Loader storage. Wacker Neuson WL18
Publicitate
Publicitate
W L18
SE RVICING A ND INSPEC TION 205
10.9 Loader storage
The specified measures refer to shutting down and re-start
ing the loader over longer periods of time.
Shutting down the loader
Note:
Follow the Operator’s Manual for the engine.
Before beginning the shutdown procedures, drive the
Wheel Loader to its storage location.
1. Park the loader as described in Section 9, page 123
»Securing the loader«.
2. Engage the articulated frame lock (Ref. Section 6.2, page 112).
3. Raise the loader so that the tires no longer touch the ground.
4. Release the parking brake.
5. Lower the loader lift arms and attachment to the ground.
6. Relieve residual hydraulic pressure, ref. Section 8, page
120 »Relieving residual pressure in the hydraulic system«. Move all hydraulic controls to the neutral position.
7. Spray bare metal parts of the loader (e.g.: the piston rods of the hydraulic cylinders if they are not retracted) with an anti-corrosion agent.
8. Preserve the engine.
WL18 USA.indb 205 12.08.2013 15:04:56
206 SE RVICING A ND INSPEC TION
Preserving the engine Storing the battery:
1. Clean the engine in a suitable place using a high-pressure cleaner.
2. Bring the engine to operating temperature.
3. Drain the engine oil and dispose of it in an ecologically sound manner.
4. Pour anti-corrosion oil into the engine.
5. Drain the fuel from the reservoir.
6. Produce a mixture of 90% fuel and 10% anti-corrosion oil and pour it into the fuel reservoir.
7. Let the engine idle for 10 minutes before turning it off.
8. To preserve the cylinders and combustion chamber, crank the engine by hand several times.
9. Remove the fan belt and pack it for storage so that it is airtight and light-proof.
10. Spray the belt pulley contact surface with anti-corrosion agent.
11. Close the intake and exhaust opening of the engine.
1. Remove the battery.
2. Clean the battery.
3. Charge the battery.
4. Store the battery in a dry, well-ventilated room at approx. 20°C (68°F).
5. Check the acid level once a month.
6. Recharge the battery before installing it again.
WL18 USA.indb 206 12.08.2013 15:04:56
W L18
SE RVICING A ND INSPEC TION 207
Restarting the loader Remove preservatives from the engine
1. Remove the engine preservative.
2. Install the battery.
3. Check the air pressure of the tires.
4. Remove the preservative for the hydraulic cylinders‘ piston rods.
5. Lower the loader.
6. Check the functioning of the electrical system.
7. Unblock the articulated joint.
8. Vent the hydraulic system.
9. Check the functioning of the steering and the brakes.
1. Remove the closures from the intake and exhaust opening of the engine.
2. Remove the anti-corrosion agent from the pulley.
3. Install the fan belt.
4. Drain the preservative oil and pour in engine oil.
5. Start up the engine.
6.
Check the V-belt tension after the first two operating hours.
WL18 USA.indb 207 12.08.2013 15:04:56
Descarcă
Publicitate