Initial System Power Up And Test. Brigade BN360 USB (4648B)


Add to my manuals
34 Pages

advertisement

Initial System Power Up And Test. Brigade BN360 USB (4648B) | Manualzz

5

Initial System Power Up And Test

Turn on the vehicle ignition and check the image output on the monitor.

Each cameras single view can be checked by pressing the View Select button on the Set-up & View Select button.

Connecting the calibration tool (without SD card) will put the system into full screen mode, where the cameras can be viewed better. Scroll through each camera by pressing the view select button on the

Set-up & View Select button

to check the views are unobstructed and all calibration grid reference points can be seen. Each camera is named in the top left corner of the display, Front Camera, Rear Camera etc.

Note: ‘

WARNING ' will be displayed on the monitor until a calibration has been completed for the first time.

9

advertisement

Was this manual useful for you? Yes No
Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Related manuals