FS-250 Installation and Operation Manual
Primary And Secondary Power Wiring
The AC main connections (TB1) and the battery connections (J4) must be made along the left-hand side of the main termination board. Route all high voltage and non-power limited wiring together and away from power limited wiring.
TX-1
Supervised
120 VAC 60Hz
2.4A Max FS-250
Non-Power Limited
AC
N
GND
AC
N
GND
BB+
BAT.
Keep All Non-Power Limited Wiring
Separate from Power Limited Wiring
Battery Connections
Supervised
Non-Power Limited
For FS-250
24V Battery Set (7 to 38.5 AH)
Technical Manuals Online! - http://www.tech-man.com
31
advertisement
Related manuals
Download
PDF
advertisement
Table of contents
- 9 Power Supply
- 10 P2 Addressable Device Circuit
- 10 Notification Appliance Circuits
- 10 Serial Interface Circuit
- 10 Status Relays
- 10 Programming Port
- 10 FS-MT Municipal Tie Board
- 10 FS-DACT Board
- 10 FS-NPE Transformer Assembly
- 11 Battery Sets
- 11 Serial LCD Annunciator
- 11 Serial Relay Unit and Serial Relay Extender
- 11 Serial Annunciator Unit and Serial Annunciator Extender
- 11 PAD-3 Remote Signal Expander
- 12 FirePrint™ Smoke Detector
- 12 Heat Detectors
- 12 Addressable Modules (Monitor and Control)
- 12 Manual Stations
- 12 Programming P2 devices
- 14 Environmental
- 14 Power Limiting
- 14 Ground Fault Detection
- 14 NAC Operation
- 14 Transient Protection
- 14 Security Features
- 15 Federal Communications Commission
- 15 Underwriters Laboratories
- 15 Environmental
- 15 Primary Supply
- 15 Secondary and Trouble Power Supply
- 15 Auxiliary Power Outputs
- 16 Status Relays
- 16 Notification Appliance Circuits
- 16 Serial Interface Circuit
- 16 P2 Addressable Device Circuits
- 17 Municipal Tie (Optional Municipal Tie Board FS-MT)
- 17 DACT Circuit (Optional DACT Board FS-DACT)
- 18 Standby Condition
- 18 Alarm Conditions
- 19 Trouble Conditions
- 20 Supervisory Conditions
- 20 Maintenance
- 20 Lamp Test
- 20 Drill
- 21 Recall
- 21 Pre-Alarm
- 21 General Alarm
- 21 Alert
- 22 History
- 25 With Enclosure Packages (Black or Red)
- 25 With Electronics Package
- 25 With FS-NPE Transformer Package
- 27 FS-250 Enclosure Mounting Pictures
- 28 Remove Knock-Outs
- 28 Main Board Installation
- 29 Transformer Mounting – FS-NPE
- 30 FS-DLC Loop Driver Board Mounting
- 30 Door Assembly
- 31 Display Board Installation
- 32 Front Plate Mounting
- 33 Ground Wire Installation – P/N
- 33 AC Supply Connection
- 34 Battery Installation
- 34 Powering The Control Panel
- 34 Optional Modules
- 34 Check System Operation
- 35 Control Panel Wiring Overview
- 35 Wiring Entering Enclosure
- 35 Install Wiring
- 36 Wiring Separation
- 37 Primary And Secondary Power Wiring
- 38 Status Relays And Auxiliary Power Outputs Wiring
- 38 FS-250 System Power Requirements (Does not include NAC power)
- 39 Auxiliary Power Supply
- 39 Battery Size Calculations
- 39 NAC Wiring
- 40 Serial Interface Circuit
- 41 Serial Remote Device Wiring Overview
- 41 P2 Addressable Device Circuit(s)
- 42 P2 Addressable Device Wiring Diagrams
- 47 Resistance of Solid Copper Wire
- 47 Notification Appliance Circuit Wire Selection Guide
- 47 Maximum Wire Loop Distance (Feet)
- 48 Addressable Device Circuit Wire Selection Guide
- 48 Line Resistance Graph
- 49 FS-250 Current Calculations
- 49 Auxiliary Module Battery Calculations
- 50 Device Current Calculations
- 51 Total System Currents
- 51 Battery Size
- 52 Siemens P2 Manual Pull Stations
- 52 Siemens P2 Modules
- 52 Siemens P2 Photo Electric Detectors
- 52 Siemens P2 Bases
- 52 Siemens P2 Accessories
- 53 Notification Appliances
- 62 A. General
- 63 B. System Troubles
- 64 C. System Events