C. Install the Ceiling Firestop
A ceiling fi restop MUST be used between fl oors and attics.
• SLP pipe only - Frame opening 229 mm x 229 mm (9 inch x 9 inch) whenever the vent penetrates a ceiling/floor (see Figure
8.3).
• Frame the area with the same sized lumber as used in ceiling/fl oor joist.
• The ceiling fi restop may be installed above or below the ceiling joists when installed with a attic insulation shield. It must be under joists between fl oors that are not insulated. Refer to Figure 8.4.
• Secure with three fasteners on each side.
WARNING! Risk of Fire! DO NOT pack insulation around the vent. Insulation must be kept back from the pipe to prevent overheating.
ATTIC ABOVE
A
A
PIPE
SLP
A
229 mm (9 in.)
Figure 8.3 Installing Ceiling Firestop
INSTALL ATTIC INSULATION SHIELDS
BEFORE OR AFTER INSTALLATION OF VENT SYSTEM
3 FASTENERS
PER SIDE
CEILING FIRESTOP
INSTALLED BELOW CEILING
Figure 8.4 Installing the Attic Shield
Heat & Glo • XLR-PLUS-N-AU, XLR-PLUS-PB-AU • 2264-900 Rev. D • 6/11
CEILING FIRESTOP
INSTALLED ABOVE CEILING
31
advertisement
Related manuals
advertisement
Table of contents
- 3 A. Congratulations
- 6 B. Limited Lifetime Warranty
- 8 A. Appliance Certifi cation
- 8 B. Gas Pressure Requirements
- 8 C. High Altitude Installations
- 8 D. Non-Combustible Materials Specifi cation
- 8 E. Combustible Materials Specifi cation
- 8 F. Electrical Codes
- 9 A. Gas Fireplace Safety
- 9 B. Your Fireplace
- 10 C. Clear Space
- 10 D. Decorative Doors and Fronts
- 10 E. Decorative Media Options
- 10 F. Fixed Glass Assembly
- 10 G. Remote Controls, Wall Controls and Wall Switches
- 10 H. Before Lighting Fireplace
- 11 I. Lighting Instructions (IPI)
- 12 J. Control Module Operation
- 13 K. After Fireplace is Lit
- 13 L. Frequently Asked Questions
- 14 A. Maintenance Tasks-Homeowner
- 15 B. Maintenance Tasks-Qualifi ed Service Technician
- 16 A. Typical Appliance System
- 17 B. Design and Installation Considerations
- 17 C. Tools and Supplies Needed
- 17 D. Inspect Appliance and Components
- 18 A. Selecting Appliance Location
- 19 B. Constructing the Appliance Chase
- 19 C. Clearances
- 20 D. Mantel and Wall Projections
- 21 A. Vent Termination Minimum Clearances
- 23 A. Approved Pipe
- 23 B. Vent Table Key
- 23 C. Use of Elbows
- 23 D. Measuring Standards
- 23 E. Vent Diagrams
- 30 A. Pipe Clearances to Combustibles
- 30 B. Wall Penetration Framing
- 31 C. Install the Ceiling Firestop
- 32 D. Install Attic Insulation Shield
- 33 A. Top Vent
- 34 B. Securing and Leveling the Appliance
- 34 C. Installing the Optional Heat-Zone-240V Kit
- 35 A. Assemble Vent Sections
- 36 B. Assemble Slip Sections
- 36 C. Secure The Vent Sections
- 37 D. Disassemble Vent Sections
- 37 E. Install Decorative Ceiling Components
- 38 F. Install Metal Roof Flashing
- 38 G. Assemble and Install Storm Collar
- 39 H. Install Vertical Termination Cap
- 39 I. Install Decorative Wall Components
- 39 J. Heat Shield Requirements for Horizontal Termination
- 40 K. Install Horizontal Termination Cap
- 41 A. Gas Pressure Requirements
- 41 B. Gas Connection
- 42 C. High Altitude Installations
- 43 A. Wiring Requirements
- 43 B. IntelliFire Plus Ignition System Wiring
- 43 C. Optional Accessories Requirements
- 44 D. Junction Cord Information
- 44 E. Electrical Service and Repair
- 44 F. Blower