INSTALLATION
Framing and Finishing
1. Choose unit location.
2. Frame in fireplace with a header across the top. It is important to allow for finished face when setting the depth of the frame.
3. Attach fireplace to frame using adjustable frame. Preset depth to suit facing material (adjustable to 1/2", 5/8" or 3/4" depths).
4. Use (8) 1/2" hex-head screws supplied in hardware package, to screw through slotted holes in drywall strip and then screw into pre-drilled holes on fireplace side. Measure from face of fireplace to face of drywall strip to determine final depth.
Vent Pipe Clearance
Note: Maintain one inch (1") of clearance around vertical vent pipe. See Fig. 9A. For horizontal vent, maintain a minimum 1" clearance to the bottom and sides of the vent, and 3" clearance to combustibles above the vent pipe. See Fig. 9B
Figure 8
VENT PIPE
Top of Vent
3"
(76 mm)
1"
(25 mm)
17375-10-0706
Figure 9B
Combustibles NOT allowed in shaded area
5” Diameter flue
8” Diameter intake vent
1" MINIMUM CLEARANCE AROUND VENT PIPE
Figure 9A
1"
(25 mm)
Page 11
INSTALLATION (continued)
Flush Mount Mantel Installation (Figure 10)
The fireplace must extend 3/4" beyond finished wall surface when using a flush mount mantel. Refer to Figure 10 to locate nailing flanges on fireplace sides. Mark and drill two (2) 1/8" holes into fireplace side to mount each nailing flange. Use eight (8) 1/2" hex-head screws supplied in hardware package to attach nailing flanges to fireplace sides.
NAIL OR OTHER SUITABLE FASTENER
Figure 10
Framing (Figure 11)
Fireplace framing can be built before or after the fireplace is set in place. Framing should be positioned to accommodate wall covering and fireplace facing material. The fireplace framing should be constructed of 2 x 4 lumber or heavier. The framing headers may rest on the fireplace standoffs. Refer to Figure 11 for minimum framing dimensions.
CAUTION: MEASURE FIREPLACE DIMENSIONS AND
VERIFY FRAMING METHODS, AND WALL COVERING
DETAILS BEFORE FRAMING CONSTRUCTION
BEGINS.
Framing dimension "A" includes a three inch clearance for standoffs on firebox. After installing firebox into framing, the finished wall surface must cover the three inch opening above the firebox.
DVP42 DVP48
"A" 37 3/4" 37 3/4"
"B" 43 3/8" 49 3/8"
"C" 19 7/8" 19 7/8"
Figure 11
Attention: If a base or mantel is not used and the appliance is installed directly on carpeting, tile or other combustible material other than wood flooring, it shall be installed on a metal or wood panel extending the full width and depth of the appliance. The vertical dimension in Figure 11 must be adjusted when a metal or wood panel is placed beneath the appliance.
Finishing (Figures 12 and 13)
Finish the walls with the material of your choice. Figure 3 on page 8 shows the minimum vertical and corresponding maximum horizontal dimensions of mantels or other combustible projections above the top front edge of the fireplace.
Only non-combustible materials may be used to cover the black fireplace front.
Warning: When finishing the fireplace never obstruct or modify the air inlet/outlet louvers in any manner. Provide adequate clearances around air openings into the combustion chamber.
Caution: If the joints between the finished wall and the fireplace surround (top and sides) are sealed, a 300°F minimum sealant material must be used. These joints are not required to be sealed.
Only non-combustible material (using 300°F minimum adhesive if needed), can be applied as facing to the fireplace surround.
Page 12 17375-10-0706
Flush Wall Installation
FINISHED WALL
3! OF NON-COMBUSTIBLE MATERIAL
FRONT TRIM OR NON-
COMBUSTIBLE MA TERIAL
(INSTALLA TION IS OPTIONAL)
JOINT BETWEEN FINISHED
WALL AND UNIT SEALED
WITH 300° F, 149° C SEALANT
MATERIAL (SEALANT IS OPTIONAL)
Attention: Cold climate installation recommendation:
When installing this unit against a non-insulated exterior wall, it is recommended that the outer walls be insulated to conform to applicable insulation codes.
Vent Runs (Figures 14, 15, 16, 17 and 18)
In planning the installation for the fireplace, it is necessary to install certain components before the appliance is completely positioned and installed. These include the direct vent system, gas piping for the appliance and the electrical wiring. (If the fan option is used.)
The appliance can be mounted on any of the following surfaces:
1. A flat, hard combustible (burnable) surface.
2. A raised wooden platform.
3. Four (4) corner supports. (Example: Four (4) concrete masonry blocks.) These supports must be positioned so they contact all four (4) perimeter edges on the bottom of the unit.
VERTICAL, 90° ELBOW WITH HORIZONTAL
TERMINATION
Figure 12
Combustible Surround Installation
2 X 4
HEADER
STAND OFF
MANTELSHELF
COMBUSTIBLE SURROUND
FINISHED WALL
3! OF NON-COMBUSTIBLE MATERIAL
FRONT TRIM OR NON-COMBUSTIBLE
MATERIAL (INSTALLATION IS OPTIONAL)
JOINT BETWEEN FINISHED WALL AND
UNIT SEALED WITH 300° F 149
SEALANT
° C
MATERIAL (SEALANT IS OPTIONAL)
DVP42, 48
49 ½”(126 mm)
TO BOTTOM
OF UNIT
VENT CAP/
THIMBLE
/
THIMBLE
Figure 14
17375-10-0706
Figure 13
Page 13
INSTALLATION (continued)
HORIZONTAL ONLY, STRAIGHT OUT THE BACK
" A"
PIPE LENGTH
CORNER INSTALLATION VERTICAL, 90° ELBOW TO
HORIZONTAL OUT THE WALL
WALL FIRESTOP/
THIMBLE
VENT
CAP
VENT CAP
WALL FIRESTOP/
THIMBLE
"A" "B"
6"(152mm) 5 1/8"(130mm) to 6 /2"(165mm)
9"(229mm) 8 1/8"(206mm) to 91/2"(241mm)
MODEL
DVP 42,48
DVP 42
12"(305mm) 11 1/8"(283mm) to 12 1/2"(317mm) DVP 42
Figure 15
VERTICAL, 90° ELBOW TO
HORIZONTAL OUT THE WALL
Dim.
A
B
C
D
DVP42
45 3/8"
1152mm
32 1/8"
816mm
DVP48
49 5/8"
1260mm
35 1/8"
892mm
13 3/8"
34 mm
15 1/2"
39 mm
64 1/8" 70 1/8"
1628mm
Figure 17
1781mm
CORNER INSTALLATION HORIZONTAL, 45° ELBOW
TO HORIZONTAL OUT THE WALL
WALL FIRESTOP/
THIMBLE
WALL FIRESTOP/
THIMBLE
"A" "B"
6"(152mm) 11 1/4"(286mm) to
12 3/4"(324mm)
9"(229mm) 14 1/4"(362mm) to
15 3/4"(400mm)
12"(305mm) 17 1/4"(438mm) to
18 3/4"(476mm)
Figure 16
Page 14
"C"
4 3/4"(121mm) to
6 1/4"(159mm)
7 3/4"(197mm) to
9 1/4"(235MM)
10 3/4"(273mm) to
12 1/4"(311mm)
DVP42
"A" "B"
6"(152mm) 4"(102mm) to
5 1/2"(140mm)
9"(229mm) 6"(152mm) to
7 /2"(191mm)
12"(305mm) 9"(229mm) to
10 1/2"(267mm)
DVP48
"B"
4"(102mm) to
5"(127mm)
6"(152mm) to
7 1/2"(191mm)
9"(229mm) to
10 1/2"(267mm)
Figure 18
17375-10-0706
advertisement
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Related manuals
advertisement
Table of contents
- 3 Important Safety Information
- 4 Safety Information for Users of LP Gas
- 5 Requirements for Massachusetts
- 6 Introduction
- 7 Specifications
- 7 Fireplace Dimensions
- 8 Clearances
- 8 Locating Fireplace
- 9 Gas Supply
- 10 Rear Vent Conversion/Vent Systems
- 11 Installation
- 15 Venting Fireplace-Top Vent
- 19 Venting Fireplace-Rear Vent
- 21 Termination Clearances
- 22 Vent Clearances
- 23 Vent System Identification
- 24 Framing and Finishing
- 25 Horizontal Termination
- 26 DVVK-5F Flex Vent
- 27 Vertical Termination
- 29 Log Placement
- 30 Operating Instructions
- 32 Wiring Diagram-Standing Pilot
- 33 Lighting Instructions-Standing Pilot
- 34 Troubleshooting-Standing Pilot
- 35 Intermittent Pilot Operating Instructions
- 35 Intermittent Pilot Wiring Instructions
- 36 Intermittent Pilot Lighting Instruction
- 37 Intermittent Pilot Troubleshooting
- 41 RF Standing Pilot Operating Instructions
- 42 RF Transmitter Functions
- 43 RF Wiring Diagram
- 44 RF Standing Pilot Lighting Instructions
- 45 Maintenance and Service
- 46 Parts View
- 47 Parts List
- 49 FBB4 Optional Variable Speed Blower Installation
- 51 Junction Box Wiring Installation Instruction
- 51 Optional Brick Liner Installation Instruction
- 52 Accessories
- 53 How To Order Repair Parts
- 53 Service Notes