- Home
- Domestic appliances
- Climate control
- Fireplaces
- Regency Fireplace Products
- HZ42E-LP
- Installation manual
advertisement
INSTALLATION
INNER PANEL INSTALLATION
Before installation, panels must be handled and cleaned as per instructions noted below:
Stainless Steel Panels
•
Stainless panels must be inspected for scratches and dimples prior to installation. All claims to be recorded at this time.
Claims for damage after installation will not receive consideration.
•
To protect the fi nish during installation and handling - cotton gloves MUST be worn at all times while handling the panels (even when removing protective coating).
•
Use a hair dryer or similar device to remove the protective coating from the panels.
•
Stainless panels will discolor a little during normal operation.
This is normal and should not be considered a defect.
* All hand and fi nger marks MUST be cleaned off with a soft cloth and a stainless steel cleaner. Most stainless steel cleaners leave a fi lm/ residue on the surface of the panels. Use an ammonia based cleaner (ie. glass cleaner) to remove this fi lm before applying heat to the unit.
Failure to do this will result in burn stains on panels which you will be unable to remove.
Not protected by product warranty.
1) Install the back panel fi rst - to maneuver the panel into position - tilt the top of the panel forward and position the bottom of the panel in fi rst. Use care - do not scratch the panel when clearing the pilot hood.
3) Install other side panel next. Position side panel and secure with a clip and one screw.
2) Install a side panel next (not important which side goes in fi rst).
Position the panel with the bend in the panel facing towards the outside or wall of the unit. Position side panel and secure with a clip and one screw.
4) Final install - shown below.
18
Regency Horizon™ HZO42 Gas Fireplace
advertisement
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Related manuals
advertisement
Table of contents
- 4 Copy of Safety Decal
- 5 Unit Dimensions
- 6 Important Message
- 6 Before You Start
- 6 General Safety Information
- 7 Installation Checklist
- 7 Locating Your Gas Fireplace
- 8 Important Installation Info for outdoor appliances
- 9 Minimum Clearances to combustibles
- 10 Framing Dimensions
- 11 Mantel Clearances
- 11 Non-Combustible Requirements
- 12 Finishing
- 13 High Elevation
- 13 Gas Line Installation
- 13 Pilot Adjustment
- 13 Gas Pipe Pressure Testing
- 13 880 S.I.T. Valve Description
- 13 Aeration Adjustment
- 14 Unit Assembly Prior to Installation
- 14 Standoff Assembly
- 14 Nailing Strips
- 15 Drain Installation (Recommended)
- 16 Wall switch and battery installation
- 17 Wiring Diagram
- 18 Inner panel installation
- 19 Glass crystal installation
- 20 Pebble installation
- 21 Volcanic stone installation
- 22 Optional Log Set Installation
- 24 Heat defl ector installation
- 25 Faceplate installation
- 26 Glass wind shield installation
- 26 Weather cover installation / removal
- 32 Operating Instructions
- 32 Lighting Procedure
- 32 Shutdown Procedure
- 32 First Fire
- 32 Aeration Adjustment
- 33 Copy of Lighting Plate Instructions
- 34 Maintenance Instructions
- 35 Valve assembly Replacement
- 36 Battery Replacement
- 38 Main Assembly
- 39 Burner Assembly
- 40 Accessories
- 43 Limited Warranty