Primary And Secondary Power Wiring. Siemens FS-250

Add to My manuals
68 Pages

advertisement

Primary And Secondary Power Wiring. Siemens FS-250 | Manualzz

FS-250 Installation and Operation Manual

Primary And Secondary Power Wiring

The AC main connections (TB1) and the battery connections (J4) must be made along the left-hand side of the main termination board. Route all high voltage and non-power limited wiring together and away from power limited wiring.

TX-1

Supervised

120 VAC 60Hz

2.4A Max FS-250

Non-Power Limited

AC

N

GND

AC

N

GND

BB+

BAT.

Keep All Non-Power Limited Wiring

Separate from Power Limited Wiring

Battery Connections

Supervised

Non-Power Limited

For FS-250

24V Battery Set (7 to 38.5 AH)

Technical Manuals Online! - http://www.tech-man.com

31

advertisement

Related manuals

Download PDF

advertisement

Table of contents