INSTALLATION INSTRUCTIONS - Combination APEX-Electric. Blaze King APEX CBT
Add to my manuals
40 Pages
advertisement
APEX CBT
Page 19
INSTALLATION INSTRUCTIONS - Combination APEX-Electric
ADD-ON TO ELECTRIC FURNACE
Minimum blower capacity must be at least 900 cfm. Electric furnaces approved for installation in any position can be inverted and used in a down fl ow position using an adapter duct between the furnace and the addto combustibles must be maintained. Refer to general and pressure loss portions of this manual also (see
“INSTALLATION INSTRUCTIONS cont.” on page 14) .
If changes are made to the installation of the electric furnace they must comply with CSA Standard C22.1.
AN INTERLOCK LIMIT SWITCH MUST BE INCLUDED IN THE CONTROL CIRCUITRY
PREVENTING THE GAS FURNACE FROM OPERATING WHEN THE SYSTEM OUTPUT PLENUM
TEMPERATURE IS ABOVE 150°F. TYPICAL WIRING DIAGRAM FOLLOWS: SEE FIG 21. IF
YOUR ELECTRIC FURNACE DOES NOT HAVE AN R AND G CONNECTION SEE FIG. 22.
OM-APEX E V1.06
November 19, 2012
Page 20
APEX CBT
INSTALLATION INSTRUCTIONS - Combination APEX-Electric
Fig. 21 ELECTRICAL CONNECTIONS WOOD/ELECTRIC WITH R AND G CONNECTIONS
OM-APEX E V1.06
November 19, 2012
advertisement
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Related manuals
advertisement
Table of contents
- 3 INTRODUCTION
- 4 SPECIFICATIONS
- 5 APPLIANCE DIMENSIONS
- 6 PRODUCT INFORMATION
- 7 CERTIFICATION LABEL
- 8 SAFETY PRECAUTIONS
- 9 INSTALLATION INSTRUCTIONS
- 15 INSTALLATION INSTRUCTIONS - Venting
- 19 INSTALLATION INSTRUCTIONS - Combination APEX-Electric
- 21 INSTALLATION INSTRUCTIONS - Combination APEX-Gas/Oil
- 23 INSTALLATION INSTRUCTIONS - Wood only
- 24 VB1000 BLOWER
- 25 OPERATING INSTRUCTIONS
- 25 BYPASS
- 25 CATALYTIC MONITOR (THERMOMETER)
- 25 FUEL
- 26 AIR SETTINGS
- 26 THERMOSTATS
- 27 FAN OPERATION
- 27 LIGHTING THE FIRE
- 28 OPERATION DURING POWER FAILURE CONDITIONS
- 29 MAINTENANCE
- 29 ASHES
- 29 CATALYTIC COMBUSTOR REPLACEMENT
- 30 GASKET INSPECTION
- 30 LOADING DOOR GASKET REPLACEMENT
- 31 BYPASS DOOR GASKET REPLACEMENT
- 31 ADJUSTING BYPASS HANDLE
- 32 CREOSOTE
- 33 BRICK LAYOUT
- 34 REPLACEMENT PARTS
- 36 WARRANTY
- 40 NOTES