Anker SOLIX Power Dock Pro (Single-Phase)
[email protected]
(UK) +44 (0) 1604 936 200
2 Unboxing
For User Guide / App / Support
1 Overview
• When the Power Dock Pro is installed, Backup Port on the inverter should not be connected.
• When connected to Power Dock Pro, X1 Power Module supports a maximum of two units in parallel. For supported inverter models, refer to the online
Installer Guide.
• For a two-inverter parallel connection to the Power Dock Pro, the communication cable can be connected to either inverter.
Anker SOLIX Power Dock Pro
Decorative Cover
Primary Scenario
T-shaped Rear Bracket
M4
×1
*Dashed boxes indicate
optional components.
Main Panel
AC Cable
Circuit Breaker Locking Pin
Waterproof Connector
(AC Cable Gland) ×6
Waterproof Connector
(Signal Cable Gland) ×1
M8 70 mm
×4
M4 12 mm
×4
M8 70 mm
×4
Flange Nut
Expansion Bolt
Self-Tapping Screw
20-pin Pluggable
Terminal Block
Network Cable for
X1 Power Module
M5 12 mm
×1
Screw
Thumb Screw
Documents
Communication Cable
Grid
Fuse
Main Meter
Sub Panel
3 Installation
Dimensions
3.1 Select Installation Site
Spacing
450 mm
• Only qualified professionals or trained personnel are allowed to
install and maintain the equipment.
• Install the equipment in a cool, sheltered location, away from direct
sunlight and rain.
• Plan cable routing to keep the network cable for X1 Power Module
within 30 m.
Smart
Port
INV-1
INV-2
Backup
Grid
155 mm
≥200 mm
25 mm
≥200 mm
550 mm
≥60
0m
≥200 mm
m
NonBackup
≥350 mm
150 mm
≥1000 mm
21 kg
Non-Backup Loads
Non-Backup Loads
3.2 Remove Door and Inner Panel
Third-party
PV System
3.3 Mount the Bracket
Backup Loads
3
PV Panels
PV+
RJ45
RJ45
PV-
AC Grid
PV Panels
PV+
RJ45
RJ45
PV-
AC Grid
1
8 mm
75-80 mm
90
︒
2
Inverter 2
Inverter 1
M4
1N·m
M5
M4
1N·m
1N·m
4
M8
M4
8.8 N · m
1N·m
Other Scenario
4 Electrical Connections
Main Panel
Grid
Fuse
• Before wiring, ensure the main circuit breaker is off.
• Disconnect and remove wiring of existing Anker SOLIX energy storage systems from the distribution box for reconnection.
Main Meter
4.1 Wiring Suggestions
Option 1: Bottom Cable Entry
Sub Panel
Option 2: Rear Cable Entry
1
CT1
1
1
CT2
1
INV-1
INV-2
Backup
2
Grid
2
2
3
3
Backup Loads
3
4
5
6
7
2
8
11
3
1
1
PV+
PV-
RJ45
RJ45
AC Grid
Inverter 1
PV+
PV Panels
PV-
RJ45
RJ45
1
2
3
4
5
6
22
33
44
55
4
5
6
7
8
22
44
33
55
66 77 8
66 77 8
7 8
AC Grid
Inverter 2
3
2
Routing Holes 2-7
3
Third-party
PV System
PV Panels
2
1
Routing Hole 1
Non-Backup
Loads
1
L1
N
PE / PEN
Communication cable
1
Communication cable
2
Smart port cable
3
Inverter cable
4
Inverter cable
5
Backup load cable
6
Grid cable
7
Non-backup load cable
8
PEN Cable
4.2 Connect the PEN Cable
4.6.2 Connect RS485 Cable
4.3 Connect the PE Busbar
Connect the PE busbar of the Power Dock Pro to the PE
busbar of the distribution panel.
• The following sections use bottom cable entry as an example. For rear
entry, refer to the online Installer Guide.
• Tighten the circuit breaker terminals to the specified torque: 3.5 N.m for 80 A
breakers and 2 N.m for 63 A and 32 A breakers.
The method to connect the DI / DO / RS485 cable is the same. This section takes connecting the RS485 cable as an example.
1
The PEN conductor must be connected to the building's Main Earthing Terminal (MET).
2
Main Panel
10 mm
PE
PEN
COM 1
Meter_B
12±1 mm
PEN
M5
4
Φ 2-4mm
Meter_A
20
19
2
1
3
3.5 N · m
M5
0.2-1.5 mm2
3N·m
4.4 Connect to Inverter / Backup Loads / Non-Backup Loads / Power Grid
A
B
≤16 mm2
/
M5
Anker SOLIX Power Dock Pro
M5
2N·m
L1
3.5 N · m
12±1 mm
INV-1
Φ
N
A
Cable Type
Outer diameter
Cross-sectional area of
core conductor
Inverter Cable
8-17 mm
6 mm2
Grid / Backup Load /
Non-Backup Load Cable
9-25 mm
16 mm2
PE
B
>L+3 mm
L
5 Complete Connections
5.1 Install Inner Panel and the Cover
5.2 Install Decorative Cover (Optional)
1
2
1
4.5 Connect to Smart Port Loads
3
≤16 mm2
L1
Smart
Port
12±1 mm
A
A
Φ 9-25mm
B
N
PE
B
M5
M5
2N·m
3.5 N · m
>L+3 mm
2
L
M4
1N·m
M4
M4
1N·m
2N·m
4.6 Connect Communication Cables
4.6.1 Connect the Network Cable for X1 Power Module
The network cable for X1 Power Module is included in the accessory kit. If you need to make your own cable, follow the steps below.
6 Device Setup
1. Switch on the circuit breakers in the following order:
QF5 → QF2 / QF3 → QF1 → QF4.
1
0.13-0.2 mm2
< 30m
3. Download the Anker SOLIX
Professional app and follow the
in-app instructions and online
Installer Guide to complete the setup.
During normal operation, keep the circuit
breaker locking pin engaged to ensure the
bypass switch remains in the OFF position.
1 2 3 4 5 6 7 8
8
6
4
2
2. Close and lock the equipment door.
7
5
3
1
Φ 4-7.5mm
1
8
M5
1N·m
or
1 2 3 4 5 6 7 8
2
M5
8
7
2
1
COM 2
Anker SOLIX Power Dock Pro
RJ45
Anker SOLIX X1 Power Module
Model: Power Dock Pro 63-S0-EU
51005006559 V1
">