advertisement
fig. 05 Mounting the Avanta
ø8 mm
2x
2.2.3 Mounting the Remeha Avanta
• Remove template from the box. mounting bracket and flue outlet.
• Drill the (Ø 8 mm) holes.
• Fit the (Ø 8 mm) plugs.
• Core drill the (Ø 125 mm) hole for the flue outlet
• Fit (Ø 6 mm) screws into the plugs.
• Remove boiler from the box and mount on bracket.
• The boiler should be mounted on a suitable vertical wall
which is able to support the weight of the boiler.
• The boiler should be mounted in a room which, even
during severe cold weather, remains frost-free, or frost
protection controls MUST be fitted.
• If the boiler is to be installed in a timber framed building,
please refer to British Gas publication: ‘Guide for Gas
Installations in Timber frame Housing’, reference DM2.
• Make sure the boiler and any open connections are
protected from building etc. dust during the installation.
• There must be a 3 amp fused switched spur within 1 m of
• Provision must be made for the condensate discharge.
The central heating system should not require a bypass, unless all radiators are fitted with TRV’s or when the system controls could allow the boiler and pump to operate when there is no flow. Where a bypass has to be fitted, the bypass must be placed at least 1.5 metres away from the boiler.
The ‘abc ® ’ control also monitors the temperature difference across the flow and return connections and the rate of temperature rise and will automatically regulate the boiler output to ensure that it remains operational for as long as possible without the need to ‘lock out’ requiring a manual reset.
59970.LT.GB.W7H.002
The system pump must be wired directly to the boiler terminal strip and be capable of providing the nominal flow at design conditions against the combined resistance of the boiler and system.
The minimum flow rate is 1.05 m 3 /h (0.29 l/s) at full load and
15°C differential across flow and return. To operate at dT =
11°C the flow rate must be 1.37 m 3 /h (0.38 l/s)
Higher resistance systems may require a higher duty pump.
The maximum power consumption of the pump may not exceed 150 W /1.5 amps.
The connection of the pump is described in par. 2.8
9
advertisement
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Related manuals
advertisement
Table of contents
- 4 INTRODUCTION
- 5 1 SAFETY
- 5 1.1 General safety
- 5 1.2 Safety during assembly and installation
- 7 2 INSTALLATION
- 7 2.1 Scope of delivery
- 7 2.2 Mounting the boiler
- 7 Installation / maintenance clearance requirements
- 8 Dimensions and connection points
- 9 Mounting the Remeha Avanta
- 9 2.3 Water-side connections
- 9 Water flow
- 9 System Pump
- 10 Pressure loss of the boiler
- 10 Open-Vented System
- 10 Sealed systems
- 10 Additional guidelines for the domestic and CH water
- 11 Water treatment
- 12 Safety valve discharge
- 12 Draining Provision
- 12 Connecting the ‘CH return
- 12 Connecting ‘CH flow
- 13 Connecting condensate drain
- 13 2.4 Gas-side connections
- 13 Additional guidelines for gas connections
- 13 Adjusting boiler to other gas-type
- 14 Connecting the gas supply
- 14 2.5 Flue terminal and air supply connections
- 14 Flue terminal positions
- 16 Room sealed flue
- 16 Connecting the flue terminal and air supply
- 17 2.6 Electrical connection
- 17 The control unit
- 18 2.7 Connecting external controls
- 21 Connecting an outside temperature sensor
- 22 Connecting the DHW sensor/thermostat
- 22 Connecting a three-way valve
- 22 Connecting a frost thermostat
- 23 Connecting an external interlock
- 24 Connecting a PC/PDA
- 24 2.8 Connecting an external pump
- 25 2.9 Wiring diagram
- 26 2.10 Commissioning
- 26 Control Panel
- 26 Additional guidelines for commissioning
- 26 Putting the boiler into operation
- 32 Normal start-up procedure
- 32 Error during the start-up procedure
- 33 Read out settings
- 34 Adjust the boiler according to the system
- 38 2.10.10 Restore factory settings
- 38 2.11 Putting the boiler out of operation
- 38 Boiler with frost protection, during longer periods of non-use
- 39 3.1 Inspection
- 40 Checking the condensate siphon
- 40 Checking the ignition electrode
- 41 Checking the combustion
- 42 3.2 Maintenance
- 46 4 ERRORS
- 46 4.1 General
- 46 4.2 Error codes
- 49 4.3 Control stop or lock-out
- 49 4.4 Error code memory
- 50 Error read outs
- 51 5 SERVICE PARTS
- 51 5.1 General
- 54 6 EC DECLARATION
- 55 7 REGULATIONS
- 55 7.1 EC regulations
- 55 7.2 Remeha factory test
- 55 7.3 Additional guidelines
- 56 8 TECHNICAL SPECIFICATIONS and working principle
- 56 8.1 Technical data
- 57 8.2 The boiler components
- 57 8.3 Working principle
- 57 Regulating
- 58 Advanced boiler control (‘abc®’-control)
- 58 Regulating the water temperature
- 58 Low flow / water protection
- 58 High Limit temperature protection
- 59 9 EFFICIENCY DATA AND GAS EFFICIENCY LABELS
- 59 9.1 Annual efficiency
- 59 9.2 Water-side efficiency