Pubblicità
Pubblicità
MOTOMAN-HP20D MAINTENANCE MANUAL TYPE: YR-HP0020D-A00 (STANDARD SPECIFICATION FOR DX100) YR-HP0020D-B00 (ZEROING SPECIFICATIONS FOR DX100) YR-HP0020D-A10 (LONG U-ARM, 6kg PAYLOAD SPECIFICATION) Procedures described in this maintenance manual should be carried out by the person who took the maintenance-relevant trainings offered by YASKAWA. Upon receipt of the product and prior to initial operation, read these instructions thoroughly, and retain for future reference. MOTOMAN INSTRUCTIONS MOTOMAN-HP20D INSTRUCTIONS DX100 INSTRUCTIONS DX100 OPERATOR’S MANUAL DX100 MAINTENACE MANUAL The DX100 operator’s manual above corresponds to specific usage. Be sure to use the appropriate manual. 159281-1CD 3 YASKAWA ELECTRIC CORPORATION MANUAL NO. HW1480357 5 1/91 HW1480357 HP20D Contents 1 Introduction ..................................................................................................................................... 1-1 2 Notes for Maintenance .................................................................................................................... 2-1 2.1 Wrist Unit ........................................................................................................................... 2-1 2.2 Encoder Connector (with CAUTION Label) ....................................................................... 2-2 2.2.1 Battery Pack Connection for S-, L-, and U-axis Motors ........................................ 2-2 2.2.2 Battery Pack Connection for R-, B-, and T-axis Motors........................................ 2-2 3 Home Position Return ..................................................................................................................... 3-1 3.1 Home Position Return after Motor Replacement ............................................................... 3-1 3.1.1 Home Position Return by Zeroing Function.......................................................... 3-1 3.1.2 Home Position Return by Robot Calibration (MOTOCALV EG) ........................... 3-1 3.1.3 Home Position Return by Setting Teaching Point for Home Position Setting before Motor Replacement ................................................................................... 3-2 3.1.3.1 Preparation before Motor Replacement .................................................. 3-2 3.1.3.2 Motor Replacement ................................................................................. 3-4 3.1.3.3 Home Position Adjustment ...................................................................... 3-5 3.2 Home Position Return in Case of Exhaustion of Robot-Axis Motor Battery....................... 3-6 3.2.1 Home Position Return at the Time of Battery Backup by Using the Function: Home Position Calibration Function for Restoration............................................. 3-6 3.2.2 Home Position Return by Keys (for S-, L-, U-, and R-Axes)................................. 3-6 3.2.2.1 Calibration Operation............................................................................... 3-6 4 Grease Replenishment and Exchange ........................................................................................... 4-1 4.1 Notes on Grease Replenishment and Exchange Procedures ........................................... 4-1 4.2 Grease Replenishment and Exchange for S-Axis Speed Reducer.................................... 4-2 4.2.1 Grease Replenishment (Refer to fig. 4-1 “S-Axis Speed Reducer” .) .................. 4-2 4.2.2 Grease Exchange (Refer to fig. 4-1 “S-Axis Speed Reducer” .) .......................... 4-3 4.3 Grease Replenishment and Exchange for L-Axis Speed Reducer .................................... 4-4 4.3.1 Grease Replenishment (Refer to fig. 4-2 “L-Axis Speed Reducer” .) .................. 4-4 4.3.2 Grease Exchange (Refer to fig. 4-2 “L-Axis Speed Reducer” .) .......................... 4-5 4.4 Grease Replenishment and Exchange for U-Axis Speed Reducer ................................... 4-6 4.4.1 Grease Replenishment (Refer to fig. 4-3 “U-Axis Speed Reducer” .).................. 4-6 4.4.2 Grease Exchange (Refer to fig. 4-3 “U-Axis Speed Reducer” .).......................... 4-7 4.5 Grease Replenishment for R-Axis Speed Reducer ........................................................... 4-8 4.6 Grease Replenishment for B- and T-Axis Speed Reducers .............................................. 4-9 4.7 Grease Replenishment for T-Axis Gear........................................................................... 4-10 4.8 Grease Replenishment for R-Axis Cross Roller Bearing ................................................. 4-11 ii HW1480357 2/91 HW1480357 HP20D Contents 5 Disassembly and Reassembly of Motors........................................................................................ 5-1 5.1 Disassembly and Reassembly of S-Axis Motor ................................................................. 5-1 5.2 Disassembly and Reassembly of L-Axis Motor ................................................................. 5-4 5.3 Disassembly and Reassembly of U-Axis Motor................................................................. 5-6 5.4 Disassembly and Reassembly of R-Axis Motor................................................................. 5-8 5.5 Disassembly and Reassembly of B-Axis Motor ............................................................... 5-11 5.6 Disassembly and Reassembly of T-Axis Motor ............................................................... 5-13 6 Disassembly and Reassembly of Speed Reducer.......................................................................... 6-1 6.1 Disassembly and Reassembly of S-Axis Speed Reducer ................................................. 6-1 6.2 Disassembly and Reassembly of L-Axis Speed Reducer.................................................. 6-3 6.3 Disassembly and Reassembly of U-Axis Speed Reducer ................................................. 6-5 6.4 Disassembly and Reassembly of R-Axis Speed Reducer ................................................. 6-7 6.5 Disassembly and Reassembly of B-Axis Speed Reducer ................................................. 6-9 6.6 Disassembly and Reassembly of T-Axis Speed Reducer ............................................... 6-12 7 Disassembly and Reassembly of Wrist Unit ................................................................................... 7-1 8 Disassembly, Reassembly, and Adjustment of B- and T-axis Timing Belts.................................... 8-1 8.1 Disassembly and Reassembly of B- and T-axis Timing Belts ........................................... 8-1 8.2 Adjustment of Timing Belts ................................................................................................ 8-3 8.2.1 B-Axis ................................................................................................................... 8-3 8.2.2 T-Axis ................................................................................................................... 8-3 9 Battery Pack Replacement ............................................................................................................. 9-1 10 Cable Wiring ............................................................................................................................... 10-1 10.1 Disconnecting Cables .................................................................................................... 10-1 10.1.1 Cables in Wrist Unit .......................................................................................... 10-1 10.1.2 Cables in U-Arm ............................................................................................... 10-3 10.1.3 Cables in S-Head ............................................................................................. 10-6 10.2 Connecting Cables ........................................................................................................ 10-9 10.2.1 Cables in S-Head ............................................................................................. 10-9 10.2.2 Cables in U-Arm ............................................................................................. 10-10 10.2.3 Cables in Wrist Unit ........................................................................................ 10-11 11 Parts List ..................................................................................................................................... 11-1 iii HW1480357 3/91 HW1480357 HP20D Contents 11.1 S-Axis Unit ..................................................................................................................... 11-1 11.2 L-Axis Unit...................................................................................................................... 11-3 11.3 U-Axis Unit ..................................................................................................................... 11-5 11.4 R-Axis Unit ..................................................................................................................... 11-7 11.5 Wrist Unit ..................................................................................................................... 11-10 iv HW1480357 4/91 HW1480357 1 Introduction HP20D 1 Introduction MANDATORY • This maintenance manual is intended to explain maintenance procedures primarily for the MOTOMAN-HP20D. • General items related to safety are listed in Chapter 1: Safety of the DX100 Instructions. To ensure correct and safe operation, carefully read the DX100 instructions before reading this manual. CAUTION • Some drawings in this manual are shown with the protective covers or shields removed for clarity. Be sure all covers and shields are replaced before operating and maintenance this product. • The drawings and photos in this manual are representative examples and differences may exist between them and the delivered product. • YASKAWA may modify this model without notice when necessary due to product improvements, modifications, or changes in specifications. If such modification is made, the manual number will also be revised. • If your copy of the manual is damaged or lost, contact a YASKAWA representative to order a new copy. The representatives are listed on the back cover. Be sure to tell the representative the manual number listed on the front cover. • YASKAWA is not responsible for incidents arising from unauthorized modification of its products. Unauthorized modification voids your product's warranty. 1-1 HW1480357 5/91 HW1480357 1 Introduction HP20D Notes for Safe Operation Read this manual carefully before installation, operation, maintenance, or inspection of the DX100. In this manual, the Notes for Safe Operation are classified as “WARNING”, “CAUTION”, “MANDATORY”, or “PROHIBITED”. Indicates an imminent hazardous situation which, if not avoided, could result in death or serious injury to personnel. DANGER Indicates a potentially hazardous situation which, if not avoided, could result in death or serious injury to personnel. WARNING Indicates a potentially hazardous situation which, if not avoided, could result in minor or moderate injury to personnel and damage to equipment. It may also be used to alert against unsafe practices. CAUTION Always be sure to follow explicitly the MANDATORY items listed under this heading. PROHIBITED Must never be performed. Even items described as “CAUTION” may result in a serious accident in some situations. At any rate, be sure to follow these important items NOTE To ensure safe and efficient operation at all times, be sure to follow all instructions, even if not designated as “CAUTION” and “WARNING”. DANGER • Maintenance and inspection must be performed by specified personnel. Failure to observe this caution may result in electric shock or injury. • For disassembly or repair, contact your Yaskawa representative. • Do not remove the motor, and do not release the brake. Failure to observe these safety precautions may result in death or serious injury from unexpected turning of the manipulator's arm. 1-2 HW1480357 6/91 HW1480357 1 Introduction HP20D WARNING • Before operating the manipulator, check that servo power is turned OFF pressing the emergency stop buttons on the front door of the DX100 and the programming pendant. When the servo power is turned OFF, the SERVO ON LED on the programming pendant is turned OFF. Injury or damage to machinery may result if the emergency stop circuit cannot stop the manipulator during an emergency. The manipulator should not be used if the emergency stop buttons do not function. Fig. : Emergency Stop Button • Once the emergency stop button is released, clear the cell of all items which could interfere with the operation of the manipulator. Then turn the servo power ON. Injury may result from unintentional or unexpected manipulator motion. Fig. : Release of Emergency Stop TURN • Observe the following precautions when performing teaching operations within the P-point maximum envelope of the manipulator: – Be sure to use a lockout device to the safeguarding when going inside. Also, display the sign that the operation is being performed inside the safeguarding and make sure no one closes the safeguarding. – View the manipulator from the front whenever possible. – Always follow the predetermined operating procedure. – Keep in mind the emergency response measures against the manipulator’s unexpected motion toward you. – Ensure that you have a safe place to retreat in case of emergency. Improper or unintended manipulator operation may result in injury. • Confirm that no person is present in the P-point maximum envelope of the manipulator and that you are in a safe location before: – Turning ON the power for the DX100. – Moving the manipulator with the programming pendant. – Running the system in the check mode. – Performing automatic operations. Injury may result if anyone enters the P-point maximum envelope of the manipulator during operation. Always press an emergency stop button immediately if there is a problem. The emergency stop buttons are located on the right of front door of the DX100 and the programming pendant. 1-3 HW1480357 7/91 HW1480357 1 Introduction HP20D CAUTION • Perform the following inspection procedures prior to conducting manipulator teaching. If problems are found, repair them immediately, and be sure that all other necessary processing has been performed. – Check for problems in manipulator movement. – Check for damage to insulation and sheathing of external wires. • For the DX100, always return the programming pendant to the hook on the cabinet of the DX100 after use. For the FS100, always return the programming pendant to a safe place after use. The programming pendant can be damaged if it is left in the manipulator's work area, on the floor, or near fixtures. • Read and understand the Explanation of Warning Labels in the DX100 Instructions before operating the manipulator: 1-4 HW1480357 8/91 HW1480357 1 Introduction HP20D Definition of Terms Used Often in This Manual The MOTOMAN is the YASKAWA industrial robot product. The MOTOMAN usually consists of the manipulator, the controller, the programming pendant, and supply cables. In this manual, the equipment is designated as follows: Equipment Manual Designation DX100 controller DX100 DX100 programming pendant Programming pendant Cable between the manipulator and the controller Manipulator cable Registered Trademark In this manual, names of companies, corporations, or products are trademarks, registered trademarks, or bland names for each company or corporation. The indications of (R) and TM are omitted. 1-5 HW1480357 9/91 HW1480357 1 Introduction HP20D Explanation of Warning Labels The following warning labels are attached to the manipulator. Always follow the warnings on the labels. Also, an identification label with important information is placed on the body of the manipulator. Prior to operating the manipulator, confirm the contents. Fig. : Warning Label Locations Warning label B Warning label A Warning label B Nameplate Nameplate Warning Label A: WARNING MODEL MOTOMANTYPE kg ORDER NO. Moving parts may cause injury MASS PAYLOAD kg DATE SERIAL NO. YASKAWA ELECTRIC CORPORATION 2-1 Kurosakishiroishi, Yahatanishi-ku, Kitakyushu 806-0004 Japan MADE IN JAPAN NJ3247 Warning Label B: WARNING Do not enter robot work area. 1-6 HW1480357 10/91 HW1480357 2 2.1 HP20D 2 Notes for Maintenance Wrist Unit Notes for Maintenance NOTE • When performing maintenance such as replacement of a wire harness in the manipulator, the encoder connector may be necessary to be removed. In this case, be sure to connect the battery pack to the battery backup connector before removing the encoder connector. Removing the encoder connector without connecting the battery pack leads to disappearance of the encoder absolute data. • Do not remove the battery pack in the connector base. 2.1 Wrist Unit • Refer to fig. 2-1 “Wrist Unit” . The motor and encoder unit are provided to the wrist unit. The matching surfaces of the wrist cover and the wrist unit are sealed with sealing bond to prevent fumes from penetrating into the wrist unit. After removing the wrist cover, make sure to reapply sealing bond (ThreeBond 1206C). Fig. 2-1: Wrist Unit Cover Cover matching surface Cover Cover matching surface 2-1 HW1480357 11/91 HW1480357 2 2.2 HP20D 2.2 Notes for Maintenance Encoder Connector (with CAUTION Label) Encoder Connector (with CAUTION Label) Before disconnecting the encoder connector (with CAUTION label), connect the battery pack to the motor referring to fig. 2-2 “Battery Pack Connection” . 2.2.1 Battery Pack Connection for S-, L-, and U-axis Motors The connectors (crimped contact-pin) for the battery backup are installed at the end point of the motor (BAT and OBT are marked). Connect the battery pack according to the following procedure. 1. Remove the caps attached to the battery backup connectors of the motor. 2. Connect the battery pack (HW9470932-A) with the battery backup connectors located at the end point of the encoder cable. (Under this condition, remove the encoder connector and carry out the maintenance checks.) 3. After the maintenance check, confirm that all the connectors are connected, then remove the battery pack. Install the caps attached to the battery backup connectors of the motor. 2.2.2 Battery Pack Connection for R-, B-, and T-axis Motors The connectors (crimped contact-pin) for the battery backup are installed at the end point of the encoder cables for the motor (BAT and OBT are marked). Connect the battery pack according to the following procedure. 1. Connect the battery pack (HW9470932-A) with the battery backup connectors located at the end point of the encoder cable. (Under this condition, remove the encoder connector and carry out the maintenance checks.) 2. After the maintenance check, confirm that all the connectors are connected, then remove the battery pack. 2-2 HW1480357 12/91 HW1480357 2 2.2 HP20D Notes for Maintenance Encoder Connector (with CAUTION Label) Fig. 2-2: Battery Pack Connection Motor S-, L-, U-axis motor Encoder connector CAUTION Motor power connector Connect battery to encoder to save the data before removing connector. CAUTION label 0BT b a 0BT1 BAT a b BAT1 Battery pack (HW9470932-A) Battery backup connector a: Crimped contact-pin (pin) b: Crimped contact-pin (socket) Encoder R-, B-, T-axis motor Motor Motor cable, etc. Internal wire Power connector a 0BT1 0BT b BAT a b BAT1 CAUTION Connect battery to encoder to save the data before removing connector. Encoder connector Battery pack (HW9470932-A) Battery backup connector CAUTION label CAUTION Label (Enlarged View) CAUTION 0BT b a 0BT1 BAT a b BAT1 a: Crimped contact-pin (pin) b: Crimped contact-pin (socket) Connect battery to encoder to save the data before removing connector. 2-3 HW1480357 13/91 HW1480357 3 3.1 HP20D 3 Home Position Return Home Position Return after Motor Replacement Home Position Return Perform calibration and set the manipulator position in one of the following cases: • The combination of the MOTOMAN and the control unit is changed. • The motor or absolute encoder is replaced. • Stored memory is cleared. NOTE • The home position is deviated by hitting the MOTOMAN against a workpiece, etc. • The main parts of the speed reducer, etc. are replaced or disassembled and reassembled. When performing calibration, be sure to satisfy the following conditions: • No external force is applied to the manipulator. • The hand and the other parts of the wrist unit are removed. 3.1 3.1.1 Home Position Return after Motor Replacement Home Position Return by Zeroing Function The zeroing function is an optional function which automatically allows the restoration of the home position data when the manipulator’s home position data disappears. For the details of this function, refer to “INSTRUCTIONS FOR ZEROING FUNCTION”. 3.1.2 Home Position Return by Robot Calibration (MOTOCALV EG) The MOTOCALV EG allows the home position reset by teaching the fivepoint-in-five-posture. Refer to “MOTOCALV EG for Windows Operator’s Manual” (manual No. HW0483085) for details on the operation. 3-1 HW1480357 14/91 HW1480357 HP20D 3 3.1 Home Position Return Home Position Return after Motor Replacement 3.1.3 Home Position Return by Setting Teaching Point for Home Position Setting before Motor Replacement The DX100 holds the position data of the job program (hereinafter called JOB) as the pulse number from the home position of each axis. Thus, by adjusting the home position precisely, the JOB used before motor replacement can be used after the replacement without correction. This section explains how to set the DX100. 3.1.3.1 Preparation before Motor Replacement • Refer to the fig. 3-1 “Preparation before Motor Replacement (Example)” . Before motor replacement, create the standard position (hereinafter called the check-point) for home position adjustment after the replacement. The check-point must satisfy the conditions below. Furthermore, create the JOB so that the manipulator safely moves to the check-point from the standby position. (The JOB created in this manner will be hereinafter called the check-JOB.) 1 The position should not be deviated by turning the power ON or OFF, or lowering air pressure. Do not create the check point in the working part of the tool (end effecter) or the jigs (related unit including the rotary table). It is recommended to use a specific jig if necessary. Use pointed jigs to create the position so that the deviation is easily found. Keep a distance as long as possible from the rotational center of the replacing axis. 2 3 Considering the moving direction of the replacing axis, create the position at the point where any deviation is easily found and the axis will not interfere with jigs even if it is deviated. 3-2 HW1480357 15/91 HW1480357 HP20D 3 3.1 Home Position Return Home Position Return after Motor Replacement Example of Check-Point Creation when Replacing U-Axis’s Motor of HP20D-A00 • The check-point cannot be created unless each axis operates. Thus, the check-point cannot be created if the axis does not move because of failure. Therefore, it is recommended to create the check-point for each axis under normal operating conditions. Next, check the home position of the axis whose motor will be replaced. Refer to the position screen, and move the axis to the 0pulse position, the home position. Then, check the position of the home position mark. If it is deviated, adjust it. The U-axis of YR-HP0020D-A00 is shown below as an example. Fig. 3-1: Preparation before Motor Replacement (Example) Home position mark 3-3 HW1480357 16/91 HW1480357 HP20D 3.1.3.2 3 3.1 Home Position Return Home Position Return after Motor Replacement Motor Replacement • Refer to the fig. 3-2 “Motor Replacement (Example)” . CAUTION • Since the motor is removed, the manipulator cannot keep its posture during motor replacement. When replacing the motor, hold the manipulator arm with the chain block, etc. Failure to observe this caution may cause a hazardous condition. Replace the motor with due care. The U-axis of YR-HP0020D-A00 is shown below as an example. Fig. 3-2: Motor Replacement (Example) Chain block Hanging tool Remove the motor and replace it. 3-4 HW1480357 17/91 HW1480357 HP20D 3.1.3.3 3 3.1 Home Position Return Home Position Return after Motor Replacement Home Position Adjustment After motor replacement, move the axis to the position of the home position mark. Perform the home position calibration only to the axis whose motor was replaced. (For more information, refer to “DX100 INSTRUCTIONS” (manual No. RECTO-A215).) Move the axis to the check-point by the check-JOB. (Be careful when moving the axis so that the manipulator does not interfere with jigs.) Move only the axis whose motor was replaced to correct the deviation from the check-point created before calibration. Display the position screen (COMMAND POSITION). The values of the U-axis is shown below as an example. By using the above values, calculate the amount of deviation. (Subtract the CMD (command value) from the CURR (current value).) CURR - CMD = the amount of deviation U (-3067) - (-2989) = -78 Perform stepping back, etc. of the check JOB to move the axis whose motor was replaced to the position where the axis will not interfere with jigs when it moves to the home position. (Be careful when moving the axis so that the manipulator does not interfere with jigs.) Refer to the position screen, and move the axis to the pulse position equal to the amount of deviation. An example is shown below. At this position, perform the home position calibration only for the axis whose motor was replaced. (For more information, refer to “DX100 INSTRUCTIONS” (manual No. RECTO-A215).) Move the axis again to the check-point by the check-JOB. Check if the axis is at the check-point created before the operation. (If it is deviated, repeat the adjustment procedures.) Perform an operation check by using the JOB used before motor replacement. If no problem is found, write down the modified home position data (ABSO data) and the date in the label on the inside of the DX100. 3-5 HW1480357 18/91 HW1480357 3 3.2 HP20D 3.2 3.2.1 Home Position Return Home Position Return in Case of Exhaustion of Robot-Axis Motor Battery Home Position Return in Case of Exhaustion of Robot-Axis Motor Battery Home Position Return at the Time of Battery Backup by Using the Function: Home Position Calibration Function for Restoration To start the home position calibration function for restoration, move the manipulator to the posture close to the home position (within one motor rotation), then execute the software program “Backup alarm restoration” on the programming pendant. The home position return by this function updates the multi-turn data for motor. 3.2.2 Home Position Return by Keys (for S-, L-, U-, and R-Axes) To enable the home position return by using keys, write down the differential pulse between the key position and the default home position on the home position label on the inside of the DX100. If the home position data disappears, move the manipulator to the key position. Then, as the home position, set the position where the above differential pulse is added to the key position. 3.2.2.1 Calibration Operation The parts in table 3-1 “Parts List” are required for calibration. Prepare them before calibration operation. Table 3-1: Parts List Drawing No. Name Qty. Remark HW1408504-1 Shaft 1 For S-, L-, and Uaxes HW2402221-1 Shaft 1 For R-axis S-Axis Positioning As shown in fig. 3-3 “S-Axis Positioning” , insert the shaft HW1408504-1 in the hole ( 6 +0.012 dia. ) on the S-head. Then, perform positioning with 0 the programming pendant so that the shaft fits into the hole on the base. Fig. 3-3: S-Axis Positioning S-head Shaft Base 3-6 HW1480357 19/91 HW1480357 3 3.2 HP20D Home Position Return Home Position Return in Case of Exhaustion of Robot-Axis Motor Battery L-Axis Positioning As shown in fig. 3-4 “L-Axis Positioning” , insert the shaft HW1408504-1 in the hole ( 6 +0.012 dia. ) on the S-head. Then, perform positioning with 0 the programming pendant so that the shaft fits into the hole on the L-arm. Fig. 3-4: L-Axis Positioning L-arm Shaft S-head U-Axis Positioning As shown in fig. 3-5 “U-Axis Positioning” , insert the shaft HW1408504-1 in the hole ( 6 +0.012 dia. ) on the casing. Then, perform positioning with 0 the programming pendant so that the shaft fits into the hole on the L-arm. Fig. 3-5: U-Axis Positioning Casing Shaft L-arm 3-7 HW1480357 20/91 HW1480357 3 3.2 HP20D Home Position Return Home Position Return in Case of Exhaustion of Robot-Axis Motor Battery R-Axis Positioning As shown in fig. 3-6 “R-Axis Positioning” , insert the shaft HW2402221-1 in the hole ( 4 +0.012 dia. ) on the U-arm. Then, perform positioning with 0 the programming pendant so that the shaft fits into the hole on the casing. Fig. 3-6: R-Axis Positioning U-arm Shaft Casing 3-8 HW1480357 21/91 HW1480357 4 4.1 HP20D 4 Grease Replenishment and Exchange Notes on Grease Replenishment and Exchange Procedures Grease Replenishment and Exchange 4.1 Notes on Grease Replenishment and Exchange Procedures Make sure to follow the instructions listed below at grease replenishment or exchange. Failure to observe the following notes may result in damage to the motor or speed reducer. • If grease is added without removing the plug or screw from grease exhaust port, grease will leak inside a motor or an oil seal of a speed reducer will come off, which may result in damage to the motor. Make sure to remove the plug. NOTE • Do not install a joint, a hose, etc. to the grease exhaust port. Failure to observe this instruction may result in damage to the motor due to coming off of an oil seal. • Make sure to use a grease pump to inject grease. Set air supply pressure to the grease pump at 0.3 MPa or less, and the grease injection rate at 8 g/s or less. • Make sure to fill the hose on the grease inlet with grease beforehand to prevent air from leaking into the speed reducer. 4-1 HW1480357 22/91 HW1480357 4 4.2 HP20D 4.2 Grease Replenishment and Exchange Grease Replenishment and Exchange for S-Axis Speed Reducer Grease Replenishment and Exchange for S-Axis Speed Reducer Fig. 4-1: S-Axis Speed Reducer Grease exhaust port (Hexagon socket head plug PT1/8) Grease inlet (Hexagon socket head plug PT1/8) NOTE 4.2.1 S-axis speed reducer For ceiling mounted manipulators, the exhaust port and the grease inlet are inverted. Grease Replenishment (Refer to fig. 4-1 “S-Axis Speed Reducer” .) 1. Remove the hexagon socket head plugs from the grease inlet and the grease exhaust port. NOTE If grease is injected with the plug on, grease will leak inside the motor and may cause a damage. Make sure to remove the plug before grease injection. 2. Install the grease zerk PT1/8 to the grease inlet. (The grease zerk is delivered with the manipulator.) 3. Inject grease through the grease inlet using a grease gun. – Grease type: VIGO Grease RE No.0 – Amount of grease: 30 cc (60 cc for 1st supply) – Air supply pressure of grease pump: 0.3 MPa or less – Grease injection rate: 8 g/s or less 4. Move the S-axis for a few minutes to discharge excess grease. 4-2 HW1480357 23/91 HW1480357 HP20D 4 4.2 Grease Replenishment and Exchange Grease Replenishment and Exchange for S-Axis Speed Reducer 5. Remove the grease zerk from the grease inlet and reinstall the plug. Apply ThreeBond 1206C to the thread part of the plug, and tighten the plug with a tightening torque of 5 N•m (0.51 kgf•m). 6. Wipe the discharged grease with a cloth, and reinstall the plug on the grease exhaust port. Apply ThreeBond 1206C to the thread part of the plug, and tighten the plug with a tightening torque of 5 N•m (0.51 kgf•m). 4.2.2 Grease Exchange (Refer to fig. 4-1 “S-Axis Speed Reducer” .) 1. Remove the hexagon socket head plugs from the grease inlet and the grease exhaust port. NOTE If grease is injected with the plug on, grease will leak inside the motor and may cause a damage. Make sure to remove the plug before grease injection. 2. Install the grease zerk PT1/8 to the grease inlet. (The grease zerk is delivered with the manipulator.) 3. Inject grease through the grease inlet using a grease gun. – Grease type: VIGO Grease RE No.0 – Amount of grease: approx. 1800 cc – Air supply pressure of grease pump: 0.3 MPa or less – Grease injection rate: 8 g/s or less 4. The grease exchange is completed when new grease appears in the exhaust port. (The new grease can be distinguished from the old grease by color.) 5. Move the S-axis for a few minutes to discharge excess grease. 6. Remove the grease zerk from the grease inlet and reinstall the plug. Apply ThreeBond 1206C to the thread part of the plug, and tighten the plug with a tightening torque of 5 N•m (0.51 kgf•m). 7. Wipe the discharged grease with a cloth, and reinstall the plug on the grease exhaust port. Apply ThreeBond 1206C to the thread part of the plug, and tighten the plug with a tightening torque of 5 N•m (0.51 kgf•m). 4-3 HW1480357 24/91 HW1480357 4 4.3 HP20D 4.3 Grease Replenishment and Exchange Grease Replenishment and Exchange for L-Axis Speed Reducer Grease Replenishment and Exchange for L-Axis Speed Reducer Fig. 4-2: L-Axis Speed Reducer Grease exhaust port (Hexagon socket head plug PT1/8) L-arm L-axis speed reducer Grease inlet (Hexagon socket head cap screw M6) 4.3.1 Grease Replenishment (Refer to fig. 4-2 “L-Axis Speed Reducer” .) 1. Make the L-arm vertical to the ground. 2. Remove the hexagon socket head cap screw from the grease inlet and the hexagon socket head plug from the grease exhaust port. NOTE If grease is injected with the plug on, grease will leak inside the motor and may cause a damage. Make sure to remove the plug before grease injection. 3. Install the grease zerk A-MT6 x 1 to the grease inlet. (The grease zerk is delivered with the manipulator.) 4. Inject grease through the grease inlet using a grease gun. – Grease type: VIGO Grease No.0 – Amount of grease: 30 cc (60 cc for 1st supply) – Air supply pressure of grease pump: 0.3 MPa or less – Grease injection rate: 8 g/s or less 5. Move the L-axis for a few minutes to discharge excess grease. 6. Remove the grease zerk from the grease inlet and reinstall the screw. Apply ThreeBond 1206C to the thread part of the screw, and tighten the screw with a tightening torque of 5 N•m (0.51 kgf•m). 7. Wipe the discharged grease with a cloth, and reinstall the plug on the grease exhaust port. Apply ThreeBond 1206C to the thread part of the plug, and tighten the plug with a tightening torque of 5 N•m (0.51 kgf•m). 4-4 HW1480357 25/91 HW1480357 HP20D 4.3.2 4 4.3 Grease Replenishment and Exchange Grease Replenishment and Exchange for L-Axis Speed Reducer Grease Exchange (Refer to fig. 4-2 “L-Axis Speed Reducer” .) 1. Make the L-arm vertical to the ground. 2. Remove the hexagon socket head cap screw from the grease inlet and the hexagon socket head plug from the grease exhaust port. NOTE If grease is injected with the plug on, grease will leak inside the motor and may cause a damage. Make sure to remove the plug before grease injection. 3. Install the grease zerk A-MT6 x 1 to the grease inlet. (The grease zerk is delivered with the manipulator.) 4. Inject grease through the grease inlet using a grease gun. – Grease type: VIGO Grease No.0 – Amount of grease: approx. 500 cc – Air supply pressure of grease pump: 0.3 MPa or less – Grease injection rate: 8 g/s or less 5. The grease exchange is completed when new grease appears in the exhaust port. (The new grease can be distinguished from the old grease by color.) 6. Move the L-axis for a few minutes to discharge excess grease. 7. Remove the grease zerk from the grease inlet and reinstall the screw. Apply ThreeBond 1206C to the thread part of the screw, and tighten the screw with a tightening torque of 5 N•m (0.51 kgf•m). 8. Wipe the discharged grease with a cloth, and reinstall the plug on the grease exhaust port. Apply ThreeBond 1206C to the thread part of the plug, and tighten the plug with a tightening torque of 5 N•m (0.51 kgf•m). 4-5 HW1480357 26/91 HW1480357 4 4.4 HP20D 4.4 Grease Replenishment and Exchange Grease Replenishment and Exchange for U-Axis Speed Reducer Grease Replenishment and Exchange for U-Axis Speed Reducer Fig. 4-3: U-Axis Speed Reducer U-arm Grease exhaust port (Hexagon socket head cap screw M6) U-axis speed reducer Grease inlet (Hexagon socket head plug PT1/8) NOTE 4.4.1 For ceiling mounted manipulators, the exhaust port and the grease inlet are inverted. Grease Replenishment (Refer to fig. 4-3 “U-Axis Speed Reducer” .) 1. Make the U-arm horizontal to the ground. 2. Remove the hexagon socket head plug from the grease inlet and the hexagon socket head cap screw from the grease exhaust port. NOTE If grease is injected with the plug on, grease will leak inside the motor and may cause a damage. Make sure to remove the plug before grease injection. 3. Install the grease zerk A-MT6 x 1 to the grease inlet. (The grease zerk is delivered with the manipulator.) 4. Inject grease through the grease inlet using a grease gun. – Grease type: VIGO Grease No.0 – Amount of grease: 30 cc (60 cc for 1st supply) – Air supply pressure of grease pump: 0.3 MPa or less – Grease injection rate: 8 g/s or less 5. Move the U-axis for a few minutes to discharge excess grease. 6. Remove the grease zerk from the grease inlet and reinstall the plug. Apply ThreeBond 1206C to the thread part of the plug, and tighten the plug with a tightening torque of 5 N•m (0.51 kgf•m). 7. Wipe the discharged grease with a cloth, and reinstall the screw on the grease exhaust port. Apply ThreeBond 1206C to the thread part of the screw, and tighten the screw with a tightening torque of 5 N•m (0.51 kgf•m). 4-6 HW1480357 27/91 HW1480357 HP20D 4.4.2 4 4.4 Grease Replenishment and Exchange Grease Replenishment and Exchange for U-Axis Speed Reducer Grease Exchange (Refer to fig. 4-3 “U-Axis Speed Reducer” .) 1. Make the U-arm horizontal to the ground. 2. Remove the hexagon socket head plug from the grease inlet and the hexagon socket head cap screw from the grease exhaust port. NOTE If grease is injected with the plug on, grease will leak inside the motor and may cause a damage. Make sure to remove the plug before grease injection. 3. Install the grease zerk A-MT6 x 1 to the grease inlet. (The grease zerk is delivered with the manipulator.) 4. Inject grease through the grease inlet using a grease gun. – Grease type: VIGO Grease RE No.0 – Amount of grease: approx. 300 cc – Air supply pressure of grease pump: 0.3 MPa or less – Grease injection rate: 8 g/s or less 5. The grease exchange is completed when new grease appears in the exhaust port. (The new grease can be distinguished from the old grease by color.) 6. Move the U-axis for a few minutes to discharge excess grease. 7. Remove the grease zerk from the grease inlet and reinstall the plug. Apply ThreeBond 1206C to the thread part of the plug, and tighten the plug with a tightening torque of 5 N•m (0.51 kgf•m). 8. Wipe the discharged grease with a cloth, and reinstall the screw on the grease exhaust port. Apply ThreeBond 1206C to the thread part of the screw, and tighten the screw with a tightening torque of 5 N•m (0.51 kgf•m). 4-7 HW1480357 28/91 HW1480357 4 4.5 HP20D 4.5 Grease Replenishment and Exchange Grease Replenishment for R-Axis Speed Reducer Grease Replenishment for R-Axis Speed Reducer Fig. 4-4: R-Axis Speed Reducer Grease inlet (Grease zerk A-MT6 x 1) Exhaust port (Hexagon socket head cap screw M6) 1. Remove the hexagon socket head cap screw from the exhaust port. 2. Inject grease through the grease zerk A-MT6 x 1 on the grease inlet by using a grease gun. (See fig. 4-4 “R-Axis Speed Reducer” .) – Grease type: Harmonic Grease SK-1A – Amount of grease: 8 cc (16 cc for 1st supply) NOTE The exhaust port is used for air flow only. Do not inject excess grease through the grease inlet. 3. Reinstall the screw on the exhaust port. Apply ThreeBond 1206C to the thread part of the screw, and tighten the screw with a tightening torque of 5 N•m (0.51 kgf•m). 4-8 HW1480357 29/91 HW1480357 4 4.6 HP20D 4.6 Grease Replenishment and Exchange Grease Replenishment for B- and T-Axis Speed Reducers Grease Replenishment for B- and T-Axis Speed Reducers Fig. 4-5: B- and T-Axis Speed Reducers B-axis exhaust port (Plug LP-M5) T-axis speed reducer T-axis exhaust port (Hexagon socket set screw M6) B-axis speed reducer T-axis grease inlet (Hexagon socket head cap screw M6) B-axis grease inlet (Hexagon socket head cap screw M6) 1. Remove the hexagon socket head cap screw from the grease inlet and the plug LP-M5 or the hexagon socket set screw from the exhaust port. NOTE For the B-axis, remove the cover. 2. Install the grease zerk A-MT6 x 1 to the grease inlet. (The grease zerk is delivered with the manipulator.) 3. Inject grease through the grease inlet using a grease gun. (See fig. 4-5 “B- and T-Axis Speed Reducers” .) – Grease type: Harmonic Grease SK-1A – Amount of grease: B-axis: 10 cc (20 cc for 1st supply) T-axis: 5 cc (10 cc for 1st supply) NOTE The exhaust port is used for air flow only. Do not inject excess grease through the grease inlet. 4. Reinstall the plug or screw on the exhaust port. Apply ThreeBond 1206C to the thread part of the plug or screw. 5. Remove the grease zerk from the grease inlet and reinstall the screw. Apply ThreeBond 1206C to the thread part of the screw, and tighten the screw with a tightening torque of 5 N•m (0.51 kgf•m). NOTE For the B-axis, mount the cover. (Refer to chapter 2 “Notes for Maintenance” .) 4-9 HW1480357 30/91 HW1480357 4 4.7 HP20D 4.7 Grease Replenishment and Exchange Grease Replenishment for T-Axis Gear Grease Replenishment for T-Axis Gear Fig. 4-6: T-Axis Gear Exhaust port (Plug LP-M5) Gear grease inlet (Hexagon socket head cap screw M6) 1. Remove the hexagon socket head cap screw from the grease inlet and the plug LP-M5 from the exhaust port. 2. Install the grease zerk A-MT6 x 1 to the grease inlet. (The grease zerk is delivered with the manipulator.) 3. Inject grease through the grease inlet using a grease gun. (See fig. 4-6 “T-Axis Gear” .) – Grease type: Harmonic Grease SK-1A – Amount of grease: 5cc (10 cc for 1st supply) NOTE The exhaust port is used for air flow only. Do not inject excess grease through the grease inlet. 4. Reinstall the plug on the exhaust port. Apply ThreeBond 1206C to the thread part of the plug. 5. Remove the grease zerk from the grease inlet and reinstall the screw. Apply ThreeBond 1206C to the thread part of the screw, and tighten the screw with a tightening torque of 5 N•m (0.51 kgf•m). 4-10 HW1480357 31/91 HW1480357 4 4.8 HP20D 4.8 Grease Replenishment and Exchange Grease Replenishment for R-Axis Cross Roller Bearing Grease Replenishment for R-Axis Cross Roller Bearing Fig. 4-7: R-Axis Cross Roller Bearing Exhaust port (Plug LP-M5) R-axis cross roller bearing Grease inlet (Hexagon socket head cap screw M6 x 6) 1. Remove the hexagon socket head cap screw from the grease inlet and the plug LP-M5 from the exhaust port. 2. Install the grease zerk A-MT6 x 1 to the grease inlet. (The grease zerk is delivered with the manipulator.) 3. Inject grease through the grease inlet using a grease gun. (See fig. 4-7 “R-Axis Cross Roller Bearing” .) NOTE The exhaust port is used for air flow only. Do not inject excess grease through the grease inlet. 4. Reinstall the plug on the exhaust port. Apply ThreeBond 1206C to the thread part of the plug. 5. Remove the grease zerk from the grease inlet and reinstall the screw. Apply ThreeBond 1206C to the thread part of the screw, and tighten the screw with a tightening torque of 5 N•m (0.51 kgf•m). 4-11 HW1480357 32/91 HW1480357 5 5.1 HP20D 5 Disassembly and Reassembly of Motors Disassembly and Reassembly of S-Axis Motor Disassembly and Reassembly of Motors 5.1 Disassembly and Reassembly of S-Axis Motor • Refer to fig. 5-1 “Disassembly and Reassembly of S-Axis Motor” . NOTE • Refer to chapter 3 “Home Position Return” , chapter 4 “Grease Replenishment and Exchange” , and chapter 8 “Disassembly, Reassembly, and Adjustment of B- and Taxis Timing Belts” . • When replacing a motor, the backup battery does not need to be connected. • Remove old sealing bond on each part completely before reassembly. Disassembly 1. Turn OFF the DX100 power supply. 2. Connect the backup battery. (Refer to chapter 2 “Notes for Maintenance” .) 3. Disconnect the connector (signal, power) connected to the S-axis motor 1 . 4. Disconnect the power connector of the L-axis motor. Fix the connector on the motor side by using pliers, etc. when disconnecting the power connector. 5. Remove the GT-SA bolts 2 . Insert stud bolts M6 (length of the thread part: 30 mm or more) in the tapped holes M6 (2 holes) on the motor flange face. Screw the stud bolts in until the gap between the motor and the matching surface becomes 10 mm or more. Then, remove the S-axis motor 1 vertically from the M-base 5 . 6. Remove the hexagon socket head cap screw 6 , then remove the input gear 3 and the key 4 . Reassembly 1. Mount the key 4 and the input gear 3 on the S-axis motor 1 . (The key 4 is attached to the S-axis motor 1 .) 2. Put the conical spring washer on the hexagon socket head cap screw 6 , then apply Loctite 242 to the thread part of the screw. Then, tighten it with the tightening torque shown in table 5-1 “S-Axis Motor Parts Checklist” . 3. Apply ThreeBond 1206C on the matching surface between the flange face of the S-axis motor 1 and the M-base 5 . Then, mount the S-axis motor 1 on the M-base 5 . 4. Tighten the GT-SA bolts 2 with the tightening torque shown in table 5-1 “S-Axis Motor Parts Checklist” . 5. Connect the connector (signal, power) of the internal wiring harness 9 to the S-axis motor 1 . 5-1 HW1480357 33/91 HW1480357 HP20D 5 5.1 Disassembly and Reassembly of Motors Disassembly and Reassembly of S-Axis Motor 6. Connect the power connector of the L-axis motor. Fix the connector on the motor side by using pliers, etc. when connecting the power connector. 7. Remove the backup battery. 8. Turn ON the DX100 power supply. Table 5-1: S-Axis Motor Parts Checklist No. Name Qty. Notes 1 S-axis motor HW0387862-A 1 SGMRV-09ANA-YR11 2 GT-SA bolt M8 (length: 30 mm) 3 Tightening torque: 24.5 N•m 3 Input gear HW0313491-1 1 4 Key 1 5 M-base HW0305306-1 1 6 Hexagon socket head cap screw M6 (length: 60 mm) Conical spring washer 2H-6 1 Tightening torque: each 16.5 N•m 7 Cover HW0305809-1 1 8 Cross head APS bolt M5 (length: 10 mm) 4 9 Internal wiring harness 1 5-2 HW1480357 34/91 HW1480357 HP20D 5 5.1 Disassembly and Reassembly of Motors Disassembly and Reassembly of S-Axis Motor Fig. 5-1: Disassembly and Reassembly of S-Axis Motor 2 1 9 1 4 2 8 7 5 3 6 5-3 HW1480357 35/91 HW1480357 5 5.2 HP20D 5.2 Disassembly and Reassembly of Motors Disassembly and Reassembly of L-Axis Motor Disassembly and Reassembly of L-Axis Motor • Refer to fig. 5-2 “Disassembly and Reassembly of L-Axis Motor” . Disassembly 1. Turn OFF the DX100 power supply, then drain grease. 2. Connect the backup battery. (Refer to chapter 2 “Notes for Maintenance” .) 3. Disconnect the connector (signal, power, brake) of the internal wiring harness connected to the L-axis motor 1 . Fix the connector on the motor side by using pliers, etc. when disconnecting the power connector. 4. Support the L-arm with a chain block, etc. so that the L-arm does not rotate before removing the L-axis motor 1 . 5. Remove the hexagon socket head cap screws 2 . Insert stud bolts M4 (length of the thread part: 30 mm or more) in the tapped holes M4 (2 holes) on the flange face of the L-axis motor 1 . Screw the stud bolts in until the gap between the motor and the matching surface becomes 10 mm or more. Then, remove the L-axis motor 1 horizontally from the M-base 3 . At this time, be careful not to damage the oil seal inside the S-head. 6. Remove the hexagon socket head cap screw 6 , then remove the input gear 4 , the key 5 , and the plate 7 . Reassembly 1. Apply ThreeBond 1206C on the matching surface between the L-axis motor 1 and the plate 7 . Then, mount the plate 7 on the L-axis motor 1 . 2. Apply ThreeBond 1206C on the matching surface between the input gear 4 and the plate 7 . Then, mount the key 5 and the input gear 4 on the L-axis motor 1 . (The key 5 is attached to the L-axis motor 1 .) 3. Put the conical spring washer on the hexagon socket head cap screw 6 , then apply Loctite 242 to the thread part of the screw. Then, tighten it with the tightening torque shown in table 5-2 “L-Axis Motor Parts Checklist” . 4. Apply ThreeBond 1206C on the matching surface between the flange face of the L-axis motor 1 and the M-base 3 . Then, mount the L-axis motor 1 on the M-base 3 . At this time, be careful not to damage the oil seal inside the S-head. 5. Tighten the hexagon socket head cap screws 2 with the tightening torque shown in table 5-2 “L-Axis Motor Parts Checklist” . 6. Connect the connector (signal, power, brake) of the internal wiring harness to the L-axis motor 1 . Fix the connector on the motor side by using pliers, etc. when connecting the power connector. 7. Replenish grease (VIGO Grease RE No.0) through the grease inlet. 8. Remove the backup battery. 9. Remove the chain block, etc. which support the L-arm. 10. Turn ON the DX100 power supply. 5-4 HW1480357 36/91 HW1480357 HP20D 5 5.2 Disassembly and Reassembly of Motors Disassembly and Reassembly of L-Axis Motor Table 5-2: L-Axis Motor Parts Checklist No. Name Qty. Notes 1 L-axis motor HW0387863-A 1 SGMRV-13ANA-YR21 2 Hexagon socket head cap screw M8 (length: 25 mm) Conical spring washer 2H-8 4 Tightening torque: each 24.5 N•m 3 M-base HW0304229-1 1 4 Input gear HW0313492-1 1 5 Key 1 6 Hexagon socket head cap screw M6 (length: 90 mm) Conical spring washer 2H-6 1 Tightening torque: each 16.5 N•m 7 Plate HW0401506-1 1 Fig. 5-2: Disassembly and Reassembly of L-Axis Motor S-head 3 1 2 6 7 4 5 5-5 HW1480357 37/91 HW1480357 5 5.3 HP20D 5.3 Disassembly and Reassembly of Motors Disassembly and Reassembly of U-Axis Motor Disassembly and Reassembly of U-Axis Motor • Refer to fig. 5-3 “Disassembly and Reassembly of U-Axis Motor” . Disassembly 1. Turn OFF the DX100 power supply, then drain grease. 2. Connect the backup battery. (Refer to chapter 2 “Notes for Maintenance” .) 3. Remove the cross head APS bolts 9 , then remove the cover 8 . 4. Disconnect the connector (signal, power) of the internal wiring harness. 5. Support the U-arm with a chain block, etc. so that the U-arm does not rotate before removing the U-axis motor 1 . 6. Remove the GT-SA bolts 2 . Insert stud bolts M6 (length of the thread part: 30 mm or more) in the tapped holes M6 (2 holes) on the flange face of the U-axis motor 1 . Screw the stud bolts in until the gap between the motor and the matching surface becomes 10 mm or more. Then, remove the U-axis motor 1 horizontally from the casing. 7. Remove the hexagon socket head cap screw 5 , then remove the input gear 3 and the key 4 . Reassembly 1. Mount the key 4 and the input gear 3 on the U-axis motor 1 . (The key 4 is attached to the U-axis motor 1 .) 2. Put the conical spring washer on the hexagon socket head cap screw 5 , then apply Loctite 242 to the thread part of the screw. Then, tighten it with the tightening torque shown in table 5-3 “U-Axis Motor Parts Checklist” . 3. Apply ThreeBond 1206C on the matching surface between the flange face of the U-axis motor 1 and the casing. Then, mount the U-axis motor 1 on the casing. 4. Tighten the GT-SA bolts 2 with the tightening torque shown in table 5-3 “U-Axis Motor Parts Checklist” . 5. Connect the connector (signal, power) of the internal wiring harness to the U-axis motor 1 . 6. Mount the cover 8 with the cross head APS bolts 9 . 7. Replenish grease (VIGO Grease RE No.0) through the grease inlet. 8. Remove the backup battery. 9. Remove the chain block, etc. which support the U-arm. 10. Turn ON the DX100 power supply. 5-6 HW1480357 38/91 HW1480357 HP20D 5 5.3 Disassembly and Reassembly of Motors Disassembly and Reassembly of U-Axis Motor Table 5-3: U-Axis Motor Parts Checklist No. Name Qty. Notes 1 U-axis motor HW0387860-A 1 SGMRV-05ANA-YR11 2 GT-SA bolt M8 (length: 30 mm) 4 Tightening torque: 24.5 N•m 3 Input Gear 1 4 Key 1 5 Hexagon socket head cap screw M5 (length: 65 mm) Conical spring washer 2H-5 1 Tightening torque: each 10 N•m 6 Cover HW0305305-1 1 7 GT-SA bolt M6 (length: 20 mm) 6 8 Cover HW0313489-1 1 9 Cross head APS bolt M4 (length: 10 mm) Flat washer 4.3 x 12.0 x 0.8 7 each Tightening torque: 10 N•m Fig. 5-3: Disassembly and Reassembly of U-Axis Motor 6 4 7 8 9 5 3 1 2 Casing 5-7 HW1480357 39/91 HW1480357 5 5.4 HP20D 5.4 Disassembly and Reassembly of Motors Disassembly and Reassembly of R-Axis Motor Disassembly and Reassembly of R-Axis Motor • Refer to fig. 5-4 “Disassembly and Reassembly of R-Axis Motor” . Disassembly 1. Turn OFF the DX100 power supply. 2. Remove the GT-SA bolts 10 , then remove the cover 9 . 3. Remove the plastic cover on the connector (signal) of the internal wiring harness connected to the R-axis motor 1 . Then, connect the backup battery. (Refer to chapter 2 “Notes for Maintenance” .) 4. Remove the plastic cover on the connector (power) of the R-axis motor 1 . Then, disconnect the connector (signal, power) of the internal wiring harness connected to the R-axis motor 1 . 5. Remove the GT-SA bolts 3 . Insert stud bolts M6 (length of the thread part: 40 mm or more) in the tapped holes M6 (2 holes) on the Mbase 4 . Screw the stud bolts in until the gap between the motor and the matching surface becomes 10 mm or more. Then, remove the Mbase 4 from the casing. 6. Remove the hexagon socket head cap screw 8 , then remove the shaft 5 , the speed reducer 6 , and the washer 7 . 7. Remove the GT-SA bolts 2 . Then, remove the R-axis motor 1 from the M-base 4 . Reassembly 1. Mount the R-axis motor 1 on the M-base 4 . 2. Tighten the GT-SA bolts 2 with the tightening torque shown in table 5-4 “R-Axis Motor Parts Checklist” . 3. Fill the hatched area of the oil seal 11 shown in fig. 5-4 “Disassembly and Reassembly of R-Axis Motor” with Harmonic grease SK-1A. 4. Apply ThreeBond 1206C on the matching surface between the shaft 5 and the R-axis motor 1 . Then, mount the shaft 5 , the speed reducer 6 , and the washer 7 on the R-axis motor 1 . 5. Apply Loctite 242 to the thread part of the hexagon socket head cap screw 8 . Then, tighten it with the tightening torque shown in table 5-4 “R-Axis Motor Parts Checklist” . 6. Apply ThreeBond 1206C on the matching surface between the Mbase 4 and the casing. Then, mount the M-base 4 on the casing. 7. Tighten the GT-SA bolts 3 with the tightening torque shown in table 5-4 “R-Axis Motor Parts Checklist” . 8. Connect the connector (signal, power) of the internal wiring harness to the R-axis motor 1 , and remove the backup battery. Then, put the plastic cover on the connector. 9. Apply ThreeBond 1206C on the matching surface between the cover 9 and the casing. Then, mount the cover 9 with the GT-SA bolts 10 . 5-8 HW1480357 40/91 HW1480357 HP20D 5 5.4 Disassembly and Reassembly of Motors Disassembly and Reassembly of R-Axis Motor 10. Tighten the GT-SA bolts 10 with the tightening torque shown in table 5-4 “R-Axis Motor Parts Checklist” . 11. Turn ON the DX100 power supply. Table 5-4: R-Axis Motor Parts Checklist No. Name Qty. Notes 1 R-axis motor HW0389298-A 1 SGMPH-02ANA-YR11 2 GT-SA bolt M5 (length: 20 mm) 4 Tightening torque: 6 N•m 3 GT-SA bolt M6 (length: 30 mm) 3 Tightening torque: 10 N•m 4 M-base HW0304932-1 1 5 Shaft HW0404402-1 1 6 Speed reducer HW0381463-A 1 Wave generator 7 Washer HW0404196-5 1 8 Hexagon socket head cap screw M4 (length: 45 mm) Conical spring washer 2H-4 1 Tightening torque: each 4.8 N•m 9 Cover HW0305305-1 1 10 GT-SA bolt M6 (length: 20 mm) 6 11 Oil seal AE1314A0 1 Tightening torque: 10 N•m 5-9 HW1480357 41/91 HW1480357 5 5.4 HP20D Disassembly and Reassembly of Motors Disassembly and Reassembly of R-Axis Motor Fig. 5-4: Disassembly and Reassembly of R-Axis Motor 2 1 5 6 7 8 9 10 3 4 11 Apply ThreeBond 1206C. Fill with Harmonic grease SK-1A. (See the step 4 of the R-axis reassembly procedure.) (See the step 3 of the R-axis reassembly procedure.) Casing 5-10 HW1480357 42/91 HW1480357 5 5.5 HP20D 5.5 Disassembly and Reassembly of Motors Disassembly and Reassembly of B-Axis Motor Disassembly and Reassembly of B-Axis Motor • Refer to fig. 5-5 “Disassembly and Reassembly of B-Axis Motor” . Disassembly 1. Turn OFF the DX100 power supply. 2. Remove the GT-SA bolts 6 , then remove the covers 5 . 3. Remove the plastic cover on the connector (signal) of the internal wiring harness connected to the B-axis motor 1 . Then, connect the backup battery. (Refer to chapter 2 “Notes for Maintenance” .) 4. Remove the plastic cover on the connector (power) of the internal wiring harness connected to the B-axis motor 1 . Then, disconnect the connector (signal, power) of the internal wiring harness. 5. Remove the GT-SA bolts 2 , then remove the B-axis motor 1 from the U-arm. 6. Remove the hexagon socket head cap screw 4 , then remove the pulley 3 . (Use the holes (2 holes, diameter: 4 mm) on the surface of the pulley 3 to fix it.) Reassembly 1. Mount the pulley 3 on the B-axis motor 1 . 2. Apply Loctite 242 to the thread part of the hexagon socket head cap screw 4 . Then, tighten it with the tightening torque shown in table 5-5 “B-Axis Motor Parts Checklist” . (Use the holes (2 holes, diameter: 4 mm) on the surface of the pulley 3 to fix the it.) 3. Mount the B-axis motor 1 on the U-arm, then put the belt on the pulley 3 . 4. Then, tighten the GT-SA bolts 2 with the tightening torque shown in table 5-5 “B-Axis Motor Parts Checklist” . (Refer to chapter 8 “Disassembly, Reassembly, and Adjustment of Band T-axis Timing Belts” to adjust the belt tension.) 5. Connect the connector (signal, power) of the internal wiring harness to the B-axis motor 1 , and remove the backup battery. Then, put the plastic cover on the connector. 6. Mount the covers 5 with the GT-SA bolts 6 . (Apply ThreeBond 1206C on the matching surface between the cover 5 and the U-arm.) 7. Tighten the GT-SA bolts 6 with the tightening torque shown in table 5-5 “B-Axis Motor Parts Checklist” . 8. Turn ON the DX100 power supply. 5-11 HW1480357 43/91 HW1480357 HP20D 5 5.5 Disassembly and Reassembly of Motors Disassembly and Reassembly of B-Axis Motor Table 5-5: B-Axis Motor Parts Checklist No. Name Qty. Notes 1 B-axis motor HW0389298-A 1 SGMPH-02ANA-YR11 2 GT-SA bolt M5 (length: 20 mm) 2 Tightening torque: 6 N•m 3 Pulley HW9482727-A 1 4 Hexagon socket head cap screw M4 (length: 16 mm) Conical spring washer 2H-4 1 Tightening torque: each 4.8 N•m 5 Cover HW9200798-1 2 6 GT-SA bolt M5 (length: 12 mm) 24 Tightening torque: 6 N•m Fig. 5-5: Disassembly and Reassembly of B-Axis Motor 5 1 2 6 6 5 4 3 U-arm 5-12 HW1480357 44/91 HW1480357 5 5.6 HP20D 5.6 Disassembly and Reassembly of Motors Disassembly and Reassembly of T-Axis Motor Disassembly and Reassembly of T-Axis Motor • Refer to fig. 5-6 “Disassembly and Reassembly of T-Axis Motor” . Disassembly 1. Turn OFF the DX100 power supply. 2. Remove the B-axis motor 5 . (Perform the steps 2 to 4 of “Disassembly” in chapter 5.5 “Disassembly and Reassembly of B-Axis Motor” .) 3. Remove the plastic cover on the connector (signal) of the internal wiring harness connected to the T-axis motor 1 . Then, connect the backup battery. (Refer to chapter 2 “Notes for Maintenance” .) 4. Remove the plastic cover on the connector (power) of the internal wiring harness connected to the T-axis motor 1 . Then, disconnect the connector (signal, power) of the internal wiring harness. 5. Remove the GT-SA bolts 2 , then remove the T-axis motor 1 from the U-arm. 6. Remove the hexagon socket head cap screw 4 , then remove the pulley 3 . (Use the holes (2 holes, diameter: 4 mm) on the surface of the pulley 3 to fix it.) Reassembly 1. Mount the pulley 3 on the T-axis motor 1 . 2. Apply Loctite 242 to the thread part of the hexagon socket head cap screw 4 . Then, tighten it with the tightening torque shown in table 5-6 “T-Axis Motor Parts Checklist” . (Use the holes (2 holes, diameter: 4 mm) on the surface of the pulley 3 to fix the it.) 3. Mount the T-axis motor 1 on the U-arm, then put the belt on the pulley 3 . 4. Then, tighten the GT-SA bolts 2 with the tightening torque shown in table 5-6 “T-Axis Motor Parts Checklist” . (Refer to chapter 8 “Disassembly, Reassembly, and Adjustment of Band T-axis Timing Belts” to adjust the belt tension.) 5. Connect the connector (signal, power) of the internal wiring harness to the T-axis motor 1 , and remove the backup battery. Then, put the plastic cover on the connector. 6. Remove the B-axis motor 5 . (Perform the steps 3 to 7 of “Reassembly” in chapter 5.5 “Disassembly and Reassembly of B-Axis Motor” .) 7. Turn ON the DX100 power supply. 5-13 HW1480357 45/91 HW1480357 HP20D 5 5.6 Disassembly and Reassembly of Motors Disassembly and Reassembly of T-Axis Motor Table 5-6: T-Axis Motor Parts Checklist No. Name Qty. Notes 1 T-axis motor HW0389298-A 1 SGMPH-02ANA-YR11 2 GT-SA bolt M5 (length: 20 mm) 2 Tightening torque: 6 N•m 3 Pulley HW9482727-A 1 4 Hexagon socket head cap screw M4 (length: 16 mm) Conical spring washer 2H-4 1 Tightening torque: each 4.8 N•m 5 B-axis motor HW0382152-A 1 Fig. 5-6: Disassembly and Reassembly of T-Axis Motor 3 5 4 2 1 U-arm 5-14 HW1480357 46/91 HW1480357 6 6.1 HP20D 6 Disassembly and Reassembly of Speed Reducer Disassembly and Reassembly of S-Axis Speed Reducer Disassembly and Reassembly of Speed Reducer 6.1 Disassembly and Reassembly of S-Axis Speed Reducer • Refer to fig. 6-1 “Disassembly and Reassembly of S-Axis Speed Reducer” . NOTE • Refer to chapter 3 “Home Position Return” , chapter 4 “Grease Replenishment and Exchange” , chapter 5 “Disassembly and Reassembly of Motors” , chapter 7 “Disassembly and Reassembly of Wrist Unit” , and chapter 10 “Cable Wiring” . • Remove old sealing bond on each part completely before reassembly. Disassembly 1. Turn OFF the DX100 power supply. 2. Remove the S-axis motor 4 . (Perform the steps 2 to 6 of “Disassembly” in chapter 5.1 “Disassembly and Reassembly of S-Axis Motor” .) 3. Remove the hexagon socket head cap screws 6 , then remove the Mbase 5 . 4. Remove the GT-SA bolts 3 . Then, lift up the upper part of the manipulator including the S-head by using a chain block, and put it down next to the base. Before putting it down, lay shock absorbing material (such as wooden blocks and boards) under it to avoid damages on the bottom face of the S-head. Be careful not to pinch the internal wiring harness when putting it down. 5. Remove the GT-SA bolts 2 . Then, remove the speed reducer 1 by using the tapped holes. 6. Drain grease which remains inside. Reassembly 1. Apply ThreeBond 1206C on the matching surface between the base and the speed reducer 1 . Then, mount the speed reducer 1 on the base. 2. Tighten the GT-SA bolts 2 with the tightening torque shown in table 6-1 “S-Axis Speed Reducer Parts Checklist” . 3. Apply ThreeBond 1206C on the matching surface between the speed reducer 1 and the S-head. Then, mount the upper part of the manipulator including the S-head on the speed reducer 1 . 4. Tighten the GT-SA bolts 3 with the tightening torque shown in table 6-1 “S-Axis Speed Reducer Parts Checklist” . 5. Remove the old sealing bond on the matching surface between the Mbase 5 and the S-head, then apply ThreeBond 1206C on the matching surface. Then, mount the M-base 5 on the S-head. Tighten the hexagon socket head cap screws 6 with the tightening torque shown in table 6-1 “S-Axis Speed Reducer Parts Checklist” . 6-1 HW1480357 47/91 HW1480357 HP20D 6 6.1 Disassembly and Reassembly of Speed Reducer Disassembly and Reassembly of S-Axis Speed Reducer 6. Apply ThreeBond 1206C on the matching surface between the S-axis motor 4 and the M-base 5 . Then, mount the S-axis motor 4 . (Perform the steps 3 to 6 of “Reassembly” in chapter 5.1 “Disassembly and Reassembly of S-Axis Motor” .) 7. Replenish grease (VIGO Grease RE No.0) through the grease inlet. 8. Turn ON the DX100 power supply. Table 6-1: S-Axis Speed Reducer Parts Checklist No. Name Qty. Notes 1 Speed reducer HW0387753-B 1 2 GT-SA bolt M10 (length: 40 mm) 16 Tightening torque: 82 N•m 3 GT-SA bolt M12 (length: 35 mm) 9 Tightening torque: 142 N•m 4 S-axis motor HW0388932-A 1 SGMRV-09ANA-YR11 5 M-base HW0305306-2 1 6 Hexagon socket head cap screw M8 (length: 60 mm) Conical spring washer 2H-8 3 Tightening torque: each 24.5 N•m Fig. 6-1: Disassembly and Reassembly of S-Axis Speed Reducer 4 3 6 5 S-head Internal wiring harness 2 Base 1 6-2 HW1480357 48/91 HW1480357 6 6.2 HP20D 6.2 Disassembly and Reassembly of Speed Reducer Disassembly and Reassembly of L-Axis Speed Reducer Disassembly and Reassembly of L-Axis Speed Reducer • Refer to fig. 6-2 “Disassembly and Reassembly of L-Axis Speed Reducer” . Disassembly 1. Turn OFF the DX100 power supply, then drain grease. 2. Before removing the L-arm 3 , support the L-arm 3 with a chain block, etc. to prevent it from falling. 3. Remove the hexagon socket head cap screws 4 and 5 . Then, remove the L-arm 3 from the speed reducer 1 . 4. Remove the GT-SA bolts 2 . Then, remove the speed reducer 1 from the S-head. (When removing the speed reducer 1 , make sure to pull it out straight to avoid load on the input gear. If the input gear is subjected to a load, damage to the motor may result.) 5. Remove the old sealing bond on the L-arm 3 and the S-head. Reassembly 1. Apply ThreeBond 1206C on the matching surface between the speed reducer 1 and the S-head. Then, mount the speed reducer 1 on the S-head. (When mounting, make sure not to apply a load on the input gear.) 2. Tighten the GT-SA bolts 2 with the tightening torque shown in table 6-2 “L-Axis Speed Reducer Parts Checklist” . 3. Apply ThreeBond 1206C on the matching surface between the speed reducer 1 and the L-arm 3 . Then, mount the L-arm 3 on the speed reducer 1 . 4. Tighten the hexagon socket head cap screws 4 and 5 with the tightening torque shown in table 6-2 “L-Axis Speed Reducer Parts Checklist” . 5. Replenish grease (VIGO Grease RE No.0) through the grease inlet. 6. Turn ON the DX100 power supply. Table 6-2: L-Axis Speed Reducer Parts Checklist No. Name Qty. 1 Speed reducer HW0387753-C 1 2 GT-SA bolt M10 (length: 40 mm) 14 Notes Tightening torque: 82 N•m 3 L-arm HW0100546-2 1 4 Hexagon socket head cap screw M12 (length: 40 mm) Conical spring washer 2H-12 12 Tightening torque: each 142 N•m 5 Hexagon socket head cap screw M10 (length: 35 mm) Conical spring washer 2H-10 6 Tightening torque: each 82 N•m 6-3 HW1480357 49/91 HW1480357 HP20D 6 6.2 Disassembly and Reassembly of Speed Reducer Disassembly and Reassembly of L-Axis Speed Reducer Fig. 6-2: Disassembly and Reassembly of L-Axis Speed Reducer 2 S-head 1 L-axis motor Internal wiring harness Input gear 4 3 5 6-4 HW1480357 50/91 HW1480357 6 6.3 HP20D 6.3 Disassembly and Reassembly of Speed Reducer Disassembly and Reassembly of U-Axis Speed Reducer Disassembly and Reassembly of U-Axis Speed Reducer • Refer to fig. 6-3 “Disassembly and Reassembly of U-Axis Speed Reducer” . Disassembly 1. Turn OFF the DX100 power supply, then drain grease. 2. Before removing the U-arm unit, support the U-arm unit with a chain block, etc. to prevent it from falling. 3. Remove the hexagon socket head cap screws 3 . Then, remove the U-arm unit from the L-arm. 4. Remove the U-axis motor from the U-arm unit. (Perform “Disassembly” in chapter 5.3 “Disassembly and Reassembly of U-Axis Motor” .) 5. Remove the GT-SA bolts 2 , then remove the speed reducer 1 . 6. Remove the hexagon socket head cap screw 4 , then remove the input gear 5 . 7. Remove the old sealing bond on the L-arm and the U-arm unit. Reassembly 1. Mount the input gear 5 on the U-axis motor. (The input gear 5 is attached to the speed reducer 1 . Thus, when replacing the speed reducer 1 , replace the input gear 5 too.) 2. Apply Loctite 242 to the thread part of the hexagon socket head cap screw 4 . Then, tighten it with the tightening torque shown in table 6-3 “U-Axis Speed Reducer Parts Checklist” . 3. Apply ThreeBond 1206C on the matching surface between the speed reducer 1 and the U-arm unit. Then, mount the speed reducer 1 on the U-arm unit. 4. Tighten the GT-SA bolts 2 with the tightening torque shown in table 6-3 “U-Axis Speed Reducer Parts Checklist” . 5. Mount the U-axis motor on the U-arm unit. (Perform “Reassembly” in chapter 5.3 “Disassembly and Reassembly of U-Axis Motor” .) 6. Apply ThreeBond 1206C on the matching surface between the speed reducer 1 and the L-arm. Then, mount the U-arm unit with the speed reducer 1 on the L-arm. 7. Tighten the hexagon socket head cap screws 3 with the tightening torque shown in table 6-3 “U-Axis Speed Reducer Parts Checklist” . For the screws marked with , apply ThreeBond 1206C on the thread parts of them before tightening them. 8. Replenish grease (VIGO Grease RE No.0) through the grease inlet. 9. Turn ON the DX100 power supply. 6-5 HW1480357 51/91 HW1480357 HP20D 6 6.3 Disassembly and Reassembly of Speed Reducer Disassembly and Reassembly of U-Axis Speed Reducer Table 6-3: U-Axis Speed Reducer Parts Checklist No. Name Qty. Notes 1 Speed reducer HW9280880-G 1 2 GT-SA bolt M8 (length: 45 mm) 16 3 Hexagon socket head cap screw M14 (length: 35 mm) Conical spring washer GT-SH-14 6 Tightening torque: each 226 N•m 4 Hexagon socket head cap screw M4 (length: 65 mm) Conical spring washer 2H-4 1 Tightening torque: each 4.8 N•m 5 Input gear 1 Tightening torque: 26.5 N•m Fig. 6-3: Disassembly and Reassembly of U-Axis Speed Reducer U-arm unit 3 4 5 U-axis motor L-arm 1 2 6-6 HW1480357 52/91 HW1480357 6 6.4 HP20D 6.4 Disassembly and Reassembly of Speed Reducer Disassembly and Reassembly of R-Axis Speed Reducer Disassembly and Reassembly of R-Axis Speed Reducer • Refer to fig. 6-4 “Disassembly and Reassembly of R-Axis Speed Reducer” . Disassembly 1. Turn OFF the DX100 power supply. 2. Remove the R-axis motor. (Perform the steps 2 to 5 of “Disassembly” in chapter 5.4 “Disassembly and Reassembly of R-Axis Motor” .) 3. Remove the GT-SA bolts 5 , then remove the shaft 4 and the flex spline 2 . 4. Remove the hexagon socket head cap screws 6 , then remove the circular spline 1 . Reassembly 1. Mount the circular spline 1 on the casing. 2. Tighten the hexagon socket head cap screws 6 with the tightening torque shown in table 6-4 “R-Axis Speed Reducer Parts Checklist” . 3. Apply Harmonic Grease SK-1A on the surface between the teeth of the circular spline 1 and the flex spline 2 . Then, mount the flex spline 2 and the shaft 4 on the casing. 4. Tighten the GT-SA bolts 5 with the tightening torque shown in table 6-4 “R-Axis Speed Reducer Parts Checklist” . 5. Apply Harmonic Grease SK-1A on the bearing of the wave generator 3 . Then, mount the wave generator 3 on the R-axis motor. (Perform the steps 3 to 10 of “Reassembly” in chapter 5.4 “Disassembly and Reassembly of R-Axis Motor” .) 6. Turn ON the DX100 power supply. 6-7 HW1480357 53/91 HW1480357 HP20D 6 6.4 Disassembly and Reassembly of Speed Reducer Disassembly and Reassembly of R-Axis Speed Reducer Table 6-4: R-Axis Speed Reducer Parts Checklist No. Name Qty. Notes 1 Speed reducer HW0381463-A 1 Circular spline 2 Speed reducer HW0381463-A 1 Flex spline 3 Speed reducer HW0381463-A 1 Wave generator 4 Shaft HW0404403-1 1 5 GT-SA bolt M6 (length: 20 mm) 8 6 Hexagon socket head cap screw M4 (length: 20 mm) Conical spring washer 2H-4 12 Tightening torque: each 2.8 N•m Tightening torque: 16.5 N•m Fig. 6-4: Disassembly and Reassembly of R-Axis Speed Reducer 1 3 2 5 Casing R-axis motor 4 6 6-8 HW1480357 54/91 HW1480357 6 6.5 HP20D 6.5 Disassembly and Reassembly of Speed Reducer Disassembly and Reassembly of B-Axis Speed Reducer Disassembly and Reassembly of B-Axis Speed Reducer • Refer to fig. 6-5 “Disassembly and Reassembly of B-Axis Speed Reducer” . Disassembly 1. Turn OFF the DX100 power supply. 2. Remove the GT-SA bolts 11 , then remove the covers 10 . 3. Loosen the GT-SA bolts 14 which fix the B-axis motor. Then, remove the timing belt 5 . 4. Remove the GT-SA bolts 9 . Then, remove the pulley 6 , the housing 15 , the wave generator 3 , and the bearings 8 and 12 . 5. Remove the hexagon socket head cap screw 7 , then remove the pulley 6 . 6. Remove the GT-SA bolts 4 , then remove the circular spline 2 . 7. Remove the GT-SA bolts 13 , then remove the flex spline 1 . Reassembly 1. Mount the flex spline 1 on the wrist base. 2. Tighten the GT-SA bolts 13 with the tightening torque shown in table 6-5 “B-Axis Speed Reducer Parts Checklist” . 3. Apply Harmonic Grease SK-1A on the surface between the teeth of the circular spline 2 and the flex spline 1 . Apply ThreeBond 1206C on the matching surface between the circular spline 2 and the U-arm. Then, mount the circular spline 2 on the U-arm. 4. Tighten the GT-SA bolts 4 with the tightening torque shown in table 6-5 “B-Axis Speed Reducer Parts Checklist” . 5. Apply Harmonic Grease SK-1A on the bearing part of the wave generator 3 . Press-fit the bearings 8 and 12 . Then, mount the housing 15 and the pulley 6 . (When replacing the speed reducer, replace the bearings 8 and 12 too.) 6. Apply Loctite 242 to the thread part of the hexagon socket head cap screw 7 . Then, tighten it with the tightening torque shown in table 6-5 “B-Axis Speed Reducer Parts Checklist” . 7. Insert the wave generator 3 assembled at the step 5 above in the wrist base. 8. Tighten the GT-SA bolts 9 with the tightening torque shown in table 6-5 “B-Axis Speed Reducer Parts Checklist” . 9. Put the timing belt 5 on the pulley 6 . 10. Adjust the initial tension of the timing belt 5 to the designated tension. Then, tighten the GT-SA bolts 14 with the tightening torque shown in table 6-5 “B-Axis Speed Reducer Parts Checklist” . (Refer to chapter 8 “Disassembly, Reassembly, and Adjustment of B- and Taxis Timing Belts” .) 11. Remove the old sealing bond on the covers 10 and the U-arm. Apply ThreeBond 1206C on the matching surface between the covers 10 and the U-arm. Then, mount the covers 10 on the U-arm. 12. Tighten the GT-SA bolts 11 with the tightening torque shown in table 6-5 “B-Axis Speed Reducer Parts Checklist” . 6-9 HW1480357 55/91 HW1480357 HP20D 6 6.5 Disassembly and Reassembly of Speed Reducer Disassembly and Reassembly of B-Axis Speed Reducer 13. Turn ON the DX100 power supply. Table 6-5: B-Axis Speed Reducer Parts Checklist No. Name Qty. Notes 1 Speed reducer HW9381633-A 1 Flex spline 2 Speed reducer HW9381633-A 1 Circular spline 3 Speed reducer HW9381633-A 1 Wave generator 4 GT-SA bolt M4 (length: 16 mm) 12 Tightening torque: 2.8 N•m 5 Timing belt 80S4.5M653 1 6 Pulley HW9482725-A 1 7 Hexagon socket head cap screw M5 (length: 16 mm) Conical spring washer 2H-5 1 Tightening torque: each 10 N•m 8 Bearing 6002ZZ 1 9 GT-SA bolt M4 (length: 12 mm) 4 10 Cover HW9200798-1 2 11 GT-SA bolt M5 (length: 12 mm) 24 12 Bearing 6901ZZ 1 13 GT-SA bolt M5 (length: 16 mm) 11 Tightening torque: 6 N•m 14 GT-SA bolt M5 (length: 20 mm) 2 Tightening torque: 6 N•m 15 Housing HW9405792-1 1 Tightening torque: 2.8 N•m Tightening torque: 6 N•m 6-10 HW1480357 56/91 HW1480357 6 6.5 HP20D Disassembly and Reassembly of Speed Reducer Disassembly and Reassembly of B-Axis Speed Reducer Fig. 6-5: Disassembly and Reassembly of B-Axis Speed Reducer B-axis motor Wrist base U-arm 1 13 14 12 2 11 3 5 15 10 6 4 9 8 7 6-11 HW1480357 57/91 HW1480357 6 6.6 HP20D 6.6 Disassembly and Reassembly of Speed Reducer Disassembly and Reassembly of T-Axis Speed Reducer Disassembly and Reassembly of T-Axis Speed Reducer • Refer to fig. 6-6 “Disassembly and Reassembly of T-Axis Speed Reducer” . Disassembly 1. Turn OFF the DX100 power supply. 2. Remove the GT-SA bolts 10 , then remove the right side part from the point “A” in chapter 6 “Disassembly and Reassembly of Speed Reducer” . 3. Remove the circular spline 2 from the flange. 4. Remove the GT-SA bolts 4 , then, remove the flex spline 1 . 5. Remove the GT-SA bolts 5 . Then, remove the housing 6 from the wrist base. 6. Remove the hexagon socket head cap screw 8 , and remove the gear 7 and the shim 9 . Then, pull out the wave generator 3 . Reassembly 1. Apply Harmonic Grease SK-1A to the bearing of the wave generator 3 . Then, insert the wave generator 3 in the housing 6 . 2. Mount the shim 9 and the gear 7 . 3. Apply Loctite 242 to the thread part of the hexagon socket head cap screw 8 . Then, tighten it with the tightening torque shown in table 6-6 “T-Axis Speed Reducer Parts Checklist” . 4. Mount the housing 6 (the assembly prepared in the steps 1 to 3 above) on the wrist base. 5. Temporarily tighten the GT-SA bolts 5 . 6. Check if the backlash is proper, and adjust the shim as follows when necessary: Remove the GT-SA bolt 5 , then remove the housing 6 . Adjust the backlash by inserting the shim(s) on the list below between the gear 7 and the wave generator 3 . Set the backlash to 0.05 to 0.1 mm on the gear’s pitch circle diameter of 52.5 mm. Shim Type Thickness (mm) SP012010 0.1 SP012015 0.15 SP012020 0.2 SP012050 0.5 7. Confirm the backlash is correct. Then, remove the GT-SA bolts 5 again, and remove the housing 6 . Apply Harmonic Grease SK-1A on the teeth of the gear 7 . 8. Apply ThreeBond 1206C on the matching surface between the housing 6 and the wrist base. Then, mount the housing 6 on the wrist base. Tighten the GT-SA bolts 5 with the tightening torque shown in table 6-6 “T-Axis Speed Reducer Parts Checklist” . 9. Mount the flex spline 1 on the flange. 10. Tighten the GT-SA bolts 4 with the tightening torque shown in table 6-6 “T-Axis Speed Reducer Parts Checklist” . 6-12 HW1480357 58/91 HW1480357 HP20D 6 6.6 Disassembly and Reassembly of Speed Reducer Disassembly and Reassembly of T-Axis Speed Reducer 11. Apply Harmonic Grease SK-1A on the surface between the teeth of the circular spline 2 and the flex spline 1 . Apply ThreeBond 1206C on the matching surface between the housing 6 and the circular spline 2 . Then, insert the circular spline 2 in the flange, and mount it on the housing 6 . 12. Tighten the GT-SA bolts 10 with the tightening torque shown in table 6-6 “T-Axis Speed Reducer Parts Checklist” . 13. Replenish grease (Harmonic Grease SK-1A) through the grease inlet. 14. Turn ON the DX100 power supply. Table 6-6: T-Axis Speed Reducer Parts Checklist No. Name Qty. Notes 1 Speed reducer HW0382140-A 1 Flex spline 2 Speed reducer HW0382140-A 1 Circular spline 3 Speed reducer HW0382140-A 1 Wave generator 4 GT-SA bolt M5 (length: 12 mm) 8 Tightening torque: 10 N•m 5 GT-SA bolt M4 (length: 12 mm) 8 Tightening torque: 2.8 N•m 6 Housing HW0304086-1 1 7 Gear HW9381659-A 1 8 Hexagon socket head cap screw M5 (length: 16 mm) Conical spring washer 2H-5 1 Tightening torque: each 10 N•m 9 Shim (Refer to the table in the previous page.) 10 GT-SA bolt M5 (length: 16 mm) 4 Tightening torque: 10 N•m 6-13 HW1480357 59/91 HW1480357 HP20D 6 6.6 Disassembly and Reassembly of Speed Reducer Disassembly and Reassembly of T-Axis Speed Reducer Fig. 6-6: Disassembly and Reassembly of T-Axis Speed Reducer 8 9 5 3 1 4 2 6 7 Wrist base A 10 Flange 6-14 HW1480357 60/91 HW1480357 7 Disassembly and Reassembly of Wrist Unit HP20D 7 Disassembly and Reassembly of Wrist Unit • Refer to fig. 7-1 “Disassembly and Reassembly of Wrist Unit” . NOTE Refer to chapter 2 “Notes for Maintenance” , chapter 3 “Home Position Return” , and chapter 10 “Cable Wiring” . Disassembly 1. Turn OFF the DX100 power supply. 2. Remove the GT-SA bolts 6 , then remove the cover 5 . 3. Connect backup batteries to the B- and T-axis motors. 4. Disconnect the connectors of the B- and T-axis internal wiring harness. 5. Remove the GT-SA bolts 4 , and remove the support 3 . Then, cut off the cable tie which fixes the B- and T-axis internal wiring harness. 6. Remove the hexagon socket head cap screws 2 , then remove the wrist unit 1 . Reassembly 1. Run the B- and T-axis internal wiring harness through the wrist unit 1 , then fix the wrist unit 1 with the hexagon socket head cap screws 2 . 2. Tighten the hexagon socket head cap screws 2 with the tightening torque shown in table 7-1 “Wrist Unit Parts Checklist” . 3. Fix the white-marked part of the B- and T-axis internal wiring harness to the support 3 with a cable tie. 4. Mount the support 3 on the wrist unit 1 with the GT-SA bolts 4 . 5. Tighten the GT-SA bolts 4 with the tightening torque shown in table 7-1 “Wrist Unit Parts Checklist” . 6. Connect the B- and T-axis internal wiring harness to the B- and T-axis motor connectors, then remove the backup batteries. (Refer to chapter 10 “Cable Wiring” .) 7. Apply ThreeBond 1206C on the matching surface between the cover 5 and the wrist unit 1 . Then, mount the cover 5 on the wrist unit 1 with the GT-SA bolts 6 . 8. Tighten the GT-SA bolts 6 with the tightening torque shown in table 7-1 “Wrist Unit Parts Checklist” . 9. Turn ON the DX100 power supply. 7-1 HW1480357 61/91 HW1480357 7 Disassembly and Reassembly of Wrist Unit HP20D Table 7-1: Wrist Unit Parts Checklist No. Name Qty. Notes 1 Wrist unit 1 Mass: 14.5 kg 2 Hexagon socket head cap screw M6 (length: 65 mm) Conical spring washer 2H-6 8 Tightening torque: each 10 N•m 3 Support HW9406556-1 1 4 GT-SA bolt M4 (length: 12 mm) 2 5 Cover HW9200798-1 1 6 GT-SA bolt M5 (length: 12 mm) 12 Tightening torque: 2.8 N•m Tightening torque: 6 N•m Fig. 7-1: Disassembly and Reassembly of Wrist Unit 2 6 4 3 5 1 B- and T-axis internal wiring harness 7-2 HW1480357 62/91 HW1480357 8 8.1 HP20D 8 Disassembly, Reassembly, and Adjustment of B- and T-axis Timing Belts Disassembly and Reassembly of B- and T-axis Timing Belts Disassembly, Reassembly, and Adjustment of B- and T-axis Timing Belts 8.1 Disassembly and Reassembly of B- and T-axis Timing Belts • Refer to table 8-1 “B- and T-Axis Timing Belt Parts Checklist” and fig. 8-1 “Disassembly and Reassembly of B- and T-Axis Timing Belts” . Disassembly (Refer to chapter 5.5 “Disassembly and Reassembly of B-Axis Motor” and chapter 5.6 “Disassembly and Reassembly of T-Axis Motor” .) 1. Remove the B-axis motor 5 , then remove the B-axis timing belt 1 . 2. Remove the T-axis motor 3 , then remove the T-axis timing belt 2 . Reassembly (Refer to chapter 5.5 “Disassembly and Reassembly of B-Axis Motor” and chapter 5.6 “Disassembly and Reassembly of T-Axis Motor” .) 1. Install the T-axis timing belt 2 , then install the T-axis motor 3 . 2. Install the B-axis timing belt 1 , then install the B-axis motor 5 . 8-1 HW1480357 63/91 HW1480357 HP20D 8 8.1 Disassembly, Reassembly, and Adjustment of B- and T-axis Timing Belts Disassembly and Reassembly of B- and T-axis Timing Belts Table 8-1: B- and T-Axis Timing Belt Parts Checklist No. Name Qty. 1 B-axis timing belt 80S4.5M653 1 2 T-axis timing belt 80S4.5M518 1 Notes 3 T-axis motor HW0389298-A 1 SGMPH-02ANA-YR11 4 GT-SA bolt M5 (length: 20 mm) 2 Tightening torque: 6 N•m 5 B-axis motor HW0389298-A 1 SGMPH-02ANA-YR11 6 GT-SA bolt M5 (length: 20 mm) 2 Tightening torque: 6 N•m 7 Cover HW9200798-1 2 8 GT-SA bolt M5 (length: 12 mm) 24 Tightening torque: 6 N•m 9 Pulley HW9482727-A 1 For B-axis 10 Pulley HW9482727-A 1 For T-axis Fig. 8-1: Disassembly and Reassembly of B- and T-Axis Timing Belts 8 7 8 7 6 5 9 10 4 2 3 1 8-2 HW1480357 64/91 HW1480357 8 8.2 HP20D 8.2 8.2.1 Disassembly, Reassembly, and Adjustment of B- and T-axis Timing Belts Adjustment of Timing Belts Adjustment of Timing Belts B-Axis 1. Loosen the GT-SA bolts 6 shown in fig. 8-1 “Disassembly and Reassembly of B- and T-Axis Timing Belts” . 2. Adjust the initial tension of the timing belt 1 by pushing the pulley 9 in the direction in which the timing belt 1 stretches. 3. Temporarily tighten the GT-SA bolts 6 , then adjust the initial tension to the tension specified in table 8-2 “Initial Tension of Timing Belt” by using a tension meter. 4. Tighten the GT-SA bolts 6 with the specified tightening torque. Then, operate the B-axis at low speed to equalize the tension, and confirm that the initial tension of the timing belt is the initial tension shown in table 8-2 “Initial Tension of Timing Belt” . As the set value of the tension meter, start with the following: Belt mass: 26 gram per meter (width: 10 mm) Belt width: 8 mm Distance between axes: 276 mm 8.2.2 T-Axis 1. Loosen the GT-SA bolts 4 shown in fig. 8-1 “Disassembly and Reassembly of B- and T-Axis Timing Belts” . 2. Adjust the initial tension of the timing belt 2 by pushing the pulley 10 in the direction in which the timing belt 2 stretches. 3. Temporarily tighten the GT-SA bolts 4 , then adjust the initial tension to the tension specified in table 8-2 “Initial Tension of Timing Belt” by using a tension meter. 4. Tighten the GT-SA bolts 4 with the specified tightening torque. Then, operate the B-axis at low speed to equalize the tension, and confirm that the initial tension of the timing belt is the initial tension shown in table 8-2 “Initial Tension of Timing Belt” . As the set value of the tension meter, start with the following: Belt mass: 26 gram per meter (width: 10 mm) Belt width: 8 mm Distance between axes: 184 mm Table 8-2: Initial Tension of Timing Belt Initial tension B-axis 15 to 36 N (1.5 to 3.6 kgf) T-axis 15 to 36 N (1.5 to 3.6 kgf) 8-3 HW1480357 65/91 HW1480357 9 Battery Pack Replacement HP20D 9 Battery Pack Replacement The battery packs are installed in the position shown in fig. 9-1 “Battery Pack Location” . If the battery alarm occurs in the DX100, replace the battery in accordance with the following procedure: Fig. 9-1: Battery Pack Location Battery pack Connector base Support Connector base Connector base fixing screw 9-1 HW1480357 66/91 HW1480357 9 Battery Pack Replacement HP20D Fig. 9-2: Battery Pack Connection Battery pack before replacement See the step 5 Connector Circuit board See the step 4 New battery pack (HW0470360-A) 1. Turn OFF the DX100 main power supply. 2. Remove the plate on the connector base, then pull the battery pack out to replace it with the new one. 3. Remove the battery pack from the battery holder. 4. Connect the new battery pack to an unconnected connector on the board. 5. Remove the old battery pack from the board. NOTE Remove the old battery pack after connecting the new one so that the encoder absolute data does not disappear. 6. Mount the new battery pack to the battery holder. 7. Reinstall the plate. NOTE Do not allow the plate to pinch the cables when reinstalling the plate. 9-2 HW1480357 67/91 HW1480357 10 Cable Wiring 10.1 Disconnecting Cables HP20D 10 Cable Wiring NOTE 10.1 10.1.1 To prevent loss of the encoder absolute data, make sure to connect the new battery pack before disconnecting the encoder cable connectors. (Refer to chapter 2 “Notes for Maintenance” .) Disconnecting Cables Cables in Wrist Unit • Refer to table 10-1 “B- and T-Axis Cable Wiring Parts Checklist” and fig. 10-1 “B- and T- Axis Cable Wiring” . 1. Remove the GT-SA bolts 2 , then remove the cover 1 . 2. Remove the plastic covers on the connector parts of the B- and T-axis motors. Then, connect the backup batteries to the B- and T-axis motors. 3. Disconnect the connectors of the B- and T-axis motors. 4. Remove the GT-SA bolts 3 , then remove the support 4 . 5. Cut off the cable tie which fixes the B- and T-axis internal wiring harness to the support 4 . Table 10-1: B- and T-Axis Cable Wiring Parts Checklist No. Name Qty. Notes 1 Cover HW9200798-1 1 2 GT-SA bolt M5 (length: 12 mm) 12 Tightening torque: 6 N•m 3 GT-SA bolt M4 (length: 12 mm) 2 Tightening torque: 2.8 N•m 4 Support HW9406556-1 1 10-1 HW1480357 68/91 HW1480357 HP20D 10 Cable Wiring 10.1 Disconnecting Cables Fig. 10-1: B- and T- Axis Cable Wiring B-axis internal wiring harness, connector T-axis internal wiring harness, connector Wrist unit B- and T-axis internal wiring harness 3 4 B-axis motor T-axis motor 1 2 10-2 HW1480357 69/91 HW1480357 10 Cable Wiring 10.1 Disconnecting Cables HP20D 10.1.2 Cables in U-Arm • Refer to table 10-2 “U-Arm Cable Wiring Parts Checklist” and fig. 10-2 “U-Arm Cable Wiring” . 1. Remove the GT-SA bolts 2 , then remove the cover 1 . 2. Connect the backup batteries to the U- and R-axis motors. 3. Remove the cross head APS bolts 3 , then pull out the N-base 5 . 4. Remove the pan-head sems screws 4 , then remove the connectors of the internal wiring harness from the N-base 5 . Remove the tube (for air) on the back of the N-base 5 , then remove the N-base 5 . 5. Remove the plastic covers on the connectors of the internal wiring harness and the B- and T-axis internal wiring harness. Then, disconnect all the connectors. 6. Remove the cross head APS bolt 9 which fixes the ground wire. 7. Remove the GT-SA bolts and hexagon socket head cap screws 6 , then remove the S-cover 7 . 8. Pull out the internal wiring harness to the L-arm side. Then, cut off the cable tie which fixes the internal wiring harness to the S-cover 7 and the cable tie which fixes the internal wiring harness to the support 8 . 9. Remove the GT-SA bolts 10 , then remove the stoppers 11 from the Scover 7 . Then, remove the internal wiring harness from the S-cover 7 . 10. Remove the GT-SA bolts 12 , then remove the support 13 . 11. Remove the GT-SA bolts 14 and 15 , then pull out the B- and T-axis internal wiring harness to the casing side. 12. Remove the hexagon socket head cap screws 17 , then cut off the cable tie. Then, remove the saddles 16 and the B- and T-axis internal wiring harness from the supports 18 and 19 . 10-3 HW1480357 70/91 HW1480357 HP20D 10 Cable Wiring 10.1 Disconnecting Cables Table 10-2: U-Arm Cable Wiring Parts Checklist No. Name Qty. Notes 1 Cover HW0305305-1 1 2 GT-SA bolt M6 (length: 20 mm) 6 3 Cross head APS bolt M4 (length: 10 mm) 4 4 Pan-head sems screw M3 (length: 16 mm) Nut M3 2 each 5 N-base HW0404900-1 1 6 GT-SA bolt M5 (length: 16 mm) Hexagon socket head cap screw M5 (length: 35 mm) Conical spring washer 2H-5 4 For part A 2 For part B each 7 S-cover HW0200530-1 1 8 Support HW0404919-1 1 9 Cross head APS bolt M5 (length: 8 mm) 1 10 GT-SA bolt M4 (length: 16 mm) 4 11 Stopper HW0404179-1 2 12 GT-SA bolt M4 (length: 12 mm) 2 13 Support HW0304930-1 1 14 GT-SA bolt M4 (length: 12 mm) 2 Tightening torque: 2.8 N•m 15 GT-SA bolt M4 (length: 12 mm) 2 Tightening torque: 2.8 N•m 16 Saddle HW0404503-1 2 17 Hexagon socket head cap screw M4 (length: 20 mm) Conical spring washer 2H-4 4 Tightening torque: each 2.8 N•m 18 Support HW0304914-1 1 19 Support HW0304918-1 1 Tightening torque: 10 N•m Tightening torque: 2.8 N•m Tightening torque: 2.8 N•m 10-4 HW1480357 71/91 8 11 10 Casing 3 5 Main key position U-axis motor Internal user I/O wiring harness 1 U-, R-, B-, and T-axis encoder cable 14 6 13 17 12 A A 7 A A B B View Without Cover 7 16 17 15 18 B- and T-axis internal wiring harness U-, R-, B-, and T-axis power cable 3BC encoder cable 3BC power cable Air hose R-axis encoder cable B- and T-axis power cable B- and T-axis encoder cable View Without Cover 1 (Enlarged) 9 Connector of internal user I/O wiring harness 4 Air hose Ground wire R-axis motor 1 2 U-axis power cable U-axis encoder cable R-axis power cable 6 19 16 HP20D 10 Cable Wiring 10.1 Disconnecting Cables HW1480357 Fig. 10-2: U-Arm Cable Wiring 10-5 HW1480357 72/91 HW1480357 HP20D 10 Cable Wiring 10.1 Disconnecting Cables 10.1.3 Cables in S-Head • Refer to table 10-3 “S-Head Cable Wiring Parts Checklist” and fig. 10-3 “S-Head Cable Wiring” . 1. Remove the cross head APS bolts 2 , then remove the cover 1 . Then, cut off the cable tie which fixes the internal wiring harness. 2. Connect the backup batteries to the S-axis motor and the L-axis motor. 3. Disconnect the connectors (signal, power, brake) connected to the Saxis motor and the L-axis motor. 4. Remove the cross head APS bolts 4 , then remove the tube for grease exhaust on the back of the cover. Then, remove the cover 3 . 5. Disconnect the connector of the S-axis motor from the internal wiring harness. 6. Remove the GT-SA bolts 2 . Then, pull out the holder 6 which fixes the internal wiring harness. 7. Remove the hexagon socket head cap screws 7 , then remove the saddle 8 . 8. Cut off the cable tie which fixes the internal wiring harness, then remove the holder 6 . 9. Remove the GT-SA bolts 11 , then remove the cover 12 . 10. Remove the GT-SA bolts 13 , then remove the holder 14 . 11. Pull out the internal wiring harness from the S-head, then remove the GT-SA bolts 15 . Then, remove the saddle 16 , cut off the cable tie, and remove the holder 14 . 12. Remove the cross head APS bolts 9 , then pull out the C-base 10 . 13. Remove the tube for grease replenishment installed on the back of the C-base 10 . 14. Pull out the C-base 10 further, and remove the internal wiring harness. 10-6 HW1480357 73/91 HW1480357 HP20D 10 Cable Wiring 10.1 Disconnecting Cables Table 10-3: S-Head Cable Wiring Parts Checklist No. Name Qty. 1 Cover HW0304227-1 1 2 Cross head APS bolt M6 (length: 8 mm) 4 3 Cover HW0305809-1 1 4 Cross head APS bolt M5 (length: 10 mm) 4 5 GT-SA bolt M6 (length: 15 mm) 2 6 Holder HW0305812-1 1 7 Hexagon socket head cap screw M6 (length: 10 mm) Conical spring washer 2H-6 2 Tightening torque: each 10 N•m 8 Saddle CD-31 1 9 Cross head APS bolt M5 (length: 10 mm) 6 10 C-base HW0303378-2 1 11 GT-SA bolt M5 (length: 12 mm) 4 12 Cover HW0305698-1 1 13 GT-SA bolt M5 (length: 12 mm) 2 14 Holder HW0305813-1 1 15 GT-SA bolt M5 (length: 12 mm) 2 16 Saddle FCD-31 1 17 Support HW0304226-1 1 Notes Tightening torque: 10 N•m Tightening torque: 6 N•m Tightening torque: 6 N•m Tightening torque: 6 N•m 10-7 HW1480357 74/91 HW1480357 10 Cable Wiring 10.1 Disconnecting Cables HP20D Fig. 10-3: S-Head Cable Wiring 6 5 7 8 S-axis connector 17 1 2 Internal wiring harness L-axis motor S-head 4 11 S-axis motor 12 16 3 Cable ties (2 pieces) T18S 15 Apply sealing bond to the hatched area. 10 14 9 13 10-8 HW1480357 75/91 HW1480357 10 Cable Wiring 10.2 Connecting Cables HP20D 10.2 10.2.1 Connecting Cables Cables in S-Head • Refer to table 10-3 “S-Head Cable Wiring Parts Checklist” and fig. 10-3 “S-Head Cable Wiring” . 1. Run the internal wiring harness to which the C-base 10 is attached through the S-head from the back of the manipulator. 2. Before installing the C-base 10 , insert the tube for grease replenishment to the back of the C-base 10 , and push the internal wiring harness to the left. 3. Apply ThreeBond 1206C on the upper part of the matching surface of the C-base 10 (the hatched area in fig. 10-3 “S-Head Cable Wiring” ). Then, mount the C-base 10 with the cross head APS bolts 9 . 4. Mount the holder 6 to the internal wiring harness. Hold the spring part (the second or third coil from the end of the spring) by using the saddle 8 . Fix it to the holder 6 with the hexagon socket head cap screws 7 . Then, fix the white marked part of the internal wiring harness by using cable ties. Tighten the hexagon socket head cap screws 7 with the tightening torque shown in table 10-3 “S-Head Cable Wiring Parts Checklist” . 5. Mount the holder 6 on the S-head with the GT-SA bolts 5 . Then, tighten them with the tightening torque shown in table 10-3 “S-Head Cable Wiring Parts Checklist” . 6. Mount the holder 14 to the internal wiring harness. Fix the holder 14 to the white marked part of the internal wiring harness by using cable ties. Hold the spring part (the second or third coil from the end of the spring) by using the saddle 16 . Fix it to the holder 14 with the GT-SA bolts 15 . Tighten the GT-SA bolts 15 with the tightening torque shown in table 10-3 “S-Head Cable Wiring Parts Checklist” . 7. Mount the holder 14 on the S-head with the GT-SA bolts 13 . Then, tighten them with the tightening torque shown in table 10-3 “S-Head Cable Wiring Parts Checklist” . 8. Connect the connectors of the S-axis motor and the L-axis motor to the internal wiring harness. 9. Remove the backup batteries connected to the S-axis motor and the Laxis motor. 10. Connect the tube for grease exhaust to the back of the cover 3 , and mount the cover 3 with the cross head APS bolts 4 . 11. Mount the cover 12 with the GT-SA bolts 11 . 12. Tighten the GT-SA bolts 11 with the tightening torque shown in table 10-3 “S-Head Cable Wiring Parts Checklist” . 13. Fix the white marked part of the internal wiring harness to the support 17 by using cable ties. 14. Run the internal wiring harness through the L-arm, then mount the cover 1 with the cross head APS bolts 2 . 10-9 HW1480357 76/91 HW1480357 HP20D 10 Cable Wiring 10.2 Connecting Cables 10.2.2 Cables in U-Arm • Refer to table 10-2 “U-Arm Cable Wiring Parts Checklist” and fig. 10-2 “U-Arm Cable Wiring” . 1. Hold the spring part (the second or third coil from the end of the spring) of the B- and T-axis internal wiring harness by using the saddles 16 . Then, fix it to the support 18 and 19 with the hexagon socket head cap screws 17 . 2. Tighten the hexagon socket head cap screws 17 with the tightening torque shown in table 10-2 “U-Arm Cable Wiring Parts Checklist” . 3. Fix the white marked part of the B- and T-axis internal wiring harness by using a cable tie. 4. Apply the Multemp PS2A grease to the spring of the B- and T-axis internal wiring harness. Pass the B- and T-axis motor connectors through the wrist unit, then set the spring in the casing. Mount the support 18 and 19 to the casing respectively with the GT-SA bolts 15 and 14 . 5. Tighten the GT-SA bolts 15 and 14 with the tightening torque shown in table 10-2 “U-Arm Cable Wiring Parts Checklist” . 6. Pass the connectors of the B- and T-axis internal wiring harness to the R-axis motor side. Mount the support 13 to the casing with the GT-SA bolts 12 . 7. Tighten the GT-SA bolts 12 with the tightening torque shown in table 10-2 “U-Arm Cable Wiring Parts Checklist” . 8. Run the internal wiring harness through the S-cover 7 . Hold the spring by using the stoppers 11 , then fix it to the S-cover 7 with the GTSA bolts 10 . 9. Tighten the GT-SA bolts 10 with the tightening torque shown in table 10-2 “U-Arm Cable Wiring Parts Checklist” . 10. Fix the white marked part of the internal wiring harness to the support 8 (which is mounted on the S-cover 7 ) by using a cable tie. 11. Fix the internal wiring harness to the S-cover 7 by using cable ties. (For the positions of the air line tube, 3BC cable, and U-, R-, B-, and Taxis cables, see fig. 10-2 “U-Arm Cable Wiring” .) 12. Push the internal wiring harness into the casing, then apply ThreeBond 1206C to the matching surface between the S-cover 7 and the casing. Mount the S-cover 7 to the casing with the GT-SA bolts and hexagon socket head cap screws 6 . 13. Tighten the GT-SA bolts and hexagon socket head cap screws 6 with the tightening torque shown in table 10-2 “U-Arm Cable Wiring Parts Checklist” . 14. Mount the internal wiring harness connector to the N-base 5 with the pan-head sems screws 4 . At this time, make sure that the main key of the connector is set upward. Then, insert the air line tube. 15. Mount the N-base 5 to the casing with the cross head APS bolts 3 . 16. Mount the ground wire of the internal wiring harness to the casing with the cross head APS bolt 9 . 17. Connect the B- and T-axis internal wiring harness to the internal wiring harness. 18. Mount the cover 1 with the GT-SA bolts 2 . 10-10 HW1480357 77/91 HW1480357 HP20D 10 Cable Wiring 10.2 Connecting Cables 19. Apply ThreeBond 1206C to the matching surface between the cover 1 and the casing. Tighten the GT-SA bolts 2 with the tightening torque shown in table 10-2 “U-Arm Cable Wiring Parts Checklist” . 10.2.3 Cables in Wrist Unit • Refer to table 10-1 “B- and T-Axis Cable Wiring Parts Checklist” and fig. 10-1 “B- and T- Axis Cable Wiring” . 1. Fix the white marked part of the B- and T-axis internal wiring harness to the support 4 by using a cable tie. 2. Mount the support 4 to the wrist unit with the GT-SA bolts 3 . 3. Tighten the GT-SA bolts 3 with the tightening torque shown in table 10-1 “B- and T-Axis Cable Wiring Parts Checklist” . 4. Connect the connectors of the B- and T-axis motors to the internal wiring harness. 5. Remove the backup batteries connected to the B- and T-axis motors. Protect the connecting parts of the connectors of the B- and T-axis motors and the internal wiring harness by using plastic covers, then put them back. Tie up both ends of each plastic cover by using cable ties. 6. Apply ThreeBond 1206C to the matching surface between the cover 1 and the wrist unit. Then, mount the cover 1 with the GT-SA bolts 2 . 7. Tighten the GT-SA bolts 2 with the tightening torque shown in table 10-1 “B- and T-Axis Cable Wiring Parts Checklist” . 10-11 HW1480357 78/91 HW1480357 11 Parts List 11.1 S-Axis Unit HP20D 11 Parts List 11.1 S-Axis Unit Fig. 11-1: S-Axis Unit 1008 1001 1011 1012 1010 1034 1013 1036 1020 1035 1031 1032 1014 1024 1023 1022 1021 1026 1009 1030 1024 1023 1027 1030 1033 1002 1016 1004 1015 1017 1003 1006 1018 1025 1005 1014 1020 1007 1028 1029 11-1 HW1480357 79/91 HW1480357 HP20D 11 Parts List 11.1 S-Axis Unit Table 11-1: S-Axis Unit No. DWG No. Name Pcs. 1001 SGMRV-09ANA-YR1* Motor 1 1002 HW0100545-2 S-head 1 1003 M16X20 Socket screw 1 1004 2H-16 Conical spring washer 1 1005 HW0387753-B Speed reducer 1 1006 M10X40 GT-SA bolt 16 1007 HW0100544-2 Base 1 1008 M8X30 GT-SA bolt 3 1009 HW0305306-2 M-base 1 1010 M5X10 APS bolt 1 1011 PT1/8 Plug 1 1012 UKM6-01 Union 1 1013 HW0305809-1 Cover 1 1014 NB-0640-0.3 Tube 2 1015 HW0304221-1 Cover 1 1016 M6X15 GT-SA bolt 2 1017 MSB8-15 Shoulder 1 1018 HW0400645-1 Lever 1 1019 M5X10 APS bolt 6 1020 TSH6-01M Union 2 1021 CD-31 Saddle 1 1022 M6X10 Socket screw 2 1023 TA1-S10 Clamp 2 1024 M5X10 Screw with spring washer 2 1025 EZ5036A0 Cap 1 1026 M6X15 GT-SA bolt 2 1027 HW0305812-1 Holder 1 1028 HW9406775-1 Cover 1 1029 M6X8 APS bolt 1 1030 M12 Eye bolt 2 1031 M8X60 Socket screw 3 1032 2H-8 Conical spring washer 3 1033 M12X35 GT-SA bolt 12 1034 HW0313491-1 Gear 1 1035 M6X60 Socket screw 1 1036 2H-6 Conical spring washer 1 11-2 HW1480357 80/91 HW1480357 11 Parts List 11.2 L-Axis Unit HP20D 11.2 L-Axis Unit Fig. 11-2: L-Axis Unit 2024 2025 2001 2023 2017 2005 2004 2008 2011 2012 2019 2010 2009 2018 2028 2003 2006 2002 2007 2032 2026 2027 2014 2013 2022 2021 2020 2014 2013 2016 2015 2029 1002 2031 2030 2033 2034 2035 2036 2031 11-3 HW1480357 81/91 HW1480357 HP20D 11 Parts List 11.2 L-Axis Unit Table 11-2: L-Axis Unit No. DWG No. Name Pcs. 2001 SGMRV-13ANA-YR2* Motor 1 2002 M6X90 Socket screw 1 2003 2H-6 Conical spring washer 1 2004 HW0313492-1 Gear 1 2005 HW0304229-1 M-base 1 2006 Y426012.5 Oil seal 1 2007 HW0401506-1 Plate 1 2008 HW0304226-1 Support 1 2009 M6X10 Socket screw 2 2010 2H-6 Conical spring washer 2 2011 HW0304227-1 Cover 1 2012 M6X8 APS bolt 4 2013 M12X40 Socket screw 12 2014 2H-12 Conical spring washer 12 2015 M10X35 Socket screw 6 2016 2H-10 Conical spring washer 6 2017 HW0100546-2 L-arm 1 2018 HW0387753-C Speed reducer 1 2019 M10X40 GT-SA bolt 14 2020 M12X40 Socket screw 2 2021 2H-12 Conical spring washer 2 2022 HW0404196-4 Washer 1 2023 M8X30 GT-SA bolt 4 2024 M8X25 *DACROTIZED coating* Socket screw 4 2025 2H-8 *DACROTIZED coating* Conical spring washer 4 2026 TA1-S10 Clamp 4 2027 M5X10 Screw with spring washer 4 2028 M6X10 Socket screw 1 2029 HW0305813-1 Holder 1 2030 HW0305698-1 Cover 1 2031 M5X12 GT-SA bolt 6 2032 PT1/8 *DACROTIZED coating* Plug 1 2033 CD-31 Saddle 1 2034 M5X12 GT-SA bolt 2 2035 TA1-S10 Clamp 2 2036 M5X10 Screw with spring washer 2 1002 HW0100545-2 S-head 1 11-4 HW1480357 82/91 HW1480357 11 Parts List 11.3 U-Axis Unit HP20D 11.3 U-Axis Unit Fig. 11-3: U-Axis Unit 3003 3004 3002 3003 3004 3001 3005 3020 3002 3019 3019 3012 3006 2017 3016 3018 3017 3016 3018 3017 3009 3008 3011 3010 3007 3015 3013 3014 11-5 HW1480357 83/91 HW1480357 HP20D 11 Parts List 11.3 U-Axis Unit Table 11-3: U-Axis Unit No. DWG No. Name Pcs. 3001 SGMRV-05A3A-YR1* Motor 1 3002 HW0313489-1 Cover 1 3003 M4X10 APS bolt 7 3004 M4 Washer 7 3005 HW0102379-1 Casing 1 3006 HW9280880-G Speed reducer 1 3007 M8X45 GT-SA bolt 16 3008 M5X65 Socket screw 1 3009 2H-5 Conical spring washer 1 3010 M14X35 Socket screw 6 3011 GT-SH-14 GT-SH washer 6 3012 M8X30 GT-SA bolt 4 3013 M10X20 Socket screw 1 3014 H-10 Conical spring washer 1 3015 M6X10 Socket screw 1 3016 HW0404196-2 Washer 2 3017 M10X35 Socket screw 2 3018 2H-10 Conical spring washer 2 3019 PT1/8 Plug 2 3020 EZ2940A0 Cap 1 2017 HW0100546-2 L-arm 1 11-6 HW1480357 84/91 HW1480357 11 Parts List 11.4 R-Axis Unit HP20D 11.4 R-Axis Unit Fig. 11-4: R-Axis Unit 4033 4012 4031 4032 4029 4071 4074 4036 4072 4066 4010 4030 4029 4008 4042 4005 4058 3005 4057 4035 4009 4056 4043 4006 4007 4044 4011 4003 4028 4027 4026 4076 4075 4073 4022 4034 4023 4037 4060 4055 4039 4025 4040 4051 3014 4062 4046 4045 3012 4020 4013 4024 4019 4021 4015 4017 4067 4065 4014 4002 4016 4004 4001 4070 4069 4068 5046 4018 11-7 HW1480357 85/91 HW1480357 HP20D 11 Parts List 11.4 R-Axis Unit Table 11-4: R-Axis Unit (Sheet 1 of 2) No. DWG No. Name Pcs. 4001 M6X65 Socket screw 8 4002 2H-6 Conical spring washer 8 4003 M5X20 GT-SA bolt 4 4004 M4X12 GT-SA bolt 4 4005 HW0305305-1 M-cover 1 4006 M4X20 Socket screw 12 4007 2H-4 Conical spring washer 12 4008 HW0404196-5 Washer 1 4009 M6X20 GT-SA bolt 8 4010 M4X45 Socket screw 1 4011 M6X6 Socket screw 1 4012 A-MT6X1 G Nipple 1 4013 HW0381872-A Cross roller bearing 1 4014 M6X35 GT-SA bolt 8 4015 HW0403879-1 Saddle 1 4016 TC941045*A727* Oil seal 1 4017 HW0403857-1 Shaft 1 4018 HW0405201-2 Block 1 4019 HW0304318-1 Housing 1 4020 HW0304085-1 Shaft 1 4021 HW0304914-1 Support 1 4022 HW0403879-1 Saddle 1 4023 M4X20 Socket screw 2 4024 M4X12 GT-SA bolt 2 4025 HW0200530-1 S-cover 1 4026 HW0404919-1 Support 1 4027 M5X16 Socket screw 2 4028 2H-5 Conical spring washer 2 4029 HW0381463-A Speed reducer 1 4030 HW0404403-1 Shaft 1 4031 AE1314A0 Oil seal 1 4032 HW0304932-1 M-base 1 4033 HW0404402-1 Shaft 1 4034 2H-4 Conical spring washer 2 4035 HW0404900-1 N-base 1 4036 M4X10 Screw with spring washer 4 4037 M5X16 GT-SA bolt 4 4039 TA1-S8 Clamp 4 4040 M4X8 Screw with spring washer 4 4042 M5X8 APS bolt 1 4043 M6X6 Socket screw 1 4044 LP-M5 Plug 1 4045 M5X35 Socket screw 2 4046 2H-5 Conical spring washer 2 11-8 HW1480357 86/91 HW1480357 HP20D 11 Parts List 11.4 R-Axis Unit Table 11-4: R-Axis Unit (Sheet 2 of 2) No. DWG No. Name Pcs. 4051 M4X12 GT-SA bolt 2 4055 HW0404918-1 Support 1 4056 SGMPH-02A2A-YR1* Motor 1 4057 EZ5036A0 Cap 1 4058 M6X20 GT-SA bolt 6 4060 HW0304930-1 Support 1 4062 6811LLU Bearing 1 4065 M4X20 Socket screw 2 4066 KQE12-03 Union 1 4067 2H-4 Conical spring washer 2 4068 M4X20 Socket screw 2 4069 2H-4 Conical spring washer 2 4070 MS4-10 Pin 2 4071 2H-4 Conical spring washer 1 4072 PT 3/8 Plug 1 4073 M4X12 GT-SA bolt 2 4074 M6X30 GT-SA bolt 3 4075 TA1-S8 Clamp 3 4076 M4X8 Screw with spring washer 3 3005 HW0102378-1 Casing 1 3012 M4X16 GT-SA bolt 4 3014 HW0404179-1 Support 2 5046 HW0100623-1 U-arm 1 11-9 HW1480357 87/91 HW1480357 11 Parts List 11.5 Wrist Unit HP20D 11.5 Wrist Unit Fig. 11-5: Wrist Unit 3005 5045 5046 5005 5001 5002 5003 5006 5007 5011 5008 5008 5007 5045 5026 5044 5006 5037 5064 5003 5035 5071 5043 5005 5048 5038 5014 5019 5039 5049 5040 5013 5012 5036 5018 5041 5062 5016 5031 5032 5063 5017 5047 5023 5071 5042 5029 5020 5022 5053 5028 5050 5027 5024 5034 5033 5021 5025 5026 5065 5030 5066 5052 5060 11-10 HW1480357 88/91 HW1480357 HP20D 11 Parts List 11.5 Wrist Unit Table 11-5: Wrist Unit (Sheet 1 of 2) No. DWG No. Name Pcs. 5001 HW9406556-1 Support 1 5002 M4X12 GT-SA bolt 2 5003 M5X20 GT-SA bolt 4 5005 HW9200798-1 Cover 2 5006 SGMPH-02A2A-YR12 Motor 2 5007 M4X16 Socket screw 2 5008 HW9482727-A Pulley 2 5011 80S4.5M518 Belt 1 5012 HW9381658-A Gear 1 5013 M4X12 GT-SA bolt 4 5014 HW9405452-1 B-cover 1 5016 HW9482725-A Pulley 1 5017 M5X16 GT-SA bolt 1 5018 M4X16 GT-SA bolt 4 5019 HW9482218-A Bearing 1 5020 HW9405199-1 B nut 1 5021 SP-0120** Shim 1 5022 HW9481180-A Bearing 1 5023 M5X16 GT-SA bolt 1 5024 M5X12 GT-SA bolt 8 5025 HW0304232-1 Shaft 1 5026 TC60747 Oil seal 2 5027 HW9481187-A Bearing 1 5028 HW0304233-1 Shaft 1 5029 S75 O ring 1 5030 HW0304087-1 Housing 1 5031 HW0382140-A Speed reducer 1 5032 HW0304086-1 Housing 1 5033 HW9381659-A Gear 1 5034 HW9482726-A Pulley 1 5035 M5X16 Socket screw 1 5036 6002ZZ Bearing 1 5037 6901ZZ Bearing 1 5038 6814ZZ Bearing 1 5039 HW9482668-A Oil seal 1 5040 HW9381633-A Speed reducer 1 5041 HW9405792-1 Housing 1 5042 HW0200451-1 Wrist base 1 5043 M5X16 GT-SA bolt 11 5044 80S4.5M653 Belt 1 5045 M5X12 GT-SA bolt 24 5046 HW0100623-1 U-arm 1 5047 M6X6 Socket screw 1 5048 M4X16 GT-SA bolt 12 11-11 HW1480357 89/91 HW1480357 HP20D 11 Parts List 11.5 Wrist Unit Table 11-5: Wrist Unit (Sheet 2 of 2) No. DWG No. Name Pcs. 5049 M4X12 GT-SA bolt 4 5050 M6X6 Socket screw 1 5052 M5X16 GT-SA bolt 5 5053 M6X6 Socket screw 1 5060 M5X16 GT-SA bolt 4 5062 LP-M5 Plug 1 5063 HW9405791-3 Housing 1 5064 6811LLU Bearing 1 5065 HW0404606-1 Cover 1 5066 HW040605-1 Plug 1 3005 HW0102378-1 Casing 1 11-12 HW1480357 90/91 MOTOMAN-HP20D MAINTENANCE MANUAL For inquiries or after-sales service on this product, contact your local YASKAWA representative as shown below. YASKAWA ELECTRIC CORPORATION 2-1 Kurosakishiroishi, Yahatanishi-ku, Kitakyushu, 806-0004, Japan Phone: +81-93-645-7703 Fax: +81-93-645-7802 www.yaskawa.co.jp YASKAWA AMERICA, INC. (MOTOMAN ROBOTICS DIVISION) 100 Automation Way, Miamisburg, OH 45342, U.S.A. Phone: +1-937-847-6200 Fax: +1-937-847-6277 www.motoman.com YASKAWA EUROPE GmbH (ROBOTICS DIVISION) Yaskawastrasse 1, 85391, Allershausen, Germany Phone: +49-8166-90-0 Fax: +49-8166-90-103 www.yaskawa.eu.com YASKAWA NORDIC AB Verkstadsgatan 2, Box 504, SE-385 25 Torsas, Sweden Phone: +46-480-417-800 Fax: +46-486-414-10 www.yaskawa.se YASKAWA ELECTRIC (CHINA) CO., LTD. 22F, One Corporate Avenue, No.222 Hubin Road, Huangpu District, Shanghai 200021, China Phone: +86-21-5385-2200 Fax: +86-21-5385-3299 www.yaskawa.com.cn YASKAWA SHOUGANG ROBOT CO., LTD. No.2 Building, No.6 Rongchang East Street, Beijing E&T Development Area, Beijing 100176, China Phone: +86-10-6788-2858 Fax: +86-10-6788-2878 www.ysr-motoman.cn YASKAWA ELECTRIC KOREA CORPORATION 6F, 112, LS-ro, Dongan-gu, Anyang-si, Gyeonggi-do, 14118, Korea Phone: +82-31-8015-4224 Fax: +82-31-8015-5034 www.yaskawa.co.kr YASKAWA ELECTRIC TAIWAN CORPORATION 12F, No.207, Sec. 3, Beishin Rd., Shindian District, New Taipei City 23143, Taiwan Phone: +886-2-8913-1333 Fax: +886-2-8913-1513 www.yaskawa.com.tw YASKAWA ASIA PACIFIC PTE. LTD. 30A Kallang Place, #06-01, 339213, Singapore Phone: +65-6282-3003 Fax: +65-6289-3003 www.yaskawa.com.sg YASKAWA ELECTRIC (THAILAND) CO., LTD. 59, 1st-5th Floor, Flourish Building, Soi Ratchadapisek 18, Ratchadapisek Road, Huaykwang, Bangkok 10310, Thailand Phone: +66-2-017-0099 Fax: +66-2-017-0199 www.yaskawa.co.th PT. YASKAWA ELECTRIC INDONESIA Secure Building-Gedung B Lantai Dasar & Lantai 1 Jl. Raya Protokol Halim Perdanakusuma, Jakarta 13610, Indonesia Phone: +62-21-2982-6470 Fax: +62-21-2982-6471 www.yaskawa.co.id YASKAWA INDIA PRIVATE LIMITED (ROBOTICS DIVISION) No.136, Sector-8, Industrial Estate, IMT Manesar, Gurugram, Haryana 122050, India Phone: +91-124-475-8500 www.yaskawaindia.in Specifications are subject to change without notice for ongoing product modifications and improvements. C Printed in Japan July 2023 11-05 YASKAWA ELECTRIC CORPORATION MANUAL NO. HW1480357 5 91/91 ">
/
Scarica
Solo un promemoria. Puoi visualizzare il documento qui. Ma soprattutto, la nostra IA l''ha già letto. Può spiegare cose complesse in termini semplici, rispondere alle tue domande in qualsiasi lingua e aiutarti a navigare rapidamente anche nei documenti più lunghi o complicati.
Pubblicità