Post-Install Checklist. PreCise IX-101

Add to My manuals
16 Pages

advertisement

Post-Install Checklist. PreCise IX-101 | Manualzz

Post-Install Checklist

Upon successful completion of the IX module installation, the following tasks should be performed:

Ensure the vehicle is in a location where it has a clear view of the sky for obtaining a GPS lock on at least 4 satellites and registering on a cellular tower for wireless communications.

Start the vehicle and visually inspect the LED status lights on the IX module

(refer to Appendix A ) o

NOTE: The IX module may take a few minutes to acquire a GPS lock on the first startup. Subsequent startups will acquire a GPS lock quickly.

Confirm the device is reporting either by watching for the Cellular LED to turn solid green (not blinking), or by checking the asset’s status on the PreCise website ( www.preciseinfox.com

) o

NOTE: This step assumes that the asset has already been configured in the PreCise website. For information regarding the initial setup and configuration of devices and assets in the PreCise website please refer to the online tutorials.

Confirm the meter readings have been configured and are correct in the

PreCise website

Confirm the settings on the GSM/Cellular tab are configured and correct in the PreCise website

Confirm the location of the asset on the map in the PreCise website

Confirm that the inputs are working by running a Raw Data Report on the

PreCise website or using the optional service kit

415 N. Maple Grove Boise, ID 83704

Support: (888) 254-1634

Sales: (888) 449-0357

www.PreciseMRM.com

p. 10 of 16

3710024B

Copyright 2009

advertisement

Related manuals