7 Cable Connectors
7.3 Shrink Tubing
7.3.1 Cable Type TFH
1. The TFH cable connector assemblies must be encapsulated in watertight shrink tubing. Test connectors according to the "Cable and Connector Testing Procedures" before heating the shrink tubing. Connectors that are calibration points must be kept dry until the system has been commissioned. After commissioning, the shrink tubing should be installed.
If water is allowed to enter the end of the cable and get under the jacket, the cable must be replaced .
2. Install the shrink tubing in accordance with the following steps:
Step A Slide the overbraid and cable jacket back from the reducing adapter, to expose ½" of braid wire.
Smooth the excess cable jacket away from the connector, so there is at least 5" of smooth surface adjacent to the connector. If the sensor cable is being connected to a jumper cable, skip steps A and B for jumper cable.
Step B Place a 1/4" bead of RTV sealant around the cable on the exposed braid wire.
Step C Slide the 4" long shrink tubing to the reducing adapter, if the CASTD connector is used. Make sure there are no wrinkles in the cable jacket. Make sure the shrink tubing does not overlap the reducing adapter. Slide the shrink tubing over the outer crimp ferrule to the back of the connector body if the CAGOLD crimp style connector is used. Heat the shrink tubing with a heat gun until it has fully shrunk and adhesive oozes out the end. Do not disturb the assembly until the shrink tubing has cooled (approximately 5-10 minutes).
48
advertisement
Related manuals
advertisement
Table of contents
- 7 Introduction
- 7 General Description
- 7 Applications
- 7 Receiving and Handling Precautions
- 7 Materials and Equipment Normally Supplied by PermAlert
- 8 Materials and Equipment Normally Supplied by Installing Contractor
- 9 PAL-AT Alarm/Locator Panel
- 9 Alarm/Locator Panel Installation
- 11 Internal Wiring
- 11 Control Relays
- 12 RS-232 Port
- 12 Intrinsically Safe - UL / FMRC
- 15 Jumper Cable and Junction Box Installation
- 15 Jumper Cable
- 15 Calibration Points
- 16 Junction Boxes
- 17 Cable Installation in Secondary Contained Piping
- 17 General
- 18 Pull Points
- 20 Cable Splices
- 20 Factory Installed Fiber Pull Rope to Continuous Pull Wire Rope Splice
- 21 Wire Rope to Wire Rope Splice
- 22 Wire Rope to Wire Rope Splice (alternate)
- 23 Wire Rope to Leak Detection Cables
- 25 Installation of the Continuous Pull Rope
- 27 Installing the Sensor and Jumper Cables
- 29 Cathodic Protection
- 30 Air Testing
- 31 Installation of Direct Buried Sensor Cable
- 31 General
- 32 Installing the Sensor Cable
- 35 Above Ground Storage Tanks
- 37 Cable Installation for Raised Floor Areas
- 37 General
- 37 Install the Sensor Cable
- 38 Locator Chart
- 39 Cable Connectors
- 39 General
- 39 Cable Connector Installation
- 39 Gold and TFH
- 42 JPP and JMP
- 44 CASTD Connector for Jumper Cable Types JMP-U and JMP-UD - Alternate
- 46 Butt Splice Connector for TFH Cable
- 48 CAGOLD Connector for ATP Cable
- 50 Shrink Tubing
- 50 Cable Type TFH
- 51 Cable Types AGT-Gold and AGW-Gold
- 52 Cable and Connector Testing Procedures
- 52 General
- 52 Continuity Test
- 52 Insulation Test
- 52 Alternative System Test
- 53 Probes
- 53 UL and FMRC Requirements
- 53 Probe Integrator Selection
- 53 Probe Installation
- 55 PHLR Hydrocarbon Probe
- 56 Cleaning Sensor Elements Procedure
- 57 Testing the Probe
- 57 Troubleshooting
- 58 Typical Installations
- 63 Probe Tests
- 65 ATP Cable in Polyurethane Foam Insulation
- 65 General
- 65 System Configuration
- 65 Calibration Points
- 65 ATP Cable Tests
- 65 Insulation Test
- 66 Continuity Test
- 66 Start of Run
- 67 Connection of ATP Cable
- 68 ATP Cable at Tee Connections
- 69 End of Run Termination
- 71 WARRANTY