Key features

  • Three-phase power distribution hub

  • Supports up to two inverters in parallel

  • Waterproof AC/signal cable connectors

  • T-shaped bracket for secure mounting

  • Clear wiring layout for easy installation

  • Torque specs for safe connections

Frequently asked questions

No, when the Power Dock Pro is installed, the Backup Port on the inverter should not be connected.

The X1 Power Module supports a maximum of two units in parallel when connected to the Power Dock Pro.

For a two-inverter parallel connection to the Power Dock Pro, the communication cable can be connected to either inverter.

The network cable for the X1 Power Module should be kept within 30 meters.

Install the equipment in a cool, sheltered location, away from direct sunlight and rain, and ensure cable routing keeps the network cable within 30 m.