REMOTE BOX WIRING SCHEMATICS ASCO SOLENOID VALVE USED BY ASDI SOLENOID NOISE SOLENOID VALVE INSTALLATION AND MAINTENANCE INSTRUCTIONS WARRANTY REGISTRATION CARD – Refer to the nameplate on the unit to fill out the product registration. 1 INTRODUCTION DESCRIPTION The dimensional drawing (see page 1-2) identifies various components of the Algas-SDI TORREXXTM SSR model vaporizer. This equipment is intended for use with liquid propane, butane, or propane-butane mixtures. Multiple resistance heating elements provide thermal energy to the finned aluminum heat exchanger. A solid-state controller monitors the heat exchanger temperature and regulates the operating temperature to a predetermined set point. The controls consist of 2 individual K-type thermocouple sensors with independent high temperature limits. One sensor monitors operating temperature and the other controls the liquid inlet solenoid valve. The liquid inlet solenoid valve does not open until a predetermined warm-up temperature is reached. The vaporizer reaches operating temperature in approximately 60 seconds from a cold start. The vaporized LPG rises into the vapor header and exits through the vapor outlet. The Liqui-SAFETM Valve is designed to prevent liquid from passing downstream. TORREXXTM Vaporizer can be configured for many applications. ♦ 1-1 Standard configuration for Zone I for use with Propane and LPG, DNV GL Nemko Presafe & CE mark. In this configuration the TORREXXTM complies with the following standards: o EN 60079-0:2012/A11:2013 (IEC 60079-0 ed. 6.0) o EN 60079-1:2014 (IEC 60079-1 ed. 7.0) o EN 60079-18:2015 (IEC 60079-18 ed. 4.0) ♦ TORREXXTM vaporizer can be manifolded together for increased capacity on a single skid. Consult Algas-SDI for Configuration information. ♦ TORREXXTM vaporizer can be packaged with an Algas-SDI mixing system on a single skid. Consult Algas-SDI for Configuration information. ♦ For customizing the TORREXXTM vaporizer to your requirements consult Algas-SDI for information. ASDI Operations and Maintenance – TX Models – P/N: 54629 Figure 1 – TORREXX SSR Dimensional Drawing ASDI Operations and Maintenance – TX Models – P/N: 54629 1-2 TORREXX VAPORIZER OPTIONS Optional items for the TORREXXTM vaporizer are designed to enhance convenience for the end user and can be applied in the field to all models. This section provides a brief introduction to the options available for the TORREXXTM. See SECTION 7 of this manual or contact Algas-SDI for more information. 1) Valve and Strainer Package – Includes strainer with magnetic plug, inlet shut-off angle valve, hydrostatic relief valve, outlet shut-off ball valve and outlet pressure gauge. Ships loose. All items not shown below. 2) Pipe Away Adapter – Allows the user to pipe the relief valve away from the vaporizer. Fits relief valve P/N 34876. 1” FNPT pipe connection. 3) TORREXX Stand – Elevates TORREXXTM about 1 ft (30 cm) off the ground for ease of control box access and removes the vaporizer from elements i.e. snow and mud. Hardware to mount TORREXXTM to the stand is included. Ships loose. 1-3 ASDI Operations and Maintenance – TX Models – P/N: 54629 4) Economy Valve – Allows use of propane storage tank natural vaporization when the storage tank can provide enough vaporization and pressure to satisfy the load requirements. 5) Remote Start/Stop Box – Includes remote start/stop capability and a status light indicating the vaporizer is ready for operation (solenoid valve open). IP65 (NEMA 4) enclosure. Must be installed outside Zone 1 and 2 (IP65). 6) Drain valve kit – Enables the user to drain the oils, heavy ends, and other impurities that can collect over time in the vaporizer heat exchanger. Kit available factory or field installed. 7) Stabilaire Pump Package – Consult factory 8) FILTAIRETM Contaminant Separator – The Algas-SDI FILTAIRETM is a filtering device designed to trap heavy hydrocarbons commonly present in LP-gas vapor. It also traps other materials, which may be in gas due to storage conditions and internal condition of the equipment. 9) Balancing orifice – When installing multiple vaporizers in parallel, balancing orifices should be installed at the outlet of each vaporizer to properly balance the load between the vaporizers and achieve full combined capacity. ASDI Operations and Maintenance – TX Models – P/N: 54629 1-4 SAFETY CAUTION Propane Odor can fade. CAUTION Vaporizer may be hot after or during use. CAUTION Allow only a TRAINED and FULLY QUALIFIED person to service this equipment. 1-5 ASDI Operations and Maintenance – TX Models – P/N: 54629 MAJOR COMPONENTS 2 The TORREXXTM is designed to be reliable and user friendly. Several features allow you to quickly determine the status of your vaporizer. There are two basic control systems within a TORREXXTM: 1) Heating System – Figure 2 2) Liquid Passage Prevention System – Figure 3 Figure 2 – Heating System • • • • SELF REGULATING HEATING SYSTEM NO START/STOP SWITCHES ENGAGES AUTOMATICALLY JUST APPLY POWER TO TURN VAPORIZER ON POWER DISTRIBUTION BLOCK UNUSED ENTRY / CUSTOMER ELECTRICAL CONNECTION (M32 X 1.5) SOLID-STATE RELAYS TEMPERATURE CONTROLLER DETECTS HEAT EXCHANGER TEMPERATURE VIA DUAL K TYPE THERMOCOUPLE TEMPERATURE ACTIVATED CIRCUIT OPENS AT 55°C OR 131°F WITH SOLENOID VALVE TO ENSURE AUTOMATIC RESTART AFTER POWER INTERRUPTION TX320 SSR SHOWN ASDI Operations and Maintenance – TX Models – P/N: 54629 2-6 Figure 3 – Liquid Passage Prevention System RED FLAG INDICATES STATUS VALVE IS TRIPPED WHEN FLAG IS UP (AS SHOWN) • • VALVE IS IN OPERATING POSITION WHEN FLAG IS DOWN (AS SHOWN) • • FLOAT BALL ACTIVATED MANUAL RESET Liqui-SAFE VALVE DETECTS AND PREVENTS LIQUID FROM PASSING THROUGH THE Liqui-SAFE VALVE CAN BE MANUALLY TRIPPED TO VERIFY CLOSING INTEGRITY FLOAT BALL 2-7 ASDI Operations and Maintenance – TX Models – P/N: 54629 Figure 4 – TORREXX SSR Major Components Drawing 6 2 5 7 3 4 8 1 2 2 1) Liquid Inlet Solenoid Valve 2) Valve, Gauge and Strainer kit components (Optional) 3) Transformer 4) Temperature Controller Board 5) Economy Valve (Optional) 6) Liqui-SAFETM Valve with manual reset 7) Insulation Jacket 8) Solid-State Relays ASDI Operations and Maintenance – TX Models – P/N: 54629 2-8 3 INSTALLATION WARNING The equipment described in this manual is designed to operate with LP-gas, a flammable fuel under pressure. The nature of the application involves inherent hazards that could result in injury. Only a TRAINED and FULLY QUALIFIED person should service this equipment. NOTE Prior to installing your new TORREXXTM vaporizer, check all relevant codes and standards that apply in your local area to ensure compliance! CAUTION To prevent ignition of hazardous atmospheres: Keep flameproof enclosure cover tight, torque to 26.6 Nm (19.6 ft. lbs.) while in service and disconnect power before installing or removing unit from service. NOTE Installer must install a terminal box (connection facility). Metal Terminal Box (M32x1.5) Ex d II A Gb, (ATEX certified or equivalent) - marking for Europe WARNING Potential electrostatic charging hazard. Clean insulation with a damp cloth. CAUTION Connect only metal electrical conduit or armored cable to the vaporizer sealing fitting. CAUTION Internal ground connection is provided by factory. 3-9 ASDI Operations and Maintenance – TX Models – P/N: 54629 GENERAL Install the TORREXXTM vaporizer on a level firm base at least 6” (15 cm) above grade and secure it through the four ½” (13 mm) holes. Protect the equipment against damage from moving vehicles by use of an appropriate barrier. Consult state, provincial, insurance carriers, and local authorities for installation requirements. Clean all foreign material from all pipelines prior to making final connections. All joints require a pipe sealant approved for LPG, depending on type of service. Test for leaks using an inert gas, such as compressed carbon dioxide or nitrogen, at 1½ times the working pressure or as required by applicable codes. Check all connections using an appropriate leak detection solution or device. Even very small leaks are unacceptable. Eliminate all leaks prior to operation. Ensure installation environment does not exceed 50°C. Install in accordance with applicable codes and local regulations as required. Explosion proof seal off must carry the same approvals as the vaporizer to maintain the approval of the overall installation. Figure 5 - Typical TORREXX Installation Drawing with Pump & Vapor Bypass 1. 2. 3. 4. NOTES LIQUID PIPING LOSSES BETWEEN VAPORIZER AND THE TANK MUST NOT EXCEED HYDROSTATIC HEAD WHEN THE PUMP IS SHUT OFF. INSTALL VAPORIZER 1ST STAGE REGULATOR UPSTREAM OF VAPOR BYPASS LINE CONNECTION TO MAIN VAPOR LINE. SET 1ST STAGE VAPORIZER REULATOR 2-4 PSIG (0.1-0.3 BAR) HIGHER THAN TANK VAPOR PRESSURE REGULATOR SETPOINT. NO CHECK VALVES IN LIQUID LINE. LIQUID MUST BE ABLE TO FLOW IN BOTH DIRECTIONS. *BY OTHERS TANK VAPOR PRESSURE REGULATOR* ISOLATION VALVE* VAPOR BY-PASS LINE ISOLATION VALVE* VAPORIZER REGULATOR* (VAPOR) TO LOAD STORAGE TANK PRESSURE GAUGE* OUTLET ISOLATION VALVE” STRAINER WITH MAGNET FOR IRON PARTICLE PICK-UP* LIQUID SEAL OFF REQUIRED* OPTIONAL ELECTRIC SERVICE REQUIRED* ISOLATION VALVE W/HYDROSTATIC RELIEF* Note: The vapor bypass line is not required except when you have the Economy Operation option. However, it is recommended to install a bypass line on all installations because it will provide a backup supply of vapor from the tank to the load in case of vaporizer failure or power interruption. Vaporizer will operate properly without the bypass. ASDI Operations and Maintenance – TX Models – P/N: 54629 3-10 Figure 6 - Typical TORREXX Installation Drawing with Vapor Bypass & No Pump NOTES 1. LIQUID PIPING LOSSES BETWEEN VAPORIZER AND THE TANK MUST NOT EXCEED HYDROSTATIC HEAD. INSTALL VAPORIZER 1ST STAGE REGULATOR UPSTREAM OF VAPOR BYPASS LINE CONNECTION TO MAIN VAPOR LINE. SET 1ST STAGE VAPORIZER REULATOR 2-4 PSIG (0.1-0.3 BAR) HIGHER THAN TANK VAPOR PRESSURE REGULATOR SETPOINT. NO CHECK VALVES IN LIQUID LINE. LIQUID MUST BE ABLE TO FLOW IN BOTH DIRECTIONS. 2. 3. 4. *BY OTHERS TANK VAPOR PRESSURE REGULATOR* ISOLATION VALVE* VAPOR BY-PASS LINE OUTLET ISOLATION VALVE” ISOLATION VALVE* (VAPOR) TO LOAD STORAGE TANK PRESSURE GAUGE* VAPORIZER REGULATOR* STRAINER WITH MAGNET FOR IRON PARTICLE PICK-UP* SEAL OFF REQUIRED* LIQUID ELECTRIC SERVICE REQUIRED* ISOLATION VALVE W/HYDROSTATIC RELIEF* ISOLATION VALVE” Figure 7 - Typical TORREXX Installation Drawing with Economy Operation & Vapor Bypass 1. 2. 3. 4. NOTES LIQUID PIPING LOSSES BETWEEN VAPORIZER AND THE TANK MUST NOT EXCEED HYDROSTATIC HEAD. INSTALL VAPORIZER 1ST STAGE REGULATOR UPSTREAM OF VAPOR BYPASS LINE CONNECTION TO MAIN VAPOR LINE. SET 1ST STAGE VAPORIZER REULATOR 2-4 PSIG (0.1-0.3 BAR) HIGHER THAN TANK VAPOR PRESSURE REGULATOR SETPOINT. NO CHECK VALVES IN LIQUID LINE. LIQUID MUST BE ABLE TO FLOW IN BOTH DIRECTIONS. *BY OTHERS TANK VAPOR PRESSURE REGULATOR* ISOLATION VALVE* VAPOR BY-PASS LINE ISOLATION VALVE* OUTLET ISOLATION VALVE* ASDI ECONOMY VALVE SENSES UPSTREAM PRESSURE (VAPOR) TO LOAD STORAGE TANK PRESSURE GAUGE* VAPORIZER REGULATOR* SEAL OFF REQUIRED* STRAINER WITH MAGNET FOR IRON PARTICLE PICK-UP* LIQUID ELECTRIC SERVICE REQUIRED* ISOLATION VALVE W/HYDROSTATIC RELIEF* ISOLATION VALVE” Note: Economy Option cannot be used on an installation that requires a pump. 3-11 ASDI Operations and Maintenance – TX Models – P/N: 54629 Figure 8 – Typical TORREXX Installation for Manifolding 2 Vaporizers. BALL VALVE WITH BALANCING ORIFICE Liqui-SAFE VALVE OVERSIZED COMMON HEADER VAPOR OUT NOTES: 1. USE 1” UNION AND BALL VALVE WITH BALANCING ORIFICES P/N 64004 ON ALL VAPORIZER OUTLETS 2. USE ONLY ONE COMMON REGULATOR AT THE OUTLET 3. ONLY VAPORIZERS OF SAME SIZE AND APPLIED VOLTAGE SHALL BE MANIFOLDED TOGETHER 4. HEADERS MUST BE SIZED APPROPRIATELY FOR THE ENTIRE CAPACITY OF ALL VAPORIZERS IN THE SYSTEM TORREXX VAPORIZER LIQUID INLET STRAINER W/MAGNET FOR IRON PARTICLE PICK-UP LIQUID IN Figure 9 – Typical TORREXX Installation for Manifolding 3 Vaporizers. BALL VALVE WITH BALANCING ORIFICE Liqui-SAFE VALVE NOTES: 1. USE 1” UNION AND BALL VALVE WITH BALANCING ORIFICES P/N 64004 ON ALL VAPORIZER OUTLETS 2. USE ONLY ONE COMMON REGULATOR AT THE OUTLET 3. ONLY VAPORIZERS OF SAME SIZE AND APPLIED VOLTAGE SHALL BE MANIFOLDED TOGETHER 4. HEADERS MUST BE SIZED APPROPRIATELY FOR THE ENTIRE CAPACITY OF ALL VAPORIZERS IN THE SYSTEM 5. IF COMMON HEADERS ARE USED ON 3 OR MORE VAPORIZERS, THERE MAY BE A CAPACITY DE-RATE ON THE SYSTEM. REFER TO DWG 50018005 IN THE APPENDIX FOR ILLUSTRATION OF BALANCED PIPING WITH MULTIPLE VAPORIZERS. ASDI Operations and Maintenance – TX Models – P/N: 54629 OVERSIZED COMMON HEADER VAPOR OUT TORREXX VAPORIZER LIQUID INLET STRAINER W/MAGNET FOR IRON LIQUID IN PARTICLE PICK-UP 3-12 LIQUID LINE Size the liquid line from the storage tank to the vaporizer to supply the vaporizer at full capacity with a minimal pressure drop. A liquid linesizing chart is provided in Table 6. Install a liquid line strainer with magnet for iron particle pickup at the vaporizer inlet. Do not install the liquid line such that it must pass above the vaporizer to enter the tank. It is also recommended not to use liquid dip tube withdrawal (top withdrawal) from the tank as vaporizer may experience difficulty pushing liquid back at lower capacities. CAUTION A liquid pump must be installed if the pressure drop in the liquid line between the vaporizer and the tank exceeds the hydrostatic liquid head in the storage tank. ONE FOOT (30 CM) OF LIQUID PROPANE EQUALS .21 PSI (.014 BAR)! Liquid line frosting indicates too much pressure drop in the liquid line. LIQUID PUMP Is a Liquid Pump necessary? What are your vapor pressure requirements? Pressure in the storage tank depends on temperature (See Table 5). A good “rule of thumb” for determining when a Liquid Pump is necessary is if the storage pressure will not always exceed the required distribution pressure by 5 PSI (0.35 bar), a pump is necessary. Install an ASDI STABILAIRETM Liquid Pump in the liquid line close to the storage tank. To prevent cavitation, place the liquid strainer at least five feet upstream of the pump inlet. Typically, a pump is not required unless a mixing system is used or temperature at the installation will be extremely low, causing the pressure to drop below the required process pressure. When using a pump, vaporizer capacity may decrease due to increase in boiling point of LPG. Increasing boiling point requires larger portion of heat exchanger area to be used for liquid heating instead for boiling and vaporization. Please consult ASDI when using a pump. VAPOR LINE Install an appropriate regulator immediately downstream and at or above the level of the vaporizer outlet. Connect pipe from the outlet port of the regulator to the distribution system. Further reduction of downstream pressure requires a “Second Stage” regulator close to the consuming equipment. Properly sized piping and regulators will insure satisfactory service. NOTE For safety reasons both FIRST and SECOND stage regulators must be 250 PSIG (17.58 bar) inlet pressure rated! 3-13 ASDI Operations and Maintenance – TX Models – P/N: 54629 SAFETY RELIEF VALVE If the vaporizer is to be installed within an enclosure or building, vent the safety relief valve outside the enclosure and redirect the discharge upwards. A pipe-away adapter must be used at the relief valve. Always install a rain-cap or similar device to prevent water and other debris from entering the relief valve. If water enters, it may freeze and prevent the relief valve from properly discharging, creating a potentially hazardous situation. ELECTRICAL SERVICE The rating plate on the vaporizer and the data sheet provided with the manual provides your specific vaporizer’s electrical power requirements and the drawing numbers of the appropriate wiring diagrams and schematics. This unit is constructed to meet ATEX/IECEx Zone I requirements (depending on model). All wiring to the unit, including the ground connection, must meet the applicable codes for the area in which it is being installed and with approved connectors. Internally a ground connection is provided by the factory. Wire size and type must comply with the applicable codes for the area in which it is being installed. Tables 1 through 4 list the recommended wire size for the different models and are to be used as guides only. Provide a fused disconnect or circuit breaker outside of the classified area. If it is not within sight of the vaporizer, the fused disconnect must have a locking device. Run wire within rigid conduit and install a seal-off at the connection of the field conduit to the vaporizer. For Zone 1 locations, the unused entry size is 1” NPT with factory supplied M32x1.5 adapter. Each vaporizer shall have a separate disconnect. If the installation is prone to surges it is recommended to protect the equipment by installing a properly sized Semiconductor or “ultra-fast acting” fuse in each phase upstream of the TORREXXTM that has a total clearing I2t rating of less than 18,000 A2sec. GROUNDING INTERNAL Internal ground connection is required. Use the grounding connection in the respective enclosure where the power is supplied. A factory provided #8 AWG (3.26 mm diameter or 8.3 mm2 cross sectional area) wire is permanently secured to the enclosure. Use a dual rated (Al/Cu) and dual barrel lug connector to make the connection between the factory and field ground wires. Reference lug connector manufacturer’s recommendation for tightening moment. Alternatively, crimp a dual rated (Al/Cu) ring connector to the factory provided ground wire and make a connection at the provided junction box terminal. Reference ring connector manufacturer’s recommendation for proper crimping tools and technique. Reference junction box manufacturer’s recommendations for tightening moment. EXTERNAL External ground connection is optional. At the back of the enclosure base an external ground hole measuring 0.17 in (4.3 mm) in diameter is provided. Use a 5/32 in (0.156 mm) diameter blind aluminum rivet and a dual rated (Al/Cu) ring connector to connect the external ground wire to the enclosure attachment. Verify all ground connections are secure. ASDI Operations and Maintenance – TX Models – P/N: 54629 3-14 WIRE SIZE When selecting the type and size of wire used to install the TORREXX series electric vaporizers, please consider the following environmental information: ■ Maximum enclosure surface temperature: 65ºC (150 ºF). ■ Maximum enclosure ambient temperature: 80ºC (176 ºF). ■ Maximum temperature at relay terminals: 80ºC (176 ºF). ■ Current draw of vaporizer: Indicated on vaporizer rating plate and on the data sheet. ■ Power distribution block terminal lug wire size range: #2 - 14. For Zone 1 installations the phase conductor wire must be of the same size as the factory provided #8 AWG (3.26 mm diameter or 8.3 mm2 cross sectional area) ground wire. Refer to Table 3 for wire run limitations based on vaporizer current draw. For Zone 1 installations the size of the grounding cable shall be in accordance with the table below. The minimum permitted size of the equipotential bonding connector is 4 mm2. When installing the wire, it is important to have a good connection at the terminal lugs. Loose terminals may cause an excessive temperature rise at the terminal lugs, which can lead, to premature solid-state relay failure, and/or overheating and possible destruction of the transformer. For this reason, it is strongly recommended that the wire terminations be checked and re-tightened periodically to prevent excessive overheating at the terminals due to loose connections. Always ensure terminals at the heater pins are tight. If not, torque to 10 in-lbs (1.13 Nm). 3-15 ASDI Operations and Maintenance – TX Models – P/N: 54629 Table 1 – Wire Length Chart [#4 AWG, 25 mm2] – Div. 1 only Table 2 – Wire Length Chart [#6 AWG, 16 mm2] – Div. 1 only ASDI Operations and Maintenance – TX Models – P/N: 54629 3-16 Table 3 – Wire Length Chart [#8 AWG, 10 mm2] – Div. 1 and Zone 1 Table 4 – Wire Length Chart [10 AWG, 6 mm2] – Div. 1 only 3-17 ASDI Operations and Maintenance – TX Models – P/N: 54629 Table 5 – Liquid Temperature vs. Tank Pressure Chart Liquid Temperature Propane Butane Tank Gauge Pressure Tank Gauge Pressure °F °C PSI Bar -43.73 -40 -35 -30 -25 -20 -15 -10 -41.7 -39.6 -36.9 -34.1 -31.4 -28.6 -25.9 -23.1 0 1.4 3.4 5.6 8.0 10.7 13.6 16.7 0 0.10 0.24 0.39 0.56 0.74 0.94 1.15 -5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 -20.4 -17.6 -14.9 -12.1 -9.35 -6.6 -3. -1.1 1.7 4.4 7.2 9.9 12.7 15.4 18.2 20.9 23.7 26.4 29.2 31.9 34.7 37.4 40.2 42.9 45.7 48.4 51.2 53.9 56.7 59.4 20.0 23.6 27.6 31.7 36.2 41.1 46.2 51.7 57.6 63.8 70.5 77.5 84.9 92.8 101.2 109.9 119.3 129.1 139.7 150.2 161.6 173.6 186.1 199.2 213.0 227.4 242.5 258.2 274.7 291.9 1.36 1.63 1.90 2.19 2.50 2.83 3.19 3.57 3.97 4.40 4.86 5.34 5.86 6.40 6.98 7.58 8.22 8.90 9.64 10.36 11.14 11.97 12.83 13.74 14.69 15.68 16.72 17.81 18.94 20.12 ASDI Operations and Maintenance – TX Models – P/N: 54629 PSI Bar NOTE: Below 30°F or -10°C, Butane is a liquid at normal atmospheric pressure. 1.2 2.9 4.8 6.9 9 11.3 13.8 16.5 19.3 22.4 25.8 29.2 32.7 36.7 41.0 46.6 50.3 55.3 60.5 66.1 72.1 78.2 0.10 0.20 0.33 0.47 0.62 0.78 0.95 1.14 1.33 1.55 1.78 2.01 2.25 2.53 2.83 3.21 3.47 3.81 4.17 4.56 4.97 5.39 3-18 Table 6 – LPG Liquid Line Sizing Chart (Minimum Pipe Size) Capacity of units MMBTU (Kcal) 1.146 (288,792) 2.292 (557,584) 4.584 (1,155,168) 7.280 (1,834,537) 10.920 (2,751,806) 14.665 (3,668,800) Distance from storage to vaporizer - feet (meters)* Kg 25 50 100 160 240 320 LBS 25 50 75 100 150 200 300 400 (GPH) (8) (15) (23) (31) (36) (61) (92) (122) 55 ½” ½” ½” ½” ½” ¾” ¾” ¾” (12.5) (DN15) (DN15) (DN15) (DN15) (DN15) (DN20) (DN20) (DN20) 110 ½” ½” ½” ¾” ¾” 1” 1” 1” (25) (DN15) (DN15) (DN15) (DN20) (DN20) (DN25) (DN25) (DN25) 220 ½” ¾” ¾” ¾” 1” 1” 1” 1¼” (50) (DN15) (DN20) (DN20) (DN20) (DN25) (DN25) (DN25) (DN32) 352 ¾” ¾” 1” 1” 1” 1¼” 1¼” 1¼” (80) (DN20) (DN20) (DN25) (DN25) (DN25) (DN32) (DN32) (DN32) 530 1” 1” 1¼” 1¼” 1¼” 1½” 1½” 1½” (120) (DN25) (DN25) (DN32) (DN32) (DN32) (DN40) (DN40) (DN40) 530 1” 1” 1¼” 1¼” 1¼” 1½” 1½” 1½” (160) (DN25) (DN25) (DN32) (DN32) (DN32) (DN40) (DN40) (DN40) Table 7 – Equivalent Pipe Length of Various Valves and Fittings Globe Valve ½” (1.27 cm) 15.5/4.72 ¾” (1.91 cm) 21/6.40 1” (2.54 cm) 27/8.23 1 ¼” (3.18 cm) 36/10.97 1 ½” (3.81 cm) 43/13.11 Gate Valve 0.6/0.18 0.8/0.24 1/0.30 1.4/0.43 1.6/0.49 Angle Valve 8/2.44 11/3.35 14/4.23 18/5.49 21/6.40 Elbow, 90 1.4/0.43 1.9/0.58 2.4/0.73 3.2/0.98 3.8/1.19 Elbow, 45 0.7/0.21 1/0.30 1.2/0.37 1.6/0.49 2/0.61 Elbow, 90 STR 2.3/0.70 3.1/0.94 4/1.22 5.3/1.62 6.3/1.92 Tee 2.7/0.82 3.7/1.13 4.8/1.46 6.4/1.95 7.5/2.29 Size/Description 3-19 ASDI Operations and Maintenance – TX Models – P/N: 54629 4 OPERATION GENERAL TORREXXTM Electric Vaporizer utilizes a finned cast aluminum heater core. The heater core contains multiple cast-in resistance heating elements. Multiple wiring configurations allow a variety of AC input voltages to suit local power supply requirements. Liquid LPG enters the vaporizer through the liquid inlet solenoid valve at the base of the pressure vessel. During operation, a K-type thermocouple temperature sensor and solid-state control system maintain the core temperature at 165°F to 175°F (74°C to 79°C). As the temperature increases on start, the liquid inlet solenoid valve opens at 131°F (55°C), liquid enters the vaporizer and comes in contact with the heater core. Vaporization results as the liquid extracts energy (heat) from the heater core. As the heater core cools, the temperature sensor provides a signal to the control system to energize the heater power solid-state relay, applying power to the heating elements. Prior to startup, always ensure cover plate is torqued to 26.6 Nm (19.6 ft. lbs.). Improperly installed cover plate compromises the explosion proof rating of the vaporizer and can lead to water ingress that damages the electrical equipment. OPERATING INSTRUCTIONS 1) Complete the installation and leak test. 2) Check current and voltage to verify proper operation of the vaporizer. 3) This unit will not be damaged by operating the unit in a “dry” condition. It is not necessary to have liquid in the unit for testing or evaluation. 4) Normal operating temperature is 165°F to 175°F (74°C to 79°C). caution when working around vaporizer. Use STARTING THE VAPORIZER CAUTION Power wiring terminals may become loose during shipping. Prior to applying electrical power all power wiring terminals must be retightened. Recheck terminals and retighten as necessary during next service interval. CAUTION Do not start the vaporizer when both inlet and outlet isolation valves are closed. Pressure can build in the vaporizer during startup and blow the relief valve. ASDI Operations and Maintenance – TX Models – P/N: 54629 4-20 1) Close the outlet isolation valve. 2) Open all valves between the storage tank and the vaporizer to allow liquid flow to the vaporizer when the solenoid valve opens. 3) Apply power. If the upper control box lid is off, the solid-state relay LED lights should come on. The vaporizer heating elements are now energized. It will take approximately 60 seconds for the vaporizer to reach operating temperature. After reaching the operating temperature, the inlet solenoid valve will open automatically to allow LPG to enter. Wait approximately 2 minutes for excess LPG to be pushed back to the storage tank. 4) Carefully press the Button on top of the Liqui-SAFETM valve all the way down and SLOWLY release it. A latch mechanism inside the Liqui-SAFETM valve will keep the red flag in the down position, indicating the valve is open and in operating position. 5) The TORREXXTM is now ready to supply vapor. Slowly open the outlet isolation valve to pressurize the supply piping. Then, fully open the outlet isolation valve to allow vapor to flow to the load. Heater will cycle automatically to match the flow conditions. NOTE Do not fill tank above 90% full. When the tank is overfilled, the vaporizer cannot push liquid back to the tank. STOPPING THE VAPORIZER 1) Close the outlet isolation valve. 2) Disconnect power. PURGING THE VAPORIZER Purging procedure should be followed anytime a vaporizer needs to be maintained, serviced, relocated, or shut down for any other reason. CAUTION Prior to purging the vaporizer, ensure there are no closed ball valves or back check valves restricting the flow of liquid to the tank. 1) Close the valve at the outlet of the vaporizer. 2) If the vaporizer is not operating, start the vaporizer. 3) Allow 5 minutes for vaporizer to heat up and push most of the remaining liquid back into the tank. 4) Close the tank liquid outlet valve. 5) Open the vaporizer outlet valve and flare or allow attached equipment to consume remaining gas in the line. 4-21 ASDI Operations and Maintenance – TX Models – P/N: 54629 5 MAINTENANCE GENERAL TORREXXTM vaporizer is designed for long-term, trouble-free operation. Because of the nature of their use, and the severe duty they receive, it is important to perform scheduled maintenance. The maintenance schedule, type, and frequency provided in this manual is the minimum maintenance required for proper operation of the vaporizer. Ambient conditions surrounding the vaporizer installation and LPG quality may require a more frequent maintenance schedule. A list of RECOMMENDED SPARE PARTS is located in the Appendix section of this manual. CAUTION The equipment described in this manual is designed to operate with LP gas, a flammable fuel under pressure. The nature of the application involves inherent hazards that could result in injury. Only a TRAINED and FULLY QUALIFIED person should service this equipment. CAUTION Before performing maintenance on the vaporizer, Disconnect and lock out power to the vaporizer to prevent electric shock. Be sure the LP-gas supply is shut off and the vaporizer is completely purged. Ensure ALL sources of ignition are extinguished within 25 feet of the work area. Initial Installation & Operation Inspections: Required 30-60 days after initial installation Component Action Required Inlet Strainer Inspect strainer and remove accumulated debris. NOTE: If debris accumulation is heavy check every 3-6 months. Electronic wiring and connections Check primary terminal lug tension. Inspect electrical connections for loose wires and any indication of heat build-up. Heat exchanger & drip legs Check all drip legs and vaporizer for heavy ends and oil build-ups. If present, first ensure there are no sources of ignition within 25 ft (7.6 m), then drain heavy ends. NOTE: In areas where LPG quality is poor it may be necessary for the drip legs and heat exchanger to be checked for heavy ends more frequently (monthly or bimonthly depending on quality of LPG). Once it is verified no significant quantity of heavy ends is accumulating during vaporizer operation, this maintenance can be performed on an annual basis. ASDI Operations and Maintenance – TX Models – P/N: 54629 5-22 Annual Maintenance Requirements: Component Action Required Inlet strainer Remove plug and clean the screen. Replace screen if gaps or holes are present in the screen. If oils or contaminants are present, it may be necessary to use a cleaner to remove them. If magnetic plug is installed in the strainer, clean any debris off the plug using a lint-free rag. Inlet solenoid valve Perform a leak test of the valve according to procedure on page 6-39. If no leak is observed, continue to use the valve as-is. If a leak is observed, change solenoid valve diaphragm and internal component using recommended repair kit for the inlet solenoid valve (see spare parts list for proper part number). Refer to the maintenance and operation information for ASCO 2-way valves included in the Appendix section. Replace solenoid valve if the valve body is damaged. NOTE: Install kit if the valve makes unusual noise (chatter or buzzing) during normal operation regardless if leak is present. Liqui-SAFETM valve Conduct performance check as described on page 5-25. If valve does not pass leak test, replace all O-rings in the Liqui-SAFETM valve provided in the repair kit. If valve does not pass latch test, replace Liqui-SAFETM valve assembly. (see spare parts list for part numbers). Relief Valve Visually check and replace if leaks are observed. Check for excessive corrosion and ensure the relief valve is covered with the appropriate rain cap to prevent rain and debris from entering the valve. Replace rain cap if not present or damaged. Relief valve should be replaced per the manufacturers’ recommended replacement date or if it relieves during normal operation. Electronic wiring and connections Check primary terminal lug tension and visually inspect all electrical connections for corrosion, loose wires, heat build-up and/or charring. Tighten or replace if necessary. Heat exchanger & system drip legs Check the system drip legs and vaporizer for heavy ends and oil build-ups. If present, first ensure there are no sources of ignition within 25 feet (7.6 m), then drain heavy ends. NOTE: In areas where LPG quality is poor it may be necessary for the drip legs and heat exchanger to be checked for heavy ends more frequently (monthly or bi-monthly depending on quality of LPG). Once it is verified no significant quantity of heavy ends is accumulating during vaporizer operation, this maintenance can be performed on an annual basis. 5-23 ASDI Operations and Maintenance – TX Models – P/N: 54629 Liqui-SAFE Valve – Performance Check I Latch operation. – While the valve is in the open position and the red flag is down, press button and release QUICKLY. This will cause the valve to close and the red flag should pop up. Carefully press the button again all the way down and release SLOWLY. The valve will stay open with red flag down. II Leak detection. – Follow the instructions in “I” to manually open and close the valve. Perform leak tests in both conditions. If a leak is detected at the valve body (Step 1) when the valve is open, replace the valve body O-ring (This can be performed in the field. See below.) If a leak is detected in Step 2 (#5) when the valve is closed (see Figure 10), follow the “Liqui-SAFETM valve – Service Instructions” and change all the O-rings. (This service should not be performed in the field.) Figure 10 – Steps to check Liqui-SAFE valve operation. 2. PRESS AND RELEASE QUICKLY TO CLOSE 1. CHECK FOR LEAKS (AT THE GAP) 3. CHECK FOR LEAKS (AT PIPE THREADS) 6. PRESS AND RELEASE SLOWLY TO RE-OPEN 5. CHECK FOR LEAKS (AT THE GAP) STEP 1 4. CHECK FOR LEAKS (AT VALVE THREADS) 7. MAKE SURE VALVE FLAG IS DOWN. VAVLE IS NOW IN OPERATING POSITION STEP 2 STEP 3 WARNING Extreme caution must be taken due to the potential of flammable vapors being exposed to the atmosphere creating an ignition. Do not operate any equipment that may create a spark from this point. Do not open the explosion-proof enclosure. ASDI Operations and Maintenance – TX Models – P/N: 54629 5-24 Liqui–SAFE Valve – Service Instructions There are four (4) o-rings in the Liqui-SAFETM valve; the button post O-ring, valve body O-ring, valve seat O-ring and valve stem base O-ring. Follow the instructions below to service the Liqui-SAFETM valve. Clean all the metal parts with WD-40. Re-assemble all the parts. Simulate the tripping action of the valve to ensure proper latch operation before re-installing in the vaporizer. The tripping force applied on the Extension Stem is between 0.25 lbf (1.11 N) and 0.5 lbf (2.22 N). Figure 11A – STEP 1 – Be sure the Liqui-SAFE valve is in the closed position as shown. Figure 11B – STEP 2 – Unscrew reset button base and remove the spring. UNSCREW RESET BUTTON BASE REMOVE SPRING 5-25 ASDI Operations and Maintenance – TX Models – P/N: 54629 Figure 11C – STEP 3 – Replace button post internal O-ring. COMPRESS SUB-ASSEMBLY TO GAIN BEST ACESS TO THE O-RING. REMOVE USING FULL HOOK O-RING TOOL (SEE FIGURE 11D) REPLACE O-RING. APPLY WHITE LITHIUM GREASE PRIOR TO INSERTING BACK IN THE O-RING GROOVE. Figure 11D – Full hook O-ring tool Figure 11E – STEP 4 – Unscrew valve latch body. UNSCREW VALVE LATCH BODY WARNING: BE SURE THAT THE VALVE IS IN THE CLOSED POSITION BEFORE UNSCREWING VALVE LATCH BODY. FAILURE TO DO SO MAY RESULT IN PERMANENTLY DAMAGING THE LATCH! ASDI Operations and Maintenance – TX Models – P/N: 54629 5-26 Figure 11F – STEP 5 – Replace valve body static O-ring. USE O-RING HOOK TOOL TO REMOVE O-RING FROM O-RING GROOVE. SLIDE O-RING OVER STEM GUIDE. REPLACE O-RING. APPLY WHITE LITHIUM GREASE PRIOR TO INSERTING BACK IN THE O-RING GROOVE PULL VALVE STEM GUIDE UP Figure 11G – STEP 6 – Replace valve seat and valve stem base O-rings. USE O-RING HOOK TOOL TO REMOVE O-RINGS FROM O-RING GROOVES. REPLACE O-RING. APPLY WHITE LITHIUM GREASE TO BOTH O-RINGS PRIOR TO INSERTING BACK IN THE O-RING GROOVES • 5-27 IMPORTANT: Always perform a functional check and leak test (see Figure 10) of the re-assembled valve to ensure that it actuates per design and that valve seat O-ring seals properly against the valve body. A proper seal is present when the large valve seat O-ring shown in Figure 11G is sealing along the entire surface on the bottom face of the valve body. ASDI Operations and Maintenance – TX Models – P/N: 54629 6 TROUBLESHOOTING General Follow the troubleshooting guide below to identify the problem: NO FLOW OUT OF THE VAPORIZER YES IS Liqui-SAFE VALVE TRIPPED? SEE TROUBLESHOOTING TREE 1A ASDI Operations and Maintenance – TX Models – P/N: 54629 NO SEE TROUBLESHOOTING TREE 2A 6-28 TREE # 1 A Liqui-SAFE VALVE TRIPS YES IS VAPORIZER WARM AND UP TO TEMPERATURE? PERFORM FULL LOAD CURRENT CHECK. SEE PAGE 6-36 YES SEE TROUBLESHOOTING TREE 1B NO IS CURRENT CHECK GOOD? PERFORM FULL LOAD VOLTAGE CHECK. SEE PAGE 6-35 REMOVE LIQUI-SAFE VALVE. SEE PAGE 5-26 FOR SERVICE INSTRUCTIONS. RE-INSTALL LIQUI-SAFE VALVE YES YES VERIFY LOAD IS NOT EXCEEDING THE SYSTEM CAPACITY VERIFY LIQUID LINE IS SIZED CORRECTLY FOR SYSTEM LOAD. ENSURE THERE ARE NO RESTRICTIONS IN LIQUID LINES SUCH AS PARTIALLY OPENED VALVES OR A CHECK VALVE. RESTRICTIONS CAN BE IDENTIFIED BY FROSTING ON THE OUTSIDE OF THE PIPE. 6-29 RESTART VAPORIZER. DOES THE VALVE TRIP? NO IS VOLTAGE CHECK GOOD? NO NO FIX VOLTAGE ISSUE AND RESTART VAPORIZER CHECK FOR OPEN FUSE LINKS RESUME OPERATING THE VAPORIZER YES FUSE LINKS OPEN? REPLACE OPEN FUSE LINKS. CONTACT ASDI NO CHECK FOR OPEN HEATERS. CONTACT ASDI ASDI Operations and Maintenance – TX Models – P/N: 54629 TREE # 1 B Liqui-SAFE VALVE TRIPS YES IS VAPORIZER POWER OFF? PERFORM SOLENOID VALVE LEAK TEST (SEE PAGE 6-39). REPAIR OR REPLACE SOLENOID VALVE NO SEE TROUBLESHOOTING TREE # 2A PERFORM LEAK TEST AGAIN TO ENSURE ISSUE IS CORRECTED. RESTART VAPORIZER ASDI Operations and Maintenance – TX Models – P/N: 54629 6-30 TREE # 2A Liqui-SAFE VALVE DOES NOT TRIP NO LIGHT CHECK CONTROL BOARD LIGHT RED CHECK INCOMING POWER GREEN SEE TROUBLESHOOTING TREE #2C NO INCOMING POWER OK? SEE TROUBLESHOOTING TREE #2B YES CHECK TRANSFORMER WIRING CORRECT INCOMING POWER ISSUE BAD WIRING CONNECTIONS. REPLACE OR REPAIR ANY DAMAGED WIRING YES LOOSE WIRING? NO CHECK TRANSFORMER FUSE YES BLOWN FUSE? NO REPLACE FUSE AND RESTART VAPORIZER YES PROBLEM CAUSED BY A BLOWN FUSE. YES PROBLEM FIXED? NO REPLACE TRANSFORMER AND RESTART VAPORIZER. IS THE PROBLEM FIXED? NO REPLACE TEMPERATURE CONTROLLER. RESTART VAPORIZER 6-31 ASDI Operations and Maintenance – TX Models – P/N: 54629 TREE # 2B Liqui-SAFE VALVE DOES NOT TRIP GREEN YES NO IS RELAY LATCHED? CHECK FUSE LINKS NO FUSE LINKS OPEN? PRESS HI-LIMIT BUTTON TO RESET YES YES SEE HEATER CORE RESISTANCE ON PAGE 6-37. SERVICE INLET SOLENOID WITH SERVICING KIT (SEE SPARE PARTS LIST). IS THERE A LOOSE WIRE? NO REPLACE OPEN FUSE LINKS. CONTACT ASDI CHECK FOR LOOSE WIRING NO VAPORIZER STARTS WORKING? CHECK IF THERE IS 24V AT THE RELAY LEADING TO THE TEMPERATURE CONTROLLER YES TIGHTEN WIRES. RESTART VAPORIZER. CHECK: 1. IF THERMOCOUPLE CONNECTION TO CONTROL BOARD IS LOOSE 2. CHECK THERMAL GREASE COATS LAST 2 INCHES OF THERMOCOUPLE TIP WHEN REMOVED FROM THERMOWELL 3. CHECK THERMOCOUPLE IS FULLY INSERTED IN THE THERMOWELL. WHEN FULLY INSERTED THERMOCOUPLE SHOULD BOTTOM OUT IN THE THERMOWELL AND THERMOCOUPLE SHEATHING SHOULD COMPRESS TO SECURE BAYONETT FITTING 4. REMOVE DRAIN PLUG AND CHECK FOR HEAVY ENDS NO 24V AT THE RELAY? YES REPLACE RELAY IF THE ABOVE ACTIONS DO NOT FIX THE PROBLEM THEN REPLACE TEMPERATURE CONTROLLER BOARD. REPLACE THERMOCOUPLE ASDI Operations and Maintenance – TX Models – P/N: 54629 6-32 TREE # 2C Liqui-SAFE VALVE DOES NOT TRIP RED NO IS THERMOCOUPLE MOLEX PLUG OR TRANSITION HARNESS LOOSE OR DISCONNECTED? YES RECONNECT LOOSE OR DISCONNECTED MOLEX OR REINSTALL WIRES INTO TRANSITION HARNESS NO IS LED LIGHT RED ON CONTROL BOARD? IS FLOAT SWITCH OR PRESSURE SWITCH OPEN? PRESS RED RESET BUTTON TO RESTART VAPORIZER IF THE ABOVE ACTIONS DO NOT FIX THE PROBLEM THEN GO TO THE “NO” STEP OPTIONAL NO YES YES PRESS RED RESET BUTTON TO RESTART VAPORIZER. IF PROBLEM REOCCURS THEN: REPLACE TEMP. CONTROLLER. RESTART VAPORIZER 1. ASSESS SYSTEM CAPACITY 2. PERFORM SOLENOID VALVE LEAK TEST. 3. CHECK WIRING. 4. CHECK FUSE LINKS. IF THE ABOVE ACTIONS DO NOT FIX THE PROBLEM CONTACT ASDI. 1. CHECK THERMAL GREASE COATS LAST 2 INCHES OF THERMOCOUPLE TIP WHEN REMOVED FROM THERMOWELL 2. CHECK THERMOCOUPLE IS FULLY INSERTED IN THE THERMOWELL. WHEN FULLY INSERTED THERMOCOUPLE SHOULD BOTTOM OUT IN THE THERMOWELL AND THERMOCOUPLE SHEATHING SHOULD COMPRESS TO SECURE BAYONETT FITTING 3. REMOVE DRAIN PLUG AND CHECK FOR HEAVY ENDS IF THE ABOVE ACTIONS DO NOT FIX THE PROBLEM THEN CONTACT ASDI OR GO TO “NO” STEP IF FLOAT OR PRESSURE SWTITCH ARE INSTALLED. 6-33 ASDI Operations and Maintenance – TX Models – P/N: 54629 Full Load Voltage Check NOTE Current flow depends on the applied voltage. Voltage lower than the specified voltage causes low current and may negatively affect operation. Make all measurements with the heater ON. WARNING These tests include high voltage. Exercise great caution in making the following tests. Carelessness could result in severe injury or death. L1 ALWAYS ENERGIZED. See additional warnings located at the beginning of this chapter. FULL LOAD VOLTAGE CHECK Check heater voltage by measuring voltage at the power distribution block terminals. See data sheet on page 6-36 or rating plate on the vaporizer to determine the correct voltage for your vaporizer. Measure voltage between all poles of the distribution block. The readings should be equal to +5/-10% of the value on the rating plate. Figure 12 – Full Load Voltage Check POWER DISTRIBUTION BLOCK POWER IN SOLID-STATE RELAYS MEASURE VOLTAGE ASDI Operations and Maintenance – TX Models – P/N: 54629 6-34 Full Load Current Check NOTE See fusible link detail below for typical fusible link installation. WARNING These tests include high voltage. Exercise great caution when performing the following tests. Carelessness could result in severe injury or death. L1 ALWAYS ENERGIZED. See additional warnings located at the beginning of this chapter. Measure the current on each of the heater AC power input wires. See data sheet on page 6-36 or rating plate on the vaporizer for the correct line current for your vaporizer. All wires should have readings equal to +10/-18% of the value listed on the rating plate. Low current on all wires indicates low input voltage. Drastically different current readings may indicate a defective heater, defective wiring, or an open fusible link due to overheating. If a fusible link is open, contact the factory. Do not attempt to repair it. Figure 13 – Full Load Current Check POWER DISTRIBUTION BLOCK POWER IN VIEW OF FUSIBLE LINK IN NORMAL CONDITIONS POWER INPUT WIRING COPPER STRIP MEASURE CURRENT AMP CLAMP VIEW OF FUSIBLE LINK IN OPEN CONDITION FUSIBLE LINKS 6-35 ASDI Operations and Maintenance – TX Models – P/N: 54629 TORREXX Electric Vaporizer Data Sheet MODEL PHASE VOLTAGE (VAC) CURRENT (A) TX25 TX25 TX25 TX25 TX50 TX50 TX50 TX50 TX50 TX50 TX50 TX50 TX50 TX100 TX100 TX100 TX100 TX100 TX100 TX100 TX100 TX100 TX100 TX100 TX160 TX160 TX160 TX160 TX160 TX160 TX160 TX160 TX240 TX240 TX240 TX240 TX240 TX320 TX320 TX320 TX320 TX320 TX320 1 1 1 1 1 3 1 3 1 3 3 3 3 1 3 1 3 1 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 120 208 220 240 208 208 220 220 240 240 380 400 415 208 208 220 220 240 240 380 400 415 440 480 208 220 240 380 400 415 440 480 380 400 415 440 480 380 400 415 440 480 575 32.8 14.2 15.0 16.4 28.5 16.4 30.1 17.4 32.8 19.0 10.0 10.6 10.9 56.9 32.8 60.2 34.7 54.7 37.8 20.0 21.1 21.9 17.4 19.0 45.5 48.1 52.5 27.8 29.3 30.3 24.0 26.2 38.6 40.6 42.1 33.4 36.4 58.7 53.4 55.4 50.8 48.0 39.9 HEATER RESISTANCE (OHMS) 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 16 16 16 16 16 16 16 16 11.5 11.5 11.5 11.5 11.5 7.4 8.8 8.8 7.4 8.8 16.9 ASDI Operations and Maintenance – TX Models – P/N: 54629 WIRE-TO-WIRE RESISTANCE (OHMS) 3.7 14.8 14.8 14.8 7.4 14.8 7.4 14.8 7.4 14.8 44.3 44.3 44.3 3.7 7.4 3.7 7.4 4.4 7.4 22.2 22.2 22.2 29.6 29.6 5.3 5.3 5.3 16 16 16 21.3 21.3 11.5 11.5 11.5 15.3 15.3 7.7 8.8 8.8 10.3 11.7 16.8 NOMINAL POWER (kW) 3.9 3.0 3.3 3.9 5.9 5.9 6.6 6.6 7.9 7.9 6.6 7.3 7.8 11.8 11.8 13.2 13.2 13.1 15.7 13.2 14.6 15.7 13.2 15.8 16.4 18.3 21.8 18.3 20.3 21.8 18.3 21.8 25.4 28.1 30.3 25.5 30.3 38.6 37.0 39.8 38.7 39.9 39.7 6-36 Heater Core Resistance NOTE Refer to the data sheet for wire-to-wire resistance of your vaporizer. CAUTION Turn off electrical power at the disconnect before performing this procedure. Remove the lid on the upper control box. Measure the resistance across each pair of wires connected to OUTPUT (2) on the relays. An incorrect resistance reading indicates a faulty heater element, a wiring problem, or an open fusible link. If a fusible link is open, contact the factory. Do not attempt to repair it. Figure 14 – Heater Core Resistance Check SOLID-STATE RELAYS READ WIRE-TO-WIRE RESISTANCE SEE HEATER WIRING DIAGRAM OR DATASHEET ON PAGE 6-36 6-37 ASDI Operations and Maintenance – TX Models – P/N: 54629 Solenoid Valve Leak Test 1) Shut the outlet isolation valve. The inlet isolation valve should be open. Start the vaporizer and allow it to heat up until the heaters shut off. This allows any accumulated liquid in the vaporizer to be forced back toward the supply tank. 2) Disconnect the vaporizer by shutting off the power at the disconnect. Shut the inlet isolation valve. Cautiously bleed off any LPG pressure in the vaporizer and outlet supply piping. When the pressure reaches no pressure in the vaporizer, remove, and reinstall the pressure gauge in the vaporizer and verify 0 pressure. 3) Open the inlet isolation valve. The solenoid valve is closed and you should not have any pressure build up in the vaporizer. If pressure increases in the vaporizer, the solenoid valve is leaking and needs to be repaired or replaced. Figure 15 – Solenoid Valve Leak Test Components VAPOR DISCHARGE OUTLET ISOLATION VALVE VAPOR PRESSURE GAUGE VAPORIZER PRESSURE GAUGE FIRST STAGE REGULATOR VAPOR OUT SOLENOID VALVE STRAINER LIQUID INLET ISOLATION VALVE LIQUID IN ASDI Operations and Maintenance – TX Models – P/N: 54629 6-38 Solenoid Valve Electrical Test NOTE A multimeter is required for the following test. CAUTION Turn off electrical power at the disconnect before performing this procedure. Open the electrical housing at the vaporizer base. Disconnect the 2-PIN Molex plug connector and measure resistance between the pins. You should measure approximately 3 Ohms. If not, replace the solenoid coil. Figure 16 – Solenoid Valve Electrical Test CONTROL BOARD DISCONNECT MOLEX JUMPER RESISTANCE SHOULD BE APPROXIMATELY 3 OHMS 6-39 ASDI Operations and Maintenance – TX Models – P/N: 54629 TORREXX OPTIONS 7 Economy Operation The Economy Option minimizes the electric power required to meet your vapor demand by shutting off flow at the outlet of the vaporizer when the natural vaporization rate of the storage tank can supply enough vapor to meet the demand. The Economy Valve operates by reacting to the pressure in the storage tank. When tank pressure falls below 22 PSIG (1.5 bar), the valve is fully open allowing the vaporizer to supply vapor to the load. When the tank pressure rises above 82 PSIG (5.7 bar), the valve is fully closed allowing the storage tank to provide natural vaporization to the load. The pressure sensing valve is a mechanical device that operates independent of the electrical controls. The Economy Option will NOT function if a pump is used. The liquid piping is limited to 10 ft (3 m) of length from the tank to the Inlet Solenoid. The pressure set point of the Economy Valve is not adjustable. The Economy Valve is a field installed component and shall be installed directly at the outlet of the vaporizer prior to the first-stage regulator. Use field installation kit, ASDI P/N 41051. Ensure the Economy Valve is correctly installed by verifying the flow direction indicator on the rating plate. Figure 17 – TORREXX Economy Valve Installation NOTES 1. LIQUID PIPING LOSSES BETWEEN THE VAPORIZER AND THE TANK MUST NOT EXCEED THE HYDROSTATIC HEAD. INSTALL VAPORIZER 1ST STAGE REGULATOR UPSTREAM OF VAPOR BYPASS LINE CONNECTION TO MAIN VAPOR LINE. SET 1ST STAGE VAPORIZER REULATOR 2-4 PSIG (0.1-0.3 BAR) HIGHER THAN TANK VAPOR PRESSURE REGULATOR SETPOINT. NO CHECK VALVES IN LIQUID LINE. LIQUID MUST BE ABLE TO FLOW IN BOTH DIRECTIONS. 2. 3. 4. *BY OTHERS TANK VAPOR PRESSURE REGULATOR* ISOLATION VALVE* VAPOR BY-PASS LINE ISOLATION VALVE* OUTLET ISOLATION VALVE* ASDI ECONOMY VALVE SENSES UPSTREAM PRESSURE (VAPOR) TO LOAD STORAGE TANK PRESSURE GAUGE* VAPORIZER REGULATOR* SEAL OFF REQUIRED* STRAINER WITH MAGNET FOR IRON PARTICLE PICK-UP* LIQUID ELECTRIC SERVICE REQUIRED* ISOLATION VALVE W/HYDROSTATIC RELIEF* ISOLATION VALVE” Note: Economy Option cannot be used on an installation that requires a pump. ASDI Operations and Maintenance – TX Models – P/N: 54629 7-40 TORREXX Economy Valve Maintenance The Economy Valve consists of a moving piston which opens and closes the valve’s outlet. The movement of the piston is driven by the pressure force balance between two different sized O-rings and a spring. Follow the instructions below to perform maintenance on the Economy Valve once every two years using the Economy Valve repair kit ASDI P/N 40869. Figure 18A – STEP 1 – Unscrew the inlet housing from the outlet housing. Figure 18B – STEP 2 – Remove old O-rings and clean all piston surfaces. 7-41 ASDI Operations and Maintenance – TX Models – P/N: 54629 Figure 18C – STEP 3 – Clean all O-ring contact surfaces and the bottom surface of the outlet housing. Apply excess lithium O-ring grease to inside of both housings. Figure 18D – STEP 4 – Replace the three O-rings contained in the Economy Valve repair kit. Apply excess lithium O-ring grease to all O-rings. Figure 18E – STEP 5 – Make sure the pin hole is clear and the spring is undamaged. Carefully reassemble all parts. Apply lubrication grease on the straight threads if necessary. The inlet housing MUST be screwed all the way down for the valve to accurately function at the set pressure. DO NOT apply sealing agent or Teflon tape on these threads. ASDI Operations and Maintenance – TX Models – P/N: 54629 7-42 TX Remote Box Includes remote start/stop capability and a status light indicating the vaporizer is ready for operation (solenoid valve open). Connection between the box and the vaporizer is established trough the wire harness found on the inside the vaporizer explosion proof enclosure. Remote box is intended for indoor or outdoor installation in general purpose location. Must be installed outside Zone 1 and 2 (IP65). FIGURE 19 – Remote START/STOP Box 7-43 ASDI Operations and Maintenance – TX Models – P/N: 54629 Valve and Strainer Package For TX25 and TX320 ASDI P/N 36923 ¾” NPT inlet, 1” NPT outlet FILTAIRE Contaminant Separator The FILTAIRETM is a filtering device designed to trap heavy hydrocarbons commonly present in LPG vapor. It also traps other materials, which may be in the gas due to storage conditions and internal condition of the equipment. Impurities are collected in the system and periodically removed through the system blow down drain. Residual heavy end hydrocarbons with boiling points higher than pure LPG are trapped by the filter and fall to the bottom for removal. A complete FILTAIRETM system consists of inlet and outlet connections, a blow-down drain (5), a pressure gauge (4), a vent which is normally plugged (6), and a bypass valve system for cleaning (1, 2, and 3 not included with FILTAIRETM). The bypass valves enable the system to continue operating when the FILTAIRETM is removed for cleaning. FIGURE 20 – FILTAIRE Operation Leak Test 1. 2. 3. 4. Close outlet valve. Slowly open inlet valve and allow pressure to equalize in the vaporizer. Apply a small amount of soap/water solution to ALL pipe connections around the FILTAIRETM. Check for any leaks by observing new bubble formation in the soap/water solution. Repair any leaks before continuing. ASDI Operations and Maintenance – TX Models – P/N: 54629 7-44 APPENDIX A TECHNICAL INFORMATION TORREXX Vertical Electric Vaporizer Data Sheet CE / NEMKO LPG Vaporizer Refer to Nameplate on unit for the model and voltage information then look up specific information on the tables below. General Specifications: Applies to all units Electrical: 50 – 60 Hz, NEMA 4, 1 Phase units are 2 wire, 3 Phase units are 3 wire Starting Temperature: 55 ºC 131 ºF Operating Temperature: 71-79 ºC 160-175 ºF High Temperature Limit: 171 ºC 340 ºF Connections: ¾” FNPT – Inlet; 1” FNPT – Outlet Conduits: M32, Conduit Seal-Off by others Type of Service: Propane Vaporization ASME Pressure Vessel: 250 PSIG MAWP @ 250ºF (17.2 BAR MAWP @ 121ºC) -20ºF MDMT @ 250 PSIG (-29ºC MDMT @ 17.2 BAR) Heat Exchanger Area: 5.4 ft2 / 0.503 m2 TX240 7.1 ft2 / 0.660 m2 TX320 266 lbs / 120.9 kg TX240 284 lbs / 129.1 kg TX320 Dry Weight: Hazardous Area Rating: TO AVOID POTENTIAL ELECTROSTATIC CHARGING HAZARD, ALWAYS USE A DAMP CLOTH FOR CLEANING THE INSULATION JACKET. AVOID DRY RUBBING OF THE INSULATION JACKET. “TORREXX” is a trademark of Algas-SDI International LLC. EU marking description CE (2460) CE Conformity Marking: Identification Number of Notified Body involved in production control stage: 2460 Explosion Protection marking: Equipment Group: Equipment Category: -/II 2G The equipment is intended for Zone 1 and Zone 2. The space inside the process vessel and process lines are considered as non-hazardous area therefore (-/II) in the marking code. Equipment Category Definition Gas atmospheres "high level of protection" Gas atmospheres "normal level of protection" No Ex protection. EU Equipment Category Group Typical Zone of application 2G 3G - 1 II - 2 Out of hazardous zone Specific Conditions of Use “X” - The flameproof joints not intended to be repaired. “X” – Ambient temperature -20ºC to +60ºC “X” – Minimum yield stress of the fastening screws used for enclosure is 646 MPa. “X” – To avoid potential electrostatic charging hazard, always use a damp cloth for cleaning the insulation jacket. Avoid dry rubbing of the insulation jacket. “X” – The cable glands provided are suitable only for fixed applications and the cable must be effectively clamped and cleated to prevent pulling and twisting. Applicable Standards EN 60079-0:2012/A11:2013 (IEC 60079-0 ed.6.0) EN 60079-1:2014 (IEC 60079-1 ed.7.0) EN 60079-18:2008 (IEC 60079-18 ed. 4.0) TORREXX Alternate Configuration Refer to Nameplate on unit for the model and voltage information then look up specific information on the tables below. Alternate configuration arises from use of alternate conduit assembly. Functionality is identical. General Specifications: Applies to all units Electrical: 50 – 60 Hz, NEMA 4, 1 Phase units are 2 wire, 3 Phase units are 3 wire Starting Temperature: 55 ºC 131 ºF Operating Temperature: 71-79 ºC 160-175 ºF High Temperature Limit: 171 ºC 340 ºF Connections: ¾” FNPT – Inlet; 1” FNPT – Outlet Conduits: M32, Conduit Seal-Off by others Type of Service: Propane Vaporization ASME Pressure Vessel: 250 PSIG MAWP @ 250ºF (17.2 BAR MAWP @ 121ºC) -20ºF MDMT @ 250 PSIG (-29ºC MDMT @ 17.2 BAR) Heat Exchanger Area: 5.4 ft2 / 0.503 m2 TX240 7.1 ft2 / 0.660 m2 TX320 266 lbs / 120.9 kg TX240 284 lbs / 129.1 kg TX320 Dry Weight: Hazardous Area Rating: TO AVOID POTENTIAL ELECTROSTATIC CHARGING HAZARD, ALWAYS USE A DAMP CLOTH FOR CLEANING THE INSULATION JACKET. AVOID DRY RUBBING OF THE INSULATION JACKET. “TORREXX” is a trademark of Algas-SDI International LLC. EU marking description CE (2460) CE Conformity Marking: Identification Number of Notified Body involved in production control stage: 2460 Explosion Protection marking: Equipment Group: Equipment Category: -/II 2G The equipment is intended for Zone 1 and Zone 2. The space inside the process vessel and process lines are considered as non-hazardous area therefore (-/II) in the marking code. Equipment Category Definition Gas atmospheres "high level of protection" Gas atmospheres "normal level of protection" No Ex protection. EU Equipment Category Group Typical Zone of application 2G 3G - 1 II - 2 Out of hazardous zone Specific Conditions of Use “X” - The flameproof joints not intended to be repaired. “X” – Ambient temperature -20ºC to +60ºC “X” – Minimum yield stress of the fastening screws used for enclosure is 646 MPa. “X” – To avoid potential electrostatic charging hazard, always use a damp cloth for cleaning the insulation jacket. Avoid dry rubbing of the insulation jacket. “X” – The cable glands provided are suitable only for fixed applications and the cable must be effectively clamped and cleated to prevent pulling and twisting. Applicable Standards EN 60079-0:2012/A11:2013 (IEC 60079-0 ed.6.0) EN 60079-1:2014 (IEC 60079-1 ed.7.0) EN 60079-18:2008 (IEC 60079-18 ed. 4.0) IEC 60079-7:2017, Edition: 5.1 EN IEC 60079-7:2015/A1:2018 TORREXX VERTICAL ELECTRIC VAPORIZER DATA SHEET (CE / NEMKO CONFIGURATIONS) MODEL PHASE VOLTAGE TX240 TX240 TX240 TX320 TX320 TX320 3 3 3 3 3 3 380 400 415 380 400 415 EQUIPMENT DRAWING 5001 - 6003 5001 - 6003 5001 - 6003 5001 - 6003 5001 - 6003 5001 - 6003 ELECTRICAL DRAWING 5001-7010 5001-7010 5001-7010 5001-7010 5001-7010 5001-7010 BUSSING DIAGRAM 0620 - 7010 0620 - 7010 0620 - 7010 0620 - 7010 0620 - 7010 0620 - 7010 TORREXX Electric Vaporizer Spare Parts and Accessories (CE / NEMKO) REFERENCE KEY SPARE PARTS 1 2 3 4 5 6 7 8 9 TEMPERATURE CONTROL BOARD KIT TRANSFORMER SOLID-STATE RELAY KIT THERMOCOUPLE KIT Liqui-SAFE VALVE PRESSURE RELIEF VALVE RAIN CAP FUSIBLE LINK INLET SOLENOID 10 11 12 13 14 15 16 17 18 19 20 21 22 FUSE KIT ECONOMY VALVE FIELD INSTALL KIT ECONOMY VALVE MAINTENANCE KIT PIPE AWAY ADAPTOR VALVE, GAUGE AND STRAINER KIT DRAIN ASSEMBLY STAND WIRE HARNESS (MAIN) CORROSION INHIBITING TAPE INLET SOLENOID KIT Liqui-SAFE VALVE O-RING KIT Remote START/STOP Box BALANCING ORIFICE TX240 380V 400V 415V 40888 54575 40969 41143 5001-3003 34876 35379 33139 33418 TX240 440V 480V 40888 54576 40969 41143 5001-3003 34876 35379 33139 33418 TX320 380V 400V 415V 40888 54575 40969 41144 5001-3003 34876 35379 33139 33418 TX320 440V 480V 40888 54576 40969 41144 5001-3003 34876 35379 33139 33418 52222 41051 40869 52222 41051 40869 52222 41051 40869 52222 41051 40869 34877 36923 5010-3003 20437 53820 60806 40249 40421 41067 64004 34877 36923 5010-3003 20437 53820 60806 40249 40421 41067 64004 34877 36923 5010-3003 20437 53820 60806 40249 40421 41067 64004 34877 36923 5010-3003 20437 53820 60806 40249 40421 41067 64004 FIGURE 21 – TORREXX Electric Vaporizer Major Components and Accessories 7 5 8 6 2 18 17 3 1 9 18 3 248 9 4 " 2 1 +1/8" +3 672 - 3 26 2 " - 1/8" 3 PHASE ELECTRICAL SERVICE (BY OTHERS) 1 231 9 8 " TX240 1320 [52"] TX320 1500 59" 1" FNPT VAPOR OUTLET NOTES: 1. ALL DIMENSIONS ARE IN mm [INCHES]. 2. NEMKO APPROVED FOR USE IN ZONE 1 AREAS. 3. DNV APPROVED FOR CONFORMANCE WITH PRESSURE EQUIPMENT DIRECTIVE. 4. CE COMPLIANT. 5. VAPORIZER PRESSURE VESSEL RATED AT 250 PSIG [17.6 KG/CM ] MAWP. 6. RELIEF VALVE SETTING 17.24 BARG (250PSIG). 7. VAPORIZER CAPACITY RATED 0 F AND 100 PSIG PROPANE INLET CONDITION. 8. SUITABLE FOR INDOOR/OUTDOOR INSTALLATION. 9. VAPORIZER TO BE SECURED THROUGH THE FOUR MOUNTING HOLES ON ABOVE GROUND, LEVEL, SOLID, NON-COMBUSTIBLE BASE. 10. AVOID DRY RUBBING OF THE INSULATION JACKET TO PREVENT ELECTROSTATIC CHARGING HAZARD. ALWAYS USE DAMP CLOTH FOR CLEANING. 11. ECONOMY VALVE OPTION AVAILABLE UPON REQUEST. 12. APROXIMATE SHIPPING WEIGHT: TX240 (121kg) TX320 (130kg). OPTIONAL DRAIN PORT TX240 1441 [56 3/4"] 3 TX320 1610 63 8 " PRESSURE RELIEF VALVE (4) 1/2" MOUNTING HOLES Part # 151 S. Michigan St., Seattle, Washington. USA 98108 Tel: (206) 789-5410 Fax: (206) 789-5414 RATING PLATE 3/4" FNPT LIQUID INLET VALVE PRESSURE GAUGE 10/29/2020 BZ Dwg. # 5001-6011 RWP ASDI STD Job # Sht. No.: 1of 1 Rev.: A 1:16 AND NOTED Scale: Date: Approved By: Checked By: Drawn By: TORREXX SOLID STATE RELAY VAPORIZER - NEMKO B .X .XX .XXX ANGLE 1 FRACTIONS 1/4" UNLESS OTHERWISE SPECIFIED TOLERANCES TEMPERATURE CONTROL SENSOR HEATING ELEMENT CORE FLOAT BALL Title: INTERPRET THIS DRAWING IN ACCORDANCE WITH ANSI/ASME Y14.5-2009 THIS DRAWING SHALL NOT BE REPRODUCED OR USED IN ANY MANNER DETRIMENTAL TO ITS Size: INTERESTS. ALL RIGHTS RESERVED. © COPYRIGHT ALGAS-SDI DO NOT SCALE DRAWING THIRD ANGLE PROJECTION 10 GA WIRE MESH OR DEFORMED REBAR CONTROL HOUSING COVER 311+3 12 1 "+1/8" -3 4 - 1/8" SOLID STATE RELAY CONTROL COVER INSULATION JACKET Liqui-SAFE VALVE 152 6" PRESSURE GAUGE HYDROSTATIC RELIEF VALVE ISOLATION VALVE WITH HYDROSTATIC RELIEF VAPOR BY-PASS LINE ISOLATION VALVE (VAPOR) TO LOAD VAPORIZER REGULATOR OUTLET ISOLATION VALVE ELCTRICAL SERVICE WITH SEAL OFF REQUIRED STRAINER WITH MAGNET FOR IRON PARTICLE PICK UP LIQUID PUMP THIRD ANGLE PROJECTION TANK VAPOR PRESSURE REGULATOR ISOLATION VALVE ISOLATION VALVE DO NOT SCALE DRAWING PIPEAWAY ADAPTER PRESSURE RELIEF VALVE STORAGE TANK RWP BZ 11/12/10 A.S.D.I. STD. Job # 1:20 AND NOTED Scale: Date: Approved By: Checked By: Drawn By: NOTES: 1. LIQUID PIPING LOSSES BETWEEN VAPORIZER AND THE TANK MUST NOT EXCEED HYDROSTATIC HEAD WHEN THE PUMP IS SHUT OFF. 2. INSTALL VAPORIZER 1ST STAGE REGULATOR UPSTREAM OF THE TANK VAPOR PRESSSURE CONNECTION POINT. 3. SET 1ST STAGE VAPORIZER REULATOR 2-4 PSIG HIGHER THAN TANK VAPOR PRESSURE REGULATOR SET-POINT. 4. NO CHECK VALVES IN LIQUID LINE. LIQUID MUST BE ABLE TO FLOW IN BOTH DIRECTIONS. 5. VAPORIZER REGULATOR MUST BE INSTALLED ABOVE VAPORIZER OUTLET. TOLERANCES UNLESS OTHERWISE SPECIFIED 151 S. Michigan St., Seattle, Washington. USA 98108 Tel: (206) 789-5410 Fax: (206) 789-5414 Part # Dwg. # TORREX INSTALLATION DRAWING WITH PUMP AND VAPOR BYPASS Sht. No.: Rev.: 5001-8001 1of 1 D B .X 0.1 .XX 0.06 .XXX 0.030 ANGLE 0 30' FRACTIONS 1/16" INTERPRET THIS DRAWING IN ACCORDANCE Title: WITH ANSI/ASME Y14.5-2009 THIS DRAWING SHALL NOT BE REPRODUCED OR USED IN ANY MANNER DETRIMENTAL TO IT'S Size: INTERESTS. ALL RIGHTS RESERVED. © COPYRIGHT ALGAS-SDI ELCTRICAL SERVICE WITH SEAL OFF REQUIRED VAPORIZER REGULATOR (VAPOR) TO LOAD ISOLATION VALVE LIQUID ISOLATION VALVE STRAINER WITH MAGNET FOR IRON PARTICLE PICK UP OUTLET ISOLATION VALVE ISOLATION VALVE WITH HYDROSTATIC RELIEF PRESSURE GAUGE B Part # 151 S. Michigan St., Seattle, Washington. USA 98108 Tel: (206) 789-5410 Fax: (206) 789-5414 11/18/10 BZ RWP A.S.D.I. STD. Job # 1:20 AND NOTED Scale: Date: Approved By: Checked By: Drawn By: TORREXX INSTALLATION WITH VAPOR BYPASS AND NO PUMP Sht. No.: Rev.: Dwg. # D 5001-8002 1of 1 .X 0.1 .XX 0.06 .XXX 0.030 ANGLE 0 30' FRACTIONS 1/16" UNLESS OTHERWISE SPECIFIED TOLERANCES NOTES: 1. INSTALL VAPORIZER 1ST STAGE REGULATOR UPSTREAM OF THE TANK VAPOR PRESSSURE CONNECTION POINT. 2. SET 1ST STAGE VAPORIZER REULATOR 2-4 PSIG HIGHER THAN TANK VAPOR PRESSURE REGULATOR SET-POINT. 3. NO CHECK VALVES IN LIQUID LINE. LIQUID MUST BE ABLE TO FLOW IN BOTH DIRECTIONS. 4. VAPORIZER REGULATOR MUST BE INSTALLED ABOVE VAPORIZER OUTLET. STORAGE TANK PRESSURE RELIEF VALVE PIPEAWAY ADAPTER INTERPRET THIS DRAWING IN ACCORDANCE Title: WITH ANSI/ASME Y14.5-2009 THIS DRAWING SHALL NOT BE REPRODUCED OR USED IN ANY MANNER DETRIMENTAL TO IT'S Size: INTERESTS. ALL RIGHTS RESERVED. © COPYRIGHT ALGAS-SDI DO NOT SCALE DRAWING THIRD ANGLE PROJECTION ISOLATION VALVE TANK VAPOR PRESSURE REGULATOR VAPOR BYPASS LINE PRESSURE GAUGE ISOLATION VALVE WITH HYDROSTATIC RELIEF OUTLET ISOLATION VALVE ISOLATION VALVE (VAPOR) TO LOAD VAPORIZER REGULATOR ASDI ECONOMY VALVE SENSES UPSTREAM PRESSURE (OPEN AT 30PSIG CLOSED AT 60PSIG) ELECTRICAL SERVICE WITH SEAL OFF REQUIRED STRAINER WITH MAGNET FOR IRON PARTICLE PICK UP ISOLATION VALVE LIQUID VAPOR BYPASS LINE PIPEAWAY ADAPTER PRESSURE RELIEF VALVE STORAGE TANK 151 S. Michigan St., Seattle, Washington. USA 98108 Tel: (206) 789-5410 Fax: (206) 789-5414 Dwg. # Drawn By: Checked By: RWP BZ 11/18/10 Approved By: Date: 1:20 AND NOTED Scale: A.S.D.I. STD. Job # TORREXX INSTALATION WITH ECONOMY OPERATION AND VAPOR BYPASS Sht. No.: Rev.: D 5001-8003 1of 1 Part # NOTES: 1. INSTALL VAPORIZER 1ST STAGE REGULATOR UPSTREAM OF THE TANK VAPOR PRESSSURE CONNECTION POINT. 2. SET 1ST STAGE VAPORIZER REULATOR 2-4 PSIG HIGHER THAN TANK VAPOR PRESSURE REGULATOR SET-POINT. 3. NO CHECK VALVES IN LIQUID LINE. LIQUID MUST BE ABLE TO FLOW IN BOTH DIRECTIONS. 4. VAPORIZER REGULATOR MUST BE INSTALLED ABOVE VAPORIZER OUTLET. B .X 0.1 .XX 0.06 .XXX 0.030 ANGLE 0 30' FRACTIONS 1/16" UNLESS OTHERWISE SPECIFIED TOLERANCES TANK VAPOR PRESSURE REGULATOR ISOLATION VALVE THIRD ANGLE PROJECTION DO NOT SCALE DRAWING INTERPRET THIS DRAWING IN ACCORDANCE Title: WITH ANSI/ASME Y14.5-2009 THIS DRAWING SHALL NOT BE REPRODUCED OR USED IN ANY MANNER DETRIMENTAL TO IT'S Size: INTERESTS. ALL RIGHTS RESERVED. © COPYRIGHT ALGAS-SDI FULL SIZED GLOBE ISOLATION VALVES EQUAL TO PIPE SIZE, TO ENSURE NO RESTRICTIONS IN LIQUID INLET LINE. PROPERLY SIZED LIQUID PIPING IN ACCORDANCE WITH O&M MANUAL, ALLOWING LIQUID TO BE PUSHED BACK TO TANK (TOO SMALL LINE MAY CAUSE TRIPPING OF LIQUI-SAFE VALVE). S STRAINER WITH MAGNETIC PLUG P/N 40776 INSTALLED AT THE LIQUID INLET OF EACH VAPORIZER, TO PROTECT SOLENOID VALVE AND VAPORIZER FROM IMPURITIES. BALANCING ORIFICE P/N 64004 INSTALLED IN UNION AT OUTLET OF EACH VAPORIZER NECESSARY TO BALANCE MULTIPLE VAPORIZER INSTALLATIONS. REGULATOR LINE POSITIONED ABOVE VAPORIZER TO RE-CONDENSE LIQUID BACK INTO HEAT EXCHANGER. DO NOT SCALE DRAWING INTERPRET THIS DRAWING IN ACCORDANCE Title: WITH ANSI/ASME Y14.5-2009 THIS DRAWING IS PROPRIETARY AND CONFIDENTIAL AND SHALL NOT BE REPRODUCED OR USED IN ANY MANNER DETRIMENTAL TO ALGAS-SDI'S INTERESTS. Size: ALL RIGHTS RESERVED.© COPYRIGHT ALGAS-SDI .X 0.10 .XX 0.030 .XXX 0.010 ANGLE 1 FRACTIONS 1/4" UNLESS OTHERWISE SPECIFIED TOLERANCES THIRD ANGLE PROJECTION B Job # Dwg. # 5001-8005 Sht. No.: 1of 2 Rev.: A 1:4 AND NOTED 1/3/2018 DN RWP ASDI STD 5001-8005 TORREXX MULTI INSTALLATION P&ID Part # Scale: Date: Approved By: Checked By: Drawn By: FILTAIRE/ OIL DEMISTER. INSTALL AFTER 1ST STAGE REGULATOR TO DRAIN OILS/HEAVY ENDS. 151 S. Michigan St., Seattle, Washington. USA 98108 Tel: (206) 789-5410 Fax: (206) 789-5414 INSTALL DRAIN VALVE KIT P/N 5010-3003 IN EACH VAPORIZER TO REGULARLY DRAIN OILS/HEAVY ENDS P BY-PASS VALVE TO ALLOW CONTINUED OPERATION DURING SERVICING OF FILTER/OIL DEMISTER. SINGLE SYSTEM REGULATOR SIZED PROPERLY FOR DEMAND. INSTALL AT THE IMMEDIATE OUTLET OF THE HEADER. NOTE: 1 S S TORREXX X 2 INSTALLATION IN PARALLEL S S S 1 TORREXX X 3 INSTALLATION IN PARALLEL FIRST STAGE REGULATOR SHALL BE POSITIONED ABOVE THE OULET HEADER TO RE-CONDENSE LIQUID BACK INTO HEAT EXCHANGER S S S S TOLERANCES UNLESS OTHERWISE SPECIFIED .X 0.10 .XX 0.030 .XXX 0.010 ANGLE 1 FRACTIONS 1/4" B 151 S. Michigan St., Seattle, Washington. USA 98108 Tel: (206) 789-5410 Fax: (206) 789-5414 Dwg. # 5001-8005 1 Drawn By: Checked By: RWP DN 1/3/2018 Approved By: Date: 2of 2 Rev.: A 1:4 AND NOTED Scale: Job # Sht. No.: ASDI STD 5001-8005 TORREXX MULTI INSTALLATION P&ID Part # TORREXX X 4 INSTALLATION IN PARALLEL 1 THIRD ANGLE PROJECTION DO NOT SCALE DRAWING INTERPRET THIS DRAWING IN ACCORDANCE Title: WITH ANSI/ASME Y14.5-2009 THIS DRAWING IS PROPRIETARY AND CONFIDENTIAL AND SHALL NOT BE REPRODUCED OR USED IN ANY MANNER DETRIMENTAL TO ALGAS-SDI'S INTERESTS. Size: ALL RIGHTS RESERVED.© COPYRIGHT ALGAS-SDI This drawing is the property of Algas SDI and is not to be reproduced nor used in any manner detrimental to our interests. All rights are reserved. This drawing is the property of Algas SDI and is not to be reproduced nor used in any manner detrimental to our interests. All rights are reserved. This drawing is the property of Algas SDI and is not to be reproduced nor used in any manner detrimental to our interests. All rights are reserved. This drawing is the property of Algas SDI and is not to be reproduced nor used in any manner detrimental to our interests. All rights are reserved. This drawing is the property of Algas SDI and is not to be reproduced nor used in any manner detrimental to our interests. All rights are reserved. ASCO Valve used by Algas-SDI SOLENOID NOISE Solenoid valves emit a sound when operated. When energized, they emit a clicking sound. Also, accompanying the operation of most AC valves, is AC hum. Whether or not AC hum is objectionable actually depends on the requirements and opinion of the user. Normal AC hum is the result of the constantly reversing magnetic field produced by alternating current. The constantly reversing magnetic field can cause vibrations in the solenoid parts. 1. Solenoid noise due to damage solenoid parts such as bent solenoid base assembly, stretched return springs, loose parts, etc. Solution: parts. Inspect valve internals and exterior. Replaced damaged 2. Solenoid noise due to foreign matter between the core and plug-nut. When foreign matter is trapped between the core and plug-nut, the core assembly will rock back and forth at 60 hertz. Eventually, the core and plug-nut face will be distorted, at which time the noise can continue even though the foreign material may have been flushed or removed from the valve. Solution: Replace damaged parts entirely, clean and reassemble. 3. Solenoid noise due to damaged coil. On rare occasions, a severe voltage spike or over voltage can potentially short a small portion of the coil winding. This shorting can cause solenoid noise and coil overheating. However, it would normally lead to rapid coil burnout. The solenoid parts, however, could be damaged enough that the noise would continue even after the coil was replaced due to the deformation produced during the peening process. 4. Missing solenoid parts can severely weaken the magnetic circuit. This can produce a solenoid noise condition. As discussed above, it will probably also result in coil burn-out. Solution: Replace damaged parts, replace lost parts, clean and reassemble. In general, when a noise condition has been encountered, the source of the problem should be determined and eliminated. The valve should then be thoroughly inspected to insure that it is yet repairable. Most times, simple installation of a spare parts kit and a solenoid base sub assembly can restore a valve to like new condition. The restored and reinstalled solenoid valve should be tested to insure proper operation, and a voltage check should be made at the solenoid valve while the valve is energized. In addition, a current reading can be obtained and compared with catalog specifications to verify normal solenoid and coil operation. Note: The coil may have been damaged due to excessive current draw of at damaged shading coil within the solenoid valve. A partial rebuilding of a valve damaged by a noise condition can prove useless as the noise condition would continue. The entire valve should be dismantled and inspected and cleaned. All parts supplied in a spare parts kit should be installed. Further, and additional solenoid parts damaged by a noise condition such as a solenoid base sub assembly, should be replaced. Examine valve seating, pistons and the valve body to verify that they have not been damaged. Damage to major portions of the valve may make repairing the valve uneconomical. Should a noise condition be encountered, immediate action may prevent any damage to the solenoid valve itself. Installation & Maintenance Instructions SERIES OPEN-FRAME, GENERAL PURPOSE, WATERTIGHT/EXPLOSIONPROOF SOLENOIDS Form No.V6584R8 8003G 8202G INSTALLATION Ċ SERVICE NOTICE Ċ ASCO solenoid valves with design change letter G" or H" in the catalog number (ex. 8210G 1) have an epoxy encapsulated ASCO Red Hat II solenoid. This solenoid replaces some of the solenoids with metal enclosures and open-frame constructions. Follow these installation and maintenance instructions if your valve or operator uses this solenoid. See separate instructions for basic valve. Check nameplate for correct catalog number, service, and wattage. Check front of solenoid for voltage and frequency. WARNING: Electrical hazard from the accessibility of live parts. To prevent the possibility of death,Ăserious injury or property damage, install the open - frame solenoid in an enclosure. FOR BLACK ENCLOSURE TYPES 7 AND 9 ONLY DESCRIPTION Catalog numbers 8003G and 8202G are epoxy encapsulated pull-type solenoids. The green solenoid with lead wires and 1/2Ăconduit connection is designed to meet Enclosure Type 1-General Purpose, Type 2-Dripproof, Types 3 and 3S-Raintight, and Types 4 and 4X-Watertight. The black solenoid on catalog numbers prefixed EF" or EV" is designed to meet Enclosure Types 3 and 3S-Raintight, Types 4 and 4X-Watertight, Types 6 and 6P-Submersible, Type 7 (A, B, C & D) Explosionproof Class I, Division 1 Groups A, B, C, & D and Type 9 (E, F, & G)-Dust-Ignitionproof Class II, Division 1 Groups E, F & G. The Class II, Groups F & G Dust Locations designation is not applicable for solenoids or solenoid valves used for steam service or when a class H" solenoid is used. See Temperature Limitations section for solenoid identification and nameplate/retainer for service. When installed just as a solenoid and not attached to an ASCO valve, the core has a 0.250-28 UNF-2B tapped hole, 0.38 or 0.63 minimum full thread. NOTE: Catalog number prefix EV" denotes stainless steel construction. Catalog numbers 8202G1, 8202G3, 8202G5 and 8202G7 are epoxy encapsulated push-type, reverse-acting solenoids having the same enclosure types as previously stated for Catalog numbers 8003G1 and 8003G2. Series 8003G and 8202G solenoids are available in: Open-Frame Construction: The green solenoid may be supplied with 1/4 spade, screw or DIN terminals. (Refer to Figure 4) Panel Mounted Construction: These solenoids are specifically designed to be panel mounted by the customer through a panel having a .062 to .093 maximum wall thickness. Refer to Figure 1 and section on Installation of Panel Mounted Solenoid. Optional Features For Type 1 - General Purpose Construction Only Junction Box: This junction box construction meets Enclosure Types 2,3,3S,4, and 4X. Only solenoids with 1/4 spade or screw terminals may have a junction box. The junction box provides a 1/2 conduit connection, grounding and spade or screw terminal connections within the junction box (See Figure 5). DIN Plug Connector Kit No.K236034:Ă Use this kit only for solenoids with DIN terminals. The DIN plug connector kit provides a two pole with grounding contact DIN Type 43650 construction (See Figure 6). OPERATION Series 8003G - When the solenoid is energized, the core is drawn into the solenoid base sub-assembly. IMPORTANT: When the solenoid is de-energized, the initial return force for the core, whether developed by spring, pressure, or weight, must exert a minimum force to overcome residual magnetism created by the solenoid. Minimum return force for AC construction is 11 ounces, and 5 ounces for DC construction. Series 8202G - When the solenoid is energized, the disc holder assembly seats against the orifice. When the solenoid is de-energized , the disc holder assembly returns. IMPORTANT: Initial return force for the disc or disc holder assembly, whether developed by spring, pressure, or weight, must exert a minimum force to overcome residual magnetism created by the solenoid. Minimum return force is 1 pound, 5 ounces. MM All Rights Reserved. 50 Hanover Road, Florham Park, New Jersey 07932 CAUTION: To prevent fire or explosion, do not install solenoid and/or valve where ignition temperature of hazardous atmosphere is less than 165 C. On valves used for steam service or when a class H" solenoid is used, do not install in hazardous atmosphere where ignition temperature is less than 180C. See nameplate/retainer for service. NOTE: These solenoids have an internal non-resetable thermal fuse to limit solenoid temperature in the event that extraordinary conditions occur which could cause excessive temperatures. These conditions include high input voltage, a jammed core, excessive ambient temperature or a shorted solenoid, etc. This unique feature is a standard feature only in solenoids with black explosionproof/dust-ignitionproof enclosures (Types 7 & 9). CAUTION: To protect the solenoid valve or operator, install a strainer or filter, suitable for the service involved in the inlet side as close to the valve or operator as possible. Clean periodically depending on service conditions. See ASCO Series 8600, 8601, and 8602 for strainers. Temperature Limitations For maximum valve ambient temperatures, refer to chart. The temperature limitations listed, only indicate maximum application temperatures for field wiring rated at 90C. Check catalog number prefix and watt rating on nameplate to determine maximum ambient temperature. See valve installation and maintenance instructions for maximum fluid temperature. NOTE: For steam service, refer to Wiring section, Junction Box for temperature rating of supply wires. Temperature Limitations For Series 8003G or 8202G Solenoids for use on Valves Rated at 10.1, 11.6, 17.1, or 22.6 Watts Watt Rating Catalog Number Coil Prefix Class of Insulation Maximum Ambient Temp. 10.1 & 17.1 None, FB, KF, KP SC, SD, SF, & SP, F 125F (51.7C) 10.1 & 17.1 HB, HT, KB, KH, SS, ST, SU, H 140F (60C) 11.6 & 22.6 None, FB,KF, KP, SC, SD, SF, & SP. F 104F (40C) 11.6 & 22.6 HP, HT, KB, KH, SS, ST, SU, & SV H 104F (40C) Minimum ambient temperature -40 F (-40 C). Positioning This solenoid is designed to perform properly when mounted in any position. However, for optimum life and performance, the solenoid should be mounted vertically and upright to reduce the possibility of foreign matter accumulating in the solenoid base sub-assembly area. Wiring Wiring must comply with local codes and the National Electrical Code. All solenoids supplied with lead wires are provided with a grounding wire which is green or green with yellow stripes and a 1/2 conduit connection. To Printed in U.S.A. www.ascovalve.com Page 1 of 4 facilitate wiring, the solenoid may be rotated 360. For the watertight and explosionproof solenoid, electrical fittings must be approved for use in the approved hazardous locations. CAUTION: Cryogenic Applications - Solenoid lead wire insulation should not be subjected to cryogenic temperatures. Adequate lead wire protection and routing must be provided. Additional Wiring Instructions For Optional Features: Open-Frame solenoid with 1/4 spade terminals. For solenoids supplied with screw terminal connections use #12-18 AWG stranded copper wire rated at 90C or greater. Torque terminal block screws to 10 ± 2 in-lbs [1,0 ± 1,2 Nm]. A tapped hole is provided in the solenoid for grounding, use a #10-32 machine screw. Torque grounding screw to 15 - 20 in-lbs [1,7 - 2,3 Nm]. On solenoids with screw terminals, the socket head screw holding the terminal block to the solenoid is the grounding screw. Torque the screw to 15 - 20 in-lbs [1,7 - 2,3 Nm] with a 5/32 hex key wrench. Junction Box The junction box is used with spade or screw terminal solenoids only and is provided with a grounding screw and a 1/2 conduit connection. Connect #12-18 AWG standard copper wire only to the screw terminals. Within the junction box use field wire that is rated 90C or greater for connections. For steam service use 105C rated wire up to 50 psi or use 125C rated wire above 50 psi. After electrical hookup, replace cover gasket, cover, and screws. Tighten screws evenly in a crisscross manner. DIN Plug Connector Kit No.K236034 1. The open-frame solenoid is provided with DIN terminals to accommodate the plug connector kit. 2. Remove center screw from plug connector. Using a small screwdriver, pry terminal block from connector cover. 3. Use #12-18 AWG stranded copper wire rated at 90C or greater for connections. Strip wire leads back approximately 1/4 for installation in socket terminals. The use of wire-end sleeves is also recommended for these socket terminals. Maximum length of wire-end sleeves to be approximately 1/4.ĂTinning of the ends of the lead wires is not recommended. 4. Thread wire through gland nut, gland gasket, washer and connector cover. NOTE: Connector housing may be rotated in 90 increments from position shown for alternate positioning of cable entry. 5. Check DIN connector terminal block for electrical markings. Then make electrical hookup to terminal block according to markings on it. Snap terminal block into connector cover and install center screw. 6. Position connector gasket on solenoid and install plug connector. Torque center screw to 5 ± 1 in-lbs [0,6 ± 1,1 Nm]. NOTE: Alternating current (AC) and direct current (DC) solenoids are built differently. To convert from one to the other, it may be necessary to change the complete solenoid including the core and solenoid base sub-assembly, not just the solenoid. Consult ASCO. Installation of Solenoid Solenoids may be assembled as a complete unit. Tightening is accomplished by means of a hex flange at the base of the solenoid. Installation of Panel Mounted Solenoid (See Figure 1) 1. Disassemble solenoid following instruction under Solenoid Replacement then proceed. 2. Install solenoid base sub-assembly through customer panel. 3. Position spring washer on opposite side of panel over solenoid base sub-assembly. 4. Replace solenoid, nameplate/retainer and red cap. 5. Make electrical hookup, see Wiring section. Solenoid Temperature Standard solenoids are designed for continuous duty service. When the solenoid is energized for a long period, the solenoid becomes hot and can be touched by hand only for an instant. This is a safe operating temperature. MAINTENANCE WARNING: To prevent the possibility of death, serious injury or property damage, turn off electrical power, depressurize solenoid operator and/or valve, and vent fluid to a safe area before servicing. Cleaning All solenoid operators and valves should be cleaned periodically. The time between cleaning will vary depending on medium and service conditions. In general, if the voltage to the solenoid is correct, sluggish valve operation, excessive noise or leakage will indicate that cleaning is required. Clean strainer or filter when cleaning the valve. Preventive Maintenance Keep the medium flowing through the solenoid operator or valve as free from dirt and foreign material as possible. While in service, the solenoid operator or valve should be operated at least once a month to insure proper opening and closing. Depending on the medium and service conditions, periodic inspection of internal valve parts for damage or excessive wear is recommended. Thoroughly clean all parts. Replace any worn or damaged parts. Causes of Improper Operation Faulty Control Circuit: Check the electrical system by energizing the solenoid. A metallic click signifies that the solenoid is operating. Absence of the click indicates loss of power supply. Check for loose or blown fuses, open-circuited or grounded solenoid, broken lead wires or splice connections. Burned-Out Solenoid: Check for open-circuited solenoid. Replace if necessary. Check supply voltage; it must be the same as specified on nameplate/retainer and marked on the solenoid. Check ambient temperature and check that the core is not jammed. Low Voltage: Check voltage across the solenoid leads. Voltage must be at least 85% of rated voltage. Solenoid Replacement 1. Disconnect conduit, coil leads, and grounding wire. NOTE: Any optional parts attached to the old solenoid must be reinstalled on the new solenoid. For 3-way construction, piping or tubing must be removed from pipe adapter. 2. Disassemble solenoids with optional features as follows: Spade or Screw Terminals Remove terminal connections, grounding screw, grounding wire, and terminal block (screw terminal type only). NOTE: For screw terminals, the socket head screw holding the terminal block serves as a grounding screw. Junction Box Remove conduit and socket head screw (use 5/32 hex key wrench) from center of junction box. Disconnect junction box from solenoid. DIN Plug Connector Remove center screw from DIN plug connector. Disconnect DIN plug connector from adapter. Remove socket head screw (use 5/32 hex key wrench), DIN terminal adapter, and gasket from solenoid. 3. Snap off red cap from top of solenoid base sub-assembly. For 3-way construction with pipe adapter (Figure 3), remove pipe adapter, nameplate and solenoid. Omit steps 4 and 5. 4. Push down on solenoid. Then using a suitable screwdriver, insert blade between solenoid and nameplate/retainer. Pry up slightly and push to remove. NOTE: Series 8202G solenoids have a spacer between the nameplate/ retainer and solenoid. 5. Remove solenoid from solenoid base sub-assembly. 6. Reassemble in reverse order of disassembly. Use exploded views for identification and placement of parts. 7. Torque pipe adapter to 90 inch-pounds maximum [10,2 Nm maximum]. Then make up piping or tubing to pipe adapter on solenoid. Disassembly and Reassembly of Solenoids 1. Remove solenoid, see Solenoid Replacement. 2. Remove spring washer from solenoid base sub-assembly. For 3-way construction, remove plugnut gasket. 3. Unscrew solenoid base sub-assembly from valve body. 4. Remove internal solenoid parts for cleaning or replacement. Use exploded views for identification and placement of parts. 5. If the solenoid is part of a valve, refer to basic valve installation and maintenance instructions for further disassembly. 6. Torque solenoid base sub-assembly and adapter to 175±25 in-lbs [19,8±2,8 Nm]. ORDERING INFORMATION FOR ASCO SOLENOIDS When Ordering Solenoids for ASCO Solenoid Operators or Valves, order the number stamped on the solenoid. Also specify voltage and frequency. Page 2 of 4 Form No.V6584R8 50 Hanover Road, Florham Park, New Jersey 07932 www.ascovalve.com Torque Chart Part Name solenoid base sub-assembly & adapter pipe adapter Torque Value Inch-Pounds 175 ± 25 90 maximum Remove red cap and push solenoid down. Then pry here to lift nameplate/retainer and push to remove. Remove red cap and push solenoid down. Then pry here to lift nameplate/retainer and push to remove. red cap nameplate/ retainer grounding wire green or green with yellow stripes solenoid with 1/2 NPT finger washer .062 to .093 maximum thickness of panel for mounting core (AC) Torque Value Newton-Meters 19,8 ± 2,8 10,2 maximum 0.69 diameter mounting hole core (DC) Side View finger washer solenoid base sub-assembly Tapped hole in core 0.250-28 UNF-2B 0.63 minimum full thread (AC) 0.38 minimum full thread (DC) collar to face valve body 0.9375-26 UNS -2A thread Alternate Construction Panel Mount Figure 1. Series 8003G solenoids red cap Remove red cap and push solenoid down. Then pry here to lift nameplate/retainer and push to remove. nameplate/ retainer pipe adapter spacer plugnut gasket grounding wire green or green with yellow stripes solenoid with 1/2 NPT spring washer solenoid base sub-assembly bonnet washer core(small end up) solenoid base gasket plugnut assembly cutaway view to show positioning of retainer in gasket recess Without Adapter retainer gasket retainer adapter gasket stem disc disc holder assembly disc spring disc holder spring Figure 2. Series 8202G solenoids adapter Air Only Construction Vent to Atmosphere With Adapter Figure 3. 3-Way Construction Form No.V6584R8 50 Hanover Road, Florham Park, New Jersey 07932 www.ascovalve.com Page 3 of 4 Torque Chart Part Name terminal block screws socket head screw center screw Torque Value in Inch-Pounds 10 ± 2 15 - 20 5±1 Open-Frame Solenoid with Screw Terminals. Socket head screw is used for grounding. Open-Frame Solenoid with 1/4 Spade Terminals See torque chart above Torque Value in Newton-Meters 1,1 ± 0,2 1,7 - 2,3 0,6 ± 0,1 Open-Frame Solenoid with DIN Terminals Indicates parts supplied in Termination Module Kit No. K256104 gasket screw terminal adapter terminal block screw tapped hole for #10-32 grounding screw (not included) DIN terminal adapter socket head grounding screw (5/32 hex key wrench) socket head screw (5/32 hex key wrench) Figure 4. Open-frame solenoids Junction Box Solenoid with 1/4 Spade Terminals or Screw Terminals screw terminal block (see note) cover screw See torque chart above cover cover gasket grounding screw and cup washer junction box gasket Note: Junction box with screw terminals shown. With screw terminal block removed, remaining parts comprise the junction box for spade terminal construction. junction box with 1/2 conduit connection and grounding terminal socket head screw (5/32 hex key wrench) Figure 5. Junction box (optional feature) Open-Frame Solenoid with DIN Terminal Plug Conector DIN terminal adapter See torque chart above connector gland nut gasket gland gasket socket head screw (5/32 hex key wrench) Notes: 1. Connector cover may be rotated in 90 increments from position shown for alternate position of cable entry. 2. Refer to markings on DIN connector for proper electrical connections. Page 4 of 4 Indicates that these parts are included in DIN plug connector Kit No. K236034 gasket DIN connector terminal block (see note 2) washer center screw connector cover (see note 1) Figure 6. DIN plug connector kit No. K236034 (optional feature) 50 Hanover Road, Florham Park, New Jersey 07932 www.ascovalve.com Form No.V6584R8 50 Hanover Road Florham Park, New Jersey 07932 Tel. (973) 966-2000 Fax (973) 966 2628 1561 Columbia Highway Aiken, South Carolina 29801 Tel. (803) 641-9200 Fax (803) 641-9290 SCIENTIFIC 50 Hanover Road MMIl All Rights Reserved. Printed in U.S.A. Form No. V6950R5 Florham Park, New Jersey 07932 Tel. (973) 236-6160 Fax (973) 966 6461 50 Hanover Road, Florham Park, New Jersey 07932 www.ascovalve.com Page 1 of 2 ASCOMATICA S.A. de C.V. Bosques de Duraznos No. 65-1003A Fraccionamiento Bosques de las Lomas Delegacion Miguel Hildago Mexico, D.F. CP11700 Tel: (52)-55-5596-7741 Fax: (52)-55-5596-7719 ASCO Valve Canada P.O. Box 160 (Airport Road) Brantford, Ontario N3T 5M8 Tel: (519) 758-2700 Fax: (519)758-5540 ASCOTECH S.A. de C.V. Circuito Del Progreso No.27 Parque Industrial Progreso Mexicali, B.C. Mexico Tel: (011)-52-686-559-8500 Fax: (011)-52-686-559-8548 MMIl All Rights Reserved. 50 Hanover Road, Florham Park, New Jersey 07932 www.ascovalve.com Printed in U.S.A. Form No. 6950R5 Page 2 of 2 Innovative Liquid Vaporizing and Gas Mixing Solutions WARRANTY REGISTRATION Type of Equipment: Serial Number: ASDI Sales Order #: Order Date: Purchased By: To help us give you better service, please fill out this warranty registration form and return it to ASDI to register your purchase and for follow up on the performance of ASDI equipment. We are dedicated to producing a quality product and if a problem occurs, ASDI wants to know about it. Please help us with a small amount of information about your company and how the equipment will be used. When contacting ASDI, please have the type of equipment and the serial number handy so we can give you accurate information. If you have had any kind of problem with this equipment, or you have any comments, please attach a separate sheet to this form. Keep a copy for your records. End Customer/Company Name: Address: Tel: City: Fax: State: Zip: Name of individual to contact for follow up information: Title: Usage - Circle one: Base Load Standby System Peak Shaving Other: In what application is the equipment being used? When was the equipment put in service? Note: If you have more than one piece of ASDI equipment, fill out one warranty sheet and staple the others to it, ASDI will do the rest. 151 South Michigan Street, Tel: 206.789..5410 E-mail: [email protected] Seattle, Washington, 98108, USA Fax: 206.789.5414 Internet: www.algas-sdi.com Algas-SDI International, LLC 151 South Michigan Street Seattle, Washington 98108 USA Ph.: 1.206.789.5410 Fax.: 1.206.789.5414 www.algas-sdi.com ">
/
डाउनलोड
बस एक दोस्ताना अनुस्मारक. आप दस्तावेज़ को यहीं देख सकते हैं. लेकिन सबसे महत्वपूर्ण बात यह है कि हमारे AI ने इसे पहले ही पढ़ लिया है. यह जटिल चीजों को सरल शब्दों में समझा सकता है, किसी भी भाषा में आपके सवालों के जवाब दे सकता है, और सबसे लंबे या सबसे जटिल दस्तावेजों को भी जल्दी से नेविगेट करने में आपकी मदद कर सकता है.
विज्ञापन