Lift & Tilt Mounting Group. Doosan G33P-5 Plus

Add to My manuals
85 Pages

advertisement

Lift & Tilt Mounting Group. Doosan G33P-5 Plus | Manualzz

IDCS176S

Lift & Tilt Mounting Group

IDCS177S

8

6

DETAIL E

7

H

1. (Standard Mast, Full Free Triple Lift Mast or

Quad Lift Mast Only) With chains adjusted for equal tension, run mast to full lift. If mast does not kick (move) to one side, no shims are needed. If mast does kick (move) to one side, disconnect cylinder from the bar on that side.

Add shim, connect cylinder, adjust chains and run mast to full lift to check for kick. Repeat process if necessary. The total shim pack must not be more than three shims maximum.

2. Install bearing outer race to a depth of (F)

4.5± 0.8 mm (.177 ± .031 in).

3. Tilt cylinder installation shown.

4. Bearing split to be located at angle (D) 45±15°

5. Install bearing outer race to a depth of (G)

4.5± 0.8 mm (.177 ± .031 in).

6. (Full Free Lift Mast Only):

Tighten nuts until U-bolt is firm against cylinder, do not apply standard torque.

7. (Full Free Lift Mast Only):

With chains adjusted for equal tension run mast to full lift. If mast does not kick (move) to one side, no shims are needed. If mast does kick

(move) to one side, hold lift cylinder tube on that side and loosen bearing 1/4 turn and check mast again. Loosen bearing until kicking

(movement) stops or gap (H) reaches 3.0 mm

(.12 in) (approximately 1.5 turns), whichever is less. Insert shims (8) under bearing (it may be necessary to loosen bearing an additional amount of turns to install shims). Tighten bearing again.

Vehicle System 14 Specification

advertisement

Related manuals

advertisement

Table of contents