![Cable and Connector Testing Procedures. Permalert PAL-AT AT40K, PAL-AT AT50C, PAL-AT AT80K, PAL-AT AT20C, PAL-AT AT20K | Manualzz Cable and Connector Testing Procedures. Permalert PAL-AT AT40K, PAL-AT AT50C, PAL-AT AT80K, PAL-AT AT20C, PAL-AT AT20K | Manualzz](http://s2.manualzz.com/store/data/060388299_1-6c4a20ab470d72ad786ec6d1d660bfb0-360x466.png)
7 Cable Connectors
7.4 Cable and Connector Testing Procedures
7.4.1 General
The following tests should be performed on each length of cable after both connectors are installed.
Figure 18 illustrates the tests. Any overbraid or outer jacket is not shown.
7.4.2 Continuity Test
The continuity test checks for broken cable, open connectors, and poor solder connections.
1. Connect a short jumper wire with alligator clips between the UHF connector’s center contact and the body of the connector at one end of the cable, as shown in Figure 18. Note: Do not clip onto the threaded coupling ring because it is not tightly secured and will give intermittent readings .
2. Connect the ohmmeter's test leads to the connector’s center contact and connector body on the other end of the cable.
3. The ohmmeter reading should be less than 10 ohms/1000' of cable. If it is not, check the jumper wire, test lead connections, and repeat the test. If the problem persists, contact the PermAlert Field
Service Department for assistance.
7.4.3 Insulation Test
The insulation test checks for a short between the center conductor and outer braid shield.
1. Remove the jumper wire used in the continuity test, as shown in Figure 18 and connect one ohmmeter test lead to the connector's center contact and the other lead to the connector body.
2. A good cable will give a full-scale reading (at least 10 megohms). Test readings below full scale indicate damaged cable or an improperly installed connector. If you cannot resolve the problem, contact PermAlert's Field Service Department for assistance.
7.4.4 Alternative System Test
1. Connect the entire cable string to the PAL-AT panel.
2. Make sure the panel is turned off and the cable card is installed.
3. Measure the resistance at the far end of the cable string. Connect one test lead to the center contact of the last connector and the other lead to the connector body. It should measure less than 60 ohms
+ 10 ohms/1000' of cable string.
Figure 18
Cable Test Procedures
50
advertisement
Related manuals
advertisement
Table of contents
- 7 Introduction
- 7 General Description
- 7 Applications
- 7 Receiving and Handling Precautions
- 7 Materials and Equipment Normally Supplied by PermAlert
- 8 Materials and Equipment Normally Supplied by Installing Contractor
- 9 PAL-AT Alarm/Locator Panel
- 9 Alarm/Locator Panel Installation
- 11 Internal Wiring
- 11 Control Relays
- 12 RS-232 Port
- 12 Intrinsically Safe - UL / FMRC
- 15 Jumper Cable and Junction Box Installation
- 15 Jumper Cable
- 15 Calibration Points
- 16 Junction Boxes
- 17 Cable Installation in Secondary Contained Piping
- 17 General
- 18 Pull Points
- 20 Cable Splices
- 20 Factory Installed Fiber Pull Rope to Continuous Pull Wire Rope Splice
- 21 Wire Rope to Wire Rope Splice
- 22 Wire Rope to Wire Rope Splice (alternate)
- 23 Wire Rope to Leak Detection Cables
- 25 Installation of the Continuous Pull Rope
- 27 Installing the Sensor and Jumper Cables
- 29 Cathodic Protection
- 30 Air Testing
- 31 Installation of Direct Buried Sensor Cable
- 31 General
- 32 Installing the Sensor Cable
- 35 Above Ground Storage Tanks
- 37 Cable Installation for Raised Floor Areas
- 37 General
- 37 Install the Sensor Cable
- 38 Locator Chart
- 39 Cable Connectors
- 39 General
- 39 Cable Connector Installation
- 39 Gold and TFH
- 42 JPP and JMP
- 44 CASTD Connector for Jumper Cable Types JMP-U and JMP-UD - Alternate
- 46 Butt Splice Connector for TFH Cable
- 48 CAGOLD Connector for ATP Cable
- 50 Shrink Tubing
- 50 Cable Type TFH
- 51 Cable Types AGT-Gold and AGW-Gold
- 52 Cable and Connector Testing Procedures
- 52 General
- 52 Continuity Test
- 52 Insulation Test
- 52 Alternative System Test
- 53 Probes
- 53 UL and FMRC Requirements
- 53 Probe Integrator Selection
- 53 Probe Installation
- 55 PHLR Hydrocarbon Probe
- 56 Cleaning Sensor Elements Procedure
- 57 Testing the Probe
- 57 Troubleshooting
- 58 Typical Installations
- 63 Probe Tests
- 65 ATP Cable in Polyurethane Foam Insulation
- 65 General
- 65 System Configuration
- 65 Calibration Points
- 65 ATP Cable Tests
- 65 Insulation Test
- 66 Continuity Test
- 66 Start of Run
- 67 Connection of ATP Cable
- 68 ATP Cable at Tee Connections
- 69 End of Run Termination
- 71 WARRANTY