advertisement
Preventative Maintenance Schedule
Insure trouble-free service by performing preventive maintenance when appropriate.
Should service be required, specific procedures are described to locate and repair malfunctions.
Item Description Reading
1. Inspect door seals checking for proper seating, damage or tears. Adjust and/or replace as necessary.
Months of
Operation
1 3 6
X
9 12
2.
3.
Inspect the door operation. Should open and close easily.
Inspect recirculation fan. Make sure it is clean and free of dust build-up.
X
X
4. X Measure and record the line voltage. If the voltage is not
±10% of the nameplate specification, discontinue use and take corrective action.
6.
7.
Measure and record the recirculation fan motor current draw. X
X Measure and record the amp draw of the air heater. Verify the actual amps with the amp draw listed on the electrical schematic.
8. X Make a visual inspection of the control panel area. Make sure the electrical components are clean and free of dirt or dust buildup. CAUTION: CLEAN ONLY AFTER TURNING OFF
THE POWER AT THE POWER SOURCE.
9. X Inspect the equipment instrumentation. Check the controller, limit controller(s), and recorder calibration using a certified calibration standard. Update the calibration standards.
Complete a certificate if required.
10. X Check for proper operation of the High and Low limit controllers. Adjust the limits to assure they will "trip" in an over-temperature condition.
11. X Overall functional test. Operate the equipment and check the functionality of the heating, cooling (if equipped) systems.
Adjust controller tuning if necessary.
12. Record all parameters in the control instrument. Keep a copy on sight and send a copy to Despatch.
X
34
advertisement
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Related manuals
advertisement
Table of contents
- 8 INTRODUCTION
- 8 230 Volt, 50/60 HZ Operation
- 9 Specifications
- 10 INSTRUCTIONS
- 10 Operator Training Requirements
- 11 Installation
- 13 Installation of Cooling Gas
- 14 Installation of Carbon Dioxide
- 18 Cylinder Installation
- 19 Installation of Liquid Nitrogen
- 21 Liquid Nitrogen Cylinder
- 23 Operating
- 23 Controller Power Up
- 24 Heating Only Operation
- 25 Cooling Operation
- 26 Safety Information
- 26 Performance Characteristics
- 31 THEORY OF OPERATION
- 31 Functional Description
- 33 High Limit Controller
- 34 Watlow EZ-Zone PM Controller
- 35 Digital Communication
- 37 MAINTENANCE
- 39 Preventative Maintenance Schedule
- 40 Test Equipment Required
- 40 Chamber
- 41 Coolant Solenoid Orifice Assembly
- 42 Filter
- 43 Corrective Maintenance
- 45 Service Procedures
- 46 Electronic Control Chassis
- 47 HI-LIMIT Thermoswitch
- 48 APPENDIX
- 48 IEEE 488 Interface Converter Set-up
- 50 IEEE 488 Interface Converter
- 51 Serial Signal Descriptions
- 53 XON/XOFF Protocol
- 53 XON/XOFF Versus RTS/CTS Handshaking
- 54 Sample Program
- 55 Sample Output
- 56 Troubleshooting
- 57 Schematic Diagrams