GLOBUG GB12BW/BS/BP LIGHTING SYSTEM — SETUP (GB12BS)

NOTE

The pole clamp assembly used in this setup procedure is a dual type clamp. One side of the clamp is for the attachment of the main pole of the lighting system. The other side of the clamp is used for the attachment of a support pole that is usually connected to a piece of equipment such as a paver.

9. Using 17 mm wrench, tighten both bolts (M) on the offset adapter clamp (K) securely.

10. Place lamp assembly (N) onto offset pole (B). Tighten Thandle bolt (O) securely.

N

LAMP

ASSEMBLY

Pole Setup (GB12BS)

Refer to Figure 26 for the following procedure.

1. Remove the offset pole (B) from the shipping container.

2 Attached to the offset pole is a 17/19 mm open-end wrench (C). Remove the wingnut (D) securing the wrench to the offset pole and remove wrench.

3. Reinsert wingnut and washer back into offset pole so they will not get lost or misplaced.

4. Remove the two pole clamp assemblies (A) from the shipping container. Attach one pole clamp assembly (E) to the main pole (F) about 3 inches (76.2 mm) down from the main pole extension clamp. Using supplied 19 mm wrench, tighten locknut on the pole clamp assembly securely.

5. Attach the other pole clamp assembly (G) to the main pole (F) about 7.0 in. (140 mm.) down from the previous attached pole clamp assembly (E). Using the 19 mm wrench, tighten locknut on the pole clamp assembly securely.

6. To attach main pole (F) to equipment support pole (I), swing open adjustable tension plate (H) on clamp so that it can accomodate the diameter of the equipment support pole. Insert equipment support pole (I) through the two equipment support pole clamp assemblies as shown in Figure 26.

7. Once the equipment support pole (I) has been seated properly, move adjustment bolt and locknut (J) into locking position. Use the supplied 17 mm wrench, to tighten locknuts (J) on both clamps securely.

8. Place offset pole (B) with adapter clamp (K) on top of adjustable extension pole (L). Make sure that offset pole has been seated correctly.

LAMP

POWER

CABLE

P

LOCKNUT

POLE

CLAMP

ASSEMBLY

A

REMOVE

WRENCH

O

T-HANDLE

EQUIPMENT

SUPPORT

POLE CLAMP

J

ADJUSTMENT

BOLT AND

LOCKNUT

MAIN POLE

CLAMP

ADJUSTABLE

CHANNEL

H

TENSION

PLATE

C

WINGNUT

D

MAIN

POLE

F

EQUIPMENT

SUPPORT

POLE

I

E

G

Figure 26. Offset Pole Assembly

B

OFFSET

POLE

M

K

OFFSET

ADAPTER

CLAMP

ADJUSTABLE

EXTENSION

POLE

L

EXTENSION

CLAMP

BOLT

Q

POLE

CLAMP

ASSY.

POLE

CLAMP

ASSY.

3.0 IN.

(76.2 MM)

7.0 IN.

(140 MM)

GLOBUG LIGHTING SYSTEM — OPERATION AND PARTS MANUAL — REV. #2 (11/03/08) — PAGE 21

GLOBUG GB12BW/BS/BP LIGHTING SYSTEM — SETUP (GB12BS)

Removing the Protective Covering (GB12BS)

1. Expose the balloon by pulling down on the velcro tab and unzipping the protective cover as shown in Figure 27. Also remove the AC power cord at this time.

Connecting Power Cable (GB12BS)

1. Connect 15 ft. (4.6 meters) AC power cable (Figure 29) to the lamp power cable.

PROTECTIVE

COVER

AC-POWER

CABLE

VELCRO

TAB

Figure 27. Removing Balloon/AC Power Cord

Figure 29. Connecting Power Cables

2. Next, fold the protective cover (Figure 28) into itself and zip.

2. Attach both S-type hooks (Figure 30) on the AC power cable into the cable support holes on the offset pole.

OFFSET

POLE

POWER

CABLE

ZIPPER

S-TYPE

HOOK

PROTECTIVE

COVER

Figure 28. Folding Protective Cover

B

Figure 30. Attachement of S-Hooks

PAGE 22 — GLOBUG LIGHTING SYSTEM — OPERATION AND PARTS MANUAL — REV. #2 (11/03/08)

advertisement

Related manuals