Anker SOLIX Power Dock Pro (Single-Phase)
[email protected]
(AU) +61 1800 929 112
2 Unboxing
For User Guide / App / Support
1 Overview
• When the Power Dock Pro is installed, Backup Port on the inverter should not be connected.
• When connected to Power Dock Pro, X1 Power Module supports a maximum of two units in parallel. For supported inverter models, refer to
the online Installer Guide.
• For a two-inverter parallel connection to the Power Dock Pro, the communication cable can be connected to either inverter.
Decorative Cover
Anker SOLIX Power Dock Pro
T-shaped Rear Bracket
M4
×1
Primary Scenario
*Dashed boxes indicate
optional components.
Main Panel
Circuit Breaker Locking Pin
Waterproof Connector
(AC Cable Gland) ×6
M8 70 mm
×4
Flange Nut
N-PE Link
Waterproof Connector
(Signal Cable Gland) ×1
M8 70 mm
×4
Expansion Bolt
20-pin Pluggable
Terminal Block
M5 12 mm
×1
M4 12 mm
×4
Self-Tapping Screw
Network Cable for
X1 Power Module
Screw
Thumb Screw
Documents
AC Cable
Communication Cable
Grid
Fuse
Main Meter
Sub Panel
3 Installation
Dimensions
3.1 Select Installation Site
450 mm
• Only qualified professionals or trained personnel are allowed to
install and maintain the equipment.
• Install the equipment in a cool, sheltered location, away from direct
sunlight and rain.
• Plan cable routing to keep the network cable for X1 Power Module
within 30 m.
Smart INV INV Back-1 -2 up
Port
Grid
Spacing
155 mm
≥200 mm
25 mm
NonBackup
≥350 mm
150 mm
≥60
0m
≥200 mm
≥200 mm
550 mm
m
≥1000 mm
20 kg
Non-Backup Loads
Third-party
PV System
3.2 Remove Door and Inner Panel
Backup Loads
3
RJ45
RJ45
PV-
75-80 mm
90
︒
PV+
AC Grid
PV Panels
PV-
Inverter 1
AC Grid
2
Inverter 2
Other Scenario
M5
M4
1N·m
1N·m
M4
1N·m
4
• Before wiring, ensure the main circuit breaker is off.
• Disconnect and remove wiring of existing Anker SOLIX energy storage systems from the distribution box for reconnection.
Grid
Main Meter
Sub Panel
4.1 Wiring Suggestions
Option 1: Bottom Cable Entry
Option 2: Rear Cable Entry
1
1
1
CT1
M8
8.8 N · m
4 Electrical Connections
Main Panel
Fuse
8 mm
M4
1N·m
1
RJ45
RJ45
PV+
PV Panels
3.3 Mount the Bracket
1
CT2
INV INV Back-1 -2 up
Grid
2
2
2
3
Backup Loads
3
2
1
3 4 5
6 7
2
6 7
3 4 5
1
Routing Hole 1
2
Routing Holes 2-7
11
Non-Backup
Loads
3
Third-party
PV System
RJ45
RJ45
RJ45
RJ45
PV+
PV Panels
PV-
2
2
3
3
44
55
66 77
3
1
2
3
4
5
6
7
1
1
22
33
44
55
66 77
PV+
AC Grid
PV Panels
Inverter 1
PV-
AC Grid
Inverter 2
L1
N
PE
Communication cable
1
Communication cable
2
Smart port cable
3
Inverter cable
4
Inverter cable
5
Backup load cable
6
Grid cable
7
Non-backup load cable
4.2 Connect the N Busbar and PE Busbar
4.5.2 Connect RS485 Cable
4.3 Connect to Inverter / Backup Loads / Non-Backup Loads / Power Grid
The method to connect the DI / DO / RS485 cable is the same. This section takes connecting the RS485 cable as an example.
• The following sections use bottom cable entry as an example. For rear entry,
refer to the online Installer Guide.
• Tighten the circuit breaker terminals to the specified torque: 3.5 N·m for 80 A
breakers and 2 N·m for 63 A and 32 A breakers.
• If the Power Dock Pro is used as the primary distribution
box, the provided N-PE link must be installed to
short-circuit the neutral (N) busbar to the ground (PE)
busbar.
1
Used as Primary Distribution Box
2
Main Panel
12±1 mm
N PE
INV
-1
10 mm
L1
A
B
M5
3.5 N · m
COM 1
Meter_B
Φ
N
B
PE
4
Φ 2-4mm
>L+3 mm
Other Scenarios
A
Meter_A
L
19
2
1
3
0.2-1.5 mm2
B
20
/
Main Panel
PE
M5
3.5 N · m
N
M5
M5
2N·m
3.5 N · m
Cable Type
Outer diameter
Cross-sectional area of core conductor
Inverter Cable
8-17 mm
6 mm2
Grid / Backup Load / Non-Backup Load Cable
9-25 mm
16 mm2
Anker SOLIX Power Dock Pro
5 Complete Connections
5.1 Install Inner Panel and the Cover
4.4 Connect to Smart Port Loads
5.2 Install Decorative Cover (Optional)
When connecting a third-party PV system to the Smart Port, the neutral (N) wire can be connected to the N busbar.
1
2
1
3
12±1 mm
L1
Smart
Port
≤16 mm2
Φ 9-25mm
A
A
N
PE
B
B
>L+3 mm
M5
M5
2N·m
3.5 N · m
2
L
M4
1N·m
4.5 Connect Communication Cables
Different communication ports are not interchangeable. Verify the port labels before connecting to avoid system malfunction.
4.5.1 Connect the Network Cable for X1 Power Module
The network cable for X1 Power Module is included in the accessory kit. If you need to make your own cable, follow the steps below.
M4
2N·m
6 Device Setup
1. Switch on the circuit breakers in the following order:
QF5 → QF2 / QF3 → QF1 → QF4.
2. Close and lock the equipment door.
3. Download the Anker SOLIX
Professional app and follow the
in-app instructions and online
Installer Guide to complete the setup.
During normal operation, keep the circuit
breaker locking pin engaged to ensure the
bypass switch remains in the OFF position.
1
1 2 3 4 5 6 7 8
0.13-0.2 mm2
< 30m
M4
1N·m
8
6
4
2
7
5
3
1
Φ 4-7.5mm
1
8
M5
1N·m
or
1 2 3 4 5 6 7 8
2
8
7
2
1
COM 2
Anker SOLIX Power Dock Pro
M5
RJ45
Anker SOLIX X1 Power Module
Model: Power Dock Pro 63-S0-AU
51005006508 V2
">