![Joint Cementing Procedure. Lennox ML193UHE Gas Furnace | Manualzz Joint Cementing Procedure. Lennox ML193UHE Gas Furnace | Manualzz](http://s1.manualzz.com/store/data/067666483_1-e43c28d802f35d22c57bb57fa237310b-360x466.png)
Input Size
030,
045
070
090
110
Vent Pipe
Dia. in.
6 1-1/2
2
2-1/2
3
6 1-1/2
2
2-1/2
3
2
2-1/2
3
2
2-1/2
3
Flush
Mount Kit
51W11
(US)
51W12
(CA)
3
3
3
3
3
3 YES
3 YES
3 YES
3 YES
3 YES
3 YES
YES
YES
YES
YES
YES
YES
YES
YES
TABLE 3
OUTDOOR TERMINATION USAGE*
STANDARD
Wall Kit
3 inch 2 inch
22G44
(US)
4 30G28
(CA)
44J40 (US)
4 81J20
(CA)
Field
Fabricated
YES
YES
YES
YES
YES
YES
YES
YES
1
1
1
1
1
1
1
1
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
5
5
5
5
5
5
5
5
5
5
YES
YES
YES
YES
YES
YES
YES
YES
5 YES
5 YES
YES
YES
5 YES
5 YES
1-1.2 inch
4
71M80
44W92
2
2
2
2
2
2
2
2
(US)
(CA)
YES
YES
YES
YES
YES
YES
YES
YES
CONCENTRIC
4
2 inch
69M29
(US)
44W92
(CA)
YES
YES
YES
YES
YES
YES
4
3 inch
60L46 (US)
44W93
(CA)
YES
YES
YES
YES
YES
YES
NOTE - Standard Terminations do not include any vent pipe or elbows external to the structure. Any vent pipe or elbows external to the structure must be included in total vent length calculations. See vent length tables.
* Kits must be properly installed according to kit instructions.
1Requires field-provided outdoor 1-1/2” exhaust accelerator.
2Concentric kits 71M80 and 44W92 include 1-1/2” outdoor accelerator, when uses with 030, 045 and 070 input models. When using 1-1/2 inch vent pipe, transistion to 2” pipe before installing concentric kit.
3 Flush mount kits 51W11 and 51W12 includes 1-1/2 in. outdoor exhaust accelerator, required when used with 030, 045, 070 and 090 input models.When using 1-1/2” vent pipe, transition to 2” pipe before installing flushmount kit.
4 Termination kits 30G28, 44W92, 4493 and 81J20 are certified to ULC S636 for use in Canada only.
5 See table 8 for vent accelerator requirements.
6 Requires field provided 2” to 1-1/2” reducer.
Joint Cementing Procedure
All cementing of joints should be done according to the specifications outlined in ASTM D 2855.
NOTE - A sheet metal screw may be used to secure the intake pipe to the connector, if desired. Use a drill or self tapping screw to make a pilot hole.
DANGER
DANGER OF EXPLOSION!
Fumes from PVC glue may ignite during system check.
Allow fumes to dissipate for at least 5 minutes before placing unit into operation..
1 - Measure and cut vent pipe to desired length.
2 - Debur and chamfer end of pipe, removing any ridges or rough edges. If end is not chamfered, edge of pipe may remove cement from fitting socket and result in a leaking joint.
3 - Clean and dry surfaces to be joined.
4 - Test fit joint and mark depth of fitting on outside of pipe.
5 - Uniformly apply a liberal coat of PVC primer for PVC or use a clean dry cloth for ABS to clean inside socket surface of fitting and male end of pipe to depth of fitting socket.
NOTE - Time is critical at this stage. Do not allow primer to dry before applying cement.
6 - Promptly apply solvent cement to end of pipe and inside socket surface of fitting. Cement should be applied lightly but uniformly to inside of socket. Take care to keep excess cement out of socket. Apply second coat to end of pipe.
Page 15
advertisement
Related manuals
advertisement
Table of contents
- 2 Unit Dimensions - inches (mm)
- 3 ML193UHEGas Furnace
- 3 Shipping and Packing List
- 3 Safety
- 4 Use of Furnace as a Construction Heater
- 5 General
- 5 Combustion, Dilution, Ventilation Air
- 8 Setting Equipment
- 13 Filters
- 13 Duct System
- 15 Joint Cementing Procedure
- 16 Venting Practices
- 33 Gas Piping
- 36 Electrical
- 39 Integrated Control
- 41 Unit Start-Up
- 42 Gas Pressure Measurement
- 43 Proper Combustion
- 43 High Altitude
- 44 Testing For Combustion Air Non-Direct Vents
- 45 Other Unit Adjustments
- 46 Service
- 46 Repair Parts List
- 48 Start Up Checklist
- 52 Blower Data