1/8"
FINAL ADJUSTMENTS TO DOOR
After door is installed, check clearances. The top rail should be consistently 1/8" below the header. The bottom of the door should be consistently 3/16" above the threshold. The gap between door and jambs should be 3/32" from top to bottom.
If the gap between the top rail and header is showing too large at top of the lock stile, loosen glass jack and lift up on door until gap is corrected. Tighten down glass jack to top of glass. See FIGURE 1
DO NOT raise door by only tightening the glass jack against the glass. Glass breakage could occur.
On pairs, adjust screws in adjustable astragal to keep a consistent 1/8" gap between door leafs.
On butt hung doors, butts may be shimmed out to adjust clearance where there is too much gap at the lock stile.
FIGURE 1
ADJUST TO 1/8"
LOCK
STILE
TOP RAIL
DOOR HEADER
CUT AWAY
FOR CLARITY
GLASS
ADJUSTABLE
BLOCK
1/8"
On offset pivot doors:
1) Open doors and turn bottom pivot support screws down until they contact the slab. Do not
over-drive the screws because of additional stress being placed on pivot. See FIGURE 2
2) If top of door on hinge side is not 1/8" below the frame, remove adjustment screw cover (See
FIGURE 3), insert allen wrench into top side of pivot and adjust as necessary. Screw will be
turned clockwise to raise door and counterclockwise to lower. See FIGURE 3
3) If door opening is out more than adjustable pivot can adjust. Loosen set screw on bottom frame
pivot, raise secondary adjustment screw then tighten set screw back in place. See FIGURE 2.
Repeat step 2 as required.
MAY 2012
Finished Floor
11/16"
See page 26
25
Figure 1
Phone: 1-866-OLDCASTLE (653-2278)
Web Address: www.oldcastlebe.com
advertisement
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Related manuals
advertisement
Table of contents
- 1 00-Cover-Sheet
- 2 02-Table-of-Content
- 3 03-Inspect-Material
- 4 04-Door Warranty Guildelines
- 5 05-Hardware Locations
- 6 06-Door Handing
- 7 07-Glass Sizing
- 8 08-Glass Sizing
- 9 09-Preparation of Opening
- 10 10-Preparation of Frame
- 11 11-Install Door Frame
- 12 12-Install Threshold
- 13 13-Install Threshold
- 14 14-Threshold Modification-
- 15 15-Door Glazing
- 16 16-Door Glazing
- 17 17-Install-Offset Door on Butts.
- 18 18-Install-Offset Door on Butts
- 19 19-Install-Center Door on Pivots
- 20 20-Install-Offset Door-w-OHCC
- 21 21-Install-Center Door-w-OHCC
- 22 22-Install-Offset Door-w-LCN-OHCC
- 23 23-Install-Center Door-w-LCN-OHCC
- 24 24-Install-Center Door-w-Floor Closer
- 25 25-Final Adjustments
- 26 26-Final Adjustments
- 27 27-Attaching-Adjusting Hardware
- 28 28-Push Bar Installation
- 29 29-Pull Handle Installation
- 30 30-Maintenance Recommendations
- 31 31-Maintenance Recommendations